Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
Extracted from the file · 69 pages · 162,167 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Page 8 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 8 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - EVERSOURCE - June 2025 Data as of September 30, 2025 Not relevant to program area 4 5 Program Area 1 Baseline Underserved App Applications Received App Applications Cancelled App Applications Approved PortPorts Reserved Site Sites Installed PortPorts Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVS EVSE Rebates Awarded ($) Wiri Wiring Upgrade Awarded ($) EnroEnrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 Manged Charging Incentives Awarded ($) Tota Total kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AMPUP 1 AUTEL 2 AUTEL CLOUD 3 BLINK 4 CHARGEPOINT 5 EV GATEWAY 6 7 8 9 10 11 12 13 14 15 16 17 18 19 4 5 MUD Program Area 2 Baseline Underserved 1 3 2 3 1 2 4 2 2 2 6 6 2.0 2.0 1.0 1.0 $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ 37,425 35,447 1,978 37,425 35,447 1,978 18,713 17,724 989 0 1 4,460 $ $ $ $ $ $ $ $ $ $ $ 409,405 208,989 200,417 409,405 208,989 200,417 136,468 69,663 66,806 0 1 9,000 $ $ $ $ $ $ $ $ $ $ - 8 9 Public Program Area 4 Baseline Underserved 1 1 2 3 3 1 12 4 0 4 0 14 4.0 4.0 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 0 0 $ - $ 133,637 88,882 44,754 44,546 29,627 14,918 11,136 7,407 3,730 0 0 - $ $ $ $ $ $ $ $ $ $ $ 87,023 69,359 17,664 87,023 69,359 17,664 21,756 17,340 4,416 0 0 - 10 11 Workplace Program Area 5 Baseline Underserved 3 3 2 1 1 1 4 4 2 7 6 28 4.0 4.0 1.0 1.0 0 0 0 0 $ $ $ 33,644 $ 49,817 $ 13,916 $ 30,620 $ 19,728 $ 19,197 $ 33,644 $ 49,817 $ 13,916 $ 30,620 $ 19,728 $ 19,197 $ 8,411 $ 12,454 $ 3,479 $ 7,655 $ 4,932 $ 4,799 0 0 0 0 $ $ - Total $ $ $ $ $ $ $ $ $ $ $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 45,650 36,500 9,150 22,825 18,250 4,575 11,413 9,125 2,288 0 1 1,300 6 7 DCFC Program Area 3 Baseline Underserved 0 0 3 3 1 0 3 0 0 1 0 2 3.0 0.0 1.0 0.0 $ $ $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 See Station Characterization $ 4 0 0 2 0 0 0 2 - 2 0 0 2 0 0 0 0 - 3 0 0 0 3 0 0 0 - 0 0 0 0 0 0 0 0 - 12 0 0 8 0 0 4 0 - 4 0 0 0 0 4 0 0 - 4 0 4 0 0 0 0 0 - 4 0 0 0 0 0 4 0 - 12 19 10 33 18 62 4 1 796,601 483,713 312,888 684,685 406,208 278,476 220,351 132,392 87,959 3 14,760 0 - 33 0 4 12 3 4 8 2 0 0 0 0 0 0 0 0 0 0 0 0 0Page 9 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 9 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - September 2025 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 AUTEL CLOUD 2 FLO 3 JUICEBAR 4 LITEON 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 228 17 237 18 $ 6,978 $ 429 $ 232,493 $ 17,920 $ 22,300 $ 1,500 262 19 33 2 229 17 259 19 2 0 95 6 162 13 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,599,821.11 213,373.24 979.83 130.72 See Station Characterization 4 5 MUD Program Area 2 Baseline Underserved 3 20 6 4 0 7 0 26 8 2 16 8 0 4 0.0 1.0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 $ $ $ $ $ $ $ $ $ $ $ 266,808 308,296 241,316 66,980 44,042 34,474 9,569 11,858 9,281 2,576 0 0 - 6 7 DCFC Program Area 3 Baseline Underserved 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 8 9 Public Program Area 4 Baseline Underserved 5 6 4 3 2 2 8 8 2 0 4 0 4 4 1.0 1.0 $ $ $ $ $ $ $ $ $ $ $ 40,000 130,296 104,918 25,378 65,148 52,459 12,689 16,287 13,115 3,172 1 0 - $ $ $ $ $ $ $ $ $ $ $ 80,000 161,537 132,534 29,003 80,768 66,267 14,501 20,192 16,567 3,625 0 1 1,000 10 11 Workplace Program Area 5 Baseline Underserved 3 1 5 3 1 1 4 4 0 0 0 0 4 4 1.0 1.0 0 0 0 0 $ 20,000 $ 40,000 $ 22,680 $ 43,270 $ 17,730 $ 38,112 $ 4,950 $ 5,159 $ 22,680 $ 43,270 $ 17,730 $ 38,112 $ 4,950 $ 5,159 $ 5,670 $ 10,818 $ 4,433 $ 9,528 $ 1,238 $ 1,290 0 0 0 0 $ $ - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0 0 0 0 0 0 0 - 26 0 4 0 0 0 22 - 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 - 8 0 0 4 4 0 0 - 8 0 6 0 0 2 0 - 4 4 0 0 0 0 0 - 4 0 0 0 4 0 0 - 38 26 13 50 12 28 4 1 446,808 666,079 534,609 131,470 255,909 209,041 46,868 64,824 52,923 11,901 1 1 1,000 245 255 7,407 250,413 23,800 281 35 246 278 2 101 175 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 50 4 10 4 8 2 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 10 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 10 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - October 2025 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AMPUP 1 AUTEL 2 CHARGEPOINT 3 LITEON 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 3 14 1 7 23 8 46 16 2 4 4 16 2 2 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 235 27 235 27 $ 12,678 $ 1,236 $ 229,134 $ 26,172 $ 27,300 $ 2,800 275 29 40 1 235 28 274 28 116 13 158 15 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,820,811.78 239,675.40 1,074.53 141.39 See Station Characterization $ 460,000 560,848 442,498 118,350 24,385 19,239 5,146 12,192 9,620 2,573 0 0 - $ $ $ $ $ $ $ $ $ $ $ 239,427 255,781 223,073 32,708 31,973 27,884 4,088 15,986 13,942 2,044 2 0 - 6 7 DCFC Program Area 3 Baseline Underserved 0 0 3 11 0 2 0 4 0 0 0 0 0 2 0.0 1.0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 $ $ $ $ $ $ $ $ $ $ $ 399,756 490,478 283,034 207,444 245,239 141,517 103,722 122,620 70,759 51,861 0 2 6,500 8 9 Public Program Area 4 Baseline Underserved 1 3 8 2 1 2 2 4 2 0 4 0 2 2 1.0 1.0 $ $ $ $ $ $ $ $ $ $ $ 20,000 32,276 22,846 9,430 32,276 22,846 9,430 16,138 11,423 4,715 0 0 - $ $ $ $ $ $ $ $ $ $ $ 60,509 65,920 55,097 10,823 32,960 27,549 5,411 16,480 13,774 2,706 1 0 - 10 11 Workplace Program Area 5 Baseline Underserved 10 4 10 3 3 1 10 4 2 0 13 0 3 4 1.0 1.0 1 0 1 0 4 0 4 0 $ 56,375 $ 40,000 $ 68,515 $ 47,368 $ 52,136 $ 36,968 $ 16,379 $ 10,400 $ 22,838 $ 47,368 $ 17,379 $ 36,968 $ 5,460 $ 10,400 $ 6,852 $ 11,842 $ 5,214 $ 9,242 $ 1,638 $ 2,600 4 0 1 0 $ 1,000 $ - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 46 0 0 2 0 44 - 16 0 0 2 0 14 - 0 0 0 0 0 0 - 4 4 0 0 0 0 - 2 0 0 0 2 0 - 4 2 0 0 0 2 - 10 2 4 0 4 0 - 4 0 0 0 0 4 - 35 45 40 86 10 37 2 1 