Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

2 pages match
  1. Page 1 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 1 of 117 Program Manual Version May 19, 2026
  2. Page 2 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 2 of 117 Table of Contents TABLE OF CONTENTS ..............................................................................................................................................I SECTION 1: ACRONYMS AND GLOSSARY ...........................................................................................................3 SECTION 2: SUMMARY ............................................................................................................................................7 SECTION 3: ENROLLMENT .................................................................................................................................. 12 3.1. CUSTOMER ENROLLMENT PROCESS–LEGACY PROGRAM AND CONSTRUCT 5 ..................................................... 12 3.2. CUSTOMER ENROLLMENT PROCESS–LEGACY PROGRAM ACTIVE DISPATCH ONLY (NO UPFRONT INCENTIVE) OR CONSTRUCT 5 ACTIVE DISPATCH (NO ENROLLMENT INCENTIVE) .............................................................................. 16 3.2.1. BESS Operator, BESS Aggregator, or OEM-Led Self-Enrollment ................................................... 16 3.2.2. Customer Enrollment Platform “Self-Enrollment” ............................................................................. 18 3.3. CUSTOMER ENROLLMENT PROCESS – TRANSFER FROM CONNECTEDSOLUTIONS .............................................. 19 3.4. ENROLLMENT DEADLINES AND MILESTONES ..................................................................................................... 20 3.5. PROJECT VERIFICATION .................................................................................................................................. 20 3.5.1. Project Inspections............................................................................................................................ 20 3.6. PROJECT COMPLETION POLICY ........................................................................................................................ 21 3.7. UNENROLLING FROM ENERGY STORAGE SOLUTIONS ........................................................................................ 22 3.8. UPFRONT INCENTIVE BUYBACK AND TRANSITION TO CONSTRUCT 5 ................................................................... 22 3.9. EXTENDING ENERGY STORAGE SOLUTIONS ENROLLMENT................................................................................. 23 3.10. TRANSFER OF ENROLLMENT .................................................................................................................... 23 3.11. ELECTRONIC SIGNATURES....................................................................................................................... 24 SECTION 4: ELIGIBILITY ....................................................................................................................................... 25 4.1. CUSTOMER AND SITE ELIGIBILITY ..................................................................................................................... 25 Add-On Systems .............................................................................................................................................. 25 Ownership ........................................................................................................................................................ 25 4.2. STORAGE SYSTEM ELIGIBILITY ......................................................................................................................... 27 4.2.1. Technical Requirements ................................................................................................................... 27 4.2.2. Technology Updates ......................................................................................................................... 29 4.3. ELIGIBLE CONTRACTOR, THIRD-PARTY OWNER, AND BESS AGGREGATOR REQUIREMENTS ............................... 29 4.3.1. Required Documentation for Eligible Contractors ............................................................................ 30 4.3.2. Required Documentation for Eligible TPOs ...................................................................................... 33 4.3.3. Required Documentation for Eligible BESS Aggregators ................................................................. 35 4.3.4. Eligible Contractor, TPO, and BESS Aggregator Application Process ............................................. 35 4.3.5. Eligible Contractor, TPO, OEM and BESS Aggregator Responsibilities and Conduct .................... 37 4.3.6. Eligible Contractor, TPO, BESS Aggregator, BESS Operator, or Eligible OEM Non-Performance, Misconduct, Improper and Illegal Behavior ...................................................................................................... 38 4.3.7. Disciplinary Action and Appeal ......................................................................................................... 40 4.3.8. Important Implementation Notices for Project Completion Policy .................................................... 41 4.3.9. List of Eligible Contractors, TPOs, and BESS Aggregators ............................................................. 42 SECTION 5: OPERATIONAL CONTROL .............................................................................................................. 43 5.1.1. General Operating Standards ........................................................................................................... 44 5.1.2. Dispatching Passive and Active Services ......................................................................................... 45 5.2. BATTERY SYSTEM MAINTENANCE, INTERNET CONNECTION, AND DURABILITY RESPONSIBILITY ............................ 46 SECTION 6: PROGRAM DISPATCH AND INCENTIVE STRUCTURE ................................................................. 48 i
