Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Page 40 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 40 of 69 The EDCs recommend establishing a per-port incentive cap that would expand the definition of a site to a parcel as defined by The State of Connecticut’s computer-assisted mass appraisal (CAMA) database file. To serve as many customers as possible with the port allocation targets recommended, the ECDs further recommend a maximum port cap of 10 for each parcel. Participants will easily be able to view the Connecticut CAMA and parcel information to determine the bounds of the cap to a site and understand the maximum incentives without needing to understand the technical characteristics of the pre-existing electrical infrastructure. 4. Institute Budget Cap for Enhanced Incentive The EDCs seek to prioritize Distressed and Underserved Communities, as well as encourage projects across all geographies and customer types. Therefore, as discussed in its response to Order 18(b), Items 1 & 2 above, the EDCs recommend that the Underserved Community enhanced incentive be limited to 40% of the ports funded for each project type (e.g., Workplace L2), after which all customers (regardless of location) will receive the Baseline incentive. Establishing this cap will be highly effective in helping the EDCs to meet the new port targets while aligning with the Authority’s Equity & Underserved Targeting under the Justice40 Initiative. 5. Discontinue Program Area 3 (Public DCFC) At the conclusion of the 2026 application window, both Companies have awarded the full port deployment target for Cycle 2 (2025-2027) for the Public DCFC Program Area. The EDCs recommend no changes to the DCFC port deployment target for Cycle 2. Additionally, the EDCs recommend that the program port deployment target for the Public DCFC Program Area for Cycle 3 be zero, and that no further application periods be pursued. Installation of DCFC in CT in the last four years along with a robust pipeline of yet to be installed sites demonstrates that the market is successfully deploying DCFC ports, independent of program support, at levels above what is needed to support the forecasted and goal levels of EV adoption in CT. a) Original Port Deployment Targets The original DCFC port deployment targets in 17-12-03RE04 were developed by the Authority using the 2021 version of the US Department of Energy’s (“DOE”) EVI Pro-Lite Daily Charging Need tool 10, which estimates 9F how much EV infrastructure is needed to support typical daily travel in a given state. The 2021 version of the EVI-Pro Lite Tool did not model EVSE deployment beyond 10 percent of 2016 estimates of total in-state light duty vehicles. Accordingly, the EVI-Pro Lite Tool was limited in its estimate for EVSE needed to support up to 300,000 light-duty EVs in Connecticut. The Authority used extrapolation of the results of 10 https://afdc.energy.gov/evi-x-toolbox#/evi-pro-portsPage 41 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 41 of 69 the infrastructure needs for 150,000 EVs (the 2025 state EV adoption goal) to estimate the infrastructure needs for 500,000 EVs (the 2030 state EV adoption goal). The 2021 output of the EVI Pro-Lite tool using estimated inputs from CT DEEP yielded the following DCFC infrastructure needs: Table 9: Original DCFC Infrastructure Needs Original 2021 Output 2025 2030* EVs Supported 150,000 500,000 Public DCFC 412 1,102 Public L2 3,119 9,737 Workplace L2 4,628 14,713 *extrapolated from 2025 output Based on that output, the Authority established the DCFC port deployment targets to be a total of 550 ports by the end of Cycle 3 (50% of the total 1,102 port need). By Cycle and by Company, the original port deployment schedule was as follows: Table 10: Original DCFC Port Deployment Targets by EDC Current Deployment 2022-2024 2025-2027 2028-2030 Total 69 137 172 172 550 Eversource 110 138 138 386 UI 27 34 34 95 Total Due to strong demand for the Program Area during Cycle 1 (but not based on any revised assessment of the overall infrastructure need), the Authority approved revised DCFC port deployment targets resulting in the following: Table 11: Revised DCFC Port Targets by EDC Current Deployment 2022-2024 2025-2027 2028-2030 Total 69 438 172 172 851 Eversource 357 138 138 633 UI 81 34 34 149 TotalPage 42 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 42 of 69 b) Updated EVI Pro-Lite Output The DOE has made several updates to the EVI Pro-Lite tool that enables estimates of infrastructure needs at any EV adoption number (i.e. at greater than 10 percent of in-state light duty vehicles). The EDCs used the tool with its updated methodologies to estimate the DCFC needs of a variety of EV adoption estimates. Table 12: Updated Output of EVI Pro-Lite 2025YE Actual (a) 2025 Goal (b) 2030 Goal (c) EDC 2030 Forecast (d) EVs Supported 73,156 150,000 500,000 254,000 Public DCFC 173 350 756 442 150 kW 107 217 189 183 250 kW 33 66 221 107 350 kW 33 67 346 152 • • • • Column (a) shows the number and type of DCFC ports needed to support the 73,156 actual EVs registered in CT at the end of 2025 – 173 total DCFC ports. Column (b) shows the number and type of DCFC ports needed to support the state’s 2025 EV adoption goal of 150,000 EVs – 350 total DCFC ports. Column (c) shows the number and type of DCFC ports needed to support the state’s 2030 EV adoption goal of 500,000 EVs – 756 total DCFC ports. Column (d) shows the number and type of DCFC ports needed to support the EDCs’ 2030 EV adoption forecast of 254,000 EVs – 442 total DCFC ports. c) Current DCFC port count Based on the DOE’s Alternative Fueling Station Locator 11, which is an online tool from the DOEs Alternative 10F Fuels Data Center that identifies the location of public EV charging stations across the United States, in early 2026 there were 747 DCFC ports at over 150 sites across the state, with 162MW of capacity. Of those 747 ports, over 450 have been built since 2022 (Figure 18). Table 13: Current Installed DCFC Port Count Statewide Ports 11 >150kW 162 150kW 169 250kW 322 350kW 94 Total 747 Alternative Fuels Data Center: Alternative Fueling Station LocatorPage 43 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 43 of 69 Figure 18: Statewide DCFC Ports Installed by Year The Program has contributed funding to less than half of the ports deployed since its inception. d) Geographic Distribution The currently installed network of DCFC sites and ports is relatively distributed across the state, shown on this map of sites: Figure 19: Geographic Distribution of DCFC StationsPage 44 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 44 of 69 e) Robust Pipeline of Known Projects to Be Built In addition to the strong growth of DCFC deployment in the state since the inception of the Program, the EDCs are aware of a robust pipeline of DCFC ports that are yet to be electrified. These include the following: Table 14: Planned DCFC Sites and Ports Planned Sites Ports 9 36 CFI Grant Awards 13 8 96 UI Awarded Not Built 15 49 ES Awarded Not Built 37 182 EDC 2026 DCFC Cycle 9 46 Total 69 413 NEVI Sites 12 11F 12F Added to the currently installed 747 DCFC ports, assuming these projects come to fruition, the state would have 1,160 DCFC ports at over 220 sites. This does not account for continued growth of DCFC ports installed without Program or other federal or state funding support. Given the current status of DCFC deployment, the robust pipeline of sites yet to be built, and the recent growth of sites independent of program support, the EDCs recommend that the DCFC Program Area be discontinued beginning in 2027. Ratepayer dollars are better spent on Level 2 charging, which has not demonstrated the same level of success, and for which there remains a need that can be supported by the Program. Whether it’s the infrastructure needed to support the state’s EV adoption goals, or the EDCs’ forecast of EV adoption – in either scenario the state already has the DCFC network to support EV adoption without relying on the subsidization by the Program. B. MUD Managed Charging Recommendations The EDCs’ MUD Managed Charging Pilot program was extended through the end of 2026, to allow the EDCs and their implementor more time to collect data and learnings. PURA also granted an extension until August 1, 2026, for the EDCs to propose a final MUD program design. National Electric Vehicle Infrastructure Formula Program is a federal initiative that provides funding for states to strategically deploy DCFC stations. 13 Charging and Fueling Infrastructure Program is a federal discretionary grant program that provides funding to deploy EV charging infrastructure in communities and along designated alternative fuels corridors. 12Page 45 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 45 of 69 In addition, through the Innovative Energy Solutions (IES) Pilot (Docket 22-08-07), PURA selected AmpUp to test an EV managed charging offering with public Level 2 charging stations providing peak load reduction. This pilot reached MUD and other Level 2 public charging sites, including workplaces and other public destinations. On July 1, 2026, PURA issued a Program Cycle 1 Final Decision directing the EDCs and AmpUp to jointly file a proposal that includes a scaled deployment of AmpUp’s project within the MUD managed charging final program design. The EDCs are actively working with both AmpUp and the pilot implementor to consider updates to the pilot program’s design. The MUD Pilot participation and results have been limited, which limits the conclusions the EDCs can draw about the scalability of managed charging facilitated by MUD EV chargers. Supporting MUD EV customer participation in managed charging, through EV telematics may provide the greatest avenue for scalability in the near term. PURA has recommended the AmpUp pilot be considered in the CT EV Annual Review docket for potential scaling. The AmpUp pilot had success with enrolling MUD charger sites through an “opt-out” approach woven into the NSP and MUD site hosts’ terms and conditions. Additionally, the AmpUp app provided a simple customer interface that enabled EV charging deferment and load shifting. The EDCs believe both enhancements can be