Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

4 pages match
  1. Page 28 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 28 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report approved energy capacity to date, although so far, primarily residential projects have been completed, with residential completed capacity almost three times greater than C&I. Table 3-9. Total Allocated Energy Capacity (kWh) by Project Status Project Status as of March 31, 2024 Utility Eversource UI Customer Type Submitted (kWh) Approved (kWh) Complete (kWh) Total (kWh)1 Residential Standard 327 2,528 2,604 5,459 Residential Underserved 0 301 143 443 Residential Low-income 20 0 57 77 Residential Subtotal 347 2,828 2,804 5,979 Small C&I 1,000 16,230 660 17,890 Medium C&I 0 34,278 0 34,278 Large C&I 0 132,226 558 132,784 C&I Subtotal 1,000 182,734 1,218 184,952 Eversource Subtotal 1,347 185,562 4,022 190,931 Residential Standard 54 301 169 525 Residential Underserved 0 1,862 77 1,939 Residential Low-income 0 0 0 0 Residential Subtotal 54 2,163 246 2,463 Small C&I 0 0 0 0 Medium C&I 1,112 19,270 0 20,382 Large C&I 0 9,513 0 9,513 C&I Subtotal 1,112 28,783 0 29,895 UI Subtotal 1,166 30,945 246 32,358 Total Energy Capacity: Residential (kWh) 401 4,991 3,050 8,443 Total Energy Capacity: C&I (kWh) 2,112 211,516 1,218 214,846 Total Energy Capacity (kWh) 2,513 216,508 4,268 223,289 Note: Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. 1. Totals shown above are the sum of submitted, approved, and complete, without any projects listed as “cancelled.” Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 24
  2. Page 29 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 29 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-10 displays the average system size (in kW and kWh) per participant for approved systems, segmented by utility and customer type. To date, the average system size for Medium C&I is greater than the average system size for Large C&I in UI’s service territory. Notably, there is still limited enrollment to date on which to calculate average system size, leading the potential for greater variance. Additionally, as C&I components are classified by peak demand, it is not guaranteed that the average system size for Large C&I to be larger than Medium C&I, but instead just expected. Table 3-10. Average Project Size Utility Customer Type Average System Size1 (kW/participant) (kWh/participant) Residential Standard 8.8 21 Residential Underserved 9 23 Residential Low-income 9 19 Residential Average 9 21 Small C&I 584 2,413 Medium C&I 1,415 4,285 Large C&I 3,383 8,299 C&I Average 2,243 5,934 Eversource Average 241 636 Residential Standard 7 20 Residential Underserved 5.6 11 Residential Low-income N/A N/A Residential Average 6 13 Small C&I N/A N/A Medium C&I 3,084 9,635 Large C&I 1,112 2,378 C&I Average 1,769 4,797 UI Average 59 158 Average System Size for Residential Systems 7.5 18 Average System Size for C&I Systems 2,166 5,750 169 445 Eversource UI Average System Size 2 1. Average system size analysis includes only projects in the “approved” or “completed” stages. 2. Guidehouse used an average of each project size of kW per participant Note: Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Table 3-11 shows the number of participants and number of storage systems by make and model. Sunpower is the most popular residential manufacturer, accounting for 33% of Information for the sole benefit and use of Connecticut Green Bank Page 25
  3. Page 30 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 30 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report residential systems. Tesla is the most popular C&I manufacturer, accounting for 76% of C&I systems. Table 3-11. Number of Systems and Batteries by Storage Type Type Residential C&I Make and Model Number of Systems1 Number of Battery Units1 SunPower - SunVault 98 127 Enphase Energy - IQ Battery 10T 78 123 Enphase Energy - IQ Battery 5P 15 46 Enphase Energy - IQ Battery 3T 2 4 FranklinWH - aPower X 59 131 Generac PWRcell - PWRcell M63 25 30 Generac PWRcell - PWRcell M5 2 2 Generac PWRcell - PWRcell M4 2 2 Generac PWRcell - PWRcell M3 1 1 EndurEnergy Systems - ESP-5100 5 31 EndurEnergy Systems - ESP-BU15 1 2 Homegrid Energy - Stack'D Series 5 4 Fortress Power - eFlex 1 2 Fortress Power - eVault Max 1 4 Cadenza Innovation - CI48400-I-2P 1 4 Sol-Ark - 12K 1 1 Electriq Power - PowerPod 2 1 1 Tesla - Megapack 27 27 Tesla - Megapack 2 1 1 ELM Fieldsight - MG1000 2 2 ELM Fieldsight - CMG125 2 2 ELM Fieldsight - MG500 1 1 Socomec - SUNSYS HES L 3 3 BYD Energy Storage - CP32-B2800-U-R2M01 1 1 1. Counts by storage type includes only projects in the “approved” or “completed” stages. 2. Count of participants here includes all those participants served by an energy storage system of a given make and model. Note: “System” is defined as the full collection of equipment (e.g., batteries/inverters) and balance of plant sited at a particular location. As such, the hybrid housing project has not been allocated between residential and C&I, and is instead classified under large C&I. 3. As discussed in Section 2 above, Guidehouse did not receive interval energy data corresponding to a single Generac system, and as such, the system is not included in program evaluation metrics. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Table 3-12 shows the number of applications submitted by contractor, with both number of residential and C&I applications. There are 29 contractors with at least one residential Information for the sole benefit and use of Connecticut Green Bank Page 26