  3. Page 3 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 3 of 117 6.1. CUSTOMER CLASSIFICATIONS .......................................................................................................................... 48 6.2. PASSIVE DISPATCH ......................................................................................................................................... 52 6.2.1. Legacy Passive Dispatch Season Performance and Claw Back ..................................................... 53 6.3. CALCULATION OF UPFRONT INCENTIVE............................................................................................................. 57 6.4. CALCULATION OF ENROLLMENT INCENTIVE (EFFECTIVE 4/1/26) ........................................................................ 59 6.5. ACTIVE DISPATCH ........................................................................................................................................... 60 6.6. ACTIVE DISPATCH INCENTIVE RATES AND AVERAGE PERFORMANCE.................................................................. 62 6.7. INCENTIVE PAYMENT PROCESS ........................................................................................................................ 63 Upfront and Enrollment Incentive Payments ................................................................................................... 63 6.8. DAYS FOR DISPATCH EVENTS .......................................................................................................................... 65 6.9. NO DEMAND RESPONSE EVENTS BEFORE LARGE STORMS ............................................................................... 65 6.10. PERFORMANCE TESTING ......................................................................................................................... 65 SECTION 7: STORAGE CONFIGURATION CONSIDERATIONS ........................................................................ 67 7.1. CO-PARTICIPATION IN ISO-NE MARKET PROGRAMS......................................................................................... 67 7.2. ISO-NE MARKET PARTICIPATION VERIFICATION PROCESS................................................................................ 67 7.3. MONETIZATION OF CAPACITY RIGHTS ............................................................................................................... 67 7.4. STORAGE CONFIGURATIONS & INTERCONNECTION ........................................................................................... 68 7.4.1. Renewable Energy Plus Storage ...................................................................................................... 68 7.4.2. Storage Only Systems ...................................................................................................................... 68 SECTION 8: SYSTEM DISPOSAL ......................................................................................................................... 69 8.1 ELIGIBLE CONTRACTOR AND THIRD-PARTY OWNER RESPONSIBILITIES ............................................................... 69 APPENDIX A: ELIGIBLE EQUIPMENT LIST ........................................................................................................ 70 APPENDIX B.1: RESIDENTIAL CUSTOMER TERMS AND CONDITIONS AND DATA RELEASE (ENERGYHUB) ....................................................................................................................................................... 71 APPENDIX B.2: RESIDENTIAL CUSTOMER TERMS AND CONDITIONS AND DATA RELEASE (UPLIGHT) 77 APPENDIX B.3: ENERGY STORAGE SOLUTIONS TERMS AND CONDITIONS AND DATA RELEASE (FOR ALL CUSTOMERS ENROLLING IN CONSTRUCT 5) ........................................................................................... 84 APPENDIX C: NEW TECHNOLOGY APPLICATION ............................................................................................ 93 APPENDIX D: OWNERSHIP TRANSFER ENROLLMENT FORM ...................................................................... 107 APPENDIX E: COMMERCIAL AND INDUSTRIAL CUSTOMER OR ACTIVE DISPATCH ONLY TERMS AND CONDITIONS AND DATA RELEASE .................................................................................................................. 109 APPENDIX F: DECOMMISSIONING PLAN ......................................................................................................... 112 APPENDIX G: DIRECT PAYMENT BENEFICIARY FORM ................................................................................. 114 ii
