Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

19 pages match
  1. Page 4 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 4 of 78 Figure 5-2. Residential Program BCA ..................................................................................... 73 Figure 5-3. C&I Program BCA ................................................................................................ 74 Figure 5-4. Overall Program BCA - AESC Counterfactual 6 ...................................................... 75 3|Pa ge
  2. Page 5 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 5 of 78 Executive Summary The Energy Storage Solutions (ESS) program, administered by the Connecticut Green Bank, Eversource, and the United Illuminating Company (UI), collectively known as the Program Administrators (PAs), provides incentives to support the development and beneficial operation of behind-the-meter (BTM) energy storage systems in Connecticut. In this report, filed in Docket No. 26-08-05, the Annual Energy Storage Solutions Program Review – Year 6 proceeding, Customized Energy Solutions, Inc. (CES) provides an evaluation of the Program, including program enrollment through June 30, 2026, battery performance through March 31, 2026, benefit cost analysis, and resulting findings and recommendations. This report is the first to be issued since the implementation of Construct 5, as directed by PURA in its Final Decision in Docket No. 26-08-05 – these changes are reflected in the report. Year 6 represents a critical transition period for the ESS Program, reflecting both significant growth in residential deployment and the implementation of Construct 5 program modifications directed by PURA. It is challenging to draw conclusions about the implications of the transition to Construct 5, given how recently it was implemented. At the same time, some early indications are concerning: for example, as of the completion of this report, no new commercial applications have been filed under Construct 5. Given how much commercial projects are projected to contribute to the programs’ overall MW deployment goals, any slowdown in the commercial pipeline will challenge the ability of the program to achieve these program-level goals. As of June 30, 2026, the ESS Program has enrolled 1,885 participants (see Table ES-1), up from 1,000 as of the same date last year. The number of completed projects has nearly tripled, from 462 to 1,398, while the number of approved projects has decreased modestly, from 533 to 487. For residential projects, this decrease is attributable to the number of projects reaching complete status exceeding the number of new enrollments; for commercial projects, canceled projects also contribute to the decrease. Eversource territory accounts for roughly 81% of participants (1,553) and United Illuminating (UI) territory for roughly 19% (370); UI's share is driven substantially by a single affordable multifamily hybrid project, counted as 161 participants. On a capacity basis, submitted, approved, and completed projects total 155.4 MW, of which 21.8 MW (14%) is residential, and 133.6 MW (86%) is C&I. The MW volume of completed projects has also roughly tripled, driven almost exclusively by residential projects. Measured against the Program's 2030 capacity goals, completed residential capacity (17.6 MW) represents 11.7% of the 150 MW residential goal, while completed C&I capacity (1.3 MW) represents just 0.3% of the 430 MW C&I goal, reflecting the continued stagnation of the commercial pipeline discussed below. The performance of enrolled projects during program events also continues to improve, as outlined in Section 4. The Program Administrators have worked with OEMs to substantially improve residential battery performance, yielding improved participation rates, higher state of charge at the beginning of events, and increased percent of available energy discharged during the event. Because performance is driven largely by how OEMs respond to dispatch signals, targeted improvement with a small number of high-volume OEMs has meaningfully improved program-wide results. These improvements are particularly important because the value of distributed battery storage depends not only on installed capacity, but also on the ability of enrolled resources to reliably respond during periods of system need. These improvements have been seen in both active and passive event performance. The Program Administrators have also made progress improving the quality of telemetry data, though data quality challenges, for both enrollment and telemetry data, persist. Continued improvement in telemetry accuracy and data completeness will remain important to ensure reliable performance verification and accurate 4|Pa ge
