Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

4 pages match
  1. Page 51 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 51 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 5. BCA This section discusses changes to the benefit-cost model, specifically the incorporation of evaluated data, updates to prospective inputs based on the assessment of evaluated data, and updates to prospective inputs based on the latest avoided costs and BCA results. 5.1 Benefit-Cost Model In compliance with Order No. 7 of the Final Decision in Docket No. 17-12-03RE03, the Green Bank filed a BCA reflecting final program design in October 2021, which included details on BCA approach and the Excel-based model.21 This approach, including the model, has been used in all subsequent BCA filings related to the program, including the August 2022 ESS Annual Program Review (filed as Attachments 3 and 4) and, most recently, in written comments filed in September 2022 under Docket No. 22-08-05.22, 23 Section V.F of the Final Decision directed that the annual EM&V report include “the actual, realized benefit-cost ratios for all five cost tests listed in Section IV” as a program metric.24 However, given the approach to the BCA described above, the fully actual and realized benefits from energy storage systems presently installed will not be known for some years. To the extent that a portion of costs and benefits within the broader BCA are actual and realized, they are accounted for in the updated BCAs (e.g., installed costs, upfront incentive payouts, and program administration costs to date). Additionally, the program tracking metrics and evaluation metrics discussed in this report can inform updates to assumptions about the long-term projected program performance. 21 Connecticut Green Bank 17-12-03RE03 Order 7 compliance re-file under Docket 21-08-05, 10/4/2021, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/06045b22997703bc8525876400540604?OpenDo cument 22 Connecticut Green Bank Order 9 Compliance, August 2022 Energy Storage Solutions Annual Program Review, under Docket 2108-05, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/d645a7e8cbbc5d5f852588a700554341?OpenDoc ument 23 Connecticut Green Bank Written Comments for 22-08-05 under Docket 22-08-05, 9/21/2022, available at: www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/a25d58daf02b9681852588c4006b9e33?OpenDocument 24 Ibid, pg. 45 Information for the sole benefit and use of Connecticut Green Bank Page 47
  2. Page 52 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 52 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-1. Cost Test Definitions Benefit/Cost Category RIM Utility System Impacts1 Benefit PCT PACT SCT TRC CTET Benefit Benefit Benefit Benefit Societal Impacts2 Reduced Arrearages3 Benefit Avoided Backup Generator Cost Benefit Program Incentives Cost Benefit Non-Program Incentives ESS Technology Costs Benefit Benefit Benefit Benefit Participant Bill Savings Program Administration Benefit Cost Cost Benefit Cost Cost Cost Cost Cost Cost Cost Cost 1. Includes: Energy Savings components of Avoided Energy, DRIPE Energy, and Cross-DRIPE; Peak Savings components of Avoided Generation Capacity, Avoided Transmission Capacity, Avoided Distribution Capacity, Reliability, and DRIPE Capacity 2. Includes: Non-Embedded Emissions 3. Refers in full to the utility system benefit of reduced arrearages, collection costs, debt write-offs, or administrative costs Sources: Guidehouse analysis; CTET cost test as defined by CT DEEP in April 202225 During the year two evaluation, the model was also updated to enable calculation of a sixth cost test. In accordance with the Connecticut Department of Energy and Environment Projection’s Updates to Connecticut Conservation and Load Management Cost-Effectiveness Testing, the Connecticut Efficiency Test (CTET) was added and is now reported on as an additional BCA metric.26 The CTET is essentially a modified PACT, also including monetized avoided nonembedded emissions and reduced arrearages as additional benefits. For this program, the reduced arrearages benefit is assumed to be negligible. PURA directed the Program Administrators to set program incentives that could deliver an overall benefit-to-cost ratio of 1.4 from the RIM cost test perspective.27 The Final Decision provided a BCA submitted by the Connecticut Green Bank to the Request for Program Design (RFPD). The BCA submitted to the RFPD estimated benefits and costs for systems installed in the first 3-year program cycle over the life of those energy storage systems, which was assumed to be 10 years. The BCA underpinning the cost-effectiveness of the program is dependent