  4. Page 4 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 4 of 117 Section 1: Acronyms and Glossary Term Acronym or Abbreviation AC-Coupled BESS Definition BESS has a separate inverter from Solar PV system Active Dispatch Only Active Only Enrollment in ESS Active Dispatch but specifically not Passive Dispatch. Such enrollment is not available after April 1, 2026 as Passive Dispatch will no longer be available. Available Energy Capacity Available Capacity Remaining energy capacity (in kWh) of BESS at a given time. See also: State of Charge Commercial and industrial customer base load will be set equal to the C&I customer’s average demand during April-May and October-November from the previous 12 months. Base Load Battery Energy Storage System BESS Battery Energy Storage System: electrical, electrochemical, mechanical and other types of energy storage technologies for systems intended to supply electrical energy. Includes battery and inverter for the purposes of this Program. Behind the Meter Storage BTM BESS serving onsite load, and it may be solarpaired or standalone. (Eligible) BESS Aggregator Entity responsible for the coordination of BESS participating in Active Dispatch events or Construct 5 events within the Program, working as an intermediary between the DERMS and the BESS Operator. Eligible BESS Aggregators will aggregate and enroll Eligible BESS into the Active Dispatch or Construct 5 portion of the Program for qualified customers. BESS Operator Entity responsible for the coordination of the BESS participating in dispatch events within the Program Clawback Fee Clawback; claw back; claw-back A fee imposed on BESS owners participating in Legacy Passive Dispatch that is calculated based on Passive Dispatch nonperformance for a given season. See Section 6.1.2. Commercial and Industrial C&I Includes market rate multifamily (5+ family) housing properties (i.e. housing not defined as “Affordable”, see Multifamily Affordable Housing) Commercial Operation Date COD The date the BESS was fully approved for dispatch in the program distributed energy resource management system (DERMS). Confirmation of Enrollment COE Letter issued via email by Connecticut Green Bank to customers to formally confirm enrollment in the Program, including the applicable incentive amounts and rates. 3
  5. Page 5 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 5 of 117 Connecticut Green Bank CGB; Green Bank Construct 5 The Program design approved by PURA in Dkt. 25-08-05 Final Decision dated 12/17/25. Effective April 1, 2026. Customer Contract A sales agreement (for cash purchase or loan), Lease Agreement, or Power Purchase Agreement. Customer Enrollment Platform Salesforce-based portal used by Eligible Contractors and TPOs to apply for ESS incentives on behalf of customers. Managed a by Connecticut Green Bank: https://ctgreenbank.my.site.com/ Department of Economic and Community Development DECD DC-Coupled BESS BESS and Solar PV system share an inverter Distributed Energy Resource Management System DERMS The dispatching platform utilized by the EDCs to issue notification to Operators to discharge the BESS over a designated time period. Electric Distribution Company EDC Eversource and United Illuminating Eligible Contractor Contractor Company responsible for contracting the procurement and installation of a BESS for a customer. Eligible Third-Party Owner System Owner; TPO Company responsible for owning and operating a BESS with a customer through a lease or powerpurchase agreement. Enrollment Incentive See Upfront Incentive. Front of the meter storage FTM BESS not serving load behind a customer meter. Heavy-Duty Electric Vehicle Heavy Duty EV Motor vehicle whose propulsion is powered fully by electricity with a gross vehicle weight rating (GVWR) greater than 26,000 pounds. Installed BESS BESS is commissioned, approved, and energized, and fully operational, including fully integrated with EDCs DERMS platforms. Islanding Ability of BESS to provide back-up power to customer, within a reasonable time, during a power outage. Last mile Final internet connection to battery Inverter system. Typically, by battery manufacturer. Legacy Program Program design in effect from 1/1/22 through 3/31/26 consisting of Passive Dispatch and Active Dispatch elements. Letter of Intent LOI Preliminary commitment of the Customer to install a BESS with an Eligible Contractor and/or TPO. 4
  6. Page 6 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 6 of 117 Light-Duty Electric Vehicle Light Duty EV Motor vehicle whose propulsion is powered fully by electricity with a gross vehicle weight rating (GVWR) less than 10,000 pounds. Low-Income Households Low-Income Households with incomes below 60 percent of the state median income, and multi-family affordable housing as per PURA Final Decision in Docket 2308-05. Medium-Duty Electric Vehicle Medium Duty EV Motor vehicle whose propulsion is powered fully by electricity with a gross vehicle weight rating (GVWR) greater than 10,000 pounds but less than 26,000 pounds. Multifamily Affordable Housing MFAH, Affordable Multifamily Housing, AFMH As defined in the RRES Program. Original Equipment Manufacturer OEM Manufacturer of BESS product(s). Override Conditions Refer to situations where same-day dispatches occur with less than 24 hour notice. Participant The Third-Party System Owner of a BESS (if system is leased) or the host customer (if system is owned by the customer). Passive Dispatch Passive Performance Incentive Pre-scheduled dispatch events associated with the