Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

19 pages match
  1. Page 65 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 65 of 78 costs accurately. Given this uncertainty, the BCA model relies primarily upon cost data included in ESS applications for the BCA data, with an emphasis on the most recently approved and completed projects. Table 5-2. Project Size and Cost Assumptions Customer Segment Metric Average Total System Cost per Participant ($) Average System kW per Participant Average System kWh per Participant Average Duration per Participant (hours) Average $ per kWh (2026 Install Value) Residential Small C&I Medium C&I Large C&I $28,825 $472,076 $831,694 $1,594,200 15.3 200 500 1000 25.25 460 1150 2900 1.65 2.30 2.30 2.90 $1,142 $1,026 $723 $550 Source: CES analysis of enrollment data Federal Tax Credits. Changes stemming from the 2025 federal budget reconciliation legislation enacted in 2025 are reflected in the BCA. Specifically, the bill phases out the Section 25D credit, under which residential customers qualified for a 30% tax credit for solar and energy storage installations. The credit was no longer available, starting with projects placed in service starting in 2026. Third party owned (TPO) residential systems may also benefit from the Section 48E credit; over time this may result in a shift towards more TPO residential systems. While residential third party ownership levels are still low, based on conversations with installers, the Program Administrators expect for third party ownership to increase over time. The BCA assumes that residential third party ownership rates (indicating eligibility for the 30% tax credit) will be 20% of projects installed in 2026, 40% in 2027 and 60% in 2028. The updated BCA assumes that, starting in 2026, no residential systems will be eligible for a 30% tax credit. Commercial storage installations, which qualify under Section 48E, will still be eligible for a 30% federal tax credit; under current law, the credit won’t begin to phase out until 2033. Foreign Entity of Concern (FEOC) provisions, which place limitations on project ownership interests and the amount of content that can be sourced from identified countries, including China, will challenge the ability of commercial projects to qualify for Section 48E credits. Based on its understanding of the market and discussions with developers, CES understands that many commercial projects will still qualify for Section 48E credits - given this, the BCA still assumes that C&I projects will be able to take advantage of Section 48E credits. While developers may struggle to meet FEOC provisions, these projects are less likely to proceed, supporting the assumption that most commercial projects benefit from the tax credit. O&M. The BCA had previously assumed an O&M cost for both residential and C&I systems. Based on CES’ understanding of the market, this value was reduced to $0 for residential systems starting in the BCA filed last year. For C&I systems, the model had previously assumed no O&M costs for 64 | P a g e
  2. Page 66 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 66 of 78 evaluated years (i.e., 2022 and 2023 in the previous version); this was also updated last year such that O&M costs apply to all operating C&I systems. Construct 5 Updates. The BCA has been updated to reflect the transition to the Construct 5 program approved in the Final Decision in Docket No. 25-08-05.26 Under the revised program design, only Legacy projects enrolled prior to April 1, 2026, remain eligible for upfront incentives, while projects enrolled on or after that date are eligible for Construct 5 Enrollment Incentives. Accordingly, the BCA assumes that upfront incentives apply only to the expected Legacy installations through the program transition, using the approved residential and C&I incentive schedules shown in Table 5-3 and Table 5-4. This structure dispenses with the declining block incentive used for the Legacy upfront incentives. The BCA model also incorporates the updated performance incentives for Construct 5 systems. Effective April 1, 2026, the Construct 5 program replaces the Legacy Upfront Incentive with an Enrollment Incentive for newly enrolled projects. The model requires adopting an assumption related to how much of the capacity installed in 2026 and 2027 will be Construct 5 vs. Legacy. For commercial systems, because there are no approved Construct 5 systems and because of the typical development timeline for these systems, it is assumed that no Construct 5 systems will be deployed by the end of 2027 (the last COD incorporated into the BCA model). Table 5-3. Residential and C&I Legacy Upfront Incentive Levels ($/installed kWh) Capacity Block (Cumulative MW) Tranche, Step Residential Standard Residential Underserved Residential