Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

4 pages match
  1. Page 47 of 106Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 47 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report each of these morning events, ISO-NE’s day-ahead forecast had projected peak demand to occur in the afternoon rather than in the morning. Due to the requirement that events be called 24 hours in advance, Eversource may not have known to call a morning event on those days. In addition, because the program manual stipulates that active dispatch events may only be called during 12-9pm, events likely could not have been called that would have aligned with the morning peak, regardless. As more devices enrolled into the ESS program, and dispatch events were no longer considered “test events,” peak coincidence improved from 50% in the year two annual evaluation to 67% for the collective summer 2023 and winter 2023/24 seasons. In aggregate, 63% of active events called by either EDC aligned with the ISO-NE daily peak. Table 4-6. Peak Targeting Percentages Percentage of Active Events Aligned w/ Daily Peak Percentage of Active Events Aligned w/ Seasonal Peak Percentage of Active Events Aligned w/ Annual Peak Eversource 68% 67% 100% UI 60% 67% 100% Utility Note: Aligned events refer to active events that are called during the time window of each peak (e.g., daily, seasonal, or annual) from the period of winter 2022-2023 through winter 2023-2024. Guidehouse excludes the ISO-NE annual peaks for 2022 and 2024 for the calculation of “Percentage of Active Events Aligned w/ Annual Peak,” as the first ESS event in 2022 was after the 2022 annual peak, and the annual peak for 2024 has likely not yet occurred. Source: Guidehouse analysis of interval energy data from September 15, 2022, through March 31, 2024, inclusive of all active events called since the program’s inception. Table 4-7 displays battery performance metrics for the whole of the event season. These include battery availability (uptime) as a percentage of energy storage systems available at the start of events, solar energy used to recharge energy storage systems after dispatching vs. grid charging, and estimated bill savings. The number of systems analyzed is not uniform throughout the evaluation season due to factors such as systems enrolling into ESS and/or unenrolling. During events called between September 2022 and March 2024, nearly all batteries were available at the start of events, as demonstrated by the 99% Battery Availability (Uptime). Energy storage systems charged primarily from PV with a 71% share of average total device energy (kWh) charged from PV for “Solar Energy Used.” However, this share of PV charging is well below the nearly 100% PV charging expected from participating systems. The calculation for estimated bill savings is done in aggregate across the whole period with which telemetry data is available. Given that nearly all enrolled energy storage systems were charging with standard flat electricity rates (i.e., not Time-of-Use (TOU) rates that change throughout the day), there was no opportunity for bill savings from load shifting, and thus estimated bill savings are estimated to be negative due to energy storage performance loss. Given the relative infrequency of energy storage cycling and the relatively high round-trip efficiency of the energy storage systems, this increase in bills was minor for participants. Information for the sole benefit and use of Connecticut Green Bank Page 43
  2. Page 48 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 48 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 4-7. Battery Performance Metrics Performance Metric Value Battery Availability (Uptime)1 (%) 99% 2 Solar Energy Used (%) 71% Estimated Bill Savings3 ($) -$6,865.05 USD Estimated Bill Savings3 ($/participant) -$54.48 USD 1. Uptime is calculated as the percentage of energy storage systems with any available energy stored at the start of each active event, averaged over the course of the event season. 2. Solar Energy Used is calculated as the percentage of charging done from PV throughout the whole of the event season. 3. Estimated Bill Savings are calculated over the whole of the evaluation period, summed across all systems. In order to isolate bill savings from energy storage alone, calculations assume that, in the absence of a battery, paired PV would otherwise meet home load at the same price as customers are charged for normal energy consumption. Negative values indicate that the system costs more to charge than it earns through bill savings from discharging onsite. Source: Guidehouse analysis of interval energy data from September 15, 2022, through March 31, 2024, inclusive of all events called since the program’s inception. Table 4-8 displays emissions evaluation metrics for Carbon Dioxide (CO2), Nitrogen Oxide (NOX), and Sulfur Oxide (SOX). Avoided emissions are calculated both using the EPA AVERT model and the AESC estimates of marginal emissions for CO2 and NOx. Given the limited number of energy storage systems enrolled at the time of evaluation, emission reductions are presented in pounds (lbs.) as opposed to tons. Table 4-8. Emissions Evaluation Metrics Avoided Emissions, per EPA AVERT Avoided Emissions, per 2021 AESC Avoided CO2 Emissions (lbs.) 45,089 42,378 Avoided NOX Emissions (lbs.) 0.90 3.17 Avoided SOX Emissions (lbs.) 0.30 N/A Emissions Metric Note: Given the reduced amount of energy storage, energy storage dispatch was scaled up by 100 in the case of CO2 & NOx, and SOx, to generate AVERT metrics, at which point, outputs were then scaled down by 100. 