Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

2 pages match
  1. Page 1 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 1 of 69 Joint EDC Annual Report – Program Cycle Year 5 (2026) I. Introduction ........................................................................................................................................................2 II. Program Overview ....................................................................................................................2 A. Background ...............................................................................................................................2 B. Program Description .................................................................................................................3 III. Orders Relevant to This Report ................................................................................................5 A. Annual Report Filings...............................................................................................................5 B. DCFC Applications, Commercial EVSE Tariffs and Port Approvals and Deployments .........5 C. Incremental Reporting Metrics .................................................................................................6 D. MUD Managed Charging Pilot .................................................................................................6 E. Analysis and Proposed Program Changes in Response to D.25-08-06 Order 18 .....................7 IV. Implementation Metrics ............................................................................................................8 A. Data Collection Methods and Sources ......................................................................................8 B. Implementation Metrics ............................................................................................................9 V. Program Activities Since Last Annual Report........................................................................15 A. Multifamily Unit Dwelling (MUD) Managed Charging Pilot Results ...................................15 B. Light Duty Fleet Participation in Managed Charging ............................................................19 C. Residential Single Family Managed Charging Program ........................................................27 D. EVSE Tariff Participation Rates .............................................................................................29 E. Analysis in Support of D.25-08-0 Order 18 ...........................................................................29 VI. Proposed Program Design Changes........................................................................................38 A. Program Recommendations in Response to Order 18 ............................................................38 B. MUD Managed Charging Recommendations.........................................................................44 C. Residential Managed Charging Program Recommendations .................................................45 D. Commercial Program Recommendations ...............................................................................53 VII. Summary of Education & Outreach........................................................................................55 A. Webinars & Other Events .......................................................................................................56 B. Paid Media ..............................................................................................................................58 C. Website ...................................................................................................................................61 D. Partner Engagement ................................................................................................................63 VIII. Program Costs.........................................................................................................................67 A. Legacy Programs & Public Act 25-173 ..................................................................................68 B. Eversource ..............................................................................................................................68 C. UI ............................................................................................................................................69
