Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 1

Annual Compliance Filings – Cross-Posted Compliance

Compliance filingFiled by Avangrid22 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files22

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting

Text of 2026-11-16 UI Cross-Posted Compliance - Cover Letter 4. Annual Compliance Filings #26-08-01.pdf

Extracted from the file · 2 pages · 3,636 characters

Words on different pages
1 page match

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2c #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 2d #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 3 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 4 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 6 REDACTED #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - CT EV Charging Program Annual Report Attachment 8 #25-08-06 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 18) Exhibit A #25-08-03 #26-08-01.pdf

Extracted from the file · 5 pages · 7,448 characters

Text of 2026-11-16 UI Cross-Posted Compliance - NRES Order Nos. 6 and 9 (20-07-01 Order No 19) Exhibit B Public #25-08-03 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
  1. Page 5 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 5 of 31 1.38 “kW” means a kilowatt. 1.39 “kWh” means a kilowatt-hour. 1.40 “LREC/ZREC” means any low and/or zero emission generation projects that have been awarded contracts by the EDCs pursuant to General Statutes Sec. 16-244r or 16-244s. 1.41 “Meter” or “Meters” means all electric metering associated with the Facility, including the REC Meter, Facility meter and any other real-time meters, billing meters and back-up meters. 1.42 “Moody’s” means Moody’s Investors Service or its successor. 1.43 “MWh” means megawatt-hour, and one MWh shall equal 1,000 kWh. 1.44 “NEPOOL” means the New England Power Pool, the power pool created by and operated pursuant to the provisions of the RNA, or any successor to the New England Power Pool. 1.45 “NEPOOL GIS” means the New England Power Pool Generation Information System or any successor thereto, which includes a generation information database and certificate system, operated by NEPOOL, its designee or successor entity, which accounts for the generation attributes of electricity generated within New England. 1.46 “NEPOOL GIS Certificate” means an electronic record produced by the NEPOOL GIS that identifies the relevant generation attributes of each MWh accounted for in the NEPOOL GIS. 1.47 “NEPOOL GIS Operating Rules” means the New England Power Pool Generation Information System Operating Rules as may be amended from time to time pursuant to the NEPOOL Agreement and Participants Agreement. 1.48 “Non-Defaulting Party” has the meaning set forth in Section 13.2.1. 1.49 Non-Residential Renewable Energy Solutions Program Manual (“Program Manual”) means the Program Manual document, which may be amended from time to time. 1.50 “Participants Agreement” means the “Participants Agreement among ISO New England Inc. as the Regional Transmission Organization ("RTO") for New England and the New England Power Pool and the entities that are from time to time parties hereto constituting the Individual Participants” dated as of February 1, 2005, as may be amended from time to time, or any successor thereto accepted by the Federal Energy Regulatory Commission (“FERC”). 1.51 “Purchase Price” or “Purchase Price(s)” means the purchase price(s) for the Delivered Purchased Products referenced in the Cover Sheet and as approved by PURA. 1.52 “Qualified Institution” means a commercial bank or trust company organized under the laws of the United States or a political subdivision thereof, with (i) a Credit Rating of at least (a) “A” by S&P and “A2” by Moody’s, if such entity is rated by both S&P and Moody’s or (b) “A” by S&P or “A2” by Moody’s, if such entity is rated by either S&P or Moody’s but not both, and (ii) having a capital surplus of at least Ten Billion Dollars ($10,000,000,000). In the event of an inconsistency in the ratings (a “split rating”), the lowest Credit Rating shall control. 1.53 “RNA” means the Second Restated NEPOOL Agreement dated as of September 1, 1971, as amended and restated from time to time, governing the relationship among the NEPOOL Participants, and any successor agreement. 5
  2. Page 6 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 6 of 31 1.54 “Rating Agency” means S&P, Moody’s, Fitch or an equivalent organization acceptable to the EDC. 1.55 “Record” means all working papers and such other information and materials as may have been accumulated by EDC in performing the Agreement, including but not limited to, documents, data, plans, books, computations, drawings, specifications, notes, reports, records, estimates, summaries, memoranda and correspondence, kept or stored in any form. 1.56 “Regulatory Approval” means the approval of this Agreement by the Authority and such approval is final and not subject to appeal. 1.57 “Renewable Portfolio Standard” or “RPS” means the regulations promulgated pursuant to Conn. Gen. Stat. §16-245a, as amended, modified, restated and superseded from time to time, that require a minimum percentage of electricity sold to end-use customers in the State of Connecticut to be derived from certain renewable energy generating resources. 