  4. Page 31 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 31 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report application, 8 contractors with at least one C&I application, and 2 contractors with at least one of both residential and C&I applications. Table 3-12. Number of Approved or Completed Applications by Contractor Contractor Residential Applications C&I Applications Earthlight Technologies, LLC 80 2 SAVKAT, Inc. 59 0 Green Power Energy, LLC 43 0 RWE Clean Energy, LLC (formerly ConEdison Solutions) 20 12 Synergy Smart Homes 14 0 Earth Smart Solar 12 0 Eastern CT Solar, LLC 10 0 Venture Home Solar, LLC 10 0 Aegis Solar Energy 9 0 Sunlight Solar Energy, Inc. 7 0 Helio Solar 6 0 Summer Hill Solar 4 0 EcoSolar Installations, LLC 4 0 Ion Solar Pros 2 0 Infinity Solar Systems 2 0 Powur PBC 2 0 EcoSmart Home Services 2 0 ELC INC 1 0 West Electric LLC 1 0 Porticade Construction LLC dba Action Solar 1 0 Momentum Solar 1 0 Son Energy Systems 1 0 RT's Construction 1 0 Dyna Electric 1 0 Ovanova 1 0 Trinity Solar, Inc. 1 0 Green Banyan Consulting, LLC 1 0 PurePoint Energy 1 0 SunBug Solar 1 0 CPower 0 14 Siemens Industry, Inc. / Calibrant Energy 0 3 HQCA Energy Solutions, LLC 0 2 Enel X North America, Inc. 0 1 QCells Enable 0 2 Waldron Engineering & Construction, Inc. 0 1 1. Count only includes projects in the “approved” or “completed” stages. Note: The hybrid housing project, despite having 162 associated participants, is considered a single Large C&I application for this table. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 27
  5. Page 32 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 32 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Guidehouse also received actual program administration costs incurred by the Program Administrators to date, which is shown in Table 3-13. Table 3-13. Program Administrative Costs ($) Category 2023 Costs Personnel $1,032,678.00 Evaluation, Measurement, and Verification1 $216,344.00 Marketing $159,125.00 IT $46,840.00 Other $756,027.00 Total $2,211,014.00 Note: Table displays 2023 administrative costs only, as costs for the first quarter of 2024 are not yet finalized for reporting. 1. The EM&V category includes vendors supporting the Program Administrators’ compliance with Orders within the ESS dockets. Source: Connecticut Green Bank, Eversource, and UI Information for the sole benefit and use of Connecticut Green Bank Page 28
  6. Page 33 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 33 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-14 displays the upfront incentives encumbered by customer type. As of March 2024, over $30M in upfront incentives have been encumbered by projects either in the approved or completed stages, with Eversource’s C&I projects making up over two thirds of the approved or completed encumbered incentives to date. Table 3-14. Estimated Upfront Incentives Encumbered by Project Status ($) Utility Customer Type Approved ($)2 Complete ($)3 66,204 689,025 636,091 Residential Underserved 0 148,564 47,236 Residential Low-income 12,096 0 19,900 Residential Subtotal Residential Standard Eversource 78,300 837,589 703,227 Small C&I 0 3,244,960 132,000 Medium C&I 0 5,755,026 0 Large C&I 0 14,483,843 55,800 C&I Subtotal 0 23,483,829 187,800 Eversource Subtotal 78,300 24,321,418 891,027 Residential Standard 16,000 75,518 41,464 Residential Underserved 0 787,620 28,164 Residential Low-income 0 0 0 16,000 863,138 69,628 Residential Subtotal UI Status as of March 31, 2024 Submitted ($)1 Small C&I 0 0 0 Medium C&I 75,770 3,372,250 0 Large C&I 0 1,159,677 0 C&I Subtotal 75,770 4,531,927 0 UI Subtotal 91,770 5,395,065 69,628 94,300 1,700,727 772,855 Total Incentives Encumbered: C&I 75,770 28,015,756 187,800 Total Incentives ($) 170,070 29,716,483 960,655 Total Incentives Encumbered: Residential 1. Incentives for submitted status projects are estimated based on system capacity, location, and low-income status. 2. Incentives for approved projects are estimated in the same manner as submitted projects. However, this number is reflective of the amount of funds reserved as part of that approval. 3. Completed projects incentives are based upon what has actually been paid for installed systems. Note: The hybrid housing project has been fractionalized above to both the 161 residential underserved participants and single large C&I participant benefitting from a single energy storage system. Upfront incentives for the hybrid housing project are fractionalized as roughly 75% of incentives classified under the 161 residential underserved participants and 25% of cost classified under the single large C&I participant. The 75%/25% split of upfront incentives is calculated by applying the upfront incentive formulas for residential underserved and large C&I participants to the 47% and 53% split of project capacity, respectively. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 29
