Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf

Extracted from the file · 5 pages · 7,448 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Exhibit B1 Large Zero Emission] Year 5 Procurement Plan for the Purchase of Energy and RECs Year 5 NRES February 2026 RFP List of bids received and selected Large Zero Emission Year 5 February Budget | Year 5 February Capacity (MW) Budget Committed | Capacity Committed (MW) Budget Remaining | Capacity Remaining (MW) Status | Project Number | City/Town | Tariff Type (Netting/Buy All) | Rate Class | If New Construction, Rate class used to determine Energy Compensation (Netting Only) | Technology | SAM Project? (Yes/No) | Bid Preference (If Applicable) | System Size (kW AC) | System Size (MW AC) | Estimated Annual Production (kWh) | Estimated Annual Production (MWh) | Anticipated Load for Electric Vehicles (kWh) | Anticipated Load for Fuel Switching (kWh) | Located at SCEF Site? | Located at LREC/ZREC Site? | Non-Binding Anticipated In-Service Date | MWs Allocated Bid Selected | BL54611 | Bridgeport | Buy All | New Construction | N/A | Solar Single Axis | Yes | Distressed Municipality | No | No [Sheet: Exhibit B2 Medium Zero Emission] Year 5 Procurement Plan for the Purchase of Energy and RECs Year 5 NRES February 2026 RFP List of bids received and selected Medium Zero Emission Year 5 February Budget | Year 5 February Capacity (MW) Budget Committed | Capacity Committed (MW) Budget Remaining | Capacity Remaining (MW) Status | Project Number | City/Town | Tariff Type (Netting/Buy All) | Rate Class | If New Construction, Rate class used to determine Energy Compensation (Netting Only) | Technology | SAM Project? (Yes/No) | Bid Preference (If Applicable) | System Size (kW AC) | System Size (MW AC) | Estimated Annual Production (kWh) | Estimated Annual Production (MWh) | Anticipated Load for Electric Vehicles (kWh) | Anticipated Load for Fuel Switching (kWh) | Located at SCEF Site? | Located at LREC/ZREC Site? | Non-Binding Anticipated In-Service Date | MWs Allocated Bid Selected | NM54648 | New Haven | Netting | GST-SS | N/A | Solar Fixed Tilt | No | Distressed Municipality | No | No Bid Selected | BM54646 | New Haven | Buy All | GST-SS | N/A | Solar Fixed Tilt | No | Distressed Municipality | No | No Bid Selected | BM54647 | EAST HAVEN | Buy All | GST-SS | N/A | Solar Fixed Tilt | Yes | Distressed Municipality | No | No Bid Selected | BM54627 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Distressed Municipality | No | No Bid Selected | BM54620 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Distressed Municipality | No | No Bid Selected | BM54614 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Bid Selected | BM54634 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | Solar Carport/Canopy | No | No Bid Selected | BM54625 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Bid Selected | BM54621 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Bid Selected | BM54622 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Project Not Selected | BM54617 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Project Not Selected | BM54618 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Bid Selected | BM54616 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Project Not Selected | BM54619 | Stratford | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | Solar Carport/Canopy | No | No Project Not Selected | BM54633 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | Solar Carport/Canopy | No | No Project Not Selected | BM54643 | North Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No
  2. Part 2

    Project Not Selected | NM54641 | New Haven | Netting | GST-SS | N/A | Solar Fixed Tilt | No | Solar Carport/Canopy | No | No Project Not Selected | BM54598 | Shelton | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Project Not Selected | BM54596 | Shelton | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Project Not Selected | BM54597 | Shelton | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No [Sheet: Exhibit B3 Small Zero Emission] Year 5 Procurement Plan for the Purchase of Energy and RECs Year 5 NRES February 2026 RFP List of bids received and selected Small Zero Emission Year 5 February Budget | Year 5 February Capacity (MW) Budget Committed | Capacity Committed (MW) Budget Remaining | Capacity Remaining (MW) Status | Project Number | City/Town | Tariff Type (Netting/Buy All) | Rate Class | If New Construction, Rate class used to determine Energy Compensation (Netting Only) | Technology | SAM Project? (Yes/No) | Bid Preference (If Applicable) | System Size (kW AC) | System Size (MW AC) | Estimated Annual Production (kWh) | Estimated Annual Production (MWh) | Anticipated Load for Electric Vehicles (kW) | Anticipated Load for Fuel Switching (kW) | Located at SCEF Site? | Located at LREC/ZREC Site? | Non-Binding Anticipated In-Service Date | MWs Allocated Bid Selected | BS54393 | Milford | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | NS54414 | Bridgeport | Netting | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54420 | East Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54422 | East Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54423 | East Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54424 | East Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54436 | Shelton | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54437 | Hamden | Buy All | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54441 | Hamden | Buy All | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54451 | Hamden | Buy All | GSD | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54452 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54455 | West Haven | Buy All | GSD | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | NS54456 | Fairfield | Netting | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Declined Agreement | BS54457 | NEW HAVEN | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | NS54464 | Shelton | Netting | New Construction | GST-SS | Solar Fixed Tilt | Yes | N/A | No | No Bid Selected | BS54466 | New Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54467 | New Haven | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54468 | DERBY | Buy All | GSD | N/A | Solar Fixed Tilt | No | N/A | No | No Declined Agreement | BS54470 | Shelton | Buy All | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | NS54565 | New Haven | Netting | GSD | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54591 | Milford | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54609 | Hamden | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54615 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | N/A | No | No Bid Selected | BS54623 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | N/A | No | No
  3. Part 3

    Bid Selected | BS54624 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | N/A | No | No Bid Selected | BS54626 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | N/A | No | No Bid Selected | BS54628 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | Yes | N/A | No | No Bid Selected | BS54629 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Declined Agreement | BS54630 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Declined Agreement | BS54631 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54632 | Bridgeport | Buy All | GSD | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | BS54636 | Bridgeport | Buy All | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Selected | NS54639 | West Haven | Netting | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Not Selected | NS54640 | West Haven | Netting | GST-SS | N/A | Solar Fixed Tilt | No | N/A | No | No Bid Disqualified | BS54612 | Bridgeport | Buy All | New Construction | N/A | Solar Fixed Tilt | No | N/A | Yes | No

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Form of State Tariff Agreement Exhibit C2 #25-08-03 #26-08-01.pdf

Extracted from the file · 31 pages · 88,975 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)