Low Income Up to 10 MW 10-25 MW* Tranche 1, Step 1 Tranche 1, Step 2 $250 $212.5 $450 $450 $600 $600 Capacity Block (Cumulative MW) Tranche, Step Small C&I Medium C&I Large C&I Up to 163.9 MW* Tranches 1 and 2 $200 $175 $100 *Note: Upfront incentive values are shown only for the initial Legacy tranches, as future enrollments will be subject to Construct 5. Table 5-4. Assumed Residential and C&I Enrollment Incentive Levels ($/installed kWh) Framework Construct 5 Residential Grid Edge Residential Others C&I - Priority C&I - Others $130 $30 $10 $0 Previous BCAs assumed that a portion of the upfront incentive dollars would be funded through Greenhouse Gas Reduction Funds (GHGRF). Starting in last year’s report, the BCA was updated 26 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/b1de90d5e52b43d18 5258d630056a8bf?OpenDocument 65 | P a g e
  3. Page 67 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 67 of 78 to assume that no GHGRF funding will become available, and that all incentive dollars are funded by ratepayers (thus, a cost in the RIM). Upfront Incentive Clawbacks. Previous iterations of the BCA did not include projections for upfront incentive clawbacks. The current version has been updated to incorporate projected clawbacks; it assumes that in 2026, 40% of residential Legacy systems are subject to a clawback, falling to 35% in 2027. For commercial systems, it assumes 25% in 2026 and 20% in 2027. The model also assumes that, in addition to fewer systems being subject to any clawback over time, for those subjected to a clawback, the amount clawed back decreases over time as performance improves. Given the significant and rapid increase in Passive scoring in the program, these assumed improvements seem feasible. As noted above, clawbacks decrease the PCT, and increase most other tests, including the RIM. Performance Incentive OEM Aggregator Fee. Two OEMs currently retain a portion of the residential performance incentives as a performance incentive aggregator fee. Specifically, Tesla charges a 20% fee and Franklin began charging a 10% fee starting with Summer 2025. Based on the current market share of these two providers and their fees, the BCA has been updated to assume that residential customers pay, on average, a 6% fee to OEMs. This is realized in the BCA as a reduction in the PCT; it does not affect other tests. Peak Reduction. Section 4 provides analysis of the performance of projects enrolled in the ESS Program. For prospective performance, the BCA calculates expected kW performance during active and Passive events, determined by: • • • • System power (kW) System energy (kWh) Percent of nameplate energy expected to be dispatched during passive and active events (%) The duration of passive and active events (hours) These expected performance values are used to develop the “Max Expected Peak Reduction” values shown in Table 5-5, below, which, in turn, dictate how nameplate capacity in the BCA model translates into projected benefits. For residential systems, the values are based on a combination of observed performance and expectations for how performance may evolve. Previous BCAs had assumed that residential systems would maintain a 50% backup reserve during both Active and Passive events; this was maintained in last year’s BCA to provide consistency with previous analyses. Because systems did not, in practice, maintain such a large reserve, an assessment of performance based on this assumption yielded some expected reduction values that exceeded 100%. In this year’s BCA, the residential reserve assumption has been updated to 20%, matching program guidance for passive events as well as the patterns observed in the telemetry data. Reducing the assumed backup value reduces the calculated performance values (as they are expected to have more kWh available to discharge). This updated reserve assumption yields an expectation that residential projects will deliver 80% of their maximum peak reduction during Passive events and 78% during Active events. For C&I projects, the adopted Passive Max Expected Peak Reduction values are 90% for Small C&I and 60% for Medium and Large C&I projects, while the adopted Active Max Expected Peak Reduction values are 90% for Small C&I and 80% for Medium and Large C&I projects. These values are applied in the BCA to estimate expected peak demand reductions and the associated 66 | P a g e