  2. Page 2 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 2 of 69 I. Introduction As part of the CT Electric Vehicle (“EV”) Charging program (the “Program”) that was approved by the Public Utilities Regulatory Authority (“PURA” or “the Authority”) in Docket No. 17-12-03-RE04, the Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) and The United Illuminating Company (“UI”), collectively the electric distribution companies (“EDCs”) submit this annual report, summarizing the Program results for the time period from July 1, 2025 to June 30, 2026, and recommendations for Program modifications, based on lessons learned in implementation. This report also incorporates additional analysis as requested in the Final Decision in Docket 25-08-06 1. This document includes the following sections: 0F I. II. III. IV. V. VI. VII. VIII. Introduction Program Overview Summary of Orders Relevant to This Report Implementation Metrics Program Activities Since Last Annual Report Proposed Program Design Changes Summary of Education & Outreach Program Costs II. Program Overview A. Background On July 14, 2021, the Connecticut Public Utilities Regulatory Authority issued a final Decision in Docket No. 1712-03RE04 2 (“Decision”), which establishes a statewide zero emission EV Charging Program, available to all 1F customers and customer classes within the service territories of the EDCs. The Program will be delivered over nine years, beginning in 2022, in three-year cycles, giving the parties and the Authority opportunities to update the program guidelines as new circumstances may dictate. The Authority has identified the following objectives for a statewide zero emission program in Connecticut: 1. To enable Connecticut’s commitment to the ten-state Memorandum of Understanding (“MOU”): to collectively deploy 3.3 million ZEVs among the participating states by 2025, and the deployment of approximately 125,000-150,000 EVs in Connecticut by 2025 3; 2. To facilitate the seamless integration of new and emerging Zero Emission Vehicle (“ZEV”)related technologies, to realize the potential electric system benefits of ZEVs, along with the economic, health, and environmental benefits they provide; 3. Deploy and integrate ZEVs into Connecticut’s electric grid (i.e., the distribution system infrastructure) as a key component of meeting the objectives of the Authority’s Framework for an 2F The Final Decision in the Year 4 Annual Review of the Program. The Program Authorization Final Decision 3 Per Connecticut Department of Energy and Environmental Protection, there were 67,660 EVs registered in Connecticut as of July 1, 2025. 1 2
  3. Page 3 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 3 of 69 Equitable Modern Grid, namely: (1) support (or remove barriers) to the growth of Connecticut’s green economy; (2) enable a cost-effective economy-wide transition to a decarbonized future; (3) enhance customer access to a more resilient, reliable and secure commodity; and (4) advance the ongoing energy affordability dialogue in the State, particularly in underserved communities; and 4. Achieve an equitable transition to wide-scale EV deployment across all communities in Connecticut. Consistent with the Authority’s findings and directives in the Decision, the EDCs are providing this report on the Program’s status and achievements for the period from July 1, 2025, to June 30, 2026. This report contains updated operational information for all Program areas, including applications received, rebates issued, funding awarded, the number of EV charging stations and sites deployed, and deployment in underserved communities 4. 3F B. Program Description Through the Program, the Authority seeks to enable a self-sustaining ZEV market on the scale necessary to meet the State’s ZEV goals and greenhouse gas reduction targets, and achieve ratepayer, electric system, economic, health, and environmental benefits by equitably transitioning all communities across Connecticut to EVs. The Program is structured around three-year program review cycles whereby the Authority will re-evaluate whether the expected benefits are being delivered to Connecticut ratepayers. The EV Charging Program identifies five program areas to optimize the deployment of electric vehicle supply equipment (“EVSE”) and the associated distribution system infrastructure necessary to meet Connecticut’s transportation electrification goals: 1. 2. 3. 4. 5. Residential Single-Family Level 2 Charging; Residential Multi-Unit Dwellings (“MUDs”) Level 2 Charging; Direct Current Fast Charging (“DCFC”); Destination Level 2 Charging; and Workplace & Light-Duty Fleet Level 2 Charging. The key program elements consist of a combination of incentives for networked Level 2 EVSEs and DCFCs, as well as accompanying rate offerings. The EDCs will invest in the make-ready infrastructure required to enable charging, up to the maximum incentive available per site. Additional incentives will be available for sites hosting EVSE in underserved communities. An underserved community as defined by the EV Charging Program shall include environmental justice communities pursuant to Conn. Gen. Stat. § 22a-20a, distressed municipalities pursuant to Conn. Gen. Stat. § 32-9p, and public housing authorities. Conn. Gen. Stat. § 22a-20a defines an environmental justice community as “(A) a United States census block group, as determined in accordance with the most recent United States census, for which thirty per cent or more of the population consists of low income persons who are not institutionalized and have an income below two hundred per cent of the federal poverty level, or (B) a distressed municipality, as defined in subsection (b) of section 32-9p.” Pursuant to Conn. Gen. Stat. § 32-9p, the Department of Economic and Community Development identifies municipalities based on its tax base, residents’ personal income, and residents’ need for public services, and publishes a list of distressed municipalities annually. 4
