Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

2 pages match
  1. Page 50 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 50 of 69 windows, connected vehicles become a dispatchable absorption resource, and programs designed around this objective have moved material shares of total charging into midday. Additional option for Advanced Tier for additional monthly incentive. This optimization strategy reprioritizes charging to avoid localized system events, overriding a participant’s charging schedule and selected state of charge. In this scenario, participants would be notified of events and would always retain the right to opt-out of the event. These events would be rare and occur mostly during summer peak demand periods. d) Testing New Opportunities Within the Value Stack As discussed in Section VI.C.3, the EDCs propose a Fast Track process to evaluate these concepts with existing program participants. Potential applications of EV load flexibility should be based on identified distribution system needs and assessed for cost-effectiveness relative to alternative solutions. The EDCs will work with technology providers and other partners to develop and implement limited-scale pilots, evaluate results, and, where warranted, advance recommendations for broader implementation through the Fast Track or Annual Report review process. 2. Incentive Flexibility to help Simplify Enrollment Flow (Eversource) Eversource is working with its EV implementation vendors to simplify the enrollment process for customers by reducing the number of steps customers take to sign up for managed charging. The workflow changes contemplated would allow all customers to enroll directly into managed charging through the DERMs, instead of routing all customers to and through the rebate portal first, and then to the DERMS. While the prior workflow made sense when a vast majority of customers were receiving EVSE and Wiring Rebates, under the 2026 eligibility requirements, a majority of customers are eligible only for managed charging offer. Eversource seeks flexibility to offer the enrollment incentive ($100) to all customers and adjust the current $1,500 EVSE and wiring rebate, to $1,400. This would not make it more cumbersome for a make-ready customer to receive their enrollment incentive; it would just be two separate transactions. In addition, this would not have any change to the upfront rebate that customers could earn but would enable the Companies to process managed charging enrollment incentives more efficiently and avoid customer delays that may result from building in additional review and a potential waiting period, with submitted residential EVSE and wiring rebate applications. 3. Residential Managed Charging Fast Track Proposal Managed charging programs are evolving rapidly as new technologies, customer behaviors, and grid needs emerge. To remain effective, program designs, incentive structures, and eligible technologies must be evaluated and updated more quickly than the current annual review cycle allows. The EDCs therefore propose a Fast Track process for managed charging pilots and tests that meet pre-approved criteria. This process would accelerate the
  2. Page 51 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 51 of 69 evaluation of new technologies and program design elements, enabling timely implementation while maintaining appropriate regulatory oversight Emerging behind-the-meter technologies, including charger adapters, smart panels, subpanels, and advanced metering devices, may provide new pathways for managed charging participation. In addition, experience with existing programs has identified opportunities to refine incentive structures, enrollment strategies, and other program elements to increase participation and system value. The proposed Fast Track process would provide an efficient mechanism to test and validate these innovations before considering broader program adoption. a) The Fast Track Process The EDCs propose a Fast Track approval process for managed charging pilots and tests that satisfy established eligibility criteria. By May 1 of each annual program review proceeding, the EDCs may submit a joint or individual motion(s) seeking approval of an eligible pilot or test. Each proposal would include a clear objective, scope, budget, and evaluation metrics and would be subject to the Authority’s standard review process, including stakeholder comments, technical meetings, and discovery. The EDCs would seek a ruling from the Authority on the Fast Track proposal within the annual proceeding and in advance of the timeline that would otherwise apply to program recommendations submitted through the standard Annual Report process. The Fast Track process differs from the existing Annual Report program recommendation process by providing an earlier and more targeted regulatory review pathway for limited-scope pilots and tests. Under the current framework, the EDCs submit program recommendations as part of the Annual Report filing on August 1, and approval of those recommendations typically is not received until PURA issues a Final Decision at the conclusion of the following year’s associated regulatory proceeding, which may occur approximately sixteen months later. The Fast Track process would allow the EDCs to seek review and approval of eligible pilots and tests during the pendency of the annual proceeding, providing an opportunity to evaluate emerging technologies, customer offerings, and program design enhancements on an accelerated timeline while maintaining PURA oversight and stakeholder participation. Approved Fast Track activities would remain limited in scope and would not constitute approval of permanent program modifications, which would continue to be reviewed through the existing Annual Report process. The Fast Track process would supplement, rather than replace, the existing annual program recommendation process. Approved pilots and tests would be reported in subsequent Annual Reports, and successful results may inform future proposals for permanent program changes. b) Definitions of a Pilot and a Test For purposes of the Fast Track process, the EDCs propose the following definitions:
  3. Page 52 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 52 of 69 • • Pilot: A pilot is the deployment of a technology, program design element, or combination thereof evaluated under real-world operating conditions to determine whether it should be considered for permanent implementation within a managed charging program. Test: A test is the trial of a technology, program design element, or combination thereof evaluated on a limited basis to assess feasibility, performance, or customer response and inform future pilots or program recommendations. c) Criteria for Pilot and Test Proposals Each Fast Track proposal shall include sufficient information to support regulatory review and evaluation, including: • • • • Objective: The purpose of the proposed pilot or test and the issue or opportunity it is intended to address. Scope: The proposed duration, participant population, and implementation scale Budget: Estimated costs associated with implementation and administration. Metrics: The criteria and methodology that will be used to evaluate performance and results. d) Eligible Activities for Fast Track Review Fast Track proposals may include the following activities. 1. Testing of new technologies that support managed charging and expand eligible participation pathways. 2. Evaluation of behind-the-meter solutions that enable managed charging through data access or direct load control. 3. Limited-scale testing of alternative incentives, enrollment strategies, peak-period designs, or other program features intended to improve program performance. e) Program Modifications Not Eligible for Fast Track Program modifications that materially change the structure, objectives, or core design of a PURA-authorized managed charging program, or that would broadly apply to all participants, are not eligible for Fast Track review. Such proposals shall be submitted through the existing Annual Report and program review process. Where applicable, the EDCs may use information obtained through approved Fast Track pilots and tests to support future recommendations for permanent program modifications. The EDCs recommend that the Authority adopt the EDCs’ Fast Track Proposal through the forthcoming draft decision in the instant docket. Section VI.F. of the Final Decision in Docket No. 17-12-03RE04 authorizes PURA to make strategic program adjustments to ensure continued alignment with the program objectives and that the program is on track to meet its deployment targets. Alternatively, the EDCs may instead submit the Fast Track Proposal as a standalone motion for modification of the Year 5 Decision.
  4. Page 53 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 53 of 69 D. Commercial Program Recommendations 1. Recommendation 1- Level 2 Commercial Waitlist Process & Prioritization In PURA’s Annual EV Charging Program Review Final Decision (December 17, 2025) PURA directs the EDCs to prioritize any applications received from formerly waitlisted applicants above newly received applications in that Program Year. In other words, a 2026 waitlisted application that re-applies in 2027 should be prioritized for review above new applications received in 2027. To implement this directive in a consistent and transparent manner, the EDCs recommend establishing a standardized commercial Level 2 waitlist and prioritization process be developed for 2026 projects and beyond. • • • Any projects remaining on the waitlist at the end of the program year shall expire and may be resubmitted during a defined reapplication period in the following program year. Prioritization of projects would only apply to waitlisted applications that reapplied by March 1 of the following year. To provide administrative certainty and facilitate timely allocation of available funding, such priority status would apply only during the first 60 days of the subsequent program year. To promote broad market participation and ensure funding opportunities are distributed among multiple market actors, no single contractor on the waitlist may account for more than 40% of the estimated charging ports allocated for the program year through the waitlist prioritization process. The waitlist would be limited to the number of projects that can reasonably be supported by the estimated funding available in the subsequent program year. This approach is intended to prevent the accumulation of an unmanageable backlog of unfunded projects and provide applicants with realistic expectations regarding the likelihood of future funding. The EDCs recommend that standardizing the waitlist prioritization process will improve program transparency, create more predictable outcomes for applicants, and facilitate efficient administration of the commercial charging program. 2. Recommendation 2- Restrictions on sites receiving third party funding and/or stacked funding The EDCs recommend establishing restrictions on projects receiving funding from multiple incentive programs for the same EV charging infrastructure investment. Examples of such programs may include, but are not limited to, the Connecticut Department of Energy and Environmental Protection (DEEP) Volkswagen Settlement Program, the U.S. Department of Energy Efficiency and Conservation Block Grant (EECBG) Program, and other federal, state, or local funding opportunities. Currently, applicants may have access to multiple sources of funding for a single project. While these funding opportunities support EV charging development objectives, the absence of clear program guidance regarding incentive stacking may result in circumstances where available program funds are not allocated as efficiently as possible. To maximize the number of customers and charging ports supported through the CT EV Charging Program, the EDCs recommend that projects receiving funding from another source for the same eligible equipment or