1.58 “RPS Class I Renewable Energy Source” means a generation unit that has received a Connecticut Class I RPS Qualification from the Authority, pursuant to Conn. Gen. Stat. § 161(a)(26). 1.59 “S&P” means Standard & Poor's, a Division of The McGraw-Hill Companies, Inc. and its successors. 1.60 "State” means the State of Connecticut, including the Agency and any office, department, board, council, commission, institution or other agency or entity of the State. 1.61 “Tariff Payment Beneficiary Form” means Attachment 2 to this Agreement, which includes all information necessary to make payments and/or issue invoices to a Tariff Payment Beneficiary if applicable. 1.62 “Tax” or “Taxes” means all taxes that are currently or may in the future be assessed on any products or services that are the subject of this Agreement. 1.63 “Term” has the meaning set forth in Section 2.1. 1.64 “Trading Period” has the meanings set forth in Rule 3.2 of the NEPOOL GIS Operating Rules. 1.65 “Unit Contingent” means that the RECs are intended to be supplied from the Facility and Customer’s failure to deliver is excused to the extent the Facility will not be available to produce and Deliver the purchased RECs. 6
  3. Page 7 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 7 of 31 2 Term of Agreement; Delivery Term 2.1 Term of Agreement. This Agreement shall commence as of the Effective Date and shall remain in effect through the final settlement of all obligations hereunder after the expiration of the Delivery Term or the earlier termination of this Agreement in accordance with its terms (the “Term”). 2.2 Delivery Term. The Delivery Term shall commence on the In-Service Date as provided in the Approval to Energize letter and continue for a period of twenty (20) years, unless this Agreement is earlier terminated in accordance with the provisions hereof. Customer understands and agrees that under no circumstances shall the Delivery Term be extended beyond such twenty-year period from the In-Service Date, irrespective of any delays in Deliveries, whether or not due to one or more Force Majeure Events, even if such delay(s) result in initial Delivery under this agreement that is subsequent to the In-Service Date. Further, the production and Delivery of Purchased Products shall not occur prior to the InService Date, even if the Facility produces energy prior to the In-Service Date. The EDC is not obligated to purchase any Purchased Products connected with energy produced by the Facility prior to the In-Service Date, or after the end of the Delivery Term under this Agreement. 3 Facility 3.1 Description. The Facility is as described in the “Facility” section of the Cover Sheet. 3.2 Construction. Customer shall construct the Facility as described in the Cover Sheet. 3.3 Facility In-Service Date; Final Facility Size. Customer shall provide notice to the EDC of the In-Service Date and final Facility Size within ten (10) Business Days of the commencement of energy production. The final Facility Size shall be based on the Facility’s as-built configuration as noted in the Approval to Energize letter issued by the EDC. If the final Facility Size differs from original description as set forth in the Cover Sheet: 3.3.1 Any increase that results in a Facility Size for a Project that exceeds statutory limits for a low emission or zero emission Project, as applicable, shall result in immediate and automatic termination of the Project’s eligibility under the Tariff. 3.3.2 Any increase that results in a final in-service Facility Size that is greater than the approved as-Bid Facility Size plus five (5) percent, shall result in immediate and automatic termination of the Project’s eligibility under the Tariff. 3.3.3 Any decrease that results in a Project size for a Project which falls outside of the size limits for the category in which the Project was Bid shall be allowed only if the following criteria are met: 1) the size category in which the Project ends up had a Price Cap that was higher than the original Project size category for the applicable solicitation and EDC; 2) the Purchase Price is below the highest selected Purchase 7
  4. Page 8 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 8 of 31 Price in the size category in which the project ends up for the applicable solicitation and EDC; and 3) the Purchase Price remains the same for the Project. 3.3.4 For Projects that do not meet the criteria in Section 3.3.3 hereof, any decrease that results in a Project size for a Project which falls outside of the size limits for the category in which the Project was Bid, subject to a five (5) percent variation shall result in immediate and automatic termination of the Project’s eligibility under the Tariff. 