integrated, at least to some degree, into a revised MUD Pilot offering that provides opportunities and access to multiple NSP providers. The EDCs are actively engaged in advanced discussions with AmpUp and the Pilot’s technology provider to define a potential path forward. With this potential relationship in active development, the Companies have requested and subsequently received approval for an extension to both IES Order 1 and EV Order 6, to file updated program design recommendations by August 31, 2026. C. Residential Managed Charging Program Recommendations 1. Order 18d Value Stack of Managed Charging Order 18d of the Final Decision in Docket No. 25-08-06 states the following: No later than August 3, 2026, the EDCs shall include in their joint Annual Report filing in the 2026 Annual Review Docket: A report summarizing the EDCs’ analysis of the national, regional, and state studies provided by OCC and ChargeScape, recommendations made by ChargeScape and ev.energy regarding nearterm future steps to build upon the Program design, and conversations with EDC Transmission and distribution system operators as discussed in Section IV.F.1, Value Stack and Load Optimization. Additionally, the EDCs shall submit a proposal detailing the EDCs’ findings and recommended next steps. This proposal shall also provide details regarding the EDCs’ past, current, and planned future efforts towards load optimization.Page 46 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 46 of 69 a) Analysis of National, Regional, and State Studies In Attachment 11 the EDCs and their EM&V partner reviewed relevant value stack literature and provide analysis of this literature which includes: the relevance of these studies to CT, under what conditions managed charging can extract additional value from the stack, if and how managed charging can be deployed in this way, and what challenges exist to doing so. The analysis recommendations include, 1. Continuing to target system peaks and capture system capacity and avoided energy and emissions benefits, 2. Analysis to estimate the potential for EVs to alleviate constraints at various areas of the distribution grid, and 3. Program sophistication should change with the maturity of the EV market. b) Distribution Value & Load Optimization Considerations The EDCs Managed Charging program reduces system peak by shifting load away from the ISO- NE system peak. The EV Charging Program currently uses a peak period of 3 pm - 9 pm, and non-holiday weekdays. Due to high coincidence of system and distribution system peaks, the current program already captures distribution value by shifting load away from that peak. The EDCs are evaluating the opportunity for advanced program designs to provide addition distribution system value, including engagement with their transmission and distribution planning teams as directed by PURA. For example, UI has collaborated with its transmission and distribution planning teams to map active Managed Charging participants to circuits with known constraints. This analysis is being used to identify opportunities for targeted participant recruitment and to evaluate whether managed charging can provide additional value on highly loaded circuits. Table 15: Count of UI Managed Charging Participants on Circuits by Highest Phase Loading Circuit ID Highest Phase Loading MC Program Participant Count 1 117.90% 2 2 112.60% 31 3 110.60% 20 4 110.20% 45 5 108.30% 20 6 107.10% 26 7 106.10% 10 8 105.20% 0 9 104.30% 9 10 103.60% 29 11 103.60% 20 12 102.70% 49Page 47 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 47 of 69 13 101.50% 1 14 100.00% 9 15 99.70% 14 16 98.90% 14 17 98.80% 21 18 98.80% 22 19 98.60% 20 20 98.50% 11 21 96.40% 0 22 95.60% 4 23 95.30% 45 24 94.20% 0 25 94.00% 11 26 93.40% 28 27 93.10% 26 28 92.30% 14 29 92.30% 5 30 92.20% 42 31 91.10% 18 32 91.00% 0 33 90.60% 5 34 90.40% 8 Table 16: Top 20 UI Circuits by Number of Managed Charging Program Participants Circuit ID Highest Phase Loading MC Program Participant Count 12 102.70% 49 4 110.20% 45 23 95.30% 45 35 62.40% 44 30 92.20% 42 36 79.70% 34 37 79.90% 34 38 87.50% 32 39 75.30% 31 40 59.10% 31 2 112.60% 31 41 40.70% 31 10 103.60% 29Page 48 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 48 of 69 26 93.40% 28 42 78.70% 28 43 73.10% 26 44 89.90% 26 6 107.10% 26 45 75.10% 26 27 93.10% 26 Note: red: peak load above 100% of the circuit normal rating, yellow: 90%-100% of the circuit normal rating, green: below 90% of the circuit normal rating. Circuit mapping enables the EDCs to identify participants located on constrained portions of the distribution system and evaluate opportunities for targeted managed charging strategies. Several circuits currently include 30 to 50 enrolled vehicles, demonstrating sufficient participation levels to support evaluation of localized loadmanagement approaches. As an initial step, the EDCs propose targeted participant recruitment on selected circuits to increase the potential distribution benefits of the existing Managed Charging Program. As another example of UI’s efforts to understand localized constraints and