  7. Page 34 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 34 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-15 shows the average total project upfront incentive for approved projects, segmented by utility and customer type. Residential underserved participants within Eversource’s service territory saw a higher average total project incentive relative to UI underserved participants due to a large share of the 19 systems having received the maximum allowable cap of $16k in upfront incentives. Table 3-15. Average Total Project Upfront Incentive ($/Participant) Utility Eversource UI Customer Type Average Total Project Incentive ($/Participant)1 Residential Standard 5,409 Residential Underserved 10,305 Residential Low-income 6,633 Residential Average 5,771 Small C&I 482,423 Medium C&I 719,378 Large C&I 908,728 C&I Average 763,601 Eversource Average 84,606 Residential Standard 5,086 Residential Underserved 4,827 Residential Low-income N/A Residential Average 4,858 Small C&I N/A Medium C&I 1,686,125 Large C&I 289,919 C&I Average 755,321 UI average 27,599 Average Incentives Encumbered by Residential Participants 5,389 Average Incentives Encumbered by C&I Participants 762,258 Average Project Incentive2 61,849 1. Average total project incentive is defined as upfront and performance per participant. However, there have not been any performance-based incentives for any projects so far, so this table only reflects upfront incentives. 2. Average Project Incentive is calculated as the simple average incentive per participant. Note: Average total project incentive analysis includes only projects in the “approved” or “completed” stages. Note: The hybrid housing project has been fractionalized above to both the 161 residential underserved participants and single large C&I participant benefitting from a single energy storage system. Upfront incentives for the hybrid housing project are fractionalized as roughly 75% of incentives classified under the 161 residential underserved participants and 25% of cost classified under the single large C&I participant. The 75%/25% split of upfront incentives is calculated by applying the upfront incentive formulas for residential underserved and large C&I participants to the 47% and 53% split of project capacity, respectively. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 30
  8. Page 35 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 35 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-16 displays battery only and average battery system project costs, segmented by utility and customer type. As noted in the footnotes of each table, the treatment of the hybrid multifamily project heavily affects UI residential underserved estimates due to the higher relative number of residential underserved projects in UI service territory associated with the hybrid project as compared to UI’s overall number of underserved projects. Table 3-16 also displays that the average cost for Medium C&I exceeds the average project costs for Large C&I in UI’s service territory, indicating a wide variance and the potential for different energy storage use cases among C&I customers. Table 3-16. Average Project Cost ($/Participant) Utility Eversource UI Battery Only Cost ($/Participant) Total Energy Storage System Cost ($/Participant)1 Residential Standard 19,972 32,437 Residential Underserved 21,185 35,653 Residential Low-income 17,142 33,435 Customer Type Residential Average 20,027 32,677 Small C&I 837,464 1,246,612 Medium C&I 1,209,056 2,081,841 Large C&I 1,951,439 3,713,202 C&I Average 1,508,314 2,735,234 Eversource Average 174,848 313,816 Residential Standard 18,563 34,857 Residential Underserved 1,008 10,613 Residential Low-income N/A N/A Residential Average 3,111 13,517 Small C&I N/A N/A Medium C&I 2,225,875 4,203,521 Large C&I 928,121 1,524,194 C&I Average 1,360,706 2,417,303 UI Average 44,250 86,359 Average Cost for Residential Participants 12,951 24,663 Average Cost for C&I Participants 1,484,377 2,683,677 Average Cost 122,714 223,017 Note: Average project cost analysis includes only projects in the “approved” or “completed” stages. Note: To accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity and costs for the hybrid housing project have been fractionalized with 47% of capacity and cost classified under the 161 residential underserved participants and 53% of capacity and cost classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. 1. Total system costs includes the cost of the battery module as well as balance of system, inverter, engineering and design, interconnection, monitoring, and permitting cost. The cost does not include solar PV. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 31