upfront Passive enrollment incentive from the Legacy Program. This upfront incentive is not available after April 1, 2026 as Passive Dispatch enrollment will no longer be available. An incentive paid seasonally or annually to customers enrolled in Energy Storage Solutions based on the performance of their BESS in Active Dispatch events (based on average power rating throughout the entire season). Power Purchase Agreement PPA Program Administrators PAs; Administrators Public Utility Regulatory Authority PURA; Authority Rated Energy Capacity Rated Capacity; Nameplate Energy Capacity Reservation Letter Collectively Eversource, United Illuminating, and Green Bank Nameplate energy capacity of the BESS (kWh). Letter issued by Connecticut Green Bank to formally reserve capacity, including the applicable incentive amounts and rates, for a project to participate in ESS. See also: Reservation of Funds, Reservation of Capacity Reservation of Funds ROF, Reservation Reservation for an Upfront or Enrollment Incentive amount + Performance Incentive rate are reserved for a project’s participation in ESS 5
  7. Page 7 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 7 of 117 Reservation of Capacity ROC, Reservation Standalone Reservation for a Performance Incentive rate is reserved for a project’s future participation in ESS. A BTM BESS not paired with a source of generation (i.e. solar, wind, etc.). State of Charge SOC Terms & Conditions and Data Release T&C Third-Party Inspector Remaining energy capacity (in kWh) of BESS at a given time. See also: Available Energy Capacity A contractor hired by the Green Bank to inspect projects in the Program. Underserved Communities Underserved Distressed municipalities, according to the most recent list developed by DECD1. Upfront Incentive Enrollment Incentive An incentive paid upon commissioning of a BESS for enrollment in Energy Storage Solutions. Vendor Fee Performance Incentive Fee Any fee taken by a BESS Operator or Aggregator in exchange for operating a customer’s BESS, either as a flat rate or a percentage of performance incentives paid. Remainder of this page intentionally left blank 1 A distressed municipality includes municipalities that no longer meet the threshold requirements but are still in a 5-year grace period. (See definition at CGS Sec. 32-9p(b).) These municipalities are listed in the 2023 list below. Effective October 1, 2024 any municipality with a population greater than 100,000 shall be deemed to be a distressed municipality for a period of ten years subsequent to the date of such determination. 6
  8. Page 8 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 8 of 117 Section 2: Summary Energy Storage Solutions, herein known as the “Program”, is a voluntary incentive program offered to the residential, commercial, and industrial customers of The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) or The United Illuminating Company (UI) who are considering on-site energy storage solutions. The purpose of the following sections is to outline the purpose, requirements, steps, and expectations of the key parties involved in the application and incentive process. This document will also serve as a basis for compliance with the decision as listed below. The Program Administrators may submit a written request to PURA to modify the Program Manual or other Program guidelines and procedures at an appropriate time. On July 28, 2021, the Connecticut Public Utilities Regulatory Authority (Authority) issued a final decision in Docket No. 17-12-03RE03, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Electric Storage (Decision) establishing a nine-year electric storage program, which shall be available to all customers and customer classes within the service territories of Eversource and UI, collectively, the electric distribution companies (EDCs). 2 The Decision also establishes the EDCs and the Connecticut Green Bank (CGB) as Program Administrators. The Authority’s goal in the proceeding was to develop and implement a program for battery energy storage systems (BESS) connected to the electric distribution system that would provide multiple types of benefits to the grid, including ancillary services, peak shaving, support for the deployment of other distributed energy resources, and customer, local, or community resilience. In the Decision, PURA identified seven key objectives for the Program, including: 1. Provide positive net present value to all ratepayers. 2. Provide multiple types of benefits to the electric grid (e.g., customer, local, or community resilience, ancillary services, peak shaving, avoiding or deferring distribution system upgrades, or supporting the deployment of other distributed energy resources). 3. Foster the sustained, orderly development of a state-based electric energy storage industry. 4. Prioritize delivering increased resilience to low-and-moderate income customers, customers in environmental justice or economically distressed communities 3 , medical hardship customers, residents living in public housing, customers on the grid-edge who consistently experience more and/or longer than average outages during major storms, and critical facilities. 5. Lower the barriers to entry, financial or otherwise, for electric storage deployment in Connecticut. 