  4. Page 68 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 68 of 78 program benefits. These values suggest that Medium and Large C&I projects have more competing needs for storage, including demand charge management. In the BCA, Passive event performance is netted out of active event performance to avoid doublecounting benefits.27 As a result, Passive event performance is expected to increase (due to reduced event duration), while benefits attributed to the active program will decrease (as the larger Passive value will be netted out of measured active performance). Because the primary impact is to shift attribution from one event type to the other, the net impact on overall benefit cost ratios is negligible. Table 5-5. Average System Max Expected Peak Reduction Residential Residential Standard Underserved Residential Low Income Small C&I Medium C&I Large C&I Expected Backup Reserve (Active and Passive) 20% 20% 20% 20% 20% 20% Passive Max Expected Peak Reduction 80% 80% 80% 90% 60% 60% Active Max Expected Peak Reduction 78% 78% 78% 90% 80% 80% Note: See discussion above for source of these values. Source: CES analysis of interval data Program Deployment Targets. In its Final Decision in Docket No. 24-08-04,28 PURA ordered the reallocation of 140 MW of capacity from the residential projects to C&I, yielding the updated MW allocation illustrated in Table 5-6 below. Effective April 1, 2026, any remaining legacy Tranche capacity is reassigned to Construct 5. Table 5-6. Program Deployment Targets (MW) Customer Class Tranche 1 Tranche 2 Tranche 3 Tranche 4 TOTAL Residential Commercial 50 MW 50 MW 50 MW 113.9 MW 50 MW 126.1 MW 0 MW 140 MW 150 MW 430 MW Total* 100 MW 163.9 MW 176.1 MW 140 MW 580 MW *Note: On April 1, 2026, any remaining Tranche capacity will be reassigned to Construct 5. The BCA evaluates projects with commercial operation dates through the end of 2027, totaling 71.7 MW; as noted above, this is a decrease from the 300 MW that had previously been modeled For example, if a single system averaged a 5-kW peak reduction during active events and 3 kW during Passive events, the BCA would attribute a 2-kW reduction to the active events. 27 28 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5dfd10f7c319dfec85 258be90050bf9c/$FILE/240805-120424.pdf 67 | P a g e
  5. Page 69 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 69 of 78 to come online during this period.29 The updated projections total 72 MW of installed capacity by 2027. Aside from exceptions discussed below, other assumptions related to project deployment (e.g., assumption that 80% of projects will be in Eversource territory), remain unchanged. Table 5-7. Projected Program Enrollment (MW) Customer Type Residential Standard Residential Underserved Residential Low Income Residential Subtotal Small C&I Medium C&I Large C&I C&I Subtotal 2022 2023 2024 2025 Actual 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 Actual Actual 0.8 1.3 0.1 0.7 0.0 0.2 0.9 2.2 0.0 0.2 0.0 0.2 0.0 0.3 0.1 0.6 Actual 1.6 0.8 0.3 2.7 0.0 0.0 0.0 0.0 2026 2027 Forecast Forecast 6.3 7.2 3.2 3.6 1.1 1.2 10.5 12.0 4.2 6.0 5.3 7.6 8.0 11.4 17.6 25.0 Total 17.2 8.3 2.8 28.3 10.4 13.2 19.8 43.4 0.1 1.0 2.8 2.7 28.1 37.0 71.7 Total *It is assumed that 25% of residential ESS capacity installed in 2026 and 75% installed in 2027 will fall under Construct 5, with the remaining installations under the Legacy framework. Should the program fall short of projected MW goals, it will reduce both projected costs and benefits. Two primary factors will affect the resulting BCRs. First, fewer total installed MWs applied to fixed Program Administrative Costs will lead to higher per MW costs, reducing the RIM. Second, some levelized benefits streams (particularly capacity DRIPE) in the AESC can vary noticeably from one assumed COD to the next, which can lead to changes in resulting BCRs. Program Administration Costs The BCA model was updated with program costs for the year 2025. Program costs in the year 2025 were lower than had been projected in the BCA ($4.29 million projected vs. $2.38 million actual). Projected program administration costs for 2026 and later have been updated, based on feedback from the Program Administrators. Because the total MW included in the model was reduced, the approach to assigning program administration costs to different project vintages was updated; in essence, the model was updated to acknowledge that the program administration costs reflected in the table below would cover costs for the full program MW (i.e., up to 580 MW), while only a total of 72 MW of resources is included in the model, assigning administration costs on a pro-rata basis. The model evaluates the costs and benefits of these projects for a period of 10 years from their commercial operation date. 29 68 | P a g e