  3. Page 6 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 6 of 78 quantification and reporting of program benefits. The program continues to evolve with the rollout of the Construct 5 incentive structure, effective April 1, 2026. CES also updated the Program's benefit-cost analysis (BCA). The overall program Ratepayer Impact Measure (RIM) is 1.55, indicating the program continues to provide a net benefit to ratepayers, though this is a modest decrease from the BCA analysis filed in last year’s EM&V report (1.69), driven primarily by changes in projected MW deployment and assumed project costs. The residential BCA shows improvement across all tests: the residential RIM increased to 1.18 and the Participant Cost Test (PCT) improved to 0.81, driven principally by changes (namely, improvements) in projected performance during active events. As with any prospective analysis, the results remain sensitive to assumptions regarding future battery deployment, event performance, avoided system costs, and project economics. Several challenges warrant continued attention. The commercial (C&I) pipeline remains stymied by both a dearth of new applications and the slow pace of approved projects reaching commercial operation, leaving the program far short of its C&I capacity goal. The program also continues to fall short of its target of 40% participation by residential Low-Income and Underserved customers; a single affordable multifamily project accounts for a significant share of the Low-Income participants counted to date. Given current deployment trends, achieving the Program’s 580 MW by 2030 target may require additional program design modifications, market interventions, or other adjustments. At the same time, any additional changes must be weighed against the value of program stability. Overall, Year 6 demonstrates continued progress in residential adoption, meaningful improvements in battery performance during dispatch events, and continued evidence of program cost-effectiveness. However, achieving the Program's long-term objectives will require increased C&I deployment, continued improvement in battery performance and telemetry quality, broader participation among Low-Income and Underserved customers, and successful implementation of Construct 5 enhancements. The tables below, which consider cumulative program capacity through June 30, 2026, provide summary enrollment statistics. More detailed discussion of evaluated metrics, findings, and recommendations is provided in the body of this report. 5|Pa ge
  4. Page 7 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 7 of 78 Table ES-1. Count of Participants by Project Status, Customer Type, and Utility Utility Eversource Customer Type Project Status as of June 30, 2026 Submitted Approved Completed Total 23 (10\0\13) 139 (1\106\32) 1055 (132\612\311) 1217 (143\718\356) Residential Standard 133 (7\103\23) 175 (11\134\30) Residential Underserved 9 (4\0\5) 33 (0\31\2) 0 (0\0\0) 32 (0\31\1) 69 (0\56\13) 101 (0\87\14) Residential Low-Income Residential Subtotal 32 (14\0\18)204 (1\168\35)1257 (139\771\347) 1493 (154\939\400) 0 (0\0\0) 8 (0\8\0) 4 (0\4\0) 12 (0\12\0) Small C&I 0 (0\0\0) 17 (0\17\0) 0 (0\0\0) 17 (0\17\0) Medium C&I 0 (0\0\0) 28 (0\28\0) 3 (0\3\0) 31 (0\31\0) Large C&I 0 (0\0\0) 53 (0\53\0) 7 (0\7\0) 60 (0\60\0) C&I Subtotal Eversource Subtotal 32 (14\0\18)257 (1\221\35)1264 (139\778\347) 1553 (154\999\400) 5 (4\0\1) 19 (0\18\1) 97 (30\65\2) 121 (34\83\4) Residential Standard Residential Underserved 1 (0\0\1) 27 (0\26\1) Residential Low-Income 0 (0\0\0) 175 (0\175\0) Residential Subtotal 34 (11\22\1) 62 (11\48\3) 0 (0\0\0) 175 (0\175\0) 6 (4\0\2) 221 (0\219\2) 131 (41\87\3) 358 (45\306\7) 0 (0\0\0) 2 (0\2\0) 0 (0\0\0) 2 (0\2\0) Medium C&I 0 (0\0\0) 2 (0\2\0) 3 (0\3\0) 5 (0\5\0) Large C&I 0 (0\0\0) 5 (0\5\0) 0 (0\0\0) 5 (0\5\0) 0 (0\0\0) 9 (0\9\0) 3 (0\3\0) 12 (0\12\0) 6 (4\0\2) 230 (0\228\2) 134 (41\90\3) 370 (45\318\7) United IlluminatingSmall C&I C&I Subtotal UI Subtotal Total Number of Residential Participants Total Number of C&I Participants 38 (18\0\20) 425 (1\387\37)1388 (180\858\350)1851 (199\1245\407) Total Number of Participants 38 (18\0\20) 487 (1\449\37)1398 (180\868\350)1923 (199\1317\407) 0 (0\0\0) 62 (0\62\0) 10 (0\10\0) 72 (0\72\0) Note: Values in parentheses are reported as Only Active participants \ Active & Passive participants \ Construct 5 participants, respectively. “Total” column represents the sum of submitted, approved, and completed projects, excluding any cancelled and pipeline projects, as defined in Section 3.1.1. The hybrid project, detailed in Section 3.1.5, is counted as 161 participants under United Illuminating’s Residential Low-Income and 1 participant under United Illuminating’s Large C&I. All other applications are counted as one participant each. Note that the values in this and most tables in this report include projects transferred from ConnectedSolutions, as discussed in Section 3.2. Source: Customized Energy Solutions analysis of Connecticut Green Bank program tracking data through June 30, 2026. 6|Pa ge