1 1 4 4 1,276,067 1,521,186 1,115,653 405,533 437,039 293,382 143,657 202,110 133,973 68,137 7 3 7,500 262 262 13,914 255,305 30,100 304 41 263 302 129 173 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 86 8 4 4 6 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 11 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 11 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - November 2025 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 CHARGEPOINT 2 FLO 3 LITEON 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 6 13 0 0 4 6 19 20 4 5 8 16 5 3 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 185 11 178 10 $ 12,629 $ 403 $ 175,084 $ 10,000 $ 21,800 $ 1,200 219 12 33 1 186 11 218 12 102 7 116 5 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,069,981.18 160,574.04 657.10 98.60 See Station Characterization $ 76,234 139,447 89,104 50,343 34,862 22,276 12,586 7,339 4,690 2,650 0 0 - $ $ $ $ $ $ $ $ $ $ $ 210,495 236,040 187,390 48,650 39,340 31,232 8,108 11,802 9,370 2,433 2 0 - 6 7 DCFC Program Area 3 Baseline Underserved 1 2 0 1 0 0 0 0 1 2 2 6 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - $ - 1 0 $ $ $ $ $ $ $ $ $ $ - $ - 1 0 8 9 Public Program Area 4 Baseline Underserved 3 18 2 1 3 1 6 2 1 2 2 4 2 2 1.0 1.0 $ $ $ $ $ $ $ $ $ $ $ 59,595 75,650 55,871 19,779 25,217 18,624 6,593 12,608 9,312 3,296 1 0 - $ $ $ $ $ $ $ $ $ $ $ 31,650 33,050 30,250 2,800 33,050 30,250 2,800 16,525 15,125 1,400 9 0 - 10 11 Workplace Program Area 5 Baseline Underserved 1 2 5 0 3 6 10 20 7 7 22 44 3 3 1.0 1.0 1 1 1 1 4 4 4 4 $ 60,000 $ 232,595 $ 145,257 $ 259,892 $ 104,858 $ 203,954 $ 40,399 $ 55,938 $ 48,419 $ 43,315 $ 34,953 $ 33,992 $ 13,466 $ 9,323 $ 14,526 $ 12,995 $ 10,486 $ 10,198 $ 4,040 $ 2,797 0 0 2 1 $ 1,953 $ 2,250 Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 19 15 0 0 2 2 - 20 0 16 0 0 4 - 0 0 0 0 0 0 - 0 0 0 0 0 0 - 6 0 0 2 0 4 - 2 2 0 0 0 0 - 10 4 0 0 6 0 - 20 2 12 0 6 0 - 46 9 23 77 29 104 4 1 2 2 8 8 670,569 889,336 671,427 217,908 224,203 171,326 52,876 75,795 59,180 16,615 14 3 4,203 196 188 13,032 185,084 23,000 231 34 197 230 109 121 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 77 23 28 2 14 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 12 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 12 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - December 2025 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AMPUP 1 AUTEL 2 BLINK 3 BREEZEV 4 CHARGEPOINT 5 FLO 6 INTEGRA ENERGY (SAASCHARGE) 7 LITEON 8 LOOP 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 37 110 0 2 4 13 10 50 4 3 8 18 3 4 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 285 17 273 15 $ 24,768 $ 762 $ 268,847 $ 14,918 $ 34,300 $ 1,900 348 19 60 2 288 17 345 19 3 0 163 8 179 11 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,200,183.99 180,140.96 691.17 103.72 See Station Characterization $ 76,688 108,470 84,328 24,142 27,117 21,082 6,036 10,847 8,433 2,414 1 0 - $ $ $ $ $ $ $ $ $ $ $ 478,965 571,721 436,351 135,370 43,979 33,565 10,413 11,434 8,727 