  6. Page 70 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 70 of 78 Table 5-8. Actual (through 2025) and Projected Program Administration Costs ($) Project Year 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Residential Upfront/Passive Performance/Active Connecticut Green Eversource UI Bank $1,521,716 $124,658 $268,589 $1,478,092 $201,878 $176,545 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $556,226 $393,143 $152,683 $459,343 $330,164 $133,820 $457,612 $338,787 $140,715 $453,499 $345,815 $145,436 $447,734 $351,661 $148,829 $438,587 $354,811 $150,162 $431,009 $359,142 $151,031 C&I Upfront/Passive Performance/Active Connecticut Eversource UI Green Bank $0 $0 $0 $31,665 $205,138 $117,696 $785,357 $261,965 $174,233 $828,740 $192,994 $166,893 $857,746 $202,237 $173,800 $887,767 $405,887 $181,010 $918,839 $456,806 $190,631 $950,998 $501,632 $201,956 $984,283 $543,565 $215,279 $1,117,055 $789,539 $306,629 $1,213,939 $872,549 $353,657 $1,215,670 $900,007 $373,816 $1,219,783 $930,143 $391,181 $1,225,547 $962,576 $407,377 $1,234,694 $998,853 $422,730 $1,242,272 $1,035,132 $435,308 Notes: Evaluated and projected values provided by Program Administrators. Projected values are subject to change. Source: Program Administrators Benefits Inputs Most assumptions related to avoided costs and other benefits used in the BCA are derived from the Avoided Energy Supply Costs in New England (AESC) studies, which are commissioned by utilities, regulators, state energy offices, and other entities across New England, specifically for use in BCAs. Consistent with previous ESS BCAs, the BCA applies values from the 2021 AESC to projects with commercial operation dates of 2022-2024 and applies the 2024 AESC values to projects with commercial operation dates of 2025-2027.30 For the values sourced from the 2024 AESC, BCA results are provided using both Counterfactuals #1 and #6.31 The same approach was taken in the BCA filed in Docket No. 24-08-05.32 In its Final Decision in that docket, PURA, concluding that shifting to a new counterfactual would be As the 2024 AESC can be applied to projects with CODs in 2024, subsequent BCAs may be updated to apply 2024 AESC values to these projects, as opposed to sourcing inputs from the 2021 AESC. 31 The AESC counterfactuals are defined by whether they include the effects of different anticipated changes to the distribution system (e.g., increased energy efficiency, building electrification, BTM storage, transportation electrification, etc.). By excluding these different influences, the counterfactuals help estimate what the impact of a program might be, relative to a future in which such programs did not exist. Counterfactual #1 excludes impacts from most energy policies (e.g., energy efficiency, building electrification, demand response, etc.). Counterfactual #6 only excludes BTM storage, making it wellsuited for evaluating BTM storage programs. See Table 40 on p. 73 of the 2024 AESC: https://www.synapseenergy.com/sites/default/files/inline-images/AESC%202024%20May%202024.pdf 32 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/ddbe0b811039ecbc 85258b6c006b2d61?OpenDocument 30 69 | P a g e
  7. Page 71 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 71 of 78 disruptive to consistent analysis of the program, ordered that future BCAs should rely on AESC Counterfactual #1, while allowing the Program Administrators to “include alternative RIM calculations using new counterfactuals… provided that counterfactual one remains the primary basis for RIM scores submitted to the Authority.” 33 CES has included selected results using Counterfactual #6, as this counterfactual was designed for use in evaluating BTM storage programs. As briefly noted above, depending on the timing of the study, next year’s BCA may incorporate updated AESC assumptions from the 2027 study. Table 5-9. Benefits Inputs Sources Benefit/Cost Stream Source 2022-2024 Install Yr 2025 and future Install Yr Avoided Generation Capacity DRIPE Capacity Impacts (Intrastate and Rest-of-Pool) Avoided Energy DRIPE Energy Impacts (Intrastate and Rest-of-Pool) Cross-DRIPE Impacts (Intrastate and Rest-of-Pool) Avoided Pool Transmission Facilities • 2021 AESC • Report and User Interfaces (source of values) available here: Link • Counterfactual #1 • State set to Connecticut; otherwise default inputs used • 2024 AESC • Report and User Interfaces (source of values) available here: Link • Counterfactuals #1 and #6 • State set to Connecticut; otherwise default inputs used Reliability Non-Embedded Emissions Avoided Local Transmission Capacity Avoided Distribution Capacity • Per Eversource and UI, and as incorporated into the filed 2025-2027 Conservation & Load Management Plan (see figure 62): Link 5.3. BCA Metrics Results from the BCA, including six different test perspectives, are provided below. Unless otherwise specified, the results are based on the use of the AESC 2024 Counterfactual #1 Figure 5-1 shows the overall program BCA. The PACT, SCT, TRC, and CTET have effectively identical benefits. The PACT and CTET have lower costs than the SCT and TRC, resulting in higher benefit-cost ratios (BCRs). The primary costs for the PACT and CTET are incentives, while the