3.3.5 If a Project indicated at the time of Bid submission that additional load was expected to materialize over the five years following Bid submission attributable to transportation electrification (i.e., electric vehicles) and/or fuel switching (i.e., air source heat pumps) or New Construction load, the following shall apply: 3.3.5.1 If such load does not materialize within five years of the In-Service Date, a project’s compensation shall be reduced proportionally to the unrealized load. For Buy-All Projects, this will result in a reduction in total compensation, and for Netting Projects, this will result in a reduction in the compensation for the RECs generated by the Project, which may result in negative REC payments. 3.3.5.2 If at any point before the In-Service Date, the EDC receives notice that such part or all of the beneficial electrification load or New Construction load 1 will no longer materialize, Section 3.3.5.1 shall not apply. However, the Final Facility Size shall then be limited to the historical load provisions as outlined in the Program Manual and as applicable to the Project, and the Project will only be eligible to receive compensation for the energy and RECs that are generated once the In-Service Date occurs. 4 Prerequisites for Purchases 4.1 The EDC's obligation to begin the purchase of energy and RECs from a NRES Project at the rate(s) of payment specified in the Cover Sheet is contingent upon the satisfaction of all of the following conditions: 4.1.1 Reserved. 4.1.2 The EDC has received evidence to its reasonable satisfaction that Customer has demonstrated Project site control by the Customer of Record. In the case of a New Construction Project that has less than the expected New Construction load materialize, the system will be sized to the realized load. 1 8
  5. Page 9 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 9 of 31 4.1.3 The EDC has received evidence to its reasonable satisfaction that the Facility's InService Date has occurred, or will occur, after the issue date of the solicitation to which the Customer is responding. 4.1.4 Customer has demonstrated that the Facility is interconnected to the distribution system of the EDC. 4.1.5 The Project has a fully executed Interconnection Agreement. 4.1.6 Customer has provided Performance Assurance that satisfies the requirements of Section 9.1 and in an amount that is no less than the Performance Assurance amount listed in the Cover Sheet. 4.1.7 The EDC has received Regulatory Approval. 4.1.8 Customer has provided certification that no grants or rebates have been received by the Customer of Record from the Connecticut Green Bank or either of its predecessors the Clean Energy Finance and Investment Authority (“CEFIA”) or the Connecticut Clean Energy Fund (“CCEF”). For purposes of clarification, this prohibition includes grants or rebates from CEFIA or the CCEF for the installation or construction of the Facility, but does not include projects that receive(d) (i) only predevelopment and/or feasibility funding from Connecticut Green Bank, or (ii) financing in accordance with Conn. Gen. Stat. § 16-245(n) through Connecticut Green Bank. For purposes of this section, the Companies may consult with Connecticut Green Bank regarding the above grants or rebates as they may be applicable to the Facility. 4.1.9 Customer has provided certification that the Project (i) is not on a Shared Clean Energy Facility site; (ii) has not received an agreement under the LREC/ZREC Program or is not currently a Not In-Service LREC/ZREC project; and (iii) has not been split to qualify for a different size category. 4.1.10 Customer has provided notice in a form acceptable to the EDC at its sole discretion, certifying: (a) that generation from the Project that will result in qualifying Purchased Products has begun, (b) the Facility, as constructed, meets all of the low emission or zero emission (as applicable) generation facility requirements of the Acts, and (c) the final Facility Size. 4.1.11 If Customer’s Facility has been awarded this Agreement based, in part, on any of the Bid Preferences applicable to the RFP for which the Project was selected, Customer has provided accompanying proof in a form acceptable to the EDC at its sole discretion, that it has installed the Project in accordance with the Bid Preference which contributed to the project’s selection. Such proof must be submitted to the General Contact for the EDC noted in the Cover Sheet at least thirty days prior to the In-Service Date. 9
  6. Page 10 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 10 of 31 4.1.11.1 If the Project has been awarded this Agreement based, in part, on its receipt of the Solar Canopy/Solar Carport Bid Preference as determined by the EDC and noted on the Cover Sheet, the Customer must demonstrate that the Project has been installed exactly as noted on the Cover Sheet, i.e. the final system size of the portion of the Project indicated to be a Solar Canopy/Solar Carport is, in fact, a Solar Canopy/Solar Carport. 4.1.11.2 If a Project indicated at the time of Bid submission that additional load was expected to materialize over the five years following Bid submission attributable to transportation electrification (i.e., electric vehicles) and/or fuel switching (i.e., air source heat pumps), the Customer must inform the EDC at the time of notification of the project being In-Service if such beneficial electrification has occurred and/or is still planned. 