Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

4 pages match
  1. Page 18 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 18 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Generac device present in the program tracking data17. This system was excluded from the program evaluation metrics18. 2.4 Findings and Recommendations This section presents key findings and recommendations based on Guidehouse’s review of the program tracking data, interval energy data, event data, and program cost data. Table 2-1. Data Availability and QA/QC Findings and Recommendations Finding Recommendation Residential interval energy data was provided in the same format for both the year two and current evaluation period. This consistency allowed for swifter data cleaning of interval energy as issues in the current evaluation period were already known and resolved in the year two evaluation (e.g., specific battery partners with different time zones were known to have this issue). Conversely, Guidehouse did not receive C&I energy interval data until the Summer 2023 season, at which point, QA/QC was more time-intensive due to the differences in data availability between the residential and C&I DERMS. Guidehouse recommends the Green Bank share findings of the program tracking data review with the C&I DERMS provider, as was done previously for the residential DERMS provider, to a facilitate a more consistent data deliverable between both DERMS providers (i.e., a data deliverable with fields aligned with the needs of the evaluation and across residential and C&I sectors). Guidehouse found that program tracking data was mostly complete and accurate, with some discrepancy due to third-party data entry error. These discrepancies were limited almost entirely to the model number and record type fields. Guidehouse recommends continued efforts from the Green Bank in maintaining program tracking data quality, and continued reminders to third parties on data entry best practices. As the program continues to grow and more battery partners are added, data QA/QC has increased in its complexity as different partners may have different conventions. Guidehouse recommends that the Program Administrators consider a more frequent data transfer schedule, which would allow for early QA/QC to potentially identify any issues before an entire season has passed. During the summer 2023 and winter 2023-2024 data request processes, oftentimes there was uncertainty regarding who was responsible for providing different data sources to Guidehouse for evaluation. Considerable time was spent reconciling data from different sources and ensuring all systems were present across different data sets, sometimes unsuccessfully. For example, the single Generac system was included in the program tracking data but not in energy interval data, which precluded its inclusion in the program evaluation metrics analysis. Guidehouse recommends in the next three-year cycle that the DERMS provider, Program Administrators, and the evaluator discuss roles and responsibilities to ensure an efficient and quick data request process. Additionally, all parties should consider centralizing data transfer as much as possible, with as much data coming from one source as is feasible to minimize the need for mapping files which maximizes the amount of data included in the analysis. Source: Guidehouse analysis 17 Although some UUIDs appearing in the program tracking data did not appear in the telemetry data, conditions such as unenrollment or late enrollment in the winter 2023-2024 season explained the discrepancy between these two data sources. 18 This Generac system was included in program evaluation metrics presented in Section 3 of this report but was excluded from the program evaluation metrics (Section 4) and the lack of performance data does not affect any of those metrics (i.e. – if a value of 0 had been included for those metrics for this system, performance metrics would have decreased). Information for the sole benefit and use of Connecticut Green Bank Page 14
  2. Page 19 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 19 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 3. Program Tracking Metrics This section describes the program tracking metrics that Guidehouse reviewed for this annual evaluation, beginning with a description of the project status categories and residential income categories. The section then presents the program tracking metrics to date and concludes with findings and recommendations. 3.1 Program Tracking Data Categories This section defines select program tracking data categories, including project application stages and units, residential income categories, C&I categories, and the hybrid project. 