Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: DCFC Apps 2025] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 6 Dated 11/15/2026 Page 1 of 2 Opportunity Name | Site Address (City) | Community Type | # of eligible plugs | Chg output per plug (kW) | Site Type | Charging Location Type-Segment | Futureproofing Customer Side Cost (Cust) | Total Project Costs | Total Incentive Awarded | Worth 10 pts All Points: Total project cost with futureproofing triggers less than the maximum site incentive Half Points: Total project cost with futureproofing triggers the maximum site incentive No Points: No futureproofing measures are included in the project. | Worth 30 pts Number of Ports at Site All Points: ≥5 Half Points: 3-4 No Points: 2 | Worth 40 pts Avg kW per Port All Points: ≥150kW Half Points: 100-149 kW No Points: <100 kW | Worth 20 Pts All Points: ANSONIA, DERBY, EASTON, HAMDEN, NEW HAVEN, NORTH BRANFORD, WOODBRIDGE Half Points: BRIDGEPORT, EAST HAVEN, MILFORD, SHELTON, TRUMBULL, WEST HAVEN No Points: FAIRFIELD, NORTH HAVEN, ORANGE, STRATFORD | Total Points | Reason for Disqualification North Haven | Baseline | Public | DCFC | Awarded incentives Derby | Underserved | Public | DCFC | Awarded incentives New Haven | Underserved | Public | DCFC | Awarded incentives East Haven | Underserved | Public | DCFC | Awarded incentives West Haven | Underserved | Public | DCFC | Awarded incentives Bridgeport | Underserved | Public | DCFC | Awarded incentives Milford | Baseline | Public | DCFC | Awarded incentives Shelton | Baseline | Public | DCFC | Awarded incentives Stratford | Underserved | Public | DCFC | Awarded incentives Bridgeport | Baseline | Public | DCFC | Awarded incentives Bridgeport | Underserved | Public | DCFC | Did not provide required supporting documentation/no response. Bridgeport | Underserved | Public | DCFC | DCFCs will not be available to the public 7 days a week, for at least 12 hours a day [Sheet: DCFC Apps 2026] The United Illuminating Company Docket No. 26-08-01 Cross-file Compliance with Order 14 in Docket No. 17-12-03RE04 Cross-file Compliance with Order 14, 19, 20, in Docket No. 23-08-06 Cross-file Compliance with Orders 5, 15, 16, 17 in DN 24-08-06 Cross-file Compliance with Standing Order 4 and 18 in DN 25-08-06 Attachment 6 Dated 11/15/2026 Page 2 of 2 Opportunity Name | Site Address (City) | # of Eligible Plugs (site) | kW output per Eligible Plug (site) | Futureproofing MR Cost (site) | Total Project Costs (site) | Total Incentive Awarded | Site Type | Date Application Received | Worth 10 pts: Project Costs and Futureproofing measures All Points: Total project cost with futureproofing triggers less than the maximum site incentive Half Points: Total project cost with futureproofing triggers the maximum site incentive No Points: No futureproofing measures are included in the project. | Worth 30 pts: Number of Ports at Site All Points: ≥5 Half Points: 3-4
  2. Part 2

    No Points: 2 | Worth 40 pts: Avg kW per Port All Points: ≥150kW Half Points: 100-149 kW No Points: <100 kW | Worth 20 Pts: Town Ranking All Points: Ansonia, Derby, Easton, North Branford, Shelton, West Haven, Woodbridge Half Points: Bridgeport, Hamden, New Haven, Orange No Points: East Haven, Fairfield, Milford, North Haven, Stratford, Trumbull | Total Points Scored | Reason for Disqualification New Haven | Public | Awarded Incentives Bridgeport | Public | No ports available Milford | Public | No ports available Shelton | Public | No ports available Stratford | Public | No ports available West Haven | Public | No ports available Ansonia | Public | No ports available New Haven | Public | No ports available

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf

Extracted from the file · 5 pages · 7,448 characters

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)