Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

4 pages match
  1. Page 8 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 8 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table ES-2. Total Power Capacity (MW) by Project Status Utility Customer Type Project Status as of March 31, 2024 Submitted1 Approved2 Complete3 Total4 Residential Standard 0.15 0.98 1.17 2.30 Residential Underserved 0.00 0.11 0.06 0.17 Residential Low-income 7.68 0.00 0.03 0.03 Residential Subtotal 0.16 1.09 1.26 2.50 Small C&I 0.00 3.96 0.13 4.59 Medium C&I 0.00 11.32 0.00 11.32 Large C&I 0.00 53.88 0.25 54.13 C&I Subtotal 0.50 69.16 0.38 70.03 Eversource Subtotal 0.66 70.25 1.63 72.53 Residential Standard 0.00 0.10 0.06 0.16 Residential Underserved 0.00 0.92 0.03 0.95 Residential Low-income 0.00 0.00 0.00 0.00 Residential Subtotal 0.00 1.02 0.09 1.11 Small C&I 0.00 0.00 0.00 0.00 Medium C&I 0.63 6.17 0.00 6.79 Large C&I 0.00 4.45 0.00 4.45 C&I Subtotal 0.63 10.62 0.00 11.24 United Illuminating Subtotal 0.63 11.63 0.09 12.35 Total Power Capacity: Residential (MW) 0.16 2.11 1.35 3.61 Total Power Capacity: C&I (MW) 1.13 79.77 0.38 81.27 Total Power Capacity (MW) 1.28 81.88 1.72 84.89 Eversource United Illuminating Note: Within the ESS program, there is a system enrolled at a mixed-use multifamily apartment building, with both residential occupants and commercial space. The project is considered a “hybrid” and classified as both residential and C&I within the program. The hybrid housing project is made up of 161 residential underserved participants and one large C&I participant benefitting from a single energy storage system. In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. More detail on the hybrid housing project can be found in Section 3.1.5. 1. “Submitted” projects have documentation turned in to the Green Bank but have yet to be approved. 2. “Approved” projects have been reviewed by the Green Bank, and documentation has either been confirmed or is being inspected. 3. “Completed” projects are approved, installed, and energized, and are either being verified or already verified within DERMS. 4. Totals given are the sum of submitted, approved, or complete projects, and do not include any cancelled projects. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 4
  2. Page 9 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 9 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table ES-3 displays the total power capacity in MW of submitted, approved, and complete projects as of March 31, 2024. Additionally, a total is provided, summing across these three stages. Only the energy capacity of complete projects was used (i.e., 1.3 MW of Residential capacity and 0.4 MW C&I capacity) in calculating the percentage of complete capacity relative to goal as of March 31, 2024. Although the capacity of approved projects for C&I is 80 MW, exceeding the 2024 C&I program goals, these projects were not completed within the 20222024 cycle. Table ES-3. Progress Made Toward Program Capacity Goals Customer Type Project Submitted (MW) Residential C&I Total (MW) Program Goals (20222024) (MW) Percentage of Complete Capacity Relative to Goal as of March 31, 20241 1.3 3.6 50.0 2.7% 0.4 81.3 50.0 0.8% Project Approved (MW) Project Complete (MW) 0.2 2.1 1.1 79.8 Note: Within the ESS program, there is a system enrolled at a mixed-use multifamily apartment building, with both residential occupants and commercial space. The project is considered a “hybrid” and classified as both residential and C&I within the program. The hybrid housing project is made up of 161 residential underserved participants and one large C&I participant benefitting from a single energy storage system. In order to accurately reflect the impact of the hybrid housing project, all 162 participants are counted individually within their respective subcategories (i.e., 161 participants are counted under residential underserved, and one is counted under large C&I). Capacity for the hybrid housing project has been fractionalized with 47% of capacity classified under the 161 residential underserved participants and 53% of capacity classified under the single large C&I participant. As of March 31, 2024, the hybrid housing project is “Approved” but not yet “Complete.” More detail on the hybrid housing project can be found in Section 3.1.5 1. In aggregate, the cumulative capacity of submitted, approved, and complete projects accounts for 7.2% and 162.5% of program goals for Residential and C&I capacity respectively. Source: Guidehouse analysis of Connecticut Green Bank program tracking data as of March 31, 2024 Information for the sole benefit and use of Connecticut Green Bank Page 5