  5. Page 8 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 8 of 78 Table ES-2. Total Power Capacity (MW) by Project Status Utility Eversource United Illuminating Customer Type Project Status as of June 30, 2026 Submitted Approved Completed Total Residential Standard Residential Underserved Residential Low-Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal Eversource Subtotal Residential Standard 0.28 2.09 13.87 16.24 0.09 0.39 1.64 2.11 0.00 0.26 0.65 0.91 0.37 2.74 16.16 19.26 0.00 6.09 0.63 6.71 0.00 27.86 0.00 27.86 0.00 86.84 0.51 87.34 0.00 120.78 1.13 121.91 0.37 123.52 17.29 141.18 0.03 0.29 1.08 1.41 Residential Underserved 0.01 0.24 0.32 0.57 Residential Low-Income 0.00 0.58 0.00 0.58 0.04 1.11 1.40 2.55 Small C&I 0.00 0.76 0.00 0.76 Medium C&I 0.00 2.27 0.15 2.42 Large C&I 0.00 8.51 0.00 8.51 0.00 11.54 0.15 11.70 0.04 12.65 1.56 14.25 0.41 3.84 17.56 21.82 0.00 132.32 1.29 133.61 0.41 136.17 18.85 155.43 Residential Subtotal C&I Subtotal UI Subtotal Total Power Capacity: Residential (MW) Total Power Capacity: C&I (MW) Total Power Capacity (MW) Note: The “Total” column reflects the sum of submitted, approved, and completed projects, and excludes any cancelled and pipeline projects, as defined in Section 3.1.1. The hybrid project’s capacity, detailed in Section 3.1.5, has been proportionally allocated: 48% to United Illuminating’s Residential Low-Income and 52% to United Illuminating’s Large C&I, based on guidance from the Connecticut Green Bank. Some totals and subtotals above may be different than the sum of applicable values due to rounding errors. Source: Customized Energy Solutions analysis of Connecticut Green Bank program tracking data through June 30, 2026. 7|Pa ge
  6. Page 9 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 9 of 78 Table ES-3. Progress Made Toward Program Capacity Goals Sector Residential C&I Submitted Approved Completed Total (MW) (MW) (MW) (MW) 0.4 0.0 3.8 132.3 17.6 1.3 21.8 133.6 Program Goals Percentage of Complete (2022-2030) Capacity Relative to Goal (MW) as of June 30, 2026 150 430 11.7% 0.3% Note: As outlined in Section 3.1.5, the hybrid project has been proportionally allocated, with 48% of its capacity classified under Residential and 52% under C&I, in accordance with guidance from the Connecticut Green Bank. As of June 30, 2025, this project remains in the “Approved” stage and is not yet marked as “Complete.” Source: Customized Energy Solutions analysis of Connecticut Green Bank program tracking data through June 30, 2026. 8|Pa ge
  7. Page 10 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 10 of 78 1. Introduction 1.1. Program Background and Objectives Background and Regulatory Framework The Energy Storage Solutions Program is Connecticut’s statewide initiative to support the deployment of distributed (specifically, behind the meter or BTM) battery energy storage systems (BESS), launched after the enactment of Public Act 21-53. This legislation established statewide energy storage deployment targets of 300 MW by 2024, 650 MW by 2027, and 1,000 MW by 2030.1 Section 2 of the Act directed the Public Utilities Regulatory Authority (PURA) to develop and implement one or more programs to achieve these goals, including the establishment of appropriate funding mechanisms and administrative structures. On July 28, 2021, the Authority issued a final decision in Docket No. 17-12-03RE032, which formally established the ESS program as a nine-year initiative, beginning January 1, 2022 and continuing through at least December 31, 2030. The program is administered by the Connecticut Green Bank and Connecticut’s two electric distribution companies, Eversource and United Illuminating, collectively referred to as the Program Administrators. Under PURA oversight, the Program Administrators are tasked with designing and delivering incentives for both residential and C&I customers, with the objective of deploying BTM energy storage and fostering the sustainable growth of the energy storage industry within the State. The ESS program was initially structured around three three-year deployment tranches, with interim capacity targets of 100 MW by 2025, 300 MW by 2028, and a cumulative 580 MW by 2030. Originally, the program capacity was split evenly between residential and C&I projects; in its Final Decision in Docket 24-08-05, PURA updated the split, with 150 MW allocated to residential projects and 430 MW to C&I projects. For systems enrolled prior to April 1, 2026 (referred to in this report as "Legacy" participants), the ESS program includes two primary incentives: upfront incentives that are contingent upon project performance