2,707 13 1 3,617 6 7 DCFC Program Area 3 Baseline Underserved 2 3 3 1 11 9 52 42 1 1 12 2 5 5 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 1,646,310 7,527,241 3,600,930 3,926,311 684,295 327,357 356,937 144,755 69,249 75,506 2 11 $ 14,409 $ $ $ $ $ $ $ $ $ $ 2,248,153 5,338,238 2,780,329 2,557,909 593,138 308,926 284,212 127,101 66,198 60,903 3 8 $ 7,078 8 9 Public Program Area 4 Baseline Underserved 4 56 0 1 3 16 8 56 1 0 6 0 3 4 1.0 1.0 $ $ $ $ $ $ $ $ $ $ $ 56,292 94,959 58,599 36,360 31,653 19,533 12,120 11,870 7,325 4,545 1 1 - $ $ $ $ $ $ $ $ $ $ $ 599,069 716,157 577,685 138,472 44,760 36,105 8,654 12,789 10,316 2,473 21 1 4,033 10 11 Workplace Program Area 5 Baseline Underserved 6 6 1 0 10 7 32 41 1 1 4 4 3 6 1.0 1.0 1 0 1 0 2 0 2 0 $ 195,449 $ 265,876 $ 729,252 $ 721,151 $ 599,629 $ 564,602 $ 129,622 $ 156,549 $ 72,925 $ 103,022 $ 59,963 $ 80,657 $ 12,962 $ 22,364 $ 22,789 $ 17,589 $ 18,738 $ 13,771 $ 4,051 $ 3,818 0 0 4 1 $ 563 $ 11,275 Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 10 0 0 4 0 0 4 0 0 0 2 - 50 0 0 50 0 0 0 0 0 0 0 - 52 30 0 20 0 0 0 2 0 0 0 - 42 28 0 10 4 0 0 0 0 0 0 - 8 2 0 2 0 0 4 0 0 0 0 - 56 12 0 2 0 0 6 0 0 36 0 - 32 18 0 0 0 6 0 4 4 0 0 - 41 15 4 10 0 0 0 12 0 0 0 - 224 8 73 291 12 54 4 1 1 1 2 2 5,566,803 15,807,188 8,702,454 7,104,734 1,600,888 887,189 713,699 359,173 202,757 156,417 41 27 40,975 302 288 25,530 283,765 36,200 367 62 305 364 3 171 190 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 291 105 4 98 4 6 14 18 4 36 2 0 0 0 0 0 0 0 0 0 0Page 13 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 13 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - January 2026 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 FLO 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 1 6 4 20 2 9 4 36 15 8 70 30 2 4 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 226 21 225 20 $ 10,075 $ 1,508 $ 218,632 $ 20,000 $ 25,300 $ 2,500 259 25 30 4 229 21 256 25 111 8 145 17 7 2 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,232,205.11 183,054.41 770.99 114.54 See Station Characterization $ 40,000 47,748 38,598 9,150 23,874 19,299 4,575 11,937 9,649 2,288 0 0 - $ $ $ $ $ $ $ $ $ $ $ 357,378 414,978 318,298 96,680 46,109 35,366 10,742 11,527 8,842 2,686 0 0 - 6 7 DCFC Program Area 3 Baseline Underserved 0 0 8 7 0 0 0 0 0 0 0 0 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 8 9 Public Program Area 4 Baseline Underserved 3 6 7 18 2 0 4 0 3 4 12 20 2 0 1.0 0.0 $ $ $ $ $ $ $ $ $ $ $ 40,000 87,905 70,887 17,018 43,953 35,444 8,509 21,976 17,722 4,255 1 1 2,000 $ $ $ $ $ $ $ $ $ $ - $ - 2 0 10 11 Workplace Program Area 5 Baseline Underserved 9 10 0 1 0 0 0 0 2 2 8 8 0 0 0.0 0.0 0 0 0 0 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0 2 0 0 $ $ - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4 0 4 0 - 36 0 36 0 - 0 0 0 0 - 0 0 0 0 - 4 2 0 2 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 35 65 13 44 34 148 4 1 437,378 550,631 427,783 122,848 113,935 90,109 23,826 45,440 36,213 9,228 5 1 2,000 247 245 11,583 238,632 