Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Program Year 1] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - Program Year 1 (Data from 01/01/2022 to 12/31/2022) | 1 of 6 Data as of June 30, 2024 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging - Telematics | Telematics Managed Charging - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPUP CHARGEPOINT DRIIVZ EV CONNECT EV GATEWAY EVOKE FLO LIVINGSTON ENERGY GROUP LOOP SEMACONNECT SWTCH [Sheet: Program Year 2] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - Program Year 2 (Data from 01/01/2023 to 12/31/2023) | 2 of 6 Data as of June 30, 2024 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved
  2. Part 2

    Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging - Telematics | Telematics Managed Charging - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! AMPUP BLINK CHARGELAB (AND WHITE-LABELED VERSIONS) CHARGEPOINT DRIIVZ ENEL X ENERGY5 NETWORK EV CONNECT EV GATEWAY EVPASSPORT FLO LIVINGSTON ENERGY GROUP LOOP SWTCH [Sheet: Program Year 3] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 3 of 6 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - Program Year 3 (Data from 01/01/2024 to 12/31/2024) Data as of June 30, 2025 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure
  3. Part 3

    EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! AMPUP AUTEL CLOUD BLINK CHARGEPOINT ENERGY5 NETWORK EV CONNECT EV GATEWAY EVOKE FLO FREE2MOVE ESOUTIONS (AMPECO) KWEV LOOP MATCHA ELECTRIC SWTCH WEVO [Sheet: Program Year 4] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 4 of 6 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - Program Year 4 (Data from 01/01/2025 to 12/31/2025) Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($)
  4. Part 4

    Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! AMPUP AUTEL CLOUD BLINK CHARGEPOINT ENERGY5 NETWORK EV CONNECT FLO FUTURE EV GREENJOULEZ LOOP RED E CHARGE SWTCH WEVO [Sheet: Program Year 5] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 5 of 6 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - Program Year 5 (Data from 01/01/2026 to 12/31/2026) Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022
  5. Part 5

    DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPEDUP! AUTEL CLOUD FLO GREENJOULEZ INTEGRA ENERGY (SAASCHARGE) LOOP LYNKWELL RED E CHARGE WEVO [Sheet: Program Lifetime] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 2d Dated 11/15/2026 6 of 6 CT EV INFRASTRUCTURE PROGRAM METRICS - UI - All Program Years (Data from 01/01/2026 to 12/31/2026) Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor
Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf

Extracted from the file · 5 pages · 7,448 characters

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)