Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

19 pages match
  1. Page 17 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 17 of 78 2.1. Data from Program Administrators The following data was provided by the Program Administrators: • • • • • • Program Enrollment Data. This dataset, from the Green Bank’s tracking database, provides details on systems participating or intending to participate in the ESS Program. Fields include detailed system characteristics, customer information, cost data, and dates of relevant milestones. The data is derived from the same Green Bank database used for most of the metrics included in the Energy Storage Solutions Performance Report.11 Program Administration Costs. This data is reported separately by each Program Administrator. For benefit cost analysis (BCA), projections of future program administration costs were also provided. Outage Data. Eversource and UI provided data on outages that affected ESS participants, detailing each outage instance and duration by affected customer. Outage Protection Data. Some BESS equipment includes functionality that automatically overrides participation in incentive programs (like ESS) when there is a weather event that could lead to outages. This functionality allows systems to maintain a higher state of charge in anticipation of possible outages, so that they can provide backup power if the outages arise. For the evaluated period, data was made available for Enphase, Franklin, and Generac systems, but no other OEMs provided this data. Given that this data is not available for all participating OEMs and that there are differences in how values are reported, metrics specifically related to these datasets are not included in this report. Performance Incentive Data. Eversource and UI provided data summarizing payments made to systems for their active event performance during Summer 2025 and Winter 2025/2026. Active Event Data. Eversource and UI provided a list of active events that occurred during Summer 2025 and Winter 2025-2026.12 2.2. Telemetry Data Telemetry data provides information on the performance of resources, including fields such as project ID and ESS project ID, charging/discharging energy, battery state of charge and/or stored energy, and solar PV production if available. The Program Administrators made telemetry available for the period of January 2024 through June 2026. For the previous Annual Report, most telemetry data evaluated by CES came directly from distributed energy resource management system (DERMS) providers with minimal processing, or, in some instances, directly from original equipment manufacturers (OEMs). For this Report, all telemetry data evaluated by CES was provided by the Green Bank through new data-sharing agreements with the DERMS providers. Many of the data quality considerations and processing steps identified in the previous year’s report are addressed by the Green Bank before https://energystoragect.com/ess-performance-report/. Slight variations in the fields used to calculate metrics and data entry and edits make replicating the exact figures in this report from the Performance Report challenging. 12 This data is also available here: https://energystoragect.com/contractor-resources/; see “ESS Summer 20XX / Winter 20XX-20XX Events List” documents 11 16 | P a g e
  2. Page 18 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 18 of 78 the data was provided to CES. This has noticeably improved the quality of the data evaluated by CES. 2.3. Data Review 2.3.1. Program Enrollment Data There were relatively few issues identified with the enrollment data. Most challenges related to ensuring a consistent interpretation of edge cases (e.g., sites where additional battery capacity was added) and to the completeness of the data set. On the latter question, based on discussions with the Green Bank, most data completeness questions are tied to projects that were transferred from ConnectedSolutions to ESS and to Active Only or Construct 5 projects where customers used a “self-enrollment” approach, primarily Tesla customers. In both of these cases, the Green Bank did not have access to full ESS enrollment details, leading to missing fields. In some cases, the Program Administrators were able to layer additional fields in from other data sources (e.g., PowerClerk); while drawing information for a given field from different data sources may lead to inconsistency in the data, having some data is still more helpful than none. There were also cases in which key fields for some projects are unavailable. For example, installed costs are available for few of the Active Only projects. For tables drawing on enrollment data (primarily within Section 3), records that were missing relevant data were eliminated from the table. As a result, totals (e.g., total project count) will vary across different tables. 