2021 AESC marginal emissions data does not include marginal SOx, so an estimate of avoided SOx emissions is not available with that method. Sources: Guidehouse analysis of interval energy data from September 15, 2022, through March 31, 2024, inclusive of all active events called since the program’s inception. AVERT Model is available at: https://www.epa.gov/AVERT. 2021 AESC is available at: https://www.synapse-energy.com/project/aesc-2021-materials. Table 4-9 displays evaluation metrics by outage type, stratified by outages over or under 5 minutes in duration and with greater than or less than 10 participants in order to highlight the magnitude of each outage and its effects on program participants. From September 2022 through March 2024, 26 outage events occurred for more than 5 minutes for storage participants, with energy storage systems responding to 23 of them. Two outage events lasted for less than five minutes, and no storage systems dispatched during these quick outages. Information for the sole benefit and use of Connecticut Green Bank Page 44
  3. Page 49 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 49 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 4-9. Evaluation Metrics by Outage Type Number of Instances Energy Discharged During Outage (kWh/Outage) Instances Battery Provided Backup Power (#) Total kWh Dispatched Less than 10 participants 2 0 0 0 Less than 5 min Greater than 10 participants 0 0 0 0 More than 5 min Less than 10 participants 26 -2.4 23 -65 More than 5 min Greater than 10 0 0 0 0 Outage Duration Participants Affected per Outage Less than 5 min Source: Guidehouse analysis of interval energy data from September 15, 2022, through March 31, 2024, inclusive of all outage events identified since the program’s inception. 4.2 Findings and Recommendations Table 4-10. Evaluation Metrics Findings and Recommendations Finding Recommendation The share of energy storage system manufacturers in active events fluctuated throughout 2022-2024, with an overall average of 75% of devices participating in each active event. Additionally, these devices did not dispatch optimally, with a 3-year average dispatch around 50% of the energy expected during each event. Guidehouse recommends that the Program Administrators continue discussions with manufacturers about uniform dispatch capabilities and backup reserve settings to maximize active dispatch event performance. The timing of active events called during the analysis period was concurrent with the daily peak load for 65% of Eversource events and 61% of UI events. While this was an improvement from the year 2 peak concurrence of 50%, often when the timing did not align, the events were only off by an average of 1 hour from the daily ISO-NE peak. Importantly, rather than utilizing the full 3-hour active event window, EDCs often only called 2hour events resulting in missing the peak hour for that day. Guidehouse recommends that Eversource and UI consider expanding the active event window while considering the tradeoffs for longer dispatch periods (greater chance of hitting peak) vs. battery discharge available at time of peak, especially considering most missed peak concurrences were by one hour either before or after the event. Energy storage systems connected to DERMS charged from their co-located solar PV systems 71% of charging time, which represents a decrease from the year 2 evaluation that reported 99.4% charging from PV, though with a smaller sample size. Guidehouse recommends that the Program Administrators investigate what barriers, if any, are preventing participating systems from recharging with solar PV systems, including the timing of active and passive event windows and any battery settings that may cause a battery system to recharge at night from the grid after an event rather than from solar the next day. Average active event participation across the evaluation period was 74% for the summer season and 79% for the winter season. Event participation decreased as more devices enrolled in the program, and the summer 2023 season in particular experienced sporadic participation, some of which may be due to battery manufacturer settings preventing certain systems from responding to events due to weather conditions. Guidehouse recommends that the Program Administrators continue conversations with battery manufacturers around settings that may prevent battery systems from responding to active events when called. More frequent reviews of battery interval data (i.e., midseason or monthly) could also reveal issues with participation that may be addressed before the season is over. Information for the sole benefit and use of Connecticut Green Bank Page 45