primary costs for the SCT and TRC are ESS technology costs. Technology costs are almost all realized in the year projects are installed, while performance incentives are spaced out over time and are then discounted; this is the primary reason that costs for these two sets of tests differ. The CTET includes emissions, while the PACT does not. The BCA currently projects an increase in emissions due to ESS; this varies from the finding in Table 4-11 for several reasons, including: 1) Table 4-11 uses hourly emissions rates while the BCA uses seasonal and on/off-peak emissions rates, which are less granular P. 46: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/5dfd10f7c319dfec85 258be90050bf9c?OpenDocument 33 70 | P a g e
  8. Page 72 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 72 of 78 2) Most of the BCA charge/discharge behavior is projected (not evaluated), while Table 4-11 relies entirely upon evaluated charge/discharge data; there are differences in the shape of the projected and evaluated load shape 3) Table 4-11 is limited to one year of data, while the BCA considers emissions rates projected into the future The overall program RIM has decreased modestly relative to the last BCA, from 1.69 to 1.55. The primary drivers of this change are: 1) Decreased projected MW deployment increasing per unit program administration costs, primarily in the near term (decreases RIM) 2) Decreased program administration costs (increases RIM) 3) Increase in projected performance, as described in Table 5-5 (small increase in RIM) 4) Change in when projects are projected to come online (mixed impact – affects costs and benefits) 5) Introduction of assumed clawbacks (increases RIM) The impact of some of these changes, and others, are discussed below. The most significant contributor to the revised BCA results is the reduction in projected ESS deployment from approximately 300 MW to 72 MW by 2027. Since nearly all benefit streams— including participant bill savings, avoided capacity costs, energy savings, emissions reductions, and resilience benefits—are proportional to the deployed storage capacity, the lower deployment forecast substantially reduces total program benefits. As noted above, this decreases the RIM; it has a much more dramatic impact on the magnitude of costs and benefits, however. The introduction of the Construct 5 framework and revisions to the assumed participation of Priority and Grid-Edge customers have only a marginal influence on the BCA results. Construct 5 contributes only 9 MW of residential installations through 2027, representing a relatively small share of the total program deployment. Likewise, reducing the assumed participation of GridEdge and Priority customers from 50% to 48% and 43%, respectively, slightly modifies the incentive expenditures and associated benefits but does not materially alter the overall program economics. The revised analysis also incorporates lower program administrative costs, which improves the benefit-cost performance from the utility and societal perspectives. Since administrative expenses are treated as program costs in tests such as RIM, RIM-CT, PACT, CTET, SCT, and TRC, reducing these costs lowers the denominator of the benefit-cost calculations, resulting in modest improvements ranging from approximately 5–7%. In contrast, the Participant Cost Test (PCT) remains unaffected because program administrative expenditures are not borne directly by participating customers and therefore have no direct influence on participant economics. Conversely, the updated installed project costs relative to previous assumptions increase the capital investment required for ESS deployment, particularly within the C&I sector. Higher installed costs directly increase participant expenditures and total resource costs, leading to reductions in the PCT, SCT, and TRC. The PCT is especially sensitive because it evaluates the financial attractiveness of the program from the participant's perspective, while the SCT and TRC incorporate the total societal and resource costs associated with ESS deployment. Since these higher capital costs are not accompanied by proportional increases in program benefits, the overall cost-effectiveness under these tests decreases. While changes in projected installed cost do not directly affect the RIM, to the extent that they affect program deployment and lead to 71 | P a g e