  3. Page 10 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 10 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 1. Introduction 1.1 Program Background and Objectives In 2021, Public Act 21-53 established statewide energy storage goals of 1,000 MW by 2030, with interim goals of 300 MW by 2024 and 650 MW by 2027. In Docket No. 17-12-03RE03, based on stakeholder feedback, the Public Utility Regulatory Authority (PURA) established the statewide ESS with a 2030 goal of 580 MW of behind the meter storage capacity and an interim goal of 100 MW by 2024 to be divided evenly between residential and C&I sectors. The goals of the program, as stated in Docket No. 17-12-03RE03, are to: • Produce positive net benefits to all ratepayers, • Provide electrical grid benefits including resilience, peak shaving and ancillary services, • Foster the sustained, orderly development of a state-based electric energy storage industry, • Provide resilience benefits to customers in environmental justice communities or experiencing economic hardships, • Reduce barriers to entry for storage deployment in Connecticut, • Maximize the long-term environmental benefits with respect to emissions reductions, and • Maximize benefits to ratepayers derived from the wholesale capacity market. The program is collectively implemented by the Connecticut Green Bank (Green Bank) and the state’s electric distribution companies (EDCs), Eversource Energy (Eversource) and United Illuminating (UI) (collectively, the Program Administrators) and provides upfront and performance-based incentives for residential and C&I storage systems for customers in Connecticut. The upfront incentive is administered by the Connecticut Green Bank and is structured as a declining block incentive, which may be adjusted at the beginning of each three-year program cycle through 2030.4 5 The upfront incentive is passed onto the customer as a reduction in total system cost. Within the residential incentive block, residential low-income customers6, which includes multifamily affordable housing, and customers in underserved communities7 are eligible for higher upfront incentives for systems. To qualify for this incentive, participants must enroll in the passive dispatch program, which requires energy storage systems to provide dispatch during non-holiday weekdays, between the hours of 3 p.m. and 8 p.m. during the summer months of June, July, and August. 4 Public Utilities Regulatory Authority Final Decision under Docket 17-12-03RE03, July 28, 2021, available at: https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07bae185258752007994f7?Open Document 5 Incentives were adjusted prior to the end of the first three-year phase in the Year 3 Final Decision in Docket No. 23-08-05 6 Defined as those with income below 60% of State Median Income (SMI). 7 Defined as communities in distressed municipalities, as defined by CT Department of Economic Community Development (DECD), and multifamily affordable housing. Information for the sole benefit and use of Connecticut Green Bank Page 6
  4. Page 11 of 106Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 11 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report The performance-based incentive is based on the average kW dispatched during active events, which provides a rate of $200 per kW during the summer season8 and $25 per kW during the winter season9 for the first 5 years of a customer’s participation in the program, and $115 per kW during the summer season and $15 per kW during the winter season, from years 6-10 of their participation in the program. Participants receive the performance incentive payments after each performance incentive season, based on the battery system’s average power contribution to the grid during active dispatches. Eversource and UI administer the performance-based incentives. For applications submitted prior to 2023, customers on the grid edge10, critical facilities11, C&I customers replacing existing fossil fuel generators, and small businesses were eligible to retain and monetize their capacity rights as an additional effective incentive. However, in the Final Decision under Docket No. 22-08-05, PURA authorized the program to prohibit projects that were submitted prior to January 1, 2023 from participating in the forward capacity market (FCM) .12 In exchange, effective January 1, 2023, PURA authorized a new 50% upfront incentive adder for residential projects and a 25% upfront incentive adder for C&I projects for eligible customers located on the grid edge, eligible critical facilities, eligible small businesses, and eligible customers replacing a fossil fuel generator.13 In the Final Decision under Docket No. 23-08-05, PURA increased the Tranche 1 residential upfront incentive levels for all customer types to address low residential participation in the program. The Decision raised upfront incentives for residential standard incentive by 1.25 times and by 1.5 times for underserved and low-income customers. PURA also authorized an increase in the upfront incentive level cap for residential projects from $7,500 to $16,000. All changes were effective immediately as of the date of the Final Decision of November 29, 2023. PURA chose not to raise commercial incentives at the time of the Final Decision. 1.2 Program Metrics Overview The Program Administrators submitted program metrics to PURA for approval in December 2021,14 including program tracking metrics, evaluation metrics, and benefit-cost analysis (BCA). Guidehouse will report progress on the program metrics as part of annual and program cycle reporting. 8 9 Defined as June-September during the hours of 12 pm to 9 pm. Defined as November-March during the hours of 12 pm to 9 pm. 10 Defined as (1) the top ten percentage of circuits with the highest number of outages per customer during major storms since July 1, 2012, and (2) the top ten percentage of circuits with the longest outages due to major storms since July 1, 2012. 