Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match
No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1 of 15

    [Sheet: April 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 1 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - April 2025 Data as of September 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPUP LOOP WEVO [Sheet: May 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 2 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - May 2025 Data as of September 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved
  2. Part 2 of 15

    Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor BLINK LOOP [Sheet: June 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 3 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - June 2025 Data as of September 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE
  3. Part 3 of 15

    Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor EV CONNECT LOOP WEVO [Sheet: July 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 4 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - July 2025 Data as of September 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022
  4. Part 4 of 15

    DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor CHARGEPOINT ENERGY5 NETWORK GREENJOULEZ LOOP RED E CHARGE WEVO [Sheet: August 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 5 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - August 2025 Data as of September 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor [Sheet: September 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06
  5. Part 5 of 15

    Attachment 2c Dated 11/15/2026 6 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - September 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor FLO GREENJOULEZ LOOP SWTCH WEVO [Sheet: October 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 7 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - October 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed
  6. Part 6 of 15

    Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! GREENJOULEZ LOOP SWTCH WEVO [Sheet: November 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 8 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - November 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port)
  7. Part 7 of 15

    Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL CLOUD LOOP WEVO [Sheet: December 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 9 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - December 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics
  8. Part 8 of 15

    Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! CHARGEPOINT GREENJOULEZ LOOP RED E CHARGE [Sheet: January 2026] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 10 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - January 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025
  9. Part 9 of 15

    DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor GREENJOULEZ LOOP [Sheet: February 2026] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 11 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - February 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL CLOUD GREENJOULEZ LOOP WEVO [Sheet: March 2026] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06
  10. Part 10 of 15

    Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 12 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - March 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor GREENJOULEZ LOOP [Sheet: April 2026] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2c Dated 11/15/2026 13 of 18 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - April 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf

Extracted from the file · 5 pages · 7,448 characters

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)