Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

2 pages match
  1. Page 30 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 30 of 69 Program rebates for wiring or EVSE installation must now meet certain income requirements, while the Managed Charging Program remains open to residential EV driving customers with compatible equipment. Order 18c of the same Decision directs the EDCs to provide an analysis of “the effects, if any, of the reduced pool of Residential Single-Family upfront EVSE and wiring upgrade incentives…”. To address this order, the EDCs analyzed: • • • Overall enrollment trends in 2026 compared to historic trends The trend in the percent of customers participating in managed charging with no equipment or wiring rebate Average project and rebate costs over time Figure 13 and Figure 14 show the overall trend in applications; including those for only managed charging, by month. Grey bars indicate applications received during or after January 2026 when the new Program design went into effect. Enrollments for Eversource dropped while overall enrollments for UI continued at comparable levels to 2025. Managed Charging program average monthly enrollment in 2026 have averaged approximately 100 for Eversource and 60 for UI. Note that June data for Eversource reflects partial month data only. Figure 13: Eversource Program Rebates and Enrollments by Month (Data Through September 30, 2026)
  2. Page 31 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 31 of 69 Figure 14: UI Program Rebates and Enrollments by Month (Data Through September 30, 2026) Examining participation by pathway, however, shows that both EDCs had substantial declines in the number of equipment and wiring rebates starting in 2026. For both EDCs, managed charging-only participants now represent 88% of participants for Eversource and 92% for UI.
  3. Page 32 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 32 of 69 Figure 15: Eversource Participant Trends by Participation Pathway (Data Through September 30, 2026) Figure 16: UI Participant Trends by Participation Pathway (Data Through September 30, 2026)
  4. Page 33 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 33 of 69 Finally, changes in project costs and rebate values in 2026 are compared to the prior year. With the caveat that the population in 2026 represents a much smaller number and likely lower income level of participants, project costs do not seem substantially different between 2025 and 2026. Rebate levels for both EDCs are higher in 2026, reflecting the larger rebate amount available to the income qualified participants. Figure 17: Summary of Project Costs and Rebates for Participants Receiving Wiring or Equipment Incentives (Data Through September 30, 2026) In summary, the Residential Program changes that went into effect in January 2026 appear to have clear effects on the composition of Program participants. While substantially fewer equipment and wiring rebates are being processed, managed charging participation continues to be subscribed. Project costs for low-income customers do not appear to be meaningfully different to previous program participants while rebates are covering a larger percentage of project costs. In turn, the EDCs’ residential outreach strategies have evolved in response to the eligibility changes; please see Section VII for a comprehensive update on customer outreach and engagement efforts. Additionally, see Section VI.C.2 for changes and associated program recommendations aimed at simplifying enrollment for new managed charging only participants. Therefore, in response to Order 18c of the Final Decision in Docket No. 25-08-06, at this point in time, the EDCs recommend maintaining the $100 managed charging enrollment incentive to help support program growth in 2027 but recommend revisiting this when the Program Term report is completed in 2027.