27,800 284 34 250 281 119 162 9 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 44 2 40 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 14 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 14 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - February 2026 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 LITEON 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 1 16 31 62 0 8 0 28 6 8 17 36 0 4 0.0 1.0 $ $ $ $ $ $ $ $ $ $ 206 18 194 19 $ 22,924 $ 1,535 $ 189,669 $ 18,700 $ 38,500 $ 3,000 395 31 188 13 207 18 391 30 195 13 196 17 4 2 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,071,438.22 157,823.52 762.35 112.26 See Station Characterization - - 0 0 $ $ $ $ $ $ $ $ $ $ 292,510 333,843 262,266 71,578 41,730 32,783 8,947 11,923 9,367 2,556 0 0 - 6 7 DCFC Program Area 3 Baseline Underserved 0 0 0 2 0 0 0 0 1 1 12 2 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - - 0 0 $ $ $ $ $ $ $ $ $ $ - - 0 0 8 9 Public Program Area 4 Baseline Underserved 2 6 4 47 0 1 0 2 4 7 20 36 0 2 0.0 1.0 $ $ $ $ $ $ $ $ $ $ - - 0 0 $ $ $ $ $ $ $ $ $ $ 20,392 22,298 18,486 3,811 22,298 18,486 3,811 11,149 9,243 1,906 1 0 - 10 11 Workplace Program Area 5 Baseline Underserved 3 6 12 7 0 1 0 2 3 7 12 36 0 2 0.0 1.0 0 0 0 0 $ $ 38,400 $ $ 41,816 $ $ 34,984 $ $ 6,832 $ $ 41,816 $ $ 34,984 $ $ 6,832 $ $ 20,908 $ $ 17,492 $ $ 3,416 0 2 0 0 - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0 0 0 0 - 28 0 26 2 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 2 0 0 2 - 0 0 0 0 - 2 0 2 0 - 34 165 10 32 37 171 3 1 351,301 397,957 315,736 82,221 105,844 86,253 19,591 43,980 36,102 7,878 3 224 213 24,459 208,369 41,500 426 201 225 421 208 213 6 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 32 0 28 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 15 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 15 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - March 2026 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 BREEZEV 2 CHARGEPOINT 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 15 7 13 17 5 24 10 82 2 3 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 8 0 10 1 $ 583 $ $ 10,474 $ 1,000 $ 6,700 $ 500 69 5 60 5 9 0 66 5 29 2 37 3 5 1 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,169,503.35 174,489.78 791.36 118.08 See Station Characterization $ 100,000 172,266 148,756 23,510 34,453 29,751 4,702 17,227 14,876 2,351 4 0 - $ $ $ $ $ $ $ $ $ $ $ 873,078 979,373 725,062 254,312 40,807 30,211 10,596 11,944 8,842 3,101 1 8 3,513 6 7 DCFC Program Area 3 Baseline Underserved 0 0 0 0 0 0 0 0 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 $ $ $ $ $ $ $ $ $ $ - $ - 0 0 8 9 10 11 Public Program Area 4 Workplace Program Area 5 Baseline Underserved Baseline Underserved 1 3 4 0 0 15 2 3 0 9 0 3 0 28 0 12 0 3 0 4 0.0 1.0 0.0 1.0 0 0 0 0 $ $ 333,230 $ $ 113,977 $ $ 375,830 $ $ 144,329 $ $ 277,176 $ $ 97,916 $ $ 98,654 $ $ 46,413 $ $ 41,759 $ $ 48,110 $ $ 30,797 $ $ 32,639 $ $ 10,962 $ $ 15,471 $ $ 13,423 $ $ 12,027 $ $ 9,899 $ $ 8,160 $ $ 3,523 $ $ 3,868 0 