  9. Page 73 of 78Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 73 of 78 changes in incentive rates, they may have future impacts on the RIM. As noted previously, these updated cost values do not reflect an anticipated increase in project costs in the future; instead, they reflect project costs anticipated to be higher than previously projected. Put differently, assumed project costs reflected in the previous BCA were likely too low. For residential systems, the revised assumptions related to third-party ownership rates and resulting access to the Section 48E tax credits improves the calculated PCT by approximately 5%. The BCA does not currently include differentiated assumptions related to discount rate, administration costs, or other financial distinctions between third-party vs. homeowner-owned systems. It is reasonable to assume that a third party owner would “capture” some of the value of the tax credit, reducing the impact of the credit on the ultimate financial proposition for the host customer. When all model revisions are considered collectively—including the updated deployment forecasts, Construct 5 implementation, participant mix, installed project costs, administrative cost assumptions, clawback revisions, updated peak active and passive load reduction metrics and additional structural enhancements to the BCA framework—the overall cost-effectiveness metrics decline modestly relative to the previous analysis. The RIM decreases by approximately 9%, PCT decreases by around 6%, PACT and CTET decline by approximately 8%, while the SCT and TRC exhibit the largest reductions of approximately 13%. Although reductions in administrative costs partially offset some of these impacts, the lower projected deployment and higher installed project costs remain the dominant factors influencing the revised BCA results. Figure 5-1. Overall Program BCA Source: CES analysis Figure 5-2 shows the BCA specifically for the residential sector. The updated residential BCA shows modest improvement across all tests: the RIM rises from 1.13 to 1.18, the PCT rises from 0.75 to 0.81, the PACT increases from 1.36 to 1.44, the SCT and TRC both improve from 0.88 to 0.94 and .095 respectively, and the CTET rises from 1.36 to 1.44. Most of this improvement is driven by a reduction in the residential battery reserve margin, from 50% to 20%, which increases the battery capacity available for dispatch and, with installed costs held constant, directly increases realized program benefits, improving the RIM and RIM-CT by 72 | P a g e
  10. Page 74 of 78

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No.2, Cross Posted Compliance 17-12-03RE03, ESS Order No. 22 Attachment 1 Page 74 of 78 roughly 17–20%, the PACT, CTET, SCT, and TRC by over 15%, and the PCT by about 10%.34 While a reduction in total program costs helps cost-effectiveness, a shift in how costs are weighted between residential and commercial projects results in more costs being allocated to residential projects relative to commercial projects. It is projected that approximately 9 MW of residential ESS installations will be installed under Construct 5 by the end of 2027; previously, all of this capacity would have been under the Legacy framework. This has a comparatively modest effect, improving the RIM and RIM-CT by about 2% and the PCT and SCT by about 1%. This is by design – PURA, in revising enrollment and performance incentives for Construct 5, explicitly sought to ensure that overall compensation remained comparable. Figure 5-2. Residential Program BCA Source: CES analysis The C&I BCA results generally mirror the changes observed in the overall BCA, with the revised assumptions producing similar trends across the various benefit-cost tests. Commercial BCA results are displayed in Figure 5-3. For the commercial systems, the evaluated installed ESS project costs, derived from projects approved from 2025 onward, are the primary driver of the revised BCA results. Relative to the previous assumptions, the approximately 18% increase in assumed installed project cost per kWh increases participant and program costs without a corresponding increase in quantified benefits, reducing the PCT by approximately 8% and the SCT and TRC by 14–15%. Smaller reductions (5-6%) are observed in the RIM, PACT, and CTET tests. The updated program administration costs partially offset these impacts, as lower projected administrative expenditures reduce overall program costs and improve most BCA metrics. Similarly, the revised clawback assumptions result in modest improvements of approximately 2% in the RIM, PACT, and CTET tests, while having minimal influence on the remaining metrics. The remaining updates—including revised historical program performance and administrative data through 2025, updated dispatch assumptions, Priority C&I participation assumptions based on the project enrolment so far, updated energy and delivery tariffs, and other refinements to the BCA framework—collectively contribute to the overall reduction in the commercial cost34 Note that a part of this increase in performance is offset in the “Max Expected” values, as shown in Table 5-5. 73 | P a g e

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)