4.1.12 The In-Service Date has occurred within 3 years of the date of PURA approval of the Tariff award unless an extension has been granted by PURA or the NRES ombudsperson. 4.1.13 If the Project has been awarded this Agreement based, in part, on the fact that it is a SAM Project with 100% of the State and/or Agricultural Beneficial Accounts located in Distressed Municipalities, or a SAM Project with 100% of the Municipal Beneficial Accounts located in Distressed Municipalities and owned by a Distressed Municipality or Beneficial Accounts owned by a Distressed Municipality which is also paying for the Beneficial Accounts’ electric service, as determined by the EDC, the Customer has demonstrated via the Beneficial Account Credit Allocation Form, that all Beneficial Accounts are in fact located in Distressed Municipalities or are owned by a Distressed Municipality which is also paying for the Beneficial Accounts’ electric service, as determined by the EDC. 4.1.13.1 In the event that a Beneficial Account included on the Beneficial Account Credit Allocation Form submitted for this Project at the time of Bid submission is taken off the Distressed Municipality list, the Project may keep the same Beneficial Account(s) for the 20-year Tariff Term. 5 5.1 Purchases Purchases of Energy and RECs. Beginning on the In-Service Date, provided that the Customer has satisfied all Section 4 prerequisites, the EDC shall purchase the Delivered Energy, inclusive of RECs, from a NRES Project at the Purchase Price as indicated on the Cover Sheet and approved by PURA. EDC’s obligation to purchase the Delivered output from the Project is contingent upon the Customer’s compliance with the terms of the 10
  7. Page 11 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 11 of 31 Program. Upon Delivery, ownership of RECs, energy, and all other Energy and Environmental Attributes shall transfer to the EDC. 5.1.1 Beginning on the date of Customer’s satisfaction of all Article 4 prerequisites, Customer shall sell and Deliver, and the EDC shall purchase and receive all Purchased Products in accordance with the terms and conditions of this Agreement. The EDC shall be obligated to purchase only those Purchased Products associated with the energy that is generated by the Facility on and after the satisfaction of all Article 4 prerequisites and continuing through the remainder of the Delivery Term. 5.1.2 The Delivered output will be paid in accordance with the Payment structure(s) outlined in Article 8. 5.1.3 In addition to Customer’s sale and the EDC’s purchase of RECs, the EDC, without the payment of any additional consideration to Customer, shall receive title to, and Customer shall convey to the EDC, any and all other Environmental Attributes associated with the electricity generated by the Facility. In addition, the EDC shall take title to all available capacity rights associated with the Project. 5.1.4 If the statutory and/or regulatory framework governing the Non-Residential Renewable Energy Solutions Program in effect as of the Effective Date is amended or suspended by any Governmental Authority and/or is otherwise no longer in force (collectively, a "Change" in the regulatory framework), the EDC may choose to qualify the Facility in another state or federal program, whether for renewable energy certificates or other Environmental Attributes, and Customer shall at such time provide to the EDC any documentation and other support as may be needed for such qualification. If during the Delivery Period a change in Connecticut laws or regulations occurs that creates value in Environmental Attributes, then at the EDC’s request, Customer shall cooperate with the EDC to register such Environmental Attributes or take other action necessary to obtain the value of such Environmental Attributes for the EDC. 6 Metering; Interconnection 6.1 Metering. All electric metering associated with the Facility, including the Facility meter and any other real-time meters, billing meters and back-up meters (collectively, the “Meters”), shall be installed, operated, maintained and tested at the Customer’s expense in accordance with Good Utility Practice and any applicable requirements and standards issued by the Interconnecting Utility, ISO-NE and NEPOOL GIS; provided that each Meter shall be tested at the Customer’s expense at least once each year. The Customer shall be responsible for all costs associated with such metering consistent with all applicable standards and requirements, and the EDC shall own the Meter. Readings of the Meters at the Facility by the Interconnecting Utility in whose territory the Facility is located (or an independent person mutually acceptable to the Parties) shall be conclusive as to the amount of Energy generated 11