on the performance of installed energy storage systems beyond the years in which they are installed. Also, during the year two evaluation, the benefit-cost model was expanded from providing exclusively a prospective BCA to including both evaluated data and prospective estimates.28 As the program continues to accumulate actual data from participants, the BCA will continue to assess assumptions for enrollment, system size, performance, and cost on an as-needed basis given any variation between observed actuals and prior assumptions. For the following three- 25 Ibid. CT DEEP, Attachment B – Cost-Effectiveness Testing Update, published April 2022, available at: https://portal.ct.gov//media/DEEP/energy/ConserLoadMgmt/Attachment-B---Cost-Effectiveness-Testing-Update.pdf 27 Public Utilities Regulatory Authority Final Decision under Docket 17-12-03RE03, July 28, 2021, available at: https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07bae185258752007994f7?Open Document 28 “Prospective” refers both to projected systems that have not yet been installed and projected impacts of systems that have already been installed in later years of their useful life. In this report, the prospective benefit-cost analysis captures 10 years of benefits and costs for systems with projected installation dates between 2022 and 2027. 26 Information for the sole benefit and use of Connecticut Green Bank Page 48
  3. Page 53 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 53 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report year evaluation, assumptions have been modified for both enrollment and assumed performance. The model incorporates evaluated data for systems installed in 2022 and 202329. Evaluated data for systems installed in the first quarter of 2024 is used to inform total expected installs and performance in 2024. Similarly, the evaluated data is used to inform prospective inputs for systems expected to come online between 2024 and 2027. For example, the evaluated installed costs for 2022-2024 systems were used to update the projected installed costs of prospective 2024-2027 systems, as described further in Section 5.2. Aside from these updates to the model, the general approach to BCA is unchanged from the prior filings. Select BCA input parameters have been changed, as described in the following section. 5.2 Benefit-Cost Model Inputs As described in Section 5.1, the updated benefit-cost model includes both evaluated and prospective inputs. See Table 5-2 for a summary of the 2023 evaluated data used as input in the benefit-cost model. For the year three report, Guidehouse updated the following assumptions. BCA Inputs Based on Evaluated Data – Guidehouse revised BCA projections with metrics evaluated from programing tracking and energy interval data in 2023. These additions are a continuation of conversions regarding transition from projections to actuals (as was done with 2022 actuals added during the Year 2 evaluation). In addition to the inclusion of actual data for 2022 and 2023, evaluated data was used to inform updates to inputs for the prospective BCA, including updates to enrollment and installed costs that align with actual evaluated data through the end of 2023. The enrollment assumptions used in the BCA are based on the date of completed installation. While data from early 2024 was available, the BCA requires a full year of costs and benefits to be included as evaluated data, and therefore 2024 was projected. 29 See Section 2.1 for more details on the data received. Information for the sole benefit and use of Connecticut Green Bank Page 49
  4. Page 54 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 54 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-2. Summary of Benefit-Cost Model Inputs from Evaluated Data Customer Segment Number of Installs Total Power (kW) Total Energy (kWh) Installed Cost ($) Upfront Incentive ($) 2023 Summer Peak Capacity Savings (kW) Residential Standard 110 858 82 $3,409,738 $476,964 23 Residential Underserved 9 69 6 $335,623 $42,624 18 Residential Low-Income 3 27 2 $100,304 $19,900 13 Small C&I 1 125 28 $376,096 $132,000 21 Medium C&I 0 0 0 $0 $0 0 Large C&I 1 250 23 $431,359 $55,800 0 Source: Guidehouse analysis Program Enrollment – Guidehouse updated the program enrollment forecast seen in the Year 2 evaluation for MWs installed in 2024 through 2027 and requested the Program Administrators review and provide updates to the prospective program enrollment numbers based on enrollment to date. The updated projected program enrollment is shown in Table 5-3. Low participation in 2022, 2023 and the first quarter of 2024 resulted in higher projected installations allocated