1 2 0 0 4 0 0 $ $ 4,018 $ $ - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 10 0 10 0 0 - 82 0 76 6 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 28 0 24 0 4 - 0 0 0 0 0 - 12 0 8 0 4 - 30 50 41 132 3 1 1,420,285 1,671,798 1,248,909 422,889 165,129 123,398 41,731 54,620 41,777 12,843 8 12 7,530 8 11 583 11,474 7,200 74 65 9 71 31 40 6 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 132 0 118 6 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 16 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 16 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - April 2026 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 CHARGEPOINT 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 1 10 18 52 2 5 6 20 2 4 7 20 3 4 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 4 4 3 5 $ (300) $ $ 3,195 $ 6,105 $ 6,300 $ 800 66 11 62 7 4 4 62 11 26 6 36 5 2 3 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 1,891,766.94 249,243.96 1,300.12 171.27 See Station Characterization 40,000 50,079 41,173 8,906 25,039 20,586 4,453 8,346 6,862 1,484 0 0 - $ $ $ $ $ $ $ $ $ $ 200,000 233,607 184,107 49,500 46,721 36,821 9,900 11,680 9,205 2,475 4 0 - 6 7 DCFC Program Area 3 Baseline Underserved 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - - 2 0 $ $ $ $ $ $ $ $ $ $ - - 1 0 8 9 Public Program Area 4 Baseline Underserved 0 5 2 1 2 0 4 0 4 9 8 18 2 0 1.0 0.0 $ $ $ $ $ $ $ $ $ $ 40,000 47,637 38,487 9,150 23,819 19,244 4,575 11,909 9,622 2,288 0 0 - $ $ $ $ $ $ $ $ $ $ - - 4 0 10 11 Workplace Program Area 5 Baseline Underserved 0 1 4 2 0 1 0 4 1 1 4 4 0 4 0.0 1.0 0 0 0 0 $ $ 40,000 $ $ 51,553 $ $ 41,153 $ $ 10,400 $ $ 51,553 $ $ 41,153 $ $ 10,400 $ $ 12,888 $ $ 10,288 $ $ 2,600 0 0 0 0 - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 6 2 0 4 - 20 0 20 0 - 0 0 0 0 - 0 0 0 0 - 4 0 4 0 - 0 0 0 0 - 0 0 0 0 - 4 0 4 0 - 24 79 10 34 21 61 4 1 320,000 382,875 304,919 77,956 147,132 117,804 29,328 44,824 35,977 8,847 11 8 8 (300) 9,300 7,100 77 69 8 73 32 41 5 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 34 2 28 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Page 17 of 21
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance 17-12-03RE04, EV Order No 14, Attachment 7 Page 17 of 21 ## CT EV INFRASTRUCTURE PROGRAM METRICS - Eversource - May 2026 Data as of September 30, 2026 AppApplications Received AppApplications Cancelled AppApplications Approved Port Ports Reserved Site Sites Installed Port Ports Installed Ave Average Approved Ports per Site Ave Average Number of Sites Approved Light-Duty Fleets Sites App Public App Non-Public Approved Light-Duty Fleet Ports App Public App Non-Public ProgProgram Funds Reserved/Awarded ($) Total Project Costs Make Ready Infrastructure Mak EVSE EVS Average Project Costs (per Site) Make Ready Infrastructure Ave EVSE Ave Average Project Costs (per Port) Make Ready Infrastructure Ave EVSE Ave FutuFuture Proofing Applications Received FutuFuture Proofing Applications Approved Ave Average Futureproofing Costs Res Residential EVSE Rebates