  4. Page 4 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 4 of 69 1. Filed Program Deployment Targets The EDCs EVSE deployment targets for the first 3-year cycle (2022-2024) are summarized in the table below. In December 2022 and 2023, PURA authorized incremental ports in three of the five Program Areas 5. 4F Table 1: Filed Program Cycle 1 (2022-2024) Program Port Deployment Targets Program Area Eversource Port Deployment Goal UI Port Deployment Goal Original PY2 Total PY3 Total Original PY2 Total PY3 Total Residential Single-Family 12,000 12,000 12,000 3,000 3,000 3,000 MUD 970 1,940 2,910 243 486 729 DCFC 110 247 357 27 54 81 Destination 631 1,262 1,262 158 316 316 Workplace & Light Duty Fleets 1,851 1,851 1,851 463 463 463 Program Cycle 2 (2025-2027) and Program Cycle 3 (2028-2030) targets remain relatively unchanged since their development in the Decision. The notable exception were the MUD targets, which were deliberately unspecified in order to provide more time to PURA and the EDCs to assess program uptake prior to proposing additional deployment targets. The Decision orders that, “no later than August 1, 2023, the EDCs shall propose MUD Level 2 EVSE deployment targets and a supporting calculation methodology for the second and third Program Cycles for Authority review and approval.” The Authority approved the proposed deployment target, of 3,000 MUD ports per year, split 80/20 between Eversource and UI, in the Program Year 4 Final Decision 6. Accordingly, the 5F proposed port deployment targets for the upcoming Program Cycles are summarized in Table 2. Table 2: Filed Program Cycle 2 (2025-2027) and Program Cycle 3 (2028-2030) Program Port Deployment Targets Residential Single-Family Program Cycle 2 17,500 Program Cycle 3 17,500 Eversource Port Deployment Goal Program Program Cycle 2 Cycle 3 14,000 14,000 MUD 9,000 9,000 7,200 7,200 1,800 1,800 DCFC 172 172 138 138 34 34 Destination 1,654 1,654 1,323 1,323 331 331 Workplace & Light Duty Fleets 2,521 2,521 2,017 2,017 504 504 Program Area 5 6 Final Decision in Docket 22-08-06. Final Decision Total UI Port Deployment Goal Program Program Cycle 2 Cycle 3 3,500 3,500
  5. Page 5 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 5 of 69 III. Orders Relevant to This Report Across the Establishing Order and prior Annual Review Dockets, PURA has ordered that the EDCs provide specific updates in each annual report. The following sections summarize the pertinent Orders including their source, requirements, and where the relevant reporting responses can be found in this document or its attachments. A. Annual Report Filings Docket 2025-08-06 Order 4, referencing Docket 2023-08-06 Order 19 and Docket 2027-12-03REO4 Order 14: No later than August 1, 2024, and annually thereafter, the EDCs shall submit a joint Annual Report, as discussed in Section IV.E.2 [of the Year 3 Decision]. The joint Annual Report shall include clear language when a recommendation or update is included on behalf of both companies or just one. All data provided must continue to be separated by company but must use the same format and reporting methodology. This document is the applicable joint report for the Year 5 report. B. DCFC Applications, Commercial EVSE Tariffs and Port Approvals and Deployments Docket 2023-08-06 Order 20: No later than August 1, 2024, and annually thereafter, the EDCs shall incorporate the following in their jointly filed Annual Report: 1. For the preceding program year and current program year, all application details for the project applications received in the DCFC Program Area, including but not limited to the bid amounts and whether the application was for baseline versus underserved community incentives; and a description of which applications were approved and provide a detailed narrative explanation as to why projects were disqualified, as discussed in Section IV.B.3.e, DCFC Deployment Data; • DCFC applications, rankings, and selected sites can be found as Appendix 5 for Eversource and Appendix 6 for UI. Narrative explanations can be found starting in Section IV.B.6 DCFC Program Area Application Details. 2. Participation rates for each Company’s respective EVSE tariffs, as discussed in Section IV.B.5, EVSE Tariffs for DCFCs & Light-Duty Fleets. • A summary of EVSE tariff participation can be found in Section V.D EVSE Tariff Participation Rates 3. Port approval and deployment data per Program Year, as discussed in Section IV.B.3.c, EDCs’ Port Deployment Data. • Summaries of all ordered Program metrics can be found in Section IV.B Implementation Metrics 4. Narrative descriptions for all data reported that includes definitions for each data category, as discussed in Section IV.B.3.x, EDCs’ Port Deployment Data. • Summaries of all ordered Program metrics can be found in Section IV.B Implementation Metrics