EV impacts on system load, UI is collaborating with Gridsight, an AMI disaggregation and analytics firm, through a CT IES Project. The collaboration uses Gridsight’s machine-learning platform to analyze UI’s AMI interval data and distribution system topology to identify premise-level EV charging and determine where and when charging coincides with system peaks and distribution asset constraints. UI expects the results to provide additional data-driven insights to support localized EV program design, targeting, and enrollment. In 2026, Eversource began testing localized flexibility programs designed to address specific distribution system needs in Massachusetts. These pilots include managed charging and demand response strategies that are testing the opportunity to leverage distributed energy resources, to alleviate localized constraints, absorb excess renewable generation, and potentially defer infrastructure investments. Insights from these pilots may help inform future Connecticut program designs where localized flexibility could provide measurable grid benefits 14. 13F Eversource plans to propose and deploy pilots in Connecticut, that can address specific distribution level challenges where load flexibility solutions can potentially provide relief and delay infrastructure replacement or build out. Managed Charging+ and ConnectedSolutions+ are available to Eversource customers in specified Eversource Massachusetts electric service territory areas, in 2026. 14Page 49 of 69
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 49 of 69 In addition, Eversource has been working with technology service providers to test if changes to active managed charging strategies (algorithms) can help to flatten EV charging load and mitigate the secondary peaks. Looking ahead, the EDCs believe targeted pilots and demonstrations may be appropriate where managed charging can address specific distribution-system needs. Potential approaches are described below and are intended to illustrate opportunities for future evaluation rather than commitments to implementation. c) Potential Opportunities for Evaluation The concepts below illustrate potential future managed charging strategies that could be evaluated where specific distribution-system conditions warrant. These concepts are generally listed from lower to higher implementation complexity and could be combined depending on local system needs. Any future implementation would require consideration of customer experience, participant acceptance, and the participant's ability to maintain control over vehicle charging. Circuit-level or substation-level demand response. While the EDCs have shown that continuous load shifting greatly diminishes the amount of available load for demand response, there may be localized opportunities to implement demand response events coincident with local system peaks that are outside of the standard 3PM to 9PM peak window. In this scenario, the EDCs would identify a circuit or substation, and a peak-period window. Demand response events would be dispatched to enrolled vehicles on that part of the system accordingly. Changes to or layered requirements inside the off-peak window. In this scenario, the existing peak period of 3PM to 9PM is preserved for Advanced Tier Participants who set a daily charging schedule and select a state of charge. Additionally, the existing off-peak charging period of 9PM to 3PM is also maintained. A new, narrowly defined off-peak charging window is then introduced, that would match the specific constraints of a substation or circuit, 10PM to 9AM for example. The system peak objective is preserved, but charging is repositioned more precisely within it. In this scenario, off-peak charging priorities are configurable, so the localized distribution layer can defer to the system objective or override it as the situation requires. This allows the program to continue optimizing for system peak reduction, while exploring capabilities of also optimizing for specific distribution constraints. Turn-up (e.g., EV charging) for generation absorption. For Advanced Tier Participants who set a daily charging schedule and select a state of charge. A preferential off-peak charging window may encourage charging during windows of excess generation from midday solar, to potentially help alleviate distribution constraints and solar curtailment. This scenario essentially operates in a similar manner to the previous scenario, but new charging preference introduced changes. With program design that encourages plug-in availability during these
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
Extracted from the file · 21 pages · 73,536 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Text of ES Order 2, ESS_Items 1-4.pdf
Extracted from the file · 117 pages · 290,953 characters
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Text of ES Order 2, SCEF_Items 1-4.pdf
Extracted from the file · 49 pages · 109,450 characters
Text of ES Order 2, RRES_Items 1-4.pdf
Extracted from the file · 65 pages · 149,171 characters
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2