11 Defined according to Conn. Gen. Stat. § 16-243y(a)(2), as well as known facilities that were designated essential by the DECD pursuant to Governor Lamont’s Executive Order 7H. 12 Public Utilities Regulatory Commission Final decision under Docket No. 22-08-05, December 21, 2022, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5494c093c39b7f308525891f00571bba?OpenDoc ument 13 Public Utilities Regulatory Commission Final decision under Docket No. 22-08-05, December 21, 2022, available at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5494c093c39b7f308525891f00571bba?OpenDoc ument 14 Evaluation Metrics, Methodology, and Data Requirements for Energy Storage Solutions. December 15, 2021, available at: http://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/f0dcf43648974eb8852587ac00776b07/$FILE/2108-05%20Attachment%201%20-%20ESS%20Evaluation%20Metrics_20211215.pptx Information for the sole benefit and use of Connecticut Green Bank Page 7
  5. Page 12 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 12 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 1-1 describes the program tracking metrics, Table 1-2 provides the evaluation metrics, and Table 1-3 provides the BCA metrics.15 The program tracking metrics that Guidehouse used for this program cycle evaluation are presented in Section 3, evaluation metrics are presented in Section 4, and BCA metrics are presented in Section 5. Table A-1 provides the original data fields from the Green Bank that Guidehouse used to compile and segment the data tables. Table 1-1. ESS Program Metrics Program Tracking Metric Original Metric Name December 2021 PURA Submission, or New ESS Participants Number of Program Participants Total number of energy storage system participants, and percentage of the total, segmented by utility and customer type. Share of LowIncome & Underserved Residential Participants Incentive Adder Receipt Percentage of customers receiving either underserved or lowincome incentive adders, both by number of participants and nameplate capacity. Customers are considered underserved if located in a municipality listed on the Connecticut Department of Community Development as distressed. Customers are considered low-income if they are at or below 60% of the State Median Income. Indication of Participation in the ISO-NE FCM for C&I Participants FCM Participation Percentage of customers participating in FCM, both by number of participants and nameplate capacity. Results are segmented by Not Qualified, Qualifies for FCM but not bidding, and Qualified for FCM and bidding. Project Approval Rates Program Approval Rates Percentage of unique applications that apply for the program that are advanced through Approved enrollment status, still in Submitted status, or have been cancelled, all divided by total unique applicants. Average Days to Approve Project Application Average Time to Approval Average difference in days from Application Date to Approval Date by application. Table 3-6 Share of Energy Storage Paired with PV Added since 2021 submission Count and percentage of participants, systems, and kWh paired with PV segmented by utility and customer type. Table 3-7 Total Allocated Power / Energy Capacity by Project Status (by kW and kWh) Installed Capacity (number of units, kW and kWh) Total nameplate storage system capacity (kW) and rated energy (kWh), based on manufacturer specifications, segmented by utility, customer type, and application status. Average Project Size Average System Size Average electric storage system nameplate capacity (kW) and rated energy (kWh) per participant. Description Table # Table 3-2 Table 3-3 Table 3-4 Table 3-5 Table 3-8 Table 3-9 Table 3-10 15 In April 2022, CT DEEP published Updates to Connecticut Conservation and Load Management Cost Effectiveness Testing which introduces the Connecticut Efficiency Test (CTET) as a screening tool that aligns with state policy priorities. In response, Guidehouse added the CTET as a benefit-cost metric for 2023. Information for the sole benefit and use of Connecticut Green Bank Page 8
  6. Page 13 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 13 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Program Tracking Metric Original Metric Name December 2021 PURA Submission, or New Description Number of Systems and Batteries by Storage Type Number of Systems per Storage Type Number of storage systems by unique model (manufacturer + model). Note that that one customer may have multiple storage systems, and each of these systems will be counted individually. Number of Approved or Completed Application by Contractor Added since 2021 submission Count of applications either approved or completed, segments by residential or C&I, and contractor. Program Administrative Costs ($) Program Administrative Costs ($) Total Upfront Incentive Encumbered ($) Incentives Encumbered and/or Disbursed Total upfront incentives to all program participants. Average Total Project Incentive ($/participant) Average Project Incentive Average of upfront and performance-based incentives per program participant. Average Project Cost ($/participant) Average Installed System Cost Total storage system installed costs ($) divided by total participants. For customers with PV-paired systems, costs will be reported for whole system cost as provided data allows. Total System Costs by System Size ($/kWh and $/kW) Installed Storage System Cost per System