to later years. Within each customer segment, 80% of projected enrolled capacity is assumed to be within Eversource service territory and the remaining 20% within UI service territory. Initial applications have been slightly higher within Eversource territory than this expectation (85% to 15%) as identified in Table 3-8, but this is assumed to realign with expectations over time. The assumption of elevated enrollment in 2024-2027 carries some risk as it relates to BCA for two reasons. If these enrollment targets are not met, then fewer benefits will accrue from the program than the benefits presented in the following Section 5.3, and the fixed costs of the program, such as administration, may reduce the program’s cost-effectiveness since they would be spread across fewer projects. Information for the sole benefit and use of Connecticut Green Bank Page 50
  5. Page 55 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 55 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-3. Program Enrollment Forecast (MW)30 Customer Type 2024 2025 2026 2027 Residential 28 37 37 46 Standard 17 22 22 28 Underserved 8 11 11 14 Low-Income 3 4 4 5 C&I 26 35 35 43 Small 6 8 8 10 Medium 8 11 11 13 Large 12 16 16 20 Total 54 72 72 90 Source: Enrollment projections confirmed by Connecticut Green Bank, Eversource, and UI Administrative Costs – Guidehouse updated the ESS administrative costs based on actual costs to date in 2022, 2023 and Q1 2024, and with updated projected costs through 2036. Guidehouse requested the Program Administrators review and provide updates to the estimated program administrative costs, in addition to actual program administrative costs incurred as identified in Table 3-13. These costs were updated based on recently filed projections of program administration costs and were allocated to the power capacity of systems installed between 2022-2027 in alignment with the scope of this BCA. They are shown in Table 5-4. 30 Enrollment for 2022 and 2023 is actual, the future years are prospective projections based on input from the Program Administrators. Information for the sole benefit and use of Connecticut Green Bank Page 51
  6. Page 56 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 56 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-4. Actual (through 2023) and Projected Program Administrative Costs ($) Residential C&I Year Connecticut Green Bank Eversource UI 2022 $1,521,716 $124,658 $268,589 $0 $0 2023 $1,478,092 $201,878 $176,545 $31,665 $205,138 $117,696 2024 $1,548,292 $255,016 $186,334 $446,791 $259,134 $124,222 2025 $2,905,704 $947,117 $439,667 $387,185 $947,117 $439,667 2026 $1,662,079 $890,306 $684,448 $221,472 $890,306 $684,448 2027 $1,694,735 $996,088 $902,494 $225,823 $996,088 $902,494 2028 $1,728,370 $1,040,892 $1,129,271 $230,305 $1,040,892 $1,129,271 2029 $1,448,696 $830,332 $1,046,360 $193,039 $830,332 $1,046,360 2030 $1,195,360 $761,392 $982,515 $159,282 $761,392 $982,515 2031 $1,024,180 $702,568 $944,144 $136,472 $702,568 $944,144 2032 $954,727 $580,900 $934,902 $127,217 $580,900 $934,902 2033 $976,955 $554,679 $921,205 $130,179 $554,679 $921,205 2034 $979,355 $530,919 $837,301 $130,499 $530,919 $837,301 2035 $877,653 $452,665 $862,904 $116,947 $452,665 $862,904 2036 $719,616 $347,046 $665,071 $95,889 $347,046 $665,071 Total $542,965 $415,961 $797,051 $0 $0 $0 Connecticut Green Bank Eversource UI $0 Sources: Guidehouse analysis of projections provided by the Connecticut Green Bank, Eversource, and UI for years 2024-2036. Administrative costs in 2022 and 2023 are actual costs. Forward-looking estimates (2025 and on) are subject to change since the Program Administrators are soliciting bids from DERMS vendors for a new 3-year contract. Peak Reduction– Guidehouse updated the average max expected peak reduction for residential systems in the BCA only (not for the C&I systems). The 2022-2024 program evaluation metrics led Guidehouse to reduce the prospective assumption for typical residential peak reduction for residential energy storage systems. Guidehouse evaluated the performance of participating systems during active and passive windows concurrent with the ISO-NE daily peak. These values are shown in Table 5-5. Due to the high number of residential nonparticipants during both active and passive events, as seen in Table 4-1, Table 4-2, and Table 4-4, the estimates for prospective performance are higher than observed performance. For this reason, we relied on participant-only performance to avoid negatively biasing the assumed future performance due to reported temporary technical constraints limiting 2023 performance by some battery partners. Guidehouse assumes that issues resulting in a device’s complete non-participation – an average power greater than or equal to zero during an event window (i.e., no dispatch or mostly charging) – will be largely resolved in future program years and should therefore be excluded from analysis to estimate future performance. No adjustments were made to C&I estimates due to the small number of participants to date. Information for the sole benefit and use of Connecticut Green Bank Page 52