  5. Page 54 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 54 of 69 installation costs be ineligible for incentives through the commercial program. Alternatively, where PURA determines incentive stacking should be permitted, total funding received from all sources should not exceed total project costs, and applicants should be required to disclose all anticipated and awarded funding sources during the application process. Establishing clear restrictions regarding third-party funding will help ensure prudent use of ratepayer funds, reduce administrative complexity, prevent duplicate reimbursement of project costs, and enable the EDCs to support a greater number of charging infrastructure projects statewide. 3. Recommendation 3- Incentives for New Construction Stretch Building Codes Over the last several years, the Connecticut General Assembly has worked to pass legislation to help with encouraging and expanding EV infrastructure buildout across the state. Effective October 2022 Public Act 22-25, also known as the Connecticut Clean Air Act, established minimum building code requirements for the installation of electric vehicle charging stations when constructing new state facilities, commercial and multifamily buildings or schools. (b) On and after January 1, 2023, the Commissioner of Administrative Services shall require each new construction of a state facility, the total project costs of which exceed one hundred thousand dollars, to be installed with level two electric vehicle charging stations in at least twenty per cent of the designated parking spaces for cars or light duty trucks at such facility. (c) On and after January 1, 2023, a municipality shall require each new construction of a commercial building or multiunit residential building with thirty or more designated parking spaces for cars or light duty trucks to include electric vehicle charging infrastructure that is capable of supporting level two electric vehicle charging stations or direct current fast charging stations in at least ten per cent of such parking spaces. A municipality may, through its legislative body, require any such commercial building or multi-unit residential building to include such electric vehicle charging infrastructure in more than ten per cent of such parking spaces. As a result of these requirements, the EDCs have observed an increase in commercial EV program applications associated with new construction projects that are already required to incorporate EV charging infrastructure or EV-ready electrical infrastructure as part of their building design and permitting process. From the program’s inception, incentives were established to accelerate the deployment of EV charging infrastructure by encouraging business owners to build EV charging at new locations. To maximize the impact of limited program funds, incentives were not available for replacing or retrofitting existing charging equipment or for adding chargers at sites that already received incentive funding. The program’s primary objective was to expand Connecticut’s charging network by supporting new sites, as existing locations were already contributing to statewide charging availability and had demonstrated a commitment to EV infrastructure without the benefit of incentive funding.
  6. Page 55 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 55 of 69 A similar consideration applies to new construction projects where EV charging infrastructure is already required by code or development standards. Like property owners who independently installed EV charging equipment before incentives were available and now seek funding to upgrade their equipment, these developers have already made the decision to install EVSE. In both cases, the installation is driven by an existing obligation or commitment rather than by the availability of an incentive. This raises an important policy question: if the project would move forward regardless of incentive funding, is the incentive influencing the investment decision, or is it simply subsidizing an activity that would have occurred anyway. Since the program was launched, market conditions have evolved. Current building codes increasingly require new construction projects to be designed and built with EV charging infrastructure in mind. As a result, these projects may already be obligated to install charging equipment independent of program incentives. Traditionally, changes in codes and standards have been measures of market transformation, particularly in the case of energy efficiency. Given the changes in code, it is appropriate to consider whether the use of ratepayer funds is still necessary to support installations required by code. The EDCs recommend that PURA consider the eligibility of projects subject to EV-ready building code requirements. Specifically, PURA should consider whether: • • Projects required by code to install EV-ready infrastructure should remain eligible for EV Program incentives; and Incentives should be limited to infrastructure installed beyond minimum code requirements The EDCs believe this approach would help ensure that limited program funds are directed toward projects where incentives are a material driver of deployment, while continuing to support the expansion of Connecticut’s EV charging network in a cost-effective manner. VII. Summary of Education & Outreach The EDCs’ Education & Outreach activities for the Program are pivotal to drive customer awareness of Program incentives, leading to Program adoption and participation. The EDCs target their Education & Outreach efforts to ensure key stakeholders have a clear understanding of the Program’s offerings. Marketing programs and strategic outreach are developed and conducted based on approvals, goals and budgets, as established by the RAM. In 2025 and 2026, the EDCs conducted strategic outreach and community engagement through webinars and other events, paid digital advertising, website content, and engagement with key business partners, including our installer networks. These efforts maintain awareness and engagement with the Program offerings and deliver optimal results when deployed together. Multi-tactic education and outreach are important to launch in tandem since it takes multiple touch points to build awareness, convert to program participation, and achieve shared success.