3.1.1 Project Stage Categories The program tracking data contains a “Stage” field that indicates the application and project completion stage for each project. The relevant stages for tracking project status are listed below. Table 3-1. Project Stage Categories Project Stage Definition Application Submitted Project has submitted all required documentation but is not yet approved. Under BOD Review The C&I project’s estimated upfront incentive is above $500,000 and requires Green Bank’s Board approval.19 Approved Project has been reviewed by the Green Bank and all project information and documentation is correct or has been sent back for additional information/edits. Completed Project has been approved, installed, energized, and has either been verified in the DERMS platform, or is in the process of doing so. Cancelled Project has been cancelled and removed from the submitted, approved, or completed stage, by the contractor and/or Green Bank. Source: Connecticut Green Bank. 3.1.2 Project Unit Definitions The program tracking metrics are provided across several nuanced units to best reflect the data being presented. These units are defined as: • 19 Application: Defined as a single project application in the program for an upfront incentive in return for the installation and participation of a “System.” Guidehouse has included “Under BOD Review” under “Application Submitted” for the purposes of the program tracking metrics. Information for the sole benefit and use of Connecticut Green Bank Page 15
  3. Page 20 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 20 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report • System: Defined as a collection of energy storage devices and other necessary balance of plant (e.g., inverter) at a single installation location. Note that a “Project” includes a single “System”, but may contain multiple “Battery Units”, in addition to other balance of plant. • Battery Unit: Defined as a single energy storage device, as manufactured and sold to customers. Note that a “System” may contain multiple “Battery Units,” in addition to other balance of plant. • Participant: Defined as a single customer that either applied to the program or is part of a hybrid application, as described in Section 3.1.5. 3.1.3 Residential Categories PURA categorizes residential customers in three groups: standard, underserved communities, and low-income (which includes multifamily affordable housing). Underserved customers include those living in environmental justice communities (as defined in Conn. Gen. Stat. § 22a20a) distressed municipalities, as defined by Conn. Gen. Stat. § 32-9p, public housing authorities, and multifamily affordable housing as contemplated by Conn. Gen. Stat. § 16-244z. Customers fall into the low-income category if their annual income is below 60% of the State Median Income. The low-income and underserved categories are not mutually exclusive, a household can be both low-income and located in an underserved community. The incentive adder for low-income households is higher than it is for underserved households, so if a household is classified as both, it will receive the higher low-income incentive. PURA, in its Final Decision in Docket 17-12-03RE03, directed the Program Administrators to aim to deploy 40% of residential storage installations in underserved communities and lowincome households. 3.1.4 C&I Categories C&I participants qualify for different incentive tiers based on their annual peak demand, according to the categories below: • Small C&I: Defined as customers with annual peak demand less than 200 kW • Medium C&I: Defined as customers with annual peak demand between 200 and 500 kW • Large C&I: Defined as customers with annual peak demand greater than 500 kW 3.1.5 Hybrid Project Within this report, there is a unique project that serves a building that, in part, includes multifamily affordable housing. This project is classified as a hybrid project that includes both residential and C&I participants. Specifically, this hybrid project is classified as 1 large C&I project, serving 1 large C&I participant, in addition to 161 underserved residential participants. The Green Bank determined that 47% of the system will be considered as underserved residential and 53% as large C&I based on the proportion of site demand which will serve residential (e.g., apartments) and commercial (e.g., community rooms and the charter school) Information for the sole benefit and use of Connecticut Green Bank Page 16