2.3.2. Telemetry Data In general, the quality of the telemetry data has improved substantially relative to data reviewed for the previous annual report. CES implemented a series of quality control checks that evaluated the following (as well as other checks not listed): • • • • • Overall volume of missing values For stored energy field, instances of missing values or 0 kWh during the interval at the beginning of an event Sign reversal (i.e., energy discharge recorded as a positive value instead of a negative value) Comparison of maximum kW and stored kWh values in the telemetry data against nameplate capacity values in the enrollment data Comparison of kW charge/discharge, kWh charge/discharge, and stored energy fields in the telemetry data, looking for consistency across these three fields The nature of the data quality issues varied significantly. Some were intermittent and had straightforward explanations (e.g., missing data for isolated periods, likely due to connectivity issues). Some issues were harder to explain, such as isolated periods in which kW charge/discharge, kWh charge/discharge, and stored energy fields did not move in tandem. Other issues were more structural, including instances in which telemetry data regularly indicated kW discharged or stored kWh that exceeded nameplate values. CES engaged the Program Administrators to resolve as many of the identified issues as possible. CES is aware that the Program Administrators regularly work with DERMS providers and OEMs to address data quality issues; many of the issues identified by CES had already been identified by the Program Administrators. 17 | P a g e
  3. Page 19 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 19 of 78 Of the issues remaining in the evaluated telemetry data, CES determined that it was not feasible to reliably resolve the data quality issues; instead, CES excluded data that triggered quality control flags. This resulted in the removal of approximately 4% of telemetry data occurring during days with an Active or Passive event from the evaluated data set. 2.4. Findings and Recommendations CES has identified the following findings and recommendations related to data collection, sharing, and processing. As indicated above, CES noted improvements in data quality and collection process relative to last year. Table 2-1. Data Availability and QC Findings and Recommendations Finding Recommendation CES identified instances in which projects consistently reported max kW discharged or stored kWh in the telemetry data that exceed nameplate values. CES is aware that this is a question that the Program Administrators have raised with DERMS providers and OEMs. The Program Administrators should continue to engage with DERMS providers and OEMs to resolve this issue. To the extent that a satisfactory explanation or adjustment to the data cannot be made by the DERMS providers and/or OEMs, the Program Administrators should consider scaling telemetry values (particularly the kW discharged field, given that it determines performance payments) to ensure that telemetry values match nameplate values. The Program Administrators should continue to push DERMS providers to implement more rigorous and CES is aware that the Program proactive quality control. While OEMs also play a Administrators often identify data quality critical role in maintaining high-quality data, the issues before OEMs or DERMS providers. DERMS providers are best positioned to provide ongoing, proactive quality control. Source: CES analysis 3. Program Tracking Metrics Program tracking metrics, related findings, and recommendations are presented in this section. 3.1. Program Tracking Categorization Project categories, which guide the interpretation of the metrics in this section, are provided below. 3.1.1. Project Stage Categories Metrics in this section are filtered by, and, in many cases, differentiated by project stage. A summary of the project stage categories is presented below. 18 | P a g e