  4. Page 50 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 50 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Finding Recommendation No active events were called in June during either summer season, and the majority of active events for the summer 2023 season were called in July. The ISONE peaks for 2022 and 2023 also occurred in August and September, respectively. Guidehouse recommends that the Program Administrators consider extending and aligning the passive program season with the active season to better coincide with seasonal peaks (i.e., extending passive dispatch through September). Average passive event participation varied greatly in the summer 2023 season, ranging from 40% to 95% of systems participating per event with an average of 75% participation for the season. Average power dispatched during these events was similarly varied with a slightly higher average than active events at 53% of available maximum power dispatched. This figure is well below the program target of 80% of available power dispatched. No systems met the program’s 90% dispatch requirement in the first passive dispatch season. Guidehouse recommends that the Program Administrators further investigate barriers to passive event participation and confirm with battery manufacturers whether systems enrolled in the program can comply with the 90% passive dispatch requirement. Program Administrators should also consider modifying or suspending the claw back provision until the issues with passive event compliance are better understood. The Program Administrators could consider a grace period in which participants are not subject to claw back until their second or third summer in the program, which would allow time for adjusting battery settings to meet the passive dispatch requirements and ease the concerns of potential participants, as noted by the research in Section 6. Estimated bill savings were marginally negative (i.e., customers’ bills were higher than they would have been without energy storage) due to round-trip efficiency losses and lack of participation in TOU rates. Guidehouse recommends that Program Administrators consider requiring residential customer participation in TOU rates or provide education on potential benefits of TOU rates with battery storage. Both Eversource and UI called the same events for residential and C&I participants. While the utilities retain the ability to call events independently, the active events called by both utilities in the summer 2023 season largely aligned. N/A Source: Guidehouse analysis Information for the sole benefit and use of Connecticut Green Bank Page 46
  5. Page 51 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 51 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 5. BCA This section discusses changes to the benefit-cost model, specifically the incorporation of evaluated data, updates to prospective inputs based on the assessment of evaluated data, and updates to prospective inputs based on the latest avoided costs and BCA results. 5.1 Benefit-Cost Model In compliance with Order No. 7 of the Final Decision in Docket No. 17-12-03RE03, the Green Bank filed a BCA reflecting final program design in October 2021, which included details on BCA approach and the Excel-based model.21 This approach, including the model, has been used in all subsequent BCA filings related to the program, including the August 2022 ESS Annual Program Review (filed as Attachments 3 and 4) and, most recently, in written comments filed in September 2022 under Docket No. 22-08-05.22, 23 Section V.F of the Final Decision directed that the annual EM&V report include “the actual, realized benefit-cost ratios for all five cost tests listed in Section IV” as a program metric.24 However, given the approach to the BCA described above, the fully actual and realized benefits from energy storage systems presently installed will not be known for some years. To the extent that a portion of costs and benefits within the broader BCA are actual and realized, they are accounted for in the updated BCAs (e.g., installed costs, upfront incentive payouts, and program administration costs to date). Additionally, the program tracking metrics and evaluation metrics discussed in this report can inform updates to assumptions about the long-term projected program performance. 21 Connecticut Green Bank 17-12-03RE03 Order 7 compliance re-file under Docket 21-08-05, 10/4/2021, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/06045b22997703bc8525876400540604?OpenDo cument 22 Connecticut Green Bank Order 9 Compliance, August 2022 Energy Storage Solutions Annual Program Review, under Docket 2108-05, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/d645a7e8cbbc5d5f852588a700554341?OpenDoc ument 23 Connecticut Green Bank Written Comments for 22-08-05 under Docket 22-08-05, 9/21/2022, available at: www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/a25d58daf02b9681852588c4006b9e33?OpenDocument 24 Ibid, pg. 45 Information for the sole benefit and use of Connecticut Green Bank Page 47
  6. Page 52 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 52 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-1. Cost Test Definitions Benefit/Cost Category RIM Utility System Impacts1 Benefit PCT PACT SCT TRC CTET Benefit Benefit Benefit Benefit Societal Impacts2 Reduced Arrearages3 Benefit Avoided Backup Generator Cost Benefit Program Incentives Cost Benefit Non-Program Incentives ESS Technology Costs Benefit Benefit Benefit Benefit Participant Bill Savings Program Administration Benefit Cost Cost Benefit Cost Cost Cost Cost Cost Cost Cost Cost 1. Includes: Energy Savings components of Avoided Energy, DRIPE Energy, and Cross-DRIPE; Peak Savings components of Avoided Generation Capacity, Avoided Transmission Capacity, Avoided Distribution Capacity, Reliability, and DRIPE Capacity 2. Includes: Non-Embedded Emissions 3. Refers in full to the utility system benefit of reduced arrearages, collection costs, debt write-offs, or administrative costs Sources: Guidehouse analysis; CTET cost test as defined by CT DEEP in April 202225 During the year two evaluation, the