  4. Page 21 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 21 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report purposes. In Section 3.2 Guidehouse uses the same 47% and 53% split in determining the energy storage capacity and costs to be allocated to residential and C&I categories. The relative share of upfront incentives for residential and C&I components, 75% and 25%, respectively, was calculated by applying the residential underserved and large C&I upfront incentive formulas to the 47% and 53% split of capacity, respectively. For all metrics, including where the entirety of the project may be consolidated under either of the two categories, a description of its handling is noted beneath the table. While this hybrid project is the only of its kind thus far, multifamily affordable housing is an additional avenue through which low-income participation and capacity targets can be reached due to the larger scale of these systems and centralized incentive structure. Because the upfront incentive is paid to the multifamily property owner rather than the individual resident, residents can access the advantages of the battery backup, such as resilience, without paying the upfront cost that is an often-cited barrier to enrollment, especially for low-income and underserved participants. 3.2 Program Tracking Metrics This section summarizes the final ESS program tracking metrics for the 2022-2024 program cycle using data available through March 31, 2024. Table 3-2 displays the number of ESS participants, and percentage of the total, segmented by utility and customer type. The majority of participants are residential and in either the approved or complete stage. The majority of C&I participants are in the approved stage. Information for the sole benefit and use of Connecticut Green Bank Page 17
  5. Page 22 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 22 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-2. ESS Participants (Number and Percentage of Total) Project Status as of March 31, 2024 Utility Submitted (Participants) Approved (Participants) Complete (Participants ) Total (Participants) 13 (2.5%) 103 (20%) 142 (28%) 258 (50%) Residential Underserved 0 (0%) 12 (2.3%) 7 (1.4%) 19 (3.7%) Residential Low-income 2 (0.4%) 0 (0%) 3 (0.6%) 5 (1%) Residential Subtotal 15 (2.9%) 115 (22%) 152 (30%) 282 (55%) Small C&I 1 (0.2%) 6 (1.2%) 1 (0.2%) 8 (1.6%) Medium C&I 0 (0%) 8 (1.6%) 0 (0%) 8 (1.6%) Large C&I 0 (0%) 15 (2.9%) 1 (0.2%) 16 (3.1%) Customer Type Residential Standard Eversource C&I Subtotal 1 (0.2%) 29 (5.6%) 2 (0.4%) 32 (6.2%) Eversource Subtotal 16 (3.1%) 144 (28%) 154 (30%) 314 (61%) Residential Standard 1 (0.2%) 13 (2.5%) 10 (1.9%) 24 (4.7%) Residential Underserved 0 (0%) 164 (32%) 5 (1%) 169 (33%) Residential Low-income 0 (0%) 0 (0%) 0 (0%) 0 (0%) Residential Subtotal 1 (0.2%) 177 (34%) 15 (2.9%) 193 (37%) Small C&I 0 (0%) 0 (0%) 0 (0%) 0 (0%) Medium C&I 2 (0.4%) 2 (0.4%) 0 (0%) 4 (0.8%) Large C&I 0 (0%) 4 (0.8%) 0 (0%) 4 (0.8%) C&I Subtotal 2 (0.4%) 6 (1.2%) 0 (0%) 8 (1.6%) UI Subtotal 3 (0.6%) 183 (36%) 15 (2.9%) 201 (39%) Total Number of Residential Participants 16 (3.1%) 292 (57%) 167 (32%) 475 (92%) Total Number of C&I Participants 3 (0.6%) 35 (6.8%) 2 (0.4%) 40 (7.8%) Total Number of Participants 19 (3.7%) 327 (63%) 169 (33%) 515 (100%) UI Note: All percentages above are given as a percentage of the total sum of submitted, approved, and completed projects. Note: The hybrid housing project is made up of 161 residential underserved participants and one large C&I participant benefitting from a single energy storage system. In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024 in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Table 3-3 displays the percentage of residential participants receiving upfront incentives by expected installed capacity and by number of participants. This table is intended to show the program’s progress toward the goal defined in the Final Decision of Docket 17-12-03RE03 that 40% of residential participants be classified as low-income or underserved customers. Table 3-3 Information for the sole benefit and use of Connecticut Green Bank Page 18
  6. Page 23 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 23 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report shows that the program is currently below target with 32% falling into either the underserved or low-income residential categories. Within the 40% targets for low-income or underserved customers, goals were set for 30% being underserved and 10% being low-income. Within these targets, the program is achieving its underserved target but below target for its share of low-income installed capacity. Table 3-3. Share of Low-Income & Underserved Residential Participants Percentage by Expected Installed Capacity (MW) Percentage by Number of Participants Standard 68% 59% Underserved 31% 40% Low-income 1.0% 1.1% Underserved or Low-Income 32% 41% Upfront Incentive Received Note: Table includes approved and completed residential systems. Note: Table values may not sum to 100% due to rounding. Note: The hybrid housing project is made up of 161 residential underserved participants and one large C&I participant benefitting from a single energy storage system. In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024 in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Table 