  5. Page 34 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 34 of 69 (2) Commercial Program In response to Public Act No. 25-173 and the EDCs’ proposed revisions to the EV Charging Program incentive framework outlined in Motion No. 7, the Authority determined that further discovery and briefing were warranted prior to issuing a decision on the proposed incentive structure. The proposed revisions would modify incentive levels, program structure, design methodology, annual budget allocations, application processes, and award timelines. To evaluate the potential effects of these changes on EV charger installations, analyses examining EV adoption trends in Connecticut and EVSE demand elasticity were conducted alongside interviews and incentive surveys of site hosts and contractors that received Program funding to assess market and program impacts. To quantify the effects of hypothetical Program rebate changes on the decision of Program participants, we conducted a series of analysis that attempt to quantify the effects: • • • • Interviews with Program Site Hosts and Contractors to determine experiences with the program, motivations for participating, and sensitivity of their participation decision to changes in incentive levels. Survey of un-interviewed Program Site Hosts and Contractors to quantify the sensitivity of their participation decision to changes in incentives levels. Analysis of historic participant out-of-pocket (i.e. incremental) costs for each project and the amount by which it would change under a variety of incentive reductions. Modeling based on the elasticity of EVSE supply to incentive reductions. Findings from this analysis suggest that: • • • • 2. Any reduction in incentives will lead to a drop in applications. Depending on the methodology, a 50% reduction in incentives would lead to a drop of between 50% and 70% in applications. Site Hosts reported incurring substantial out-of-pocket expenses not covered by the incentive, including costs associated with chargers, signage, and charger management software application fees. All but one Site Host interviewee indicated that any additional costs passed on to participants would likely have discouraged participation in the program. In general, Site Hosts were significantly more sensitive to proposed changes in incentive levels than Contractors and would be much less likely to participate. Contractors often spoke in more general terms and indicated that the decision to proceed with a project depended on the out-of-pocket costs that the project’s Site Host would be exposed to. Reductions in proposed funding would more significantly affect projects in Underserved communities as project costs between Baseline and Underserved communities do not substantially differ but rebates do. Participant reactions to other proposed changes to program structure outside of the incentive levels were less strong but generally were in favor of flexibility and any design that would lead to higher incentives. Site Hosts and Contractors both noted that moving to a fixed application window for Level 2 projects, mirroring the DCFC process, would be very unattractive, especially for small businesses or those with highly seasonal activity. Analysis for Proposal Regarding Program Incentives and Port Deployment Targets Order 18b of the Final Decision in Docket No. 25-08-06 states the following:
  6. Page 35 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 35 of 69 No later than August 3, 2026, the EDCs shall include in their joint Annual Report filing in the 2026 Annual Review Docket: A proposal regarding Program incentives and deployment targets, as discussed in Section IV.A.2, Program Incentive and Budget Modifications, that includes the following: (1) a proposed methodology for a commercial Level 2 EVSE application process based on the existing DCFC application process, that includes a (a) proposed timeline, (b) prioritization criteria matrix with associated criteria weights, and (c) incentive distribution plan; (2) modified commercial Level 2 EVSE and DCFC incentive levels and/or structure that aligns with the Authority’s interpretation of eligible Statutory Expense Cap expenses and the Program Area deployment targets; (3) proposed modifications to the Program Area deployment targets, if necessary, including all supporting assumptions and calculations; and (4) an analysis regarding the impact of the proposed incentive allocation reductions on the business case for contractors and site hosts, and the Connecticut EVSE market as a whole. If the Companies find it necessary to modify the Program Area deployment targets, the Companies shall include in their proposal regarding modified commercial Level 2 EVSE and DCFC incentive levels a proposal under (1) the current port deployment targets; and (2) the proposed port deployment targets. The Electric Distribution Companies (“EDCs”) seek to first address items (2) and (3) as one comprehensive narrative and proposal below. Following this analysis, the EDCs will address item (4), with item (1) included in a summary of all recommendations being proposed. a) Key Recommendations The EDCs response to this Order is resulting in the following recommended modifications to the Light Duty EV Charging Program (the “Program”), each of which will be discussed in further detail in Section VI.A Program Recommendations in Response to Order 18.: 1. Maintain Rolling Applications & Institute Minimum Criteria Threshold 2. Maintain Incentive Levels, Adjust Port Deployment Targets 3. Revise Site Definition & Implement Site Incentive Cap 4. Institute Budget Cap for Enhanced Incentive 5. Discontinue Program Area 3 (Public DCFC) b) I. Response to Order 18(b) Items 2 & 3: Incentive Structure and Deployment Targets The current dollar-per-site incentive and cap model allocates a fixed incentive cap for Level 2 sites ($20,000 for Baseline and $40,000 for Underserved) regardless of the number of ports the participant installs. This creates budget uncertainty for annual Program spending and limits the EDCs' ability to precisely forecast, track and ensure the successful achievement of port deployment targets within the $20 million annual Program budget (“Statutory Expense Cap”) established under Senate Bill 4 (which was subsequently signed into law as Public Act