  4. Page 20 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 20 of 78 Table 3-1. Project Stage Categories Program Tracking Status Approved Cancelled Definition Project has been reviewed by the Green Bank and all submitted project information and documentation are correct or has been previously sent back for additional information/edits. Project has been cancelled and removed from the submitted, approved, or completed stage, by the contractor and/or Green Bank. Unless otherwise specified, these projects have been excluded from the metrics in this section. Completed Project has been approved, installed, energized, and has either been verified in the DERMS platform, or is in the process of doing so. Pipeline Project application has been initiated, but not yet completed. Unless otherwise specified, these projects have been excluded from the metrics in this section. Submitted Project has submitted all required documentation but is not yet approved. Note: The underlying data also includes an “Inspection” stage. For the purposes of program tracking metrics, CES has included these projects in the “Approved” stage. Source: Connecticut Green Bank 3.1.2. Project Unit Definitions Program tracking metrics provided in this section are based on definitions that align with the structure of the Green Bank database from which the underlying data is derived. • • • • Application. An application is associated with a single submission for an upfront incentive and is associated with a specific “system”. System or Project. A system represents all ESS-enrolled battery storage hardware at a single customer site (generally, behind a single customer meter). In this report, the term “project” also refers to a “system”. Battery Unit. The Green Bank collects information about individual pieces of hardware associated with a single “system.” This may include multiple integrated BESS, separate storage banks and inverters, or other combinations of hardware. Multiple battery units may be associated with a single “system”. Participant. A participant is associated with a specific applicant (or, after the project is completed, operational project). A Participant has a one-to-one relationship with an “application” and “system.” 3.1.3. Residential Categories Residential systems are categorized within one of the three segments, described in Table 3-2 below. 19 | P a g e
  5. Page 21 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 21 of 78 Table 3-2. Residential Project Categories Residential Segment Low-Income Underserved Standard Definition Includes projects at the site of households with incomes below 60% of state median income as well as multifamily affordable housing, based on PURA’s Final Decision in Docket No. 23-08-0513. Projects located within distressed municipalities, as defined by the Connecticut Department of Economic Community Development (DECD). 14 All projects that do not qualify as Low-Income or Underserved. Source: ESS Program Manual. 15 Some projects qualify as both Low-Income and Underserved; these projects receive the LowIncome incentive and are categorized as Low-Income in this report. This is the same approach to determining the appropriate incentive level for a project. In its Final Decision in Docket No. 1712-03-RE03,16 PURA directed the Program Administrators to seek a goal of 40% of residential projects qualifying as Low-Income or Underserved. 3.1.4. C&I Categories Commercial customers fall within one of three categories based on peak demand, defined in Table 3-3. Annual peak demand is defined as the highest peak demand billed for the 12 months prior to application to the ESS program. Applicants may choose to enroll projects with a rated power capacity that exceeds their annual peak demand, with a limit of the greater of 150% of the customer’s annual peak demand or 2 MW. In these instances, their upfront incentive or enrollment incentive is prorated.17 13 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/d7b4cb81bf3765ea8 5258a7600551890/$FILE/230805-112923.pdf 14 A more complete description of eligibility criteria for being identified as a Distressed Municipality, as well as a current list of Distressed Municipalities, is available from the Department of Economic and Community Development, here: https://portal.ct.gov/decd/content/about_decd/research-andpublications/02_review_publications/distressed-municipalities 15 https://energystoragect.com/wp-content/uploads/2025/01/ESS-Program-Manual-01172025-CleanFINAL.pdf 16 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07ba e185258752007994f7?OpenDocument 17 An illustration of how this prorating works is available in the incentive calculators available here: https://energystoragect.com/contractor-resources/ 20 | P a g e