  7. Page 57 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 57 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 5-5. ESS Specifications – Average System Max Expected Peak Reduction1 Residential Standard Residential Underserved Residential Low-Income Small C&I Medium C&I Large C&I Passive Dispatch Backup Reserve 50% 50% 50% 20% 20% 20% Passive Max Expected Peak Reduction 73% 73% 73% 80% 80% 80% Active Max Expected Peak Reduction 116% 116% 116% 80% 80% 80% 1. Prospective assumption for average system size and installed cost (applied to projected 2024-2027 systems). Source: Guidehouse analysis of program tracking data provided by the Connecticut Green Bank System Size and Cost – Guidehouse did not update the average system size or cost for residential or C&I systems in the BCA. Guidehouse also chose to maintain the prospective assumption for typical energy storage system sizes and installed costs last modified in the ESS Year 2 annual evaluation due to the change in program size and cost assumptions being very recent. These values are shown in Table 5-6. The assumed size of residential systems and average installed costs have not been updated based on the average of residential applications; the capacity and cost of the hybrid project as allocated to residential customers, as described in Section 3.1.5, is not reflected in the new residential averages. Table 5-6. ESS Specifications – Average System Size and Installed Cost1 Item ESS kW ESS kWh Installed Cost ($) Residential Small C&I Medium C&I Large C&I 8.1 200 500 1,000 18.5 540 1,350 2,700 $27,750 $432,000 $978,750 $1,755,000 1. Prospective assumption for average system size and installed cost (applied to projected 2024-2027 systems). Source: Guidehouse analysis of program tracking data provided by the Connecticut Green Bank Avoided Costs – Guidehouse updated the avoided costs assumed in the BCA for the years 2025, 2026, and 2027 due to the release of Synapse Energy’s AESC 2024 in February 2024. Table 5-7 includes the estimates and input selections used from both the latest AESC released in February 2024 (2024 AESC) in addition to the AESC released in 2021 (2021 AESC). The 2024 AESC is used only to monetize the estimated energy system benefits associated with program installs in 2025, 2026, and 2027. In prior evaluations, the ESS program evaluated costeffectiveness using counterfactual one in the 2021 AESC for systems installed 2022-2027; however, given the availability of updated avoided cost estimates, the BCA uses both the 2021 AESC under counterfactual one and the 2024 AESC under counterfactual one and counterfactual six. Guidehouse continues to use the 2021 AESC for systems installed in 20212024, because due to its release in 2024, the 2024 AESC only provides avoided cost estimates for systems installed in 2024 and onwards. In addition to updated avoided cost estimates, the 2024 AESC introduces two new counterfactuals not present in the 2021 AESC, counterfactual five and counterfactual six, the latter of which was designed uniquely to model the impacts of behind the meter storage. In this evaluation, results are presented using both 2024 AESC counterfactual one – for consistency Information for the sole benefit and use of Connecticut Green Bank Page 53
  8. Page 58 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 58 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report with prior evaluations – as well as 2024 AESC counterfactual six, given its much closer applicability to a behind the meter storage program like ESS. Table 5-7 lists the avoided costs sources used by the benefit-cost model to monetize program utility system benefits. Table 5-7 includes the estimates and input selections used from both the latest AESC released in February 2024 (2024 AESC) in addition to the AESC released in 2021 (2021 AESC). The 2024 AESC is used only to monetize the estimated energy system benefits associated with program installs in 2025, 2026, and 2027. In prior evaluations, the ESS program evaluated costeffectiveness using counterfactual one in the 2021 AESC for systems installed 2022-2027; however, given the availability of updated avoided cost estimates, the BCA uses both the 2021 AESC under counterfactual