model was also updated to enable calculation of a sixth cost test. In accordance with the Connecticut Department of Energy and Environment Projection’s Updates to Connecticut Conservation and Load Management Cost-Effectiveness Testing, the Connecticut Efficiency Test (CTET) was added and is now reported on as an additional BCA metric.26 The CTET is essentially a modified PACT, also including monetized avoided nonembedded emissions and reduced arrearages as additional benefits. For this program, the reduced arrearages benefit is assumed to be negligible. PURA directed the Program Administrators to set program incentives that could deliver an overall benefit-to-cost ratio of 1.4 from the RIM cost test perspective.27 The Final Decision provided a BCA submitted by the Connecticut Green Bank to the Request for Program Design (RFPD). The BCA submitted to the RFPD estimated benefits and costs for systems installed in the first 3-year program cycle over the life of those energy storage systems, which was assumed to be 10 years. The BCA underpinning the cost-effectiveness of the program is dependent on the performance of installed energy storage systems beyond the years in which they are installed. Also, during the year two evaluation, the benefit-cost model was expanded from providing exclusively a prospective BCA to including both evaluated data and prospective estimates.28 As the program continues to accumulate actual data from participants, the BCA will continue to assess assumptions for enrollment, system size, performance, and cost on an as-needed basis given any variation between observed actuals and prior assumptions. For the following three- 25 Ibid. CT DEEP, Attachment B – Cost-Effectiveness Testing Update, published April 2022, available at: https://portal.ct.gov//media/DEEP/energy/ConserLoadMgmt/Attachment-B---Cost-Effectiveness-Testing-Update.pdf 27 Public Utilities Regulatory Authority Final Decision under Docket 17-12-03RE03, July 28, 2021, available at: https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07bae185258752007994f7?Open Document 28 “Prospective” refers both to projected systems that have not yet been installed and projected impacts of systems that have already been installed in later years of their useful life. In this report, the prospective benefit-cost analysis captures 10 years of benefits and costs for systems with projected installation dates between 2022 and 2027. 26 Information for the sole benefit and use of Connecticut Green Bank Page 48
  7. Page 53 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 53 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report year evaluation, assumptions have been modified for both enrollment and assumed performance. The model incorporates evaluated data for systems installed in 2022 and 202329. Evaluated data for systems installed in the first quarter of 2024 is used to inform total expected installs and performance in 2024. Similarly, the evaluated data is used to inform prospective inputs for systems expected to come online between 2024 and 2027. For example, the evaluated installed costs for 2022-2024 systems were used to update the projected installed costs of prospective 2024-2027 systems, as described further in Section 5.2. Aside from these updates to the model, the general approach to BCA is unchanged from the prior filings. Select BCA input parameters have been changed, as described in the following section. 5.2 Benefit-Cost Model Inputs As described in Section 5.1, the updated benefit-cost model includes both evaluated and prospective inputs. See Table 5-2 for a summary of the 2023 evaluated data used as input in the benefit-cost model. For the year three report, Guidehouse updated the following assumptions. BCA Inputs Based on Evaluated Data – Guidehouse revised BCA projections with metrics evaluated from programing tracking and energy interval data in 2023. These additions are a continuation of conversions regarding transition from projections to actuals (as was done with 2022 actuals added during the Year 2 evaluation). In addition to the inclusion of actual data for 2022 and 2023, evaluated data was used to inform updates to inputs for the prospective BCA, including updates to enrollment and installed costs that align with actual evaluated data through the end of 2023. The enrollment assumptions used in the BCA are based on the date of completed installation. While data from early 2024 was available, the BCA requires a full year of costs and benefits to be included as evaluated data, and therefore 2024 was projected. 29 See Section 2.1 for more details on the data received. Information for the sole benefit and use of Connecticut Green Bank Page 49