Size Total storage system installed costs ($) divided by total nameplate system capacity (kW) and by total system rated energy (kWh), separately. For customers with newly-installed PV-paired systems, costs will be reported for whole system cost as provided data allows. Table 3-18 Battery Costs by System Size ($/kWh, $/kW) Added since 2021 submission Battery and storage installed costs ($) divided by total nameplate system capacity (kW) and total system rated energy (kWh), separately. Table 3-19 Costs incurred by the Program Administrators to manage the program. Includes cost for both EDCs and the Green Bank. Segmented by program administrator, and additionally subsegmented into IT, marketing, personnel, and EM&V Table # Table 3-11 Table 3-12 Table 3-13 Table 3-14 Table 3-15 Table 3-16 Source: Guidehouse summary of Energy Storage Systems Evaluation Metrics Submitted to PURA on December 15, 2021 Information for the sole benefit and use of Connecticut Green Bank Page 9
  7. Page 14 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 14 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 1-2. Evaluation Metrics Evaluation Metrics Original Metric Name December 2021 PURA Submission, or New Description Units Average Power per Event Average Power per Event Average storage system power output for each dispatch event, both per participant and in aggregate kW/participant MW/program Active Event Participation Active Event Participation Number of participants in each active event divided by the participants in Active or Active+Passive programs at the time of the event, as a percentage, averaged over the course of a season (weighted by number of participants at the time of the event) % Battery Energy Availability Battery Energy Availability Average available storage system energy during the first telemetry interval of active events or backup power events, as weighted average % state of charge, per participant, and in aggregate % kWh/participant MWh/event Seasonal Average Power Seasonal Average Power Average storage system power output for all dispatch events over all event hours over the course of a season, both per participant and in aggregate kW/participant MW/event Coincident Peak Power per Event Peak Power per Event Average storage system power output during the peak hour(s) identified by ISO-NE,1 both per participant and in aggregate kW/participant MW/program Coincident Peak Seasonal Average Power Peak Seasonal Average Power Average storage system power output during the on peak demand resource hours identified by ISO-NE,2 both per participant and in aggregate kW/participant MW/program Peak Targeting Percentages Peak Targeting Percentage of active events that are aligned with the ISO-NE daily peak, the seasonal peak, and the annual peak. Note that Eversource and UI may call events at different times, so this metric is EDC-specific % Battery Availability (Uptime) Battery Availability (Uptime) Percentage of telemetry intervals where storage systems are available based on status during the first interval of dispatch events or backup power events % Solar Energy Used Solar Energy Used Sum of solar energy produced during times when storage systems are charging, in aggregate, divided by total solar output % Estimated Bill Savings Estimated Bill Savings Product of Impact Load shape and average energy rates by hour $ $/participant Avoided Emissions (CO2, NOx, SOx) Avoided Emissions (CO2, NOx, SOx) Total net emissions reduction of CO2, NOx, and SOx based on the EPA AVERT model3 and AESC 20214 marginal emissions Tons CO2 Tons NOx Tons SOx Instances Battery Provided Backup Power Instances Battery Provided Backup Power Count of outage events when the storage remained operating # Energy Discharged during Outage Energy Discharged during Outage Sum of each participant’s difference of storage system energy at the start and end of backup power events kWh/outage Information for the sole benefit and use of Connecticut Green Bank Page 10
  8. Page 15 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 15 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 1. As identified at: https://www.iso-ne.com/isoexpress/web/reports/load-and-demand/-/tree/ann-sys-peak-day-hr-load 2. As identified at: https://www.iso-ne.com/markets-operations/markets/demand-resources/about 3. EPA’s Avoided Emissions and Generation Tool (AVERT), available at: https://www.epa.gov/avert 4. Avoided Energy Supply Costs in New England 2021, published May 2021, available at: https://www.synapseenergy.com/project/aesc-2021-materials Source: Guidehouse summary of Energy Storage Systems Evaluation Metrics Submitted to PURA on December 15, 2021 Information for the sole benefit and use of Connecticut Green Bank Page 11