  8. Page 12 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 12 of 31 by the Facility. The Customer shall make such hourly meter data available to the EDC at no cost. 6.2 Interconnection Agreement. This Agreement does not provide for the interconnection of the Facility to the EDC's electric distribution system. Customer shall seek such interconnection service from the Interconnecting Utility in accordance with the Interconnecting Utility's applicable interconnection process. Customer shall comply with the terms and conditions of the Interconnection Agreement. Customer shall be responsible for all costs and expenses associated with the interconnection of the Facility consistent with all standards and requirements set forth by the Interconnecting Utility. 7 Delivery 7.1 Delivery of Energy. Energy must be delivered to the distribution system of the EDC in whose service territory the Project is located. 7.2 Delivery of RECs. Payment by the EDC for RECs creates a firm obligation on the part of the Customer to Deliver RECs associated with the Delivered energy at the time that they are produced in the NEPOOL GIS. 7.2.1 It is the Customer’s responsibility to operate the NRES Project in such a way as to ensure that the NRES Project meets the qualifications requirements of a Connecticut Class I Renewable Energy Source throughout the entire Term and the Customer is responsible to provide the EDC with any and all required information to ensure such qualification. 7.2.2 Customer shall Deliver energy associated with the Facility, and Customer shall not sell, divert, grant, transfer or assign such energy or RECs to any person other than the EDC during the Term unless otherwise specifically provided herein. Customer shall not enter into any agreement or arrangement under which any person other than the EDC can claim such energy or RECs except as otherwise specifically provided herein. The EDC shall have the exclusive title and rights to all Energy, capacity, and RECs, and the right to resell or convey Energy, capacity, and RECs in its sole discretion. 7.3 Aggregation of RECs. The EDCs, their affiliates, and any agents, employees, and representatives thereof (collectively “Authorized Representatives”), are authorized to include and represent this Project in the New England Power Pool Generation Information System (“NEPOOL GIS”) and/or any U.S. state or domestic or foreign registry for environmental attributes (collectively, “Other Registries”), and to receive and use all Certificates created with respect to energy generated by the Project during the Term. I approve the EDCs inclusion of the Project as part of an aggregation in any state and agree that the EDC will be the Authorized Agent for the Aggregation. In addition, the EDC or its Authorized Representatives, as applicable, may need my assistance to: (a) monitor and record the 12
  9. Page 13 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 13 of 31 electrical energy output of the Project, and verify and provide meter data directly to the NEPOOL GIS and/or Other Registries, in accordance with applicable NEPOOL GIS operating rules; (b) perform any and all acts necessary to ensure Eversource/UI’s ability to participate in NEPOOL GIS and/or Other Registries and/or otherwise receive and use the Certificates; and (c) obtain, execute, and/or deliver any documentation as appropriate to such registries in order to qualify the Project for the purpose of including and representing the Project in NEPOOL GIS and/or Other Registries. 8 Compensation Structure, Billing, and Payment 8.1 Compensation Structures. The Compensation Structure of either Buy-All or Netting Tariff as indicated in the Cover Sheet and further described in Section 3.2 of the Program Manual. The Compensation Structure cannot be modified, either before or after the system receives Approval to Energize from the utility. 8.2 Bill Credits and Payments to Tariff Payment Beneficiaries 8.2.1 Buy-All Tariff: Payments for all Purchased Products shall occur on a quarterly basis. To the extent the customer elects to apply bill credits to the customers’ onsite account or, in the case of State, Agricultural, or Municipal projects, to any Beneficial Accounts, bill credits will be applied on a monthly basis. 8.2.2 A set percentage of the total compensation rate may be assigned to a Tariff Payment Beneficiary. Payments to such Tariff Payment Beneficiaries shall occur on a quarterly basis. Any remaining compensation shall be applied to the Customer of Record’s bill in the form of monetary (i.e., dollars, not kWh) credits applied to the Customer of Record on the Customer of Record’s bill. 8.2.2.1 If the Customer chooses to modify the percentage of the total compensation rate assigned to a Tariff Payment Beneficiary at any time after the project has executed a Tariff Agreement, an administrative fee, as noted in the most current version of the Program Manual, as may be amended from time to time, may be charged each time such request is made. 8.2.2.2 If a Bidder elects to provide direct payments to a Tariff Payment Beneficiary in the instance contemplated in Section 3.2.2 of the Program Manual, the Bidder must clearly identify the following: 1) the percentage of total compensation to be paid to a Tariff Payment Beneficiary, and 2) the percentage of total compensation to be paid to each of the Customers of Record associated with each existing revenue meter. One hundred (100) percent of the compensation can be allocated to a Tariff Payment Beneficiary. 13
  10. Page 14 of 31