  8. Page 54 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 54 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-2. Summary of Benefit-Cost Model Inputs from Evaluated Data Customer Segment Number of Installs Total Power (kW) Total Energy (kWh) Installed Cost ($) Upfront Incentive ($) 2023 Summer Peak Capacity Savings (kW) Residential Standard 110 858 82 $3,409,738 $476,964 23 Residential Underserved 9 69 6 $335,623 $42,624 18 Residential Low-Income 3 27 2 $100,304 $19,900 13 Small C&I 1 125 28 $376,096 $132,000 21 Medium C&I 0 0 0 $0 $0 0 Large C&I 1 250 23 $431,359 $55,800 0 Source: Guidehouse analysis Program Enrollment – Guidehouse updated the program enrollment forecast seen in the Year 2 evaluation for MWs installed in 2024 through 2027 and requested the Program Administrators review and provide updates to the prospective program enrollment numbers based on enrollment to date. The updated projected program enrollment is shown in Table 5-3. Low participation in 2022, 2023 and the first quarter of 2024 resulted in higher projected installations allocated to later years. Within each customer segment, 80% of projected enrolled capacity is assumed to be within Eversource service territory and the remaining 20% within UI service territory. Initial applications have been slightly higher within Eversource territory than this expectation (85% to 15%) as identified in Table 3-8, but this is assumed to realign with expectations over time. The assumption of elevated enrollment in 2024-2027 carries some risk as it relates to BCA for two reasons. If these enrollment targets are not met, then fewer benefits will accrue from the program than the benefits presented in the following Section 5.3, and the fixed costs of the program, such as administration, may reduce the program’s cost-effectiveness since they would be spread across fewer projects. Information for the sole benefit and use of Connecticut Green Bank Page 50
  9. Page 55 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 55 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-3. Program Enrollment Forecast (MW)30 Customer Type 2024 2025 2026 2027 Residential 28 37 37 46 Standard 17 22 22 28 Underserved 8 11 11 14 Low-Income 3 4 4 5 C&I 26 35 35 43 Small 6 8 8 10 Medium 8 11 11 13 Large 12 16 16 20 Total 54 72 72 90 Source: Enrollment projections confirmed by Connecticut Green Bank, Eversource, and UI Administrative Costs – Guidehouse updated the ESS administrative costs based on actual costs to date in 2022, 2023 and Q1 2024, and with updated projected costs through 2036. Guidehouse requested the Program Administrators review and provide updates to the estimated program administrative costs, in addition to actual program administrative costs incurred as identified in Table 3-13. These costs were updated based on recently filed projections of program administration costs and were allocated to the power capacity of systems installed between 2022-2027 in alignment with the scope of this BCA. They are shown in Table 5-4. 30 Enrollment for 2022 and 2023 is actual, the future years are prospective projections based on input from the Program Administrators. Information for the sole benefit and use of Connecticut Green Bank Page 51
  10. Page 56 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 56 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-4. Actual (through 2023) and Projected Program Administrative Costs ($) Residential C&I Year Connecticut Green Bank Eversource UI 2022 $1,521,716 $124,658 $268,589 $0 $0 2023 $1,478,092 $201,878 $176,545 $31,665 $205,138 $117,696 2024 $1,548,292 $255,016 $186,334 $446,791 $259,134 $124,222 2025 $2,905,704 $947,117 $439,667 $387,185 $947,117 $439,667 2026 $1,662,079 $890,306 $684,448 $221,472 $890,306 $684,448 2027 $1,694,735 $996,088 $902,494 $225,823 $996,088 $902,494 2028 $1,728,370 $1,040,892 $1,129,271 $230,305 $1,040,892 $1,129,271 2029 $1,448,696 $830,332 $1,046,360 $193,039 $830,332 $1,046,360 2030 $1,195,360 $761,392 $982,515 $159,282 $761,392 $982,515 2031 $1,024,180 $702,568 $944,144 $136,472 $702,568 $944,144 2032 $954,727 $580,900 $934,902 $127,217 $580,900 $934,902 2033 $976,955 $554,679 $921,205 $130,179 $554,679 $921,205 2034 $979,355 $530,919 $837,301 $130,499 $530,919 $837,301 2035 $877,653 $452,665 $862,904 $116,947 $452,665 $862,904 2036 $719,616 $347,046 $665,071 $95,889 $347,046 $665,071 Total $542,965 $415,961 $797,051 $0 $0 $0 Connecticut Green Bank Eversource UI $0 Sources: Guidehouse analysis of projections provided by the Connecticut Green Bank, Eversource, and UI for years 2024-2036. Administrative costs in 2022 and 2023 are actual costs. Forward-looking estimates (2025 and on) are subject to change since the Program Administrators are soliciting bids from DERMS vendors for a new 3-year contract. Peak Reduction– Guidehouse updated the average max expected peak reduction for residential systems in the BCA only (not for the C&I systems). The 2022-2024 program evaluation metrics led Guidehouse to reduce the prospective assumption for typical residential peak reduction for residential energy storage systems. Guidehouse evaluated the performance of participating systems during active and passive windows concurrent with the ISO-NE daily peak. These values are shown in Table 5-5. Due to the high number of residential nonparticipants during both active and passive events, as seen in Table 4-1, Table 4-2, and Table 4-4, the estimates for prospective performance are higher than observed performance. For this reason, we relied on participant-only performance to avoid negatively biasing the assumed future performance due to reported temporary technical constraints limiting 2023 performance by some battery partners. Guidehouse assumes that issues resulting in a device’s complete non-participation – an average power greater than or equal to zero during an event window (i.e., no dispatch or mostly charging) – will be largely resolved in future program years and should therefore be excluded from analysis to estimate future performance. No adjustments were made to C&I estimates due to the small number of participants to date. Information for the sole benefit and use of Connecticut Green Bank Page 52

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)