  6. Page 6 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 6 of 69 5. The data reporting modifications and added metrics as discussed in Section IV.E.1, Annual Data and Metrics Requirements. • Summaries of all ordered Program metrics can be found in Section IV.B Implementation Metrics C. Incremental Reporting Metrics Docket 2022-08-06 Order 15: No later than August 1, 2023, and annually thereafter, the EDCs shall each incorporate the following in their respective Annual Program Reports: 1. Data and metrics outlined in Section IV.I.2; • Summaries of all ordered Program metrics can be found in Section IV.B Implementation Metrics 2. Data regarding the level of applicant interest in futureproofing and applications received, as discussed in Section IV.D; • Summaries of all ordered Program metrics can be found in Section IV.B Implementation Metrics 3. Actual annual Program costs, organized by budget line item, with a comparison to the Company’s initial three-year Program Budget proposal, as directed in Section IV.J. • Program costs and tracking relative to Program budgets are included starting in Section VIII Program Costs. 4. Comprehensive update on light-duty fleet participation in managed charging, as directed in Section IV.E.2. • Updated fleet managed charging results and fleet usage characteristics can be found in Section V.B Light Duty Fleet Participation in Managed Charging. D. MUD Managed Charging Pilot Docket 25-08-06 Order 6: referencing, Docket No. 23-08-06, p. 62; see also, supra Section IV.D, MUD Pilot Program. No later than August 1, [2026], the EDCs shall jointly submit to the Authority for review and approval the results of the MUD Managed Charging Pilot offering and a final program design, as directed in Section IV.F.3 of the Year 2 Decision, and Section IV.C.3.c [of the Year 3 Decision]. [This motion for review and approval shall be filed in Docket No. 26-08-06, Annual EV Charging Program Review - Year 6 (2026 Annual Review Docket).] Results of the MUD Managed Charging Pilot can be found in Section V.A Multifamily Unit Dwelling (MUD) Managed Charging Pilot Results. Based upon new direction included in the Innovative Energy Solutions (IES) Docket No. 22-08-07 Final Decision, Order 1, on July 17, 2026, the EDCs jointly filed for an extension to both Order 1 and the 25-08-06 Order 6, which were subsequently granted by the Authority. For additional discussion on the IES pilot project and MUD recommendations, please see Section VI.B MUD Managed Charging Recommendations.
  7. Page 7 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 7 of 69 E. Analysis and Proposed Program Changes in Response to D.25-08-06 Order 18 Docket 25-08-06 Order 18. No later than August 3, 2026, the EDCs shall include in their joint Annual Report filing in the 2026 Annual Review Docket: 1. A report summarizing the EDCs’ tracking of Program participation rates, application trends, and any other relevant market impact resulting from the Statutory Expense Cap throughout the 2026 Program Year as discussed in Section IV.A.2, Program Incentive and Budget Modifications. Further, the report shall summarize the Companies’ study on the impact of potential incentive allocation reductions on the business case for contractors and site hosts, and the Connecticut EVSE market as a whole. • Analysis of Residential and Commercial program incentive changes can be found in Section V.E.1 Participation rates, application trends, market impact. 2. A proposal regarding Program incentives and deployment targets, as discussed in Section IV.A.2, Program Incentive and Budget Modifications, that includes the following (a) a proposed methodology for a commercial Level 2 EVSE application process based on the existing DCFC application process, that includes a (i) proposed timeline, (ii) prioritization criteria matrix with associated criteria weights, and (iii) incentive distribution plan; (b) modified commercial Level 2 EVSE and DCFC incentive levels and/or structure that aligns with the Authority’s interpretation of eligible Statutory Expense Cap expenses and the Program Area deployment targets; (c)proposed modifications to the Program Area deployment targets, if necessary, including all supporting assumptions and