  6. Page 22 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 22 of 78 Table 3-3. Commercial Project Categories C&I Segment Annual Peak Demand Small Commercial Medium Commercial Large Commercial Below 200 kW 200 kW-500 kW Greater than 500 kW Source: ESS Program Manual. As discussed in Section 1, Priority commercial customers are also eligible for higher upfront incentives (Legacy) and Priority commercial customers are eligible for an enrollment incentive under Construct 5 (non-Priority commercial customers are not eligible for any enrollment incentive under Construct 5). 3.1.5. Hybrid Project This report includes a project that serves a building comprising both multi-family affordable housing and non-residential space, referred to as a hybrid project. The project was approved as a single large C&I application, but is designed to benefit both one large C&I participant and 161 residential low-income participants. Based on PURA's Year 3 Final Decision,18 which updated the definition of low-income to include affordable multi-family housing, the project has been categorized as low-income. The Connecticut Green Bank determined that the system's use would be allocated 48% to residential low-income and 52% to large commercial, based on the share of site load serving apartments versus shared commercial functions such as community rooms and a charter school. This same 48% and 52% split is applied in Section 3.2 of this report to allocate system capacity, costs, and incentives between the two program categories. Where applicable, tables in this report indicate whether the hybrid project has been treated as 161 residential projects and 1 commercial project or consolidated as a single commercial project. As the project is under construction, it is not included in any of the telemetry data evaluated in Section 4 of this report. As discussed in the Key Findings and Recommendations section of this report, achieving the target of 40% residential Low-Income and Underserved participation will likely require additional multifamily affordable housing projects to enroll, though no additional multifamily affordable housing projects have enrolled since this project, which enrolled in 2023. 3.2. Program Tracking Metrics The metrics provided below include projects with an application date before June 30, 2026. Following an email from Eversource to approximately 900 residential ConnectedSolutions customers, approximately 328 residential projects were transferred from ConnectedSolutions to the ESS program, receiving the applicable Construct 5 performance incentives. Unless otherwise noted, these projects are included in metrics included in this report. Remaining residential ConnectedSolutions customers will have until December 2027 to transfer into ESS; at that point, any customers that have not decided to transfer will be unenrolled from ConnectedSolutions. 18 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/d7b4cb81bf3765ea8 5258a7600551890?OpenDocument 21 | P a g e
  7. Page 23 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 23 of 78 Table 3-4 provides ESS participants by project stage, utility, and project category. The number of projects in the submitted status is attributable to the relatively short period of time required for the Green Bank to review projects and, if eligibility criteria are met, move them to the approved stage. Relative to the same period last year, the total number of completed projects has approximately tripled. This includes an increase from 458 to 1388 completed residential projects and from 4 to 10 completed commercial projects. The number of approved projects is similar to the same time last year. These values demonstrate that commercial projects continue to progress through the pipeline slowly, while residential projects move from submitted, to approved, to completed relatively quickly, as also demonstrated in Table 3-8. The pace of commercial project completion and the overall expected contribution of commercial projects to ESS goals suggests that the Program Administrators will struggle to meet ESS targets. Currently, UI’s share of total participants, including submitted, approved, and completed (19%) is in line with its projected share (20%). Table 3-4. ESS Participants (Number and Percentage of Total) Utility Customer Type Residential Standard Residential Underserved Residential Low-Income Residential Subtotal Eversource Small C&I Medium C&I Large C&I C&I Subtotal Eversource Subtotal Residential Standard Submitted Project Status as of June 30, 2026 Approved Completed Total 23 (1%) 139 (7%) 1055 (55%) 1217 (63%) 9 (<1%) 33 (2%) 133 (7%) 175 (9%) 0 (<1%) 32 (2%) 69 (4%) 101 (5%) 32 (2%) 204 (11%) 1257 (65%) 1493 (78%) 0 (<1%) 8 (<1%) 4 (<1%) 12 (<1%) 0 (<1%) 17 (<1%) 0 (<1%) 17 (<1%) 0 (<1%) 28 (1%) 3 (<1%) 31 (2%) 0 (<1%) 53 (3%) 7 (<1%) 60 (3%) 32 (2%) 257 (13%) 1264 (66%) 1553 (81%) 5 (<1%) 19 (<1%) 97 (5%) 121 (6%) Residential Underserved 1 (<1%) 27 (1%) 34 (2%) 62 (3%) Residential Low-Income 0 (<1%) 175 (9%) 0 (<1%) 175 (9%) Residential Subtotal 6 (<1%) 221 (11%) 131 (7%) 358 (19%) 0 (<1%) 2 (<1%) 0 (<1%) 2 (<1%) Medium