  9. Page 16 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 16 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report Table 1-3: BCA Metrics Benefit-Cost Analysis Metrics1 Ratepayer Impact Measure (RIM) Test Benefits Utility System Impacts2 Costs Participant Bill Savings Program Incentives Program Administration Participant Cost Test (PCT) Non-Energy Impacts3 Avoided Backup Generator Participant Bill Savings Program Incentives Incremental DER Costs Program Administrator Cost Test (PACT) Utility System Impacts2 Program Incentives Program Administration Societal Cost Test (SCT) Utility System Impacts2 Societal Impacts4 Non-Energy Impacts3 Program Administration Incremental DER Costs Total Resource Cost (TRC) Test Utility System Impacts2 Program Administration Incremental DER Costs Utility System Impacts2 Societal Impacts (Non-Embedded Emissions Only) Non-Energy Impacts (Reduced Arrearages Only) Program Incentives Program Administration Connecticut Efficiency Test (CTET) 5 1. Ratios and associated benefits and costs, for total program and by customer class (Residential, C&I) 2. Includes: Avoided Energy; Avoided Generation, Transmission, and Distribution Capacity; Reliability; DRIPE Energy and DRIPE Capacity; Cross-DRIPE; Market Revenue; Avoided Ancillary Services 3. Impacts applied to participant and/or society as appropriate 4. Includes: Non-Embedded Emissions; Job Creation 5. Guidehouse added the CTET in this report. In April 2022, CT DEEP published Updates to Connecticut Conservation and Load Management Cost-Effectiveness Testing which introduces the CTET as a screening tool that aligns with state policy priorities. This metric was not included in the metrics submitted to PURA in December 2021. The CTET is equivalent to the PACT with nonembedded emissions and reduced arrearages added as benefits. Source: Guidehouse summary of Energy Storage Systems Evaluation Metrics Submitted to PURA on December 15, 2021, and the new CTET metric 1.3 Final Report Requirements and Objectives In accordance with Docket 17-12-03RE03, the goal of this report is to summarize the results of the first three-year cycle of the ESS program, including updates on program tracking metrics, evaluation metrics, and the BCA. This report will also provide information on research conducted regarding barriers to participation in the residential program. Using insights from the program metrics and the research findings, the final section will provide key findings of this first program cycle and program recommendations for the next three-year cycle. 2. Data Sources and Data Review This section describes the data sources used for this evaluation and the steps taken to prepare the data for analysis. The data sources used include: program tracking data, event data, outage data, and program cost data from the PAs, and interval energy data from the DERMs provider. All data, unless otherwise noted, is through March 31, 2024. Information for the sole benefit and use of Connecticut Green Bank Page 12
  10. Page 17 of 106

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 25 Page 17 of 106 Connecticut Energy Storage Solutions – Final Evaluation Report 2.1 Data from Program Administrators • Program Tracking Data: Encompasses project identification, customer characteristics, system characteristics, system cost details, and updates. Provided by Connecticut Green Bank. Further detail can be found in Table A-2. • Event Data: Information on all active events such as date, start time, stop time, and OEMs called, that Eversource and UI called throughout the event season. • Outage Data: One row for each instance of a participant enrolled in the program being affected by an outage. The data fields included the geographic zone of the outage16, the outage ID, the duration of the outage, and the start and end time. • Program Cost Data: Included “actual” non-incentive program costs identified as of Q1 2024, as well as projected non-incentive program costs associated with ESS, aligned with previous filings with PURA. Provided by each PA. 2.2 Data from OEMs • Interval Energy Data: One row per time, date, and unique device ID indicating cumulative energy (dis)charging, average power (dis)charging, and the stored energy both in kWh and as a percentage of total for the battery storage system and cumulative energy (dis)charging, average power (dis)charging, and the stored energy both in kWh and as a percentage of total for the site. 2.3 Data Review Guidehouse addressed several discrepancies in the data to prepare it for analysis including: correcting OEM- specific variations in time zone, removing rows with exact duplicate readings correcting OEM – specific variations in sign conventions for battery power, aggregating rows with sub-15 minute interval energy readings, removing rows that do not align with enrollment data, removing rows outside of the enrollment range, either before the accepted date or after the unenrolled date, removing conflicting energy interval data observations for the same period, removing outliers (i.e. , rows with a reading greater than 105% of nameplate capacity). In total, completion of the QC steps outlined above reduced the raw data set by 36% through converting data from 5-minute to 15-minute intervals, 20% through removing exact duplicates, 15% through removing data outside of the device’s enrollment period, 5% through removing values with differing readings, and >1% through removing dispatch outliers. Utilizing a mapping file provided by the DERMs provider to bridge different identification conventions across the energy interval data and program tracking data, Guidehouse was able to pair all cleaned energy interval data with its relevant program tracking data by battery UUID apart from a single 16 Geographic information includes the state, region (e.g., eastern/western), area work center, and town. Information for the sole benefit and use of Connecticut Green Bank Page 13

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)