  7. Page 56 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 56 of 69 The following details reflect Education & Outreach activities and engagement from July 1, 2025, through June 30, 2026. A. Webinars & Other Events Eversource and United Illuminating continue to host and participate in virtual (Table 17) and in-person (Table 18) presentations and events to educate customers, business partners, contractors and other stakeholders on the program offerings and requirements, as well as showcase staff as thought leaders in the electric vehicle charging industry. To maximize customer engagement and streamline the event experience, the Companies shared electric vehicle program information on energy efficiency and other events. The Companies tailor conversations to each customer's interests, creating a more integrated and customer-focused experience while increasing awareness of available energy programs. Positioning program experts as thought leaders is important for program adoption because it builds credibility and trust within the organization and with external stakeholders. When staff members are recognized as experts in their field, their endorsement of a program carries more weight and can significantly influence others' perceptions and acceptance of the initiative. Thought leadership demonstrates a deep understanding and commitment to the program, fostering confidence among potential adopters that it is wellconceived and beneficial. This strategy also encourages a culture of innovation and knowledge-sharing, which can further expand the program's success and sustainability. Events hosted, attended, or exhibited by the EDCs’ staff are as follows. Additionally, customers can visit the EDCs’ websites for accessible, educational content, at any time. Table 17: Summary of Webinars and Other Speaking Engagements Date Company Event Name or Topic Attendance 7/23/25 UI Southern CT Regional Council of Government EV Program Presentation Participated as a speaker: Hosted by SCRCOG 9/23/25 Eversource Managed Charging 101 140 70 10/2/25 Eversource First Thursdays – Resi 61 45 11/5/25 Eversource Tips for Closing out a project in PowerClerk 28 22 1/27/26 UI Advanced Managed Charging Insights: Case Studies from Leaders in EV Load Management Participated as a speaker, hosted: Hosted by ev.energy 2/27/26 Eversource 2026 CT Resi Changes/ Updates 12 8 3/26/26 Eversource 2026 Updates to the CT Commercial program 91 66 4/23/26 Eversource/ UI Tips for Preparing a 2026 CT DC Fast Charging Application 30 25 5/28/26 Eversource Inspections (MA & CT) 29 62
  8. Page 57 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 57 of 69 6/2/26 Eversource CDBG Application Workship – CT Department of Housing Participated as a speaker, hosted by CDBG Table 18: Conference and Community Event Attendances Date Company Event Name or Topic Event Type Involvement 7/26/25 UI West Haven Savin Rock Festival Community Exhibitor 8/15/258/16/25 UI Milford Oyster Festival Community Exhibitor 8/16/25 UI Milford Fair on the Half Shell Community Exhibitor 8/25/25 UI NHPS Lighthouse: Park Back to School Chill and Grill Community Exhibitor 8/26/258/27/25 UI PLMA (Peak Load Management Alliance) Conference Presenter 9/14/2025 Eversource Town of Coventry Going Green Event Community Exhibitor 10/25/25 Eversource Saukiog Harvest Festival, Windsor Community Smart Energy Living Mobile Exhibit 11/20/25 UI Big Connect Expo Conference Exhibitor 2/2/26-2/4/26 Eversource DistribuTECH Conference Presenter 3/6/26 3/8/26 Eversource CT Home and Remodeling Show Conference Smart Energy Living Mobile Exhibit 3/8/26 UI Fairfield CT Better Home Show Community Exhibitor 3/22/26 Eversource Maker Fair, Farmington Library Community Smart Energy Living Mobile Exhibit 3/24/26 UI Town of Fairfield Community Exhibitor 4/4/26 Eversource Easter Festival Danbury Community Smart Energy Living Mobile Exhibit 4/18/26 UI Trumbull Nature & Arts Center Earth Day Community Smart Energy Living Mobile Exhibit 4/18/26 UI Town of North Haven Earth Day Community Exhibitor 4/22/26 UI EEB Meeting Bridgeport Community Smart Energy Living Mobile Exhibit 4/25/26 UI Woodbridge Earth Day Event Community Smart Energy Living Mobile Exhibit 4/25/26 UI Bridgeport Party for the Planet Community Exhibitor 4/25/26 Eversource Bethel Earth Day Community Eversource Efficiency Experience 5/2/26 Eversource Simsbury Sustainability Fair Community Smart Energy Living Mobile Exhibit 5/2/26 UI Fairfield Earth Day Community Exhibitor
  9. Page 58 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 58 of 69 5/3/26 Eversource EcoFest Weston Community Smart Energy Living Mobile Exhibit 5/9/26 Eversource Southbury Energy Fair and Green Expo Community Smart Energy Living Mobile Exhibit 5/16/26 Eversource South Windsor Armed Forces Day Community Smart Energy Living Mobile Exhibit 5/19/26 Eversource Eversource Press Event, Berlin Community Eversource Efficiency Experience 5/31/26 Eversource New London County Strawberry Festival Community Smart Energy Living Mobile Exhibit 6/6/26 UI Stratford Main Street Festival Community Exhibitor 6/6/26 UI Hamden Fest Community Exhibitor 6/6/26 6/7/26 Eversource Celebrate West Hartford Community Smart Energy Living Mobile Exhibit 6/10/26 UI Resiliency Summit at Avangrid Conference Smart Energy Living Mobile Exhibit 6/11/26 Eversource Sustainable CT Spring into Summer Celebration Community Smart Energy Living Mobile Exhibit 6/13/26 Eversource CT Sustainability Expo Hartford Conference Eversource Efficiency Experience 6/14/26 Eversource Connecticut Bacon Festival Community Smart Energy Living Mobile Exhibit 6/18/26 UI Orange Artisan Festival & Business Expo Conference Smart Energy Living Mobile Exhibit 6/27/26 Eversource Litchfield Wellness Festival Community Smart Energy Living Mobile Exhibit 6/30/26 UI North Haven Summer Concert Series Community Exhibitor B. Paid Media The EDCs’ paid media strategy takes into account comprehensive data analysis from previous years of advertising campaigns alongside program performance, goals and budgets. Each channel execution employs advanced targeting techniques and sophisticated measurement tools to precisely identify and engage individuals with a high likelihood of interest in the EDCs’ program offerings. Targeting efforts are meticulously designed to identify users whose recent online behavior and expressed interests suggest a propensity for owning an electric vehicle (EV) and actively seeking EV charging solutions. By aligning the EDCs’ strategy with these insights, the EDCs’ aim to optimize engagement, drive higher conversion rates, and ultimately foster greater adoption of the EDCs’ programs. This data-driven, strategic focus not only enhances the efficiency of the EDCs’ advertising spend but also ensures that program messaging reaches the most relevant and receptive audiences. A pivotal metric for evaluating advertising success is impressions, which refers to the number of times an advertisement is displayed on a website or app. While this metric might appear straightforward, it plays a strategic
  10. Page 59 of 69

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 8 Page 59 of 69 role in gauging the potential reach and visibility of the EDCs’ campaigns. High impression counts indicate broad exposure, suggesting that the EDCs’ ads are effectively penetrating the target market. By analyzing impression data, the EDCs can assess the frequency and distribution of the ad placements, ensuring that program advertisements are seen by a substantial audience. Moreover, impressions serve as a foundational metric for more nuanced analyses, such as click-through rates (CTR) and conversion rates, enabling the EDCs to refine targeting strategies and optimize ad performance. This comprehensive understanding of impressions not only helps to validate the initial stages of program advertising efforts but also provides critical insights for future campaign enhancements, ultimately driving more impactful and efficient marketing initiatives. 1. Eversource The Eversource strategy for this report term focused on paid search. This form of paid media focuses on serving program ads to customers actively searching for EV solutions. This educational-focused approach results in fewer impressions with less spending, but higher quality engagements. For example, our top three keyword results for residential advertising were “ev charging station,” “ev charging program,” and “rebate for ev charger install.” Our top three keyword results for commercial advertising were “public ev charging,” “ev charging solutions,” and “city ev charging.” These results demonstrate how awareness of the rebate programs can be integrated into the customer journey, serving customers with information about the programs at the right point in their research. For the promotion of Managed Charging, Eversource also included paid social ads on Meta platforms. This efficient and historically effective channel messages those who may be interested in the offer. Table 19: Paid Media Spend Summary for Eversource Channel Spend Impressions Cost per Impression Cost per 1,000 Impressions Website Visits C&I $30,838 19,597 $1.57 $1,573.61 1,870 Managed Charging $929 3,760 $0.25 $247.07 814 Multi-Family $19,882 9,874 $2.01 $2,013.57 821 Low Income $1,385 6,9874 $0.20 $199.74 1,267 Single Family $42,133 80,574 $0.52 $788.20 8,946 Paid Search Subtotal: $95,167 120,739 $0.79 $788.20 13,718 Managed Charging $7,523 472,089 $0.02 $15.94 17,568 Paid Social Subtotal: $7,523 472,089 $0.02 $15.94 17,568 TOTAL $102,690 592,828 $0.17 173.22 31,286 Paid Search Paid Social

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)