during "Passive" dispatch periods, and performance-based incentives paid out based on project performance during "Active" events, as described in Section 1.2. Beginning with enrollments on April 1, 2026, participants are subject to a revised incentive structure ("Construct 5") adopted in PURA's Year 5 Decision, described in Section 1.4. In addition to Legacy vs. Construct 5, incentive levels are differentiated by sector (residential vs. C&I), system size, and other customer attributes, as discussed in the body of this report. The updated sector and tranche-level capacity goals, following PURA's Year 4 Decision reallocation of 140 MW from residential to C&I, are shown in the table below. Note that, per direction from PURA, capacity associated with canceled projects within a given tranche is moved to subsequent tranches. Given that Construct 5 does not include a declining block incentive structure tied to the tranches, as was the case for the Legacy construct, the relevance of the tranches has diminished. Note that these goals were for all storage capacity, not limited to behind-the-meter or front-of-the-meter resources. 1 2 https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07ba e185258752007994f7?OpenDocument 9|Pa ge
  8. Page 11 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 11 of 78 Table 1-1. ESS MW Goals by Tranche Customer Class Tranche 1 Tranche 2 Tranche 3 Tranche 4 Total Residential C&I Total 50 MW 50 MW 100 MW 50 MW 113.9 MW 163.9 MW 0 MW 140 MW 140 MW 150 MW 430 MW 580 MW 50 MW 126.1 MW 176.1 MW Source: PURA Year 4 Final Decision The ESS program is guided by seven formal objectives adopted by PURA in its 2021 Storage Decision, summarized below: 1) Provide positive net present value to all ratepayers 2) Provide multiple types of benefits to the electric grid 3) Foster the sustained, orderly development of a state-based electric energy storage industry 4) Prioritize delivering increased resilience to lower income customers, customers most affected by outages, and critical facilities 5) Lower the barriers to entry, financial or otherwise, for electric storage deployment in Connecticut 6) Maximize the long-term environmental benefits of electric storage 7) Maximize the benefits to ratepayers derived from the wholesale capacity market PURA conducts an annual review of the ESS program in Docket No. XX-08-05 each year. These proceedings assess program performance, review deployment progress, evaluate benefit-cost test results, and consider potential design adjustments. 1.2. Overview of Program Design As noted above, PURA directed a significant change in the overall structure of the ESS program in its Year 5 Decision. At a high level, the changes, applicable to systems enrolling on or after April 1, 2026, include a significant reduction in upfront incentives and an increase in performance incentives. This change was intended to offer comparable total expected compensation to participating resources (on a discounted basis), while reducing ratepayer risk by allocating more program compensation to the performance of participating projects that produce benefits for ratepayers. This analysis covers resources with an expected commercial operation date through the end of 2027. Given the April 1, 2026 transition from Legacy to Construct 5 and the development timeline of distributed storage, a significant majority of projects evaluated in this report will fall under the Legacy construct. Given this, both the Legacy and Construct 5 designs are described below, following an initial description of common program elements. 1.2.1. Legacy Construct Under the Legacy structure, the Energy Storage Solutions program provides a combination of upfront and performance-based incentives. Upfront incentives are available to both residential and C&I participants, with rates differentiated by system size and customer characteristics. 10 | P a g e
  9. Page 12 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 12 of 78 The upfront incentives are denominated in dollars per installed kWh capacity. The residential and C&I upfront incentives, which are differentiated by sector (residential vs. C&I) and customer category, are presented in Table 1-2. Table 1-2. Residential Upfront Incentive Levels (Legacy) Incentive Step Capacity Block Standard ($/kWh) Underserved ($/kWh) Low-Income ($/kWh) 1 0-10 MW $250 $450 $600 2 10-25 MW $212.5 $450 $600 3 25-50 MW $162.5 $450 $600 3 Grid Edge Adder: 50% Source: ESS Program Manual. Table 1-3. Commercial Upfront Incentive Levels (Legacy) Tranche Incentive Step Capacity Block (Cumulative) Small Commercial ($/kWh) Medium Commercial ($/kWh) Large Commercial ($/kWh) 1 n/a 0-50 MW $200 $175 $100 2 n/a 50-163.9 MW $200 $175 $100 3 1 163.9-213.9 MW $182 $159.25 $91 3 2 213.9-238.9 MW $164 $143.50 $82 3 3 238.9-290 MW $146 $127.25 $73 