  7. Page 36 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 36 of 69 25-173). Therefore, the EDCs propose the introduction of a new incentive structure that shifts funding from the current existing site cap framework to a dollar-per-port basis. More information for this task with supporting calculations and analysis can be found in Attachment 10a. A summary is presented below. To transition to a per-port incentive design within the Statutory Expense Cap, the EDCs reviewed historical incentives paid on a per-port basis since program inception. Additionally, the three-year cycle-level port deployment targets were annualized to align with the annual nature of the Statutory Expense Cap. To comply with the Statutory Expense Cap, the EDCs modeled and analyzed two scenarios: 1. Reduce port deployment targets while maintaining the per-port incentive at or near current incentive levels. 2. Maintain existing port deployment targets while reducing the per-port incentive offered. The overarching design of Scenario 1 is to maintain per-port incentives at or near historical levels to continue providing the current level of project support to customers. Based on observed historical rebates, the EDCs propose a universal rebate offering of $6,800 per Baseline Level 2 port, and $12,100 per Underserved Level 2 port uniformly across all Commercial Level 2 project types. The enhanced incentive for Underserved customers would be limited to 40% of ports, however Underserved customers would be able to receive the Baseline incentive following the achievement of the 40% cap. Under both Scenarios 1 and 2, DCFC port targets and the corresponding budget allocation have been reduced to zero. The EDCs do not recommend funding additional DCFC projects through the Program beyond 2026, as described in full detail in Section VI.A.5 Discontinue Program Area 3 (Public DCFC). Ultimately, Scenario 1 results in proposed port deployment targets of 360 Single Family Residential ports per year and 2,178 commercial ports per year including 1,488 Residential MUD Level 2 ports, 273 Destination Level 2 ports, and 417 Workplace Level 2 ports, for a total of 2,538 ports annually across all Program Areas. While this is significantly lower than the current 10,282 annualized port deployment target across all Program Areas, the proposed budget aligns with the requirements under Public Act 25-173, equating to approximately $19.97 million and satisfying the $20 million Statutory Expense Cap. In contrast to Scenario 1, the overarching principle of Scenario 2 is to maintain the existing port deployment targets. Doing so necessitates a significant reduction in per-port incentives to reconcile with the $20 million Statutory Expense Cap. Under Scenario 2, the EDCs propose universal Commercial Level 2 incentives of $3,300 Baseline per port and $5,900 Underserved per port. The enhanced offering for Underserved customers would be limited to 40% of ports, however Underserved customers would be able to receive the Baseline incentive following the achievement of the 40% cap. These proposed incentive levels maintain the existing annualized port
  8. Page 37 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 37 of 69 deployment targets while also preserving the historically observed differentiation of approximately 78% greater incentive per-port offered to Underserved compared to Baseline customers. Ultimately, Scenario 2 results in proposed port deployment targets of 360 Single Family Residential ports per year and maintains the current annualized port targets of 3,000 ports for Residential MUD Level 2, 551 ports for Destination Level 2, and 840 ports for Workplace Level 2. Scenario 2 achieves the original commercial Level 2 port targets by dramatically lowering the financial support per project. The total budget required is $19.59 million, satisfying the Statutory Expense Cap. c) Response to Order 18(b) Item 4 The EDCs' Evaluation, Measurement & Verification Vendor, Demand Side Analytics (“DSA”), conducted interviews to survey how stakeholders view current incentive levels, port targets, and application processes. Their findings are included as Attachment 9. A summary of key findings can be found in Section V.E.1(2) Commercial Program 3. The Value of Managed Charging Recent national and regional studies consistently find that managed electric vehicle (EV) charging can create meaningful grid and customer value, particularly through reduction of coincident peak demand. The most mature and defensible value streams are avoided system-level generation, distribution, and transmission capacity costs, and avoided energy procurement costs. Less demonstrated value streams include transformer asset protection, optionality value, and valuation of specific distribution system deferrals. A recurring theme across studies is that simple time-of-use (TOU) rates alone may shift charging load but can also create secondary peaks. More advanced active managed charging strategies generally outperform passive price signals when grid objectives are prioritized. However, there may be other more complex passive strategies, such as TOU rates or behavioral managed charging with staggered peak periods, that achieve similar benefits. For Connecticut, the literature suggests that the current managed charging program captures real system-level capacity value today, including distribution value due to coincidence of distribution and system level peaks. Larger value will depend on higher EV adoption, new programs and methods for targeting specific distribution system constraints, greater participation in active managed charging, and more granular planning data. A longer literature review for this analysis, provided in response to Order 18(d), can be found as Attachment 11. The EDCs discuss related recommendations in Section VI.C.