C&I 0 (<1%) 2 (<1%) 3 (<1%) 5 (<1%) Large C&I 0 (<1%) 5 (<1%) 0 (<1%) 5 (<1%) C&I Subtotal 0 (<1%) 9 (<1%) 3 (<1%) 12 (<1%) UI Subtotal Total Number of Residential Participants Total Number of C&I Participants 6 (<1%) 230 (12%) 134 (7%) 370 (19%) 38 (2%) 425 (22%) 1388 (72%) 1851 (96%) 0 (<1%) 62 (3%) 10 (<1%) 72 (4%) Total Number of Participants 38 (2%) 487 (25%) 1398 (73%) 1923 (100%) United Small C&I Illuminating Note: The “Total” column reflects the combined number of submitted, approved, and completed projects, excluding any cancelled and pipeline projects as defined in Section 3.1.1. All percentages are based on the total number of participants across these categories. The hybrid project, detailed in Section 3.1.5, has been counted as 161 participants under United Illuminating’s Residential Low-Income and 1 participant under United Illuminating’s Large C&I, in accordance with program guidance. All other applications are counted as a single participant. 22 | P a g e
  8. Page 24 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 24 of 78 Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026 Table 3-5 shows the share of residential projects by customer type for approved and completed systems. The program is short of the established objective of 40% Underserved and Low-Income projects19 on both a project count (28%) and MW (19%) basis. The total number of Underserved and Low-Income participants (501) is largely attributable to the single, large, affordable multifamily housing project which represents 161 participants. As noted in last year’s report, the program will struggle to meet its Low-Income and Underserved target without additional affordable multifamily projects, though there are no such projects in the queue. This risk is underscored by the numbers: the Low-Income and Underserved participant rate (by count) fell from 38% last year to 28% this year. Table 3-5. Share of Low-Income & Underserved Residential Participants Upfront Incentive Received Standard Underserved Low-Income Underserved or Low-Income Percentage by Expected Installed Capacity (MW) Percentage by Number of Participants 81% 72% 12% 13% 7% 15% 19% 28% Note: Table includes only approved and completed residential systems. Percentages may not total 100% due to rounding. The hybrid project’s capacity, described in Section 3.1.5, has been proportionally allocated to 48% under Residential Low-Income, in accordance with guidance from the Green Bank. This project accounts for 161 participants under the Residential Low-Income category. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. As described in Section 1.2, certain C&I projects with submission dates before January 1, 2023, were eligible to participate in the FCM. Table 3-6 identifies the portion of commercial projects that are qualified for the FCM but are not expected to bid, those that are expected to bid, and those that, per the ESS Program rules, were not eligible to monetize their capacity revenue. Changes from the previous period are driven by changes in total commercial participation, including project cancellations. As noted below the table, per guidance from the Green Bank, projects that are eligible to participate in the FCM but have not affirmatively indicated that they will not participate (i.e., the relevant field in their application has been left blank) are assumed to be intending to participate. Therefore, CES anticipates that the actual number of projects participating in the FCM will be lower than the numbers indicated below. In practice, confirming FCM participation status before projects come online would require direct contact with individual participants. The Program Manual requires that projects eligible to participate in the FCM report to the Program Administrators on an annual basis if they have participated in the FCM. 19 As established in PURA’s Final Decision in Docket No. 17-12-03-RE03 23 | P a g e
  9. Page 25 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 25 of 78 Table 3-6. Indication of Participation in the ISO-NE FCM for C&I Participants Upfront Incentive Received Qualified & Expected to Bid Qualified & Not Bidding Not Qualified Percentage by Expected Installed Capacity (MW) Percentage by Number of Participants 28% 19% 16% 13% 56% 67% Note: This table includes all approved and completed C&I projects, whether or not they qualified to retain capacity rights. “Not Qualified” capacity and participant figures include systems that either failed to meet the eligibility criteria prior to 2023 or were enrolled in 2023 or later. The hybrid project, which does not qualify to retain its capacity rights and is detailed further in Section 3.1.5, has been allocated with 52% of its capacity classified under C&I, as directed by the Green Bank. It accounts for one participant under the C&I category. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. The table below shows counts of applications by project stage, including pipeline applications (application has been submitted but not completed) and cancelled applications. Reasons for cancellations include projects failing to meet eligibility criteria and project sponsors choosing to no longer pursue the project. Residential cancellation rates (as measured by count of canceled applications divided by total count of all statuses included in the table) remain relatively steady. Commercial cancellation rates have increased considerably, however: of the 151 commercial applications (including approved or completed) in the table, 77 (51%) are cancellations; this is up from 25% in last year’s report. This is particularly concerning given that the number of approved or completed commercial projects is unchanged since last year, and the number of pipeline or submitted but not completed commercial projects is down from 11 to 2. 24 | P a g e
  10. Page 26 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 26 of 78 Table 3-7. Project Approval Rates Utility Customer Type Residential Standard Residential Underserved Residential Low-Income Residential Overall Eversource Small C&I Medium C&I Large C&I C&I Overall Eversource Overall Residential Standard Project Status as of June 30, 2026 Approved or Pipeline Submitted Cancelled Complete (Applications) (Applications) (Applications) (Applications) 8% (130/1639) 1% (23/1639) 73% (1194/1639) 18% (292/1639) 10% (23/230) 4% (9/230) 72% (166/230) 14% (32/230) 3% (3/115) 0% (0/115) 88% (101/115) 10% (11/115) 8% (156/1984) 2% (32/1984) 74% (1461/1984) 17% (335/1984) 5% (1/21) 0% (0/21) 57% (12/21) 38% (8/21) 0% (0/43) 0% (0/43) 40% (17/43) 60% (26/43) 0% (0/60) 0% (0/60) 52% (31/60) 48% (29/60) 1% (1/124) 0% (0/124) 48% (60/124) 51% (63/124) 7% (157/2108) 2% (32/2108) 72% (1521/2108) 19% (398/2108) 6% (11/172) 3% (5/172) 67% (116/172) 23% (40/172) Residential Underserved 7% (6/92) 1% (1/92) 66% (61/92) 26% (24/92) Residential Low-Income 0% (0/178) 0% (0/178) 98% (175/178) 2% (3/178) Residential Overall United Small C&I Illuminating Medium C&I 4% (17/442) 1% (6/442) 80% (352/442) 15% (67/442) 0% (0/6) 0% (0/6) 33% (2/6) 67% (4/6) 8% (1/12) 0% (0/12) 42% (5/12) 50% (6/12) Large C&I 0% (0/9) 0% (0/9) 56% (5/9) 44% (4/9) 4% (1/27) 0% (0/27) 44% (12/27) 52% (14/27) 17% (81/469) C&I Overall 4% (18/469) UI Overall Percentage of Residential Applications 7% (173/2426) 1% (2/151) Percentage of C&I Applications 1% (6/469) 78% (364/469) 2% (38/2426) 75% (1813/2426) 17% (402/2426) Percentage of Total Applications 1% (38/2577) 7% (175/2577) 0% (0/151) 48% (72/151) 51% (77/151) 73% (1885/2577) 19% (479/2577) Note: Note that “Canceled” applications does not include projects labeled as “withdrawn,” as withdrawn applications were never officially submitted and/or may have never received a reservation of funds letter. Percentages presented above are based on the number of applications, not the number of participants associated with each application. As such, the hybrid project, detailed in Section 3.1.5, is considered a single Large C&I application for the purposes of this table. Note that withdrawn applications are excluded from the table above. Source: CES analysis of Connecticut Green Bank program tracking data through June 30, 2026. Table 3-8 lends insight into the time required for upfront incentive applications to be reviewed and for projects to achieve commercial operation (complete status). Results are shown by the year in which they were submitted. Note that, for applications submitted through 2022, some of the processing times have changed somewhat, due to project cancellations and other changes to project statuses – an issue with the calculation of processing times for projects with missing data that affected the previous year’s report has also been corrected. Notably, the time to approve residential applications has consistently fallen over time. Days to approve C&I applications have generally decreased over time; time to approve C&I applications is influenced by the need for the Green Bank to seek approval from its Board of Directors for upfront incentives greater than $500,000. The days for residential projects to move to completed status have decreased over time, demonstrating increasing maturity in the residential storage space. There is insufficient data for commercial projects to draw conclusions about changes in the pace of 25 | P a g e

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)