Priority Customer Adder: 25%4 Source: ESS Program Manual and PURA Year 4 Final Decision Residential systems located in areas most impacted by outages (defined as the Grid Edge)5 may receive a 50% adder on top of the applicable base upfront incentive. C&I customers that meet one of the following definitions (“priority customers”) are eligible for a 25% adder:6 • • • Grid Edge. As defined above. Small Business. Defined as C&I customers with an annual peak demand of less than 200 kW. Critical Facilities. Facilities with critical functions, as defined by Gen. Stat. § 16243y(a)(2).7 See definition provided in Section 1.2 See definition provided in Section 1.2 5 The Grid Edge is defined as (1) the top ten percent of circuits with the highest number of outages per customer during major storms since July 1, 2012, and (2) the top ten percent of circuits with the longest outages due to major storms since July 1, 2012. Maps of circuits meeting these criteria are available on the ESS Contractor Resources page: https://energystoragect.com/contractor-resources/ 6 See full definitions in the ESS Program Manual: https://energystoragect.com/wpcontent/uploads/2026/05/Energy-Storage-Solutions-Program-Manual-Revised-for-05-19-2026.pdf 7 https://www.cga.ct.gov/2023/act/pa/pdf/2023PA-00157-R00HB-06853-PA.pdf 3 4 11 | P a g e
  10. Page 13 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 13 of 78 • C&I Customers Replacing Fossil Fuel Generators. Facilities replacing an existing, onsite fossil fuel generator with an energy storage system of a comparable size. Residential upfront incentives are capped at 50% of the total installed cost of the BESS and are subject to an overall cap of $16,000 per residential unit. C&I upfront incentives are capped at 50% of the BESS’ total installed cost. The upfront incentives are administered by the Green Bank. Systems receiving an upfront incentive are obligated to discharge during Passive events, which occur during non-holiday weekdays in June, July, and August from 5 p.m. to 8 p.m. Systems that fail to meet certain criteria for Passive event performance may be subject to a clawback of the incentive, under the scoring methodology described below. Based on this methodology, systems that score less than 90% may be subject to a prorated incentive clawback. The Program Administrators may recommend to PURA that customers failing to meet the 90% threshold be relieved of the clawback provisions; the Program Administrators are required to submit any such recommendations to PURA by November 1 each year. PURA instituted significant changes to the Passive dispatch scoring methodology in its Year 4 Final Decision. This updated methodology, which applies to all Legacy systems that received an upfront incentive, is included below. The scoring methodology used to evaluate Legacy Passive dispatch performance is shown in Table 1-4. Table 1-4. Updated Passive Dispatch Scoring Methodology Purpose To ensure customers still receive credit for dispatching less than the full amount, and to relax the Program’s uniform dispatch requirements. To fully incentivize peak reduction through active dispatch participation. To ensure customers are not penalized for Passive events canceled by the Program Administrators. To prevent penalties for OEM-triggered storm events that are beyond the customer’s control, allowing system usage during power outages. To include all possible Passive dispatch hours, if no events were canceled. Formula Component (Σ (energy discharged during a Passive dispatch called event hour) ÷ (1/3 of a system’s available energy at the start of the respective Passive dispatch event) [The allowable range for each Passive dispatch hour’s score is 0 to 2, and scores that calculate as greater than 2 will be capped at 2.] + (all active dispatch event hours called to replace a canceled Passive dispatch event in which a BESS discharged at least some portion of its available energy). + (all Passive dispatch hours canceled by the Program Administrators that were not replaced by an active dispatch event) + (all Passive dispatch event hours called, and all active dispatch event hours called to replace a Passive dispatch event, in which a battery could not perform because it was responding to an OEM-triggered severe storm event, provided the dispatch hour was not also canceled by the Program Administrators).) ÷ (total possible Passive dispatch hours in a given season) Source: PURA’s Final Decision in Docket No. 24-08-05. Performance-based incentives are offered over a ten-year period and are paid based on system performance during active events in the summer and winter dispatch seasons. For the first five years, participating systems may earn $200 per average kW of delivered performance for the 12 | P a g e

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)