Res Residential Wiring Rebates EVSEVSE Rebates Awarded ($) Wir Wiring Upgrade Awarded ($) Enr Enrollment Awarded ($) Managed Charging Enrolled Telematics Man EVSE Man Residential Managed Charging Participants DR Only Man Baseline Man Advanced Man Prem Total Number Premature Cancellation Total DR Events ## DR Events June 2022 ## DR Events July 2022 ## DR Events August 2022 ## DR Events September 2022 ## DR Events June 2023 ## DR Events July 2023 ## DR Events August 2023 ## DR Events September 2023 ## DR Events June 2024 ## DR Events July 2024 ## DR Events August 2024 ## DR Events September 2024 ## DR Events June 2025 ## DR Events July 2025 ## DR Events August 2025 ## DR Events September 2025 ## DR Events June 2026 ## DR Events July 2026 ## DR Events August 2026 ## DR Events September 2026 Manged Charging Incentives Awarded ($) TotaTotal kWh dispensed Met Metric Ton CO2 emissions avoided from EVs relative to ICE vehicles Charging Load Profiles Approved Ports per Vendor 0 AUTEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Not relevant to program area 4 5 Program Area 1 Baseline Underserved 4 5 MUD Program Area 2 Baseline Underserved 3 14 2 5 2 7 14 24 1 1 2 2 7 3 1.0 1.0 $ $ $ $ $ $ $ $ $ $ 13 3 18 2 $ 1,103 $ 935 $ 21,374 $ 2,180 $ 17,300 $ 1,000 183 13 168 10 15 3 181 13 68 4 113 9 4 1 59 59 0 0 13 13 3 3 0 0 1 1 5 5 1 1 3 3 1 1 5 5 4 4 1 1 1 1 9 9 3 3 0 0 0 0 5 5 4 4 0 0 2,567,383.45 315,699.52 1,588.56 195.33 See Station Characterization $ 29,208 37,905 20,510 17,395 18,953 10,255 8,697 2,708 1,465 1,243 0 0 - $ $ $ $ $ $ $ $ $ $ $ 267,725 300,286 231,726 68,560 42,898 33,104 9,794 12,512 9,655 2,857 3 2 3,956 6 7 DCFC Program Area 3 Baseline Underserved 8 4 3 1 0 0 0 0 0 2 0 16 0 0 0.0 0.0 $ $ $ $ $ $ $ $ $ $ - $ - 6 0 $ $ $ $ $ $ $ $ $ $ - $ - 3 0 8 9 Public Program Area 4 Baseline Underserved 4 5 0 3 0 3 0 8 4 0 14 0 0 3 0.0 1.0 $ $ $ $ $ $ $ $ $ $ - $ - 4 0 $ $ $ $ $ $ $ $ $ $ $ 100,168 112,663 90,568 22,096 37,554 30,189 7,365 14,083 11,321 2,762 4 0 - 10 11 Workplace Program Area 5 Baseline Underserved 1 4 1 0 2 3 4 6 1 1 4 4 2 2 1.0 1.0 0 0 0 0 $ 40,000 $ 87,348 $ 47,659 $ 95,423 $ 37,959 $ 79,273 $ 9,700 $ 16,150 $ 23,830 $ 31,808 $ 18,980 $ 26,424 $ 4,850 $ 5,383 $ 11,915 $ 15,904 $ 9,490 $ 13,212 $ 2,425 $ 2,692 0 1 1 0 $ $ - Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 14 0 14 - 24 0 24 - 0 0 0 - 0 0 0 - 0 0 0 - 8 0 8 - 4 2 2 - 6 0 6 - 43 15 17 56 10 42 4 1 524,449 593,936 460,036 133,900 155,042 118,952 36,090 57,121 45,143 11,978 21 3 3,956 16 20 2,038 23,554 18,300 196 178 18 194 72 122 5 59 13 3 1 5 1 3 1 5 4 1 1 9 3 5 4 - 56 2 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Text of ES Order 2, ESS_Items 1-4.pdf
Extracted from the file · 117 pages · 290,953 characters
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Text of ES Order 2, SCEF_Items 1-4.pdf
Extracted from the file · 49 pages · 109,450 characters
Text of ES Order 2, RRES_Items 1-4.pdf
Extracted from the file · 65 pages · 149,171 characters
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2