  9. Page 36 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 36 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-17 displays the total installed costs encumbered by customer type. C&I continues to have higher total installed costs as compared to the residential program, accounting for approximately 90% of total allocated installed costs. Table 3-17. Total Installed Costs Allocated to Participants by Project Status ($) Utility Customer Type Approved ($)2 Complete ($)3 $594,741 $3,562,327 $4,384,786 Residential Underserved - $438,570 $238,840 Residential Low-income $31,917 - $27 Residential Subtotal $626,658 $4,000,897 $4,623,653 Small C&I $5,177,428 $8,350,189 $376,096 Medium C&I - $16,654,729 - Large C&I - $58,979,872 $431,359 C&I Subtotal $5,177,428 $83,984,790 $807,455 Eversource Subtotal $5,804,086 $87,985,687 $5,431,108 Residential Standard $63,550 $506,228 $295,489 Residential Underserved - $1,598,977 $194,632 Residential Low-income - - - $63,550 $2,105,205 $490,121 Residential Standard Eversource Residential Subtotal UI Status as of March 31, 2024 Submitted ($)1 Small C&I - - - Medium C&I $948,153 $8,407,042 - Large C&I - $6,096,777 - C&I Subtotal $948,153 $14,503,819 - UI Subtotal $1,011,703 $16,609,024 $490,121 Total Allocated Installed Costs: Residential $690,208 $6,106,102 $5,214,051 Total Allocated Installed Costs: C&I $6,125,581 $98,488,609 $807,455 Total Installed Costs ($) $6,815,789 $104,594,711 $5,921,229 1. Incentives for submitted status projects are estimated based on system capacity, location, and low-income status. 2. Incentives for approved projects are estimated in the same manner as submitted projects however this number is reflective of the amount of funds reserved as part of that approval. 3. Completed project incentives are based upon what has actually been paid for installed systems. Note: In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity and costs for the hybrid housing project have been fractionalized with 47% of capacity and cost classified under the 161 residential underserved participants and 53% of capacity and cost classified under the single large C&I participant. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 32
  10. Page 37 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 37 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 3-18 shows average total system costs by kW and kWh by the customer type and application status associated with each project. Average costs for approved systems are slightly lower than those for completed systems, indicating the possibility that battery system costs are decreasing; however, the limited number of participants makes it difficult to draw conclusions in price trends at this time. Table 3-18. Average Total Energy Storage System Costs ($/kWh and $/kW) Cost | Status1 $/kW | Submitted2 $/kW | Approved $/kW | Completed2 $/kWh | Submitted2 $/kWh | Approved2 $/kWh | Completed2 Project Type Resi. Standard Resi. Underserved Resi. LowIncome $2,960 N/A $4,156 $3,495 $3,611 $4,326 Resi. Avg. Small Medium Large C&I C&I C&I C&I Avg. Overall Avg.3 $3,110 $10,355 $1,258 N/A $4,290 $3,296 N/A $3,508 $2,640 $1,662 $1,322 $1,645 $2,410 $5,218 $3,813 $4,381 $3,009 N/A $1,725 $2,367 $4,357 $1,591 N/A $1,583 $1,590 $5,177 $883 N/A $2,314 $1,705 $1,601 $1,671 N/A $1,609 $553 $524 $552 $544 $1,117 $1,855 $2,263 $1,785 $1,883 $570 N/A $773 $671 $1,869 1. Total system costs may be inclusive of non-energy storage equipment, (e.g., installation costs associated with paired PV). 2. The relatively low customer counts of completed or submitted projects for some customer types (e.g., submitted project statuses) may result in non-representative estimates for average cost. 3. Guidehouse used a weighted average by summing the total system costs and dividing by the total kW(h)s to reflect the effect of system size on cost. Note. Calculations shown above are given by system. As such, the hybrid housing project is classified as a single large C&I system. If the average total storage system cost was artificially fractionalized to each additional participant benefitting (i.e., the 161 underserved residential customers), the approved Residential Avg. of $/kW would drop to $2,501. Later recommendations assume that the hybrid project was relatively unique. Note: Since the hybrid project was approved, PURA's Year 3 Final Decision changed the eligibility of low-income projects to include affordable multifamily housing. As of March 31, 2024, this project was classified as underserved; however, Green Bank is correcting its enrollment data to reflect this recent change, and it will be captured in the Program Annual Review that is due August 1, 2024, in compliance with Order No.3 of the Final Decision in Docket No. 22-08-05. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 33

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)