2 Connecticut Public Utilities Regulatory Authority, Final Decision, Docket No. 17-12-03RE03: PURA Investigation Into Distribution System Planning of the Electric Distribution Companies-Electric Storage, issued Jul. 28, 2021, available online at: https://www.dpuc.state.ct.us/2nddockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6991ef77ba07bae185258752007994f7/$FILE/17 1203RE03-072821.pdf. 3 Per Conn. Gen. Stat § 22a-20a, “environmental justice communities” are defined as a municipality on the Department of Economic and Community Development list of distressed municipalities or in a defined US census block. These defined census blocks are in municipalities that are not “distressed;” however, they have census block groups with 30 percent of their population living below 200 percent of the federal poverty level. A current list of environmental justice communities is available at: https://portal.ct.gov/DEEP/Environmental-Justice/Environmental-Justice-Communities. 7
  9. Page 9 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 9 of 117 6. Maximize the long-term environmental benefits of electric storage by reducing emissions associated with fossil-based peaking generation. 7. Maximize the benefits to ratepayers derived from the wholesale capacity market. Residential and commercial and industrial customers of Eversource and UI are eligible to participate in the Program, with the Authority’s end goal of deploying 580 megawatts (MW) of electric storage by 2030, allocated between residential and commercial and industrial customer classes as shown below: Customer Class Tranche 1 Tranche 2 Tranche 3 Tranche 4 Total Residential 50 MW 50 MW 50 MW 0 MW 150 MW Commercial and Industrial 50 MW 113.9 MW 126.1 MW 140 MW 430 MW Total 100 MW 163.9 MW 176.1 MW 140 MW 580 MW Note: On April 1, 2026, any remaining Tranche capacity will be reassigned to Construct 5. Through March 31, 2026, the Program consists of two key elements and is herein referred to as the Legacy Program: Passive Dispatch: pre-scheduled by the Operator of Eligible BESS per program rules to 1) dispatch energy during established Passive event periods and 2) be overridden by the EDCs for Active Dispatch events or BESS Operators for weather-related or emergency situations. Compensated by an upfront incentive administered by CGB. Customers enrolled in Passive Dispatch are automatically also enrolled in Active Dispatch. Passive Dispatch is no longer available for new enrollments as of April 1, 2026 and is herein referred to as Legacy Passive Dispatch. Active Dispatch: managed by the EDCs, which compensates participants for the average kW4 dispatched during events over the summer and winter seasons. Compensated by a performance-based incentive structure administered by the EDCs. Customers may opt-out of Active Dispatch events on a per-event basis only. Opt-out methods are to be determined by the BESS Operator (i.e. via text message, web interface, app interface, etc.). Active Dispatch will remain in place following the transition from the Legacy Program to Construct 5. Customers participating in the Legacy Program should note that opting out of an Active Dispatch event when a Passive Dispatch event has been cancelled for that day may negatively impact a customer’s Passive Dispatch participation score. Construct 5 customers may opt out of Active Dispatch events without penalty. Please refer to Section 6 in this Program Manual for detailed participation requirements for Passive and Active Dispatch incentives. 8
  10. Page 10 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 10 of 117 Customer participation benefits and requirements will be determined by Customer Class as detailed in Table 1 below. Table 1: Legacy Program Elements Customer Description Residential or Commercial – Fully Enrolled (Legacy) Priority Customers67 – Residential or Commercial – Fully Enrolled (Legacy) Residential or Commercial – Legacy Active Dispatch Only8 Passive Dispatch Will receive upfront incentives Required to participate in Passive Dispatch events according to established guidelines. Will receive upfront incentives, including applicable adder(s) Required to participate in Passive Dispatch events according to established guidelines. Active Dispatch Will receive performance incentives As a pay-for-performance program, participation in Active events is optional5 Will not receive Upfront Incentives Will not participate in Passive Dispatch events Table 2: Construct 5 Program Elements Customer Description Active Dispatch Residential Customers (standard and grid-edge) 910 May receive Enrollment Incentives where applicable Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional Commercial Customers (nonPriority) Will not receive Enrollment Incentives Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional Commercial Priority Customers13 14 May receive Enrollment Incentives where applicable Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional 5 See Section 6.1.2 Passive Dispatch Season Performance and Claw Back for additional details. Customers receiving incentive adder as defined in Section 6.1.1.1 to 6.1.1.4. 7 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets (FCM) with approval from Program Administrators. Customers with a legacy approval for this benefit may request to exchange their FCM rights for a one-time 25% upfront incentive adder, provided the project has not yet received utility approval to energize. Requests must be made in writing to the Program