    The United Illuminating Company Docket No. 25-08-03, 26-08-01 July 1, 2026 Compliance Order Nos. 6 and 9 Exhibit C2 Page 14 of 31 8.2.3 Netting Tariff: The Total Incentive Payment will be divided between two compensation options i) a monetary on-bill credit that will be applied to the Customer of Record’s EDC billing account for the Project Site to offset any customer, supply, and delivery charges on a monthly basis and ii) a quarterly cash payment provided to a Tariff Payment Beneficiary (“REC Payments”). 8.2.3.1 REC Payments shall be made on a quarterly basis to either the Customer of Record or to a Tariff Payment Beneficiary. One hundred (100) percent of the REC payments can be allocated to a Tariff Payment Beneficiary. 8.2.4 Payments to Tariff Payment Beneficiary: The Customer must certify and approve any payments to be made to a Tariff Payment Beneficiary. If the Customer chooses to redesignate the Tariff Payment Beneficiary at any time after the project has executed a Tariff Agreement, an administrative fee, as noted in the most current version of the Program Manual, as may be amended from time to time, may be charged each time such request is made. 8.2.5 If a Tariff payment results in a net bill credit to the Customer of Record, the credit balance will be carried forward indefinitely until the end of the 20-year term as provided for in the EDC’s terms and conditions. 8.2.5.1 The Customer of Record may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill Credits at the end of the 20-year term. 8.2.5.2 Such credits shall also be transferable in the event that the owner of the Facility changes. 8.2.5.3 The EDCs will provide all Customers of Record who have received an OnBill Credit Cash Out of $600 or more in a calendar year with a 1099 tax form. 8.2.6 Eligibility for bill credits remains with the Project in the event that the Customer of Record at the Project Site changes. The new Customer of Record will receive bill credits for the Project. 8.2.7 Negative REC Payments. In the event that a Bidder’s REC price is negative, as indicated in the Cover Sheet, an invoice for negative REC payments will be issued to the Tariff Payment Beneficiary in March of each calendar year. Failure to pay such invoice in a timely manner will result in the following penalties: 8.2.7.1 If the Tariff Payment Beneficiary misses their negative REC payment due date by more than six (6) months for three (3) consecutive years, the EDCs shall terminate the Project’s eligibility under the Tariff. 8.2.7.2 The EDC’s may charge a late payment penalty of up to fifty (50) percent of the missed negative REC payments for payments made more than six (6) months late. 14

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 5) Attachment C Exhibit 1 #25-08-04 #26-08-01.pdf

Extracted from the file · 2 pages · 1,932 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 (Order No. 6) Attachment B #25-08-04 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment A #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 9 pages · 13,682 characters

Text of 2026-11-16 UI Cross-Posted Compliance - SCEF Order No 9 Attachment C #19-07-01, #25-08-04 #26-08-01.pdf

Extracted from the file · 3 pages · 5,725 characters

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 1 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 2 - CT RRES Public #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 3 – CT RRES Averaged _ Aggregated Data Year #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 4 - CT RRES Averaged _ Aggregated Data Town 1 #26-08-02 #26-08-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of 2026-11-16 UI Cross-Posted Compliance - UI CAE-01 and CAE-014 Att 5 - CT RRES Application Data Fields #26-08-02 #26-08-01.pdf

Extracted from the file · 4 pages · 5,976 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.1 / Avangrid / Annual Compliance Filings – Cross-Posted Compliance

This filing on the current system (opens in a new tab)