calculations; and (d) an analysis regarding the impact of the proposed incentive allocation reductions on the business case for contractors and site hosts, and the Connecticut EVSE market as a whole. If the Companies find it necessary to modify the Program Area deployment targets, the Companies shall include in their proposal regarding modified commercial Level 2 EVSE and DCFC incentive levels a proposal under (i) the current port deployment targets; and (ii) the proposed port deployment targets. • Analysis supporting the proposed recommendations are in Section V.E.2 Analysis for Proposal Regarding Program Incentives and Port Deployment Targets. Recommendations on incentive and deployment targets can be found in Section VI.A Program Recommendations in Response to Order 18. 3. A report summarizing the effects, if any, of the reduced pool of Residential Single-Family upfront EVSE and wiring upgrade incentives on new managed charging enrollments during the 2026 Program Year as discussed in Section IV.A.2, Program Incentive and Budget Modifications. The Companies shall include a re-examination of the appropriateness of the $100 managed charging enrollment incentives, or other relevant Program components in incentivizing EV driver enrollment in the managed charging program. • Analysis on the effect of the reduced pool of Residential Single-Family upfront EVSE and wiring upgrade incentives can be found in Section V.E.1(1) Residential Program. 4. A report summarizing the EDCs’ analysis of the national, regional, and state studies provided by OCC and ChargeScape, recommendations made by ChargeScape and ev.energy regarding nearterm future steps to build upon the Program design, and conversations with EDC Transmission and Distribution system operators. Additionally, the EDCs shall submit a proposal detailing the EDCs’ findings and recommended next steps. This proposal shall also provide details regarding the EDCs’ past, current, and planned future efforts towards load optimization • A literature review of the highlighted documents can be found in Section V.E.3 The Value of Managed Charging, with supporting material included as Attachment 11.
  8. Page 8 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 8 of 69 Additional EDC discussion and recommendations are found in Section VI.C Residential Managed Charging Program Recommendations 5. A summary of the established small-size MUD and Level 1 working group, including the positions brought forth by interested stakeholders and docket participants during the working group meetings, as discussed in Section IV.H, Small MUDs and Level 1 and Smart Outlet Charging Installations. Additionally, a proposal recommending a solution(s) to the issues described regarding (a) MUDs with less than five units; and (b) Level 1 and "smart outlet" charging installation incentive eligibility. • Details on the small-size MUD and Level 1 working group and recommendations can be found in Section V.E.4 Small MUD and Low Power Charging Solutions Working Group IV. Implementation Metrics To provide a full accounting of program progress towards goals, key metrics were developed with the intention to track changes over time to the landscape of EV charging in Connecticut. This section details the current standing of the EV Charging Infrastructure program as of June 30th, 2026. A. Data Collection Methods and Sources Data for these metrics came from a variety of sources. The Evaluator has, with the support of the EDCs, compiled results from these sources to inform internal and external stakeholders of program performance. The source of program data varied according to the topic and responsible department across EDCs, but can be summarized in the following way: 1. Participation Information, Incentives and Costs Data in this category is comprised of participant applications for program rebates, including participant site information, application status, measure(s) requested, installation date, and incentives paid. 2. Marketing and Outreach The EDC marketing teams are responsible for maintaining a full accounting of metrics related to marketing and outreach. This information is described in more detail in Section VII Summary of Education & Outreach. 3. Charging Usage and Load Profiles Participants in the Single-Family Residential program area are, upon participating in the program, enrolled in the EDCs’ residential managed charging program. The managed charging and data collection vendor for both EDCs administers both the residential and MUD managed charging programs for both Eversource and UI. Eversource also works with another vehicle telematics and managed charging provider to support managed charging for vehicle makes not integrated into the other vendor’s platform. On the commercial side, another vendor provides charging data for the four commercial Program Areas for both Eversource and UI.