3-4 displays the percentage of participants and installed capacity by plans for participation in the ISO-NE forward capacity market (FCM) for C&I systems. C&I customers who qualify and are expected to bid make up the majority of installed capacity (48%), with the smallest share of capacity being systems that are not qualified (16%). Table 3-4. Indication of Participation in the ISO-NE FCM for C&I Participants Percentage of Participants (%) Percentage of Expected Installed Capacity (% of MW) Qualified & Expected to Bid 35% 48% Qualified & Not Bidding 45% 36% 20% 16% Participation Status Not Qualified 1 1. Participants & Capacity listed as “Not Qualified” could be either those systems that did not meet the criteria for eligibility to retain capacity rights if enrolled prior to 2023 or those systems that enrolled in 2023 or later. The analysis considers all projects in the approved, completed, or cancelled stages that are not qualified. Note: The hybrid housing project is made up of 161 residential underserved participants and 1 large C&I participant benefitting from a single energy storage system. In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. The hybrid housing project was submitted in 2023 and is therefore not qualified to bid into the FCM. Note: Table values may not sum to 100% due to rounding. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 19
  7. Page 24 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 24 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-5 displays the percentage of applications that have successfully moved through the pipeline to the approval phase. The smallest share of application statuses is in the submitted stage (4%), with 71% of applications either approved or complete. 25% of applications have been cancelled and removed from the program, for reasons such as having applied with an ineligible energy storage model and have not been resubmitted. Table 3-5. Project Approval Rates Application Status as of March 31, 2024 Utility Eversource UI Customer Type Submitted (Applications) Approved or Complete (Applications) Cancelled (Applications) Residential Standard 4% (13/344) 71% (245/344) 25% (86/344) Residential Underserved 0% (0/25) 76% (19/25) 24% (6/25) Residential Low-income 29% (2/7) 43% (3/7) 29% (2/7) Residential Overall 4% (15/376) 71% (267/376) 25% (94/376) Small C&I 11% (1/9) 78% (7/9) 11% (1/9) Medium C&I 0% (0/13) 62% (8/13) 38% (5/13) Large C&I 0% (0/20) 80% (16/20) 20% (4/20) C&I Overall 2% (1/42) 74% (31/42) 24% (10/42) Eversource Overall 4% (16/418) 71% (298/418) 25% (104/418) Residential Standard 3% (1/36) 64% (23/36) 33% (12/36) Residential Underserved 0% (0/8) 100% (8/8) 0% (0/8) Residential Low-income 0% (0/1) 0% (0/1) 100% (1/1) Residential Overall 2% (1/45) 69% (31/45) 29% (13/45) Small C&I 0% (0/1) 0% (0/1) 100% (1/1) Medium C&I 50% (2/4) 50% (2/4) 0% (0/4) Large C&I 0% (0/5) 80% (4/5) 20% (1/5) C&I Overall 20% (2/10) 60% (6/10) 20% (2/10) 5% (3/55) 67% (37/55) 27% (15/55) Percentage of Residential Applications UI Overall 4% (16/421) 71% (298/421) 25% (107/421) Percentage of C&I Applications 6% (3/52) 71% (37/52) 23% (12/52) Percentage of Total Applications 4% (19/473) 71% (335/473) 25% (119/473) Note. Percentages above consider only the number of applications, and not necessarily the number participants associated with the application. Therefore, the hybrid housing project, despite having 162 associated participants, is considered as a single Large C&I application for this table. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 20
  8. Page 25 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 25 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-6 displays the average number of days to approve applications from the date submitted to approval, as well as the average number of days from the date submitted to the completion date. Note that these averages are over the duration of the program so far, and therefore do not account for previous changes in the classification of stages or potential changes in time to approval as the program matures. Averages are bifurcated between those submitted through 2022 and after 2022 to show an increase in the average days to approve an application for both residential and C&I applications, and an increase in the average days to completion for residential systems. C&I systems both through 2022 and after 2022 have an average duration to approve applications approximately 67 times longer than residential applications. Table 3-6. Average Days to Approve Project Application Average Days to Approve Application Average Days to Completion Residential Submitted through 2022 43 281 Residential Submitted after 2022 12 142 Residential Overall 28 229 C&I Submitted through 2022 277 594 C&I Submitted after 2022 94 N/A C&I Overall 257 594 Total Program Average Days 49 233 Customer Type Note: Estimates for average days to approve application and average days to completion may vary from prior estimates, potentially due to changes in program enrollment (e.g., unenrollments). Note: Averages above consider only the number of days associated with an application, and not necessarily the number of days associated with the number of participants. Therefore, the hybrid housing project, despite having 162 associated participants, is considered as a single Large C&I application for this table. Note: Application review process may include back and forth communications with project developers to ensure their applications and complete and error-free, which may impact project approval timelines. Also, depending on the estimated upfront incentive amounts, C&I projects may need to be approved by the Green Bank Board of Directors, and this is subject to pre-established board meeting schedules. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 21
  9. Page 26 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 26 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-7 displays the share of energy storage paired with PV for approved projects by system, participant, and capacity (kWh). Residential systems are almost entirely (99%) paired with PV; however, residential participants are less often paired with PV due to the hybrid project’s large share of residential underserved participants. A similar trend is observed when estimating by capacity (kWh); however, the overall average is far lower due to C&I systems making up a larger share of program capacity and having a much lower rate of PV pairing. Table 3-7. Share of Energy Storage Paired with PV By Number of Systems1 By Number of Participants2 By System’s kWh1 By Participant’s kWh2 Residential Standard 99% 99% 99% 99% Residential Underserved 100% 14% 100% 24% Residential Low-income 100% 100% 100% 100% Residential Average 99% 64% 99% 77% Small C&I 14% 14% 5.2% 5.2% Customer Type Medium C&I 0% 0% 0% 0% Large C&I 20% 20% 5.9% 4.4% C&I Average 14% 14% 4.3% 3.4% Overall Average 93% 60% 9.8% 6% 1. Percentages by system or system’s kWh above consider only systems and their energy storage capacity (kWh), and as such, the hybrid housing project has been classified exclusively as “Large C&I.” 2. Percentages by participant or participant’s kWh, fractionalizes the hybrid project’s capacity onto the 161 residential underserved participants and single C&I participant. Capacity for the hybrid housing project has been distributed as 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. Note: Share of energy storage w/ PV pairing analysis includes only projects in the “approved” or “completed” stages. Note: Table values may not sum to 100% due to rounding. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 22
  10. Page 27 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 27 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-8 shows nameplate storage system power capacity segmented by utility, customer type, and project status. Currently, the C&I program accounts for a much larger share of program enrolled capacity, due to their larger average system size, despite making up a smaller share of program participants. The vast majority of enrolled capacity is in the approved stage. Table 3-8. Total Allocated Power Capacity (kW) by Project Status Project Status as of March 31, 2024 Utility Customer Type Submitted (kW) Approved (kW) Complete (kW) Total (kW)1 Residential Standard 147 976 1,172 2,295 Residential Underserved 0 111 59 170 Residential Low-income 8 0 27 35 Residential Subtotal 155 1,087 1,258 2,500 Small C&I 500 3,961 125 4,586 Medium C&I 0 11,321 0 11,321 Large C&I 0 53,877 250 54,127 C&I Subtotal 500 69,159 375 70,034 Eversource Subtotal 655 70,246 1,633 72,535 Residential Standard 0 104 58 162 Residential Underserved 0 916 34 949 Residential Low-income 0 0 0 0 Residential Subtotal 0 1,020 91 1,111 Small C&I 0 0 0 0 Medium C&I 625 6,167 0 6,792 Large C&I 0 4,448 0 4,448 C&I Subtotal 625 10,615 0 11,240 UI Subtotal 625 11,635 91 12,351 Total Power Capacity: Residential (kW) 155 2,107 1,349 3,611 Total Power Capacity: C&I (kW) 1,125 79,775 375 81,275 Total Power Capacity (kW) 1,280 81,881 1,724 84,886 Eversource UI 1. Totals shown above are the sum of submitted, approved, and complete, without any projects listed as “cancelled.” Note: The hybrid housing project has been distributed above to the 161 residential underserved and single large C&I participants benefitting from a single energy storage system. Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Table 3-9 shows capacity (rated energy) in kWh segmented by utility, customer type, and project status. As with Table 3-8, the C&I program makes up the majority of submitted and Information for the sole benefit and use of Connecticut Green Bank Page 23

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2