  9. Page 38 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 38 of 69 4. Small MUD and Low Power Charging Solutions Working Group In response to Order 18 e), Eversource and United Illuminating (together the “EDCs”) convened the Small MUD and Low-Power Solutions Working Group (“Working Group”), from April through June of 2026. The Working Group was convened to evaluate potential programmatic modifications specifically relating to 2-4 unit Small Multi-Unit Dwellings (“Small MUD”), as well as potential program eligibility for Level 1 and “smart outlet” charging installations in both the Small MUD and 5+ unit MUD contexts. As described in full detail in the attached report (Attachment 12), The EDCs recommend maintaining two pathway options for Small MUD customers to participate in the Program: the first path via the Single-Family Residential Program is unchanged; and the second path via the Commercial MUD Program, with specific modifications tailored to Small MUD. Additionally, as certain program design elements of the Working Group’s scope extend beyond Small MUD, the EDCs propose Program modification recommendations which would be applicable only to 5+ MUD. The full Order 18e) report, including the Working Group summary and the corresponding recommendations relating to both Small MUD and 5+ MUD, are described in full detail as Attachment 12 - Order 18e Analysis Small MUD and Low Power Working Group Findings. VI. Proposed Program Design Changes The sections below propose Program changes to support improvements to the customer experience, operational efficiency, and cost-effectiveness. All recommendations in this section are proposed jointly by Eversource and UI. A. Program Recommendations in Response to Order 18 1. Level 2 EVSE Application Process – Maintain Rolling Applications & Institute Minimum Criteria Threshold Order 18(b), Part 1 directs the EDCs to propose a methodology for a commercial Level 2 application process based on the existing DCFC application process. Taking into consideration the EDCs' recommendation of Scenario 1, the EDCs recommend maintaining a rolling application window for commercial Level 2 Program Areas. Interviews conducted by DSA found that customers and contractors strongly prefer a rolling application window, as it provides the flexibility necessary to plan and budget projects. Respondents indicated that moving to a fixed application period would create long windows where funding availability would be unknown, ultimately slowing market interest.
  10. Page 39 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 39 of 69 As an alternative to the implementation of an application window, the EDCs propose a minimum criteria threshold which would need to be met in order for a Level 2 project to qualify for incentives. This would ensure that incentives are being awarded to high quality projects. Potential minimum criteria include: • • Site safety: Security cameras covering the charging area Existing or proposed lighting of the charging area Appropriate directional and charger location signage Accessible pedestrian pathways between charging stations and site amenities Other Amenities: Public restroom access Food and beverage options Retail establishments Covered seating or waiting area 2. Implement Scenario 1 Incentive Structure - Maintain Incentive Level, Adjust Port Deployment Targets As discussed in its response to Order 18(b) Items (1) & (2), the EDCs recommend the implementation of its Scenario 1 incentive structure proposal. This proposal includes the following three elements: • • • Shift incentive cap from a per-site to a per-port basis Maintain historical incentive level support Reduce port deployment targets to align with the Statutory Expense Cap Additionally, the EDCs propose that the incentive amount will be calculated using either 50% of the eligible EVSE charger costs plus 100% of the eligible make-ready installation costs, or the per-port maximum rebate, whichever is less. 3. Revise Site Definition & Implement Site Incentive Cap Scenario 1 necessitates the adjustment of a customer incentive cap from a dollar-per-site cap to align with the recommended per-port incentive. Currently a site is defined as the following in the 2026 Participant Guide for Commercial Customers and Vendors, dated 5/18/2026: Prewiring electrical infrastructure at a set of parking spaces to facilitate cost-efficient installation of a bank of EVSE, either Level 2 or DCFC, on a property within the Eversource or UI electric service territory owned or controlled by the site host. A site may include a service panel, junction boxes, conduit, wiring and other components necessary to make a particular location able to accommodate a bank of EVSE. The maximum incentives shall apply to each site. A site host may have more than one site at a single property to the extent that each site meets the specific electrical infrastructure criteria as defined.

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)