  9. Page 9 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 9 of 69 4. Evaluation Activities As needed for evaluation activities, the Evaluator requests additional data from both EDCs to support survey sampling, participant characterization, or cost-benefit analyses. B. Implementation Metrics Various Orders have directed the EDCs to file implementation metrics for each EDC, Program Year, and Program Area. This section summarizes all Program metrics relevant to this Annual Report. 1. Metrics Included & Their Definitions Order 20e in the Program Year 3 Decision directed the EDCs to provide definitions for each metric to provide consistency and clarity surrounding the specific data summarized. The definitions are included below: • • • • • • • • • • • • • • • • • • • Applications Received: Total applications submitted during specified time period (e.g. Year 2023: January 1, 2023, through December 31, 2023). Applications Cancelled: Total applications cancelled at any point during specified period. Applications Approved: Total applications approved for incentives during specified period. Ports Reserved: Total ports from applications approved during specified period. Sites Installed: Total sites completed during specified period. Ports Installed: Total ports completed during specified period. Average Approved Ports per Site: Total number of ports divided by total number of sites from applications approved during specified period. Average Number of Sites: Total number of sites divided by total applications approved during specified period. Approved Light-Duty Fleets Sites: Total Workplace sites designated as Fleet, approved during specified period. Approved Light-Duty Fleet Ports: Total ports from Workplace sites designated as fleet, approved during specified period. Program Funds Reserved/Awarded ($): Total incentives awarded from applications approved during specified period. Total Project Costs: Total make ready and EVSE costs submitted from applications approved during specified period. Average Project Costs (per Site): Total make ready and EVSE costs divided by total sites from applications approved during specified period. Average Project Costs (per Port): Total make ready and EVSE costs divided by total ports from applications approved, during specified period. Future Proofing Applications Received: Total applications submitted during specified period that include futureproofing. Future Proofing Applications Approved: Total applications approved during specified period that include futureproofing. Average Futureproofing Costs: Total futureproofing costs divided by total sites approved during specified period that include futureproofing. Residential EVSE Rebates: Total EVSE and connected vehicles approved during the specified period Residential Wiring Rebates: Total wiring rebates approved during the specified period
  10. Page 10 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 10 of 69 • • • • • • • • • • • 2. EVSE Rebates Awarded ($): Total rebates awarded for EVSEs in the specified period Wiring Upgrade Awarded ($): Total wiring rebates awarded in the specified period Enrollment Awarded ($): Total rebates awarded for connected vehicles in the specified period Managed Charging Enrolled: Total enrolled in managed charging by EVSE or connected vehicle during the specified period. Residential Managed Charging Participants: Total enrolled in managed charging by managed charging tier during the specified period. Total Number Premature Cancellation: Total number of managed charging participants that opt out of the program Total DR Events: Total number of residential DR events Managed Charging Incentives Awarded ($): Total residential incentives awarded Total kWh dispensed: Total kWh dispensed by EVSEs or connected vehicles Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles: Total CO2 avoided. Calculated by comparing the marginal emissions (AESC 2021 emissions data) from EV charging data and the tailpipe emissions of an average ICE vehicle assuming the same miles driven. Charging Load Profiles and Characteristics: Weekday hourly load profiles, by community, managed charging tier, and time period. Ports Approved in Each Program Year Compared to Goal Table 3 and Table 4 summarize total ports reserved in each Program Year, as well as provide a running total over the course of the Program compared to the updated goal in each Program Year. In 2025, the second Program Cycle began, with new port targets for the EDCs over the coming three years. At the halfway point in the second Program Cycle, port reservations lag Program goals across all Areas, excluding DCFC at UI. Current port reservations are 97% of Program Cycle I goals for Eversource and 99% for UI. Including both Program Cycle I and II port goals, current port reservations are 42% of the goal at Eversource and 43% at UI. Residential Single Family, MUD, and Workplace are undersubscribed compared to DCFC and Destination Level 2 Program Areas.

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2