one and the 2024 AESC under counterfactual one and counterfactual six. Guidehouse continues to use the 2021 AESC for systems installed in 20212024, because due to its release in 2024, the 2024 AESC only provides avoided cost estimates for systems installed in 2024 and onwards. In addition to updated avoided cost estimates, the 2024 AESC introduces two new counterfactuals not present in the 2021 AESC, counterfactual five and counterfactual six, the latter of which was designed uniquely to model the impacts of behind the meter storage. In this evaluation, results are presented using both 2024 AESC counterfactual one – for consistency with prior evaluations – as well as 2024 AESC counterfactual six, given its much closer applicability to a behind the meter storage program like ESS. Table 5-7. Sources of Avoided Costs used in the BCA Utility System Benefit Category Avoided Energy Avoided Generation Capacity Avoided Pooled Transmission Facilities Reliability Intrastate DRIPE Energy Rest-of-Pool DRIPE Energy Intrastate DRIPE Capacity Rest-of-Pool DRIPE Capacity Intrastate Cross-DRIPE Rest-of-Pool CrossDRIPE Non-Embedded Emissions Avoided Transmission Capacity Avoided Distribution Capacity Avoided Cost Source(s) 2021 AESC: AppdxB of “AESC 2021 User Interface – CF1.xlsb,” Updated August 30, 2021, available here: https://www.synapseenergy.com/project/aesc-2021-materials. Input selections: • Connecticut • Counterfactual #1 • Default presets • New England MAC (electric sector) GHG cost basis • 8% wholesale risk premium • 9% energy losses • 16% peak demand losses • $73 value of lost load • 2% inflation rate 2024 AESC: AppdxB of “AESC 2021 User Interface – CF1.xlsb,” and “AESC 2021 User Interface – CF6.xlsb,” Updated February 7, 2024, available here: https://www.synapse-energy.com/aesc2024-materials. Input selections: • Connecticut • Counterfactual #1 and #6 • Default presets • New England MAC (electric sector) GHG cost basis • 8% wholesale risk premium • 9% energy losses • 16% peak demand losses • $61 value of lost load • 2.25% inflation rate 2022-24 Connecticut Conservation & Load Management Plan: Figure 5-A of “Final 2022 2024 Plan to EEB (9-2-21).pdf,” available here: https://app.box.com/s/43qlddtxd0cxg4z9z4iaon4k0fc1utbh Information for the sole benefit and use of Connecticut Green Bank Page 54
  9. Page 59 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 59 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Source: As identified by Guidehouse in Connecticut Green Bank 17-12-03RE03 Order 7 compliance refile under Docket 21-08-05, 10/4/2021 5.3 BCA Metrics This section presents overall program, residential, and C&I results for six cost-effectiveness metrics31 calculated by the benefit-cost model for the 2022-2024 program cycle. Figure 5-1 and Figure 5-2 show results for the overall program. Assuming counterfactual one within the 2024 AESC, the RIM is now below the 1.4 target, and the PCT remains below 1. However, assuming counterfactual six, utility benefits are significantly greater, causing the RIM to go well above the 1.4 target. Utility benefits are not an element of the PCT, and for this reason, the PCT remains below one under either counterfactual. As described in the year two evaluation, the PACT and CTET are essentially the same at the program level given that benefits from reduced arrearages benefits are assumed to be negligible, and that greenhouse gas emissions are estimated to have a minor. For the same reasons, the SCT and TRC are essentially the same as well. Figure 5-1. Overall Program BCA Results using AESC 2024 Counterfactual One Source: Guidehouse analysis 31 See Table 5-1 for cost test definitions. Information for the sole benefit and use of Connecticut Green Bank Page 55
  10. Page 60 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 60 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Figure 5-2. Overall Program BCA Results using AESC 2024 Counterfactual Six Source: Guidehouse analysis Figure 5-3 and Figure 5-4 show BCA results for the residential portion of the program. As in Figure 5-1, Figure 5-2, and Figure 5-3, assuming counterfactual one within the 2024 AESC, the residential RIM is now below the 1.4 target, and the PCT remains below 1, while the RIM under counterfactual six is above 1.4. Additionally, the residential BCA is below the program-wide BCA for all evaluated ratios, indicating that the residential program is driving down overall metrics. Figure 5-3. Residential Program BCA Results using AESC 2024 Counterfactual One Source: Guidehouse analysis Information for the sole benefit and use of Connecticut Green Bank Page 56

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)