Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 7 of 16

    Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL AUTEL CLOUD FLO JUICEBAR LITEON [Sheet: October 2025] 789 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - October 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025
  2. Part 8 of 16

    DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPUP AUTEL CHARGEPOINT LITEON [Sheet: November 2025] 790 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - November 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL CHARGEPOINT FLO LITEON [Sheet: December 2025] 791 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - December 2025 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved
  3. Part 9 of 16

    Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AMPUP AUTEL BLINK BREEZEV CHARGEPOINT FLO INTEGRA ENERGY (SAASCHARGE) LITEON LOOP [Sheet: January 2026] 792 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - January 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received
  4. Part 10 of 16

    Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL FLO [Sheet: February 2026] 793 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - February 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024
  5. Part 11 of 16

    DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL LITEON [Sheet: March 2026] 794 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - March 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL BREEZEV CHARGEPOINT [Sheet: April 2026] 795 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - April 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled
  6. Part 12 of 16

    Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL CHARGEPOINT [Sheet: May 2026] 796 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - May 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received
  7. Part 13 of 16

    Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL [Sheet: June 2026] 797 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - June 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024
  8. Part 14 of 16

    DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL [Sheet: July 2026] 798 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - July 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL CHARGEPOINT [Sheet: August 2026] 799 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - August 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved
  9. Part 15 of 16

    Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor TESLA [Sheet: September 2026] 800 | CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - September 2026 Data as of September 30, 2026 | Not relevant to program area Program Area 1 | MUD Program Area 2 | DCFC Program Area 3 | Public Program Area 4 | Workplace Program Area 5 | Total Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved | Baseline | Underserved Applications Received | Applications Received Applications Cancelled | Applications Cancelled Applications Approved | Applications Approved Ports Reserved | Ports Reserved Sites Installed | Sites Installed Ports Installed | Ports Installed Average Approved Ports per Site | Average Approved Ports per Site Average Number of Sites | Average Number of Sites Approved Light-Duty Fleets Sites Approved Light-Duty Sites | Public Approved Light-Duty Sites | Non-Public Approved Light-Duty Fleet Ports Approved Light-Duty Ports | Public Approved Light-Duty Ports | Non-Public Program Funds Reserved/Awarded | Program Funds Reserved/Awarded ($) Total Project Costs Make Ready Costs | Make Ready Infrastructure EVSE Costs | EVSE Average Project Costs (per Site) Average Make Ready Costs per Site | Make Ready Infrastructure Average EVSE Costs per Site | EVSE Average Project Costs (per Port) Average Make Ready Costs per Port | Make Ready Infrastructure Average EVSE Costs per Port | EVSE Futureproofing Applications Received | Future Proofing Applications Received Futureproofing Applications Approved | Future Proofing Applications Approved
  10. Part 16 of 16

    Average Futureproofing Cost | Average Futureproofing Costs Residential EVSE Rebates | Residential EVSE Rebates Residential Wiring Rebates | Residential Wiring Rebates EVSE Rebates Awarded | EVSE Rebates Awarded ($) Wiring Upgrade Awarded | Wiring Upgrade Awarded ($) Enrollment Awarded | Enrollment Awarded ($) Managed Charging Enrolled Managed Charging Enrollments - Telematics | Telematics Managed Charging Enrollments - EVSE | EVSE Residential Managed Charging Participants Managed Charging Enrollments - Tiers | DR Only Managed Charging Enrollments - Tiers | Baseline Managed Charging Enrollments - Tiers | Advanced Premature Cancellations | Total Number Premature Cancellation Total DR Events DR Events June 2022 DR Events July 2022 DR Events August 2022 DR Events September 2022 DR Events June 2023 DR Events July 2023 DR Events August 2023 DR Events September 2023 DR Events June 2024 DR Events July 2024 DR Events August 2024 DR Events September 2024 DR Events June 2025 DR Events July 2025 DR Events August 2025 DR Events September 2025 DR Events June 2026 DR Events July 2026 DR Events August 2026 DR Events September 2026 Manged Charging Incentives Awarded ($) Total kWh dispensed | Total kWh dispensed Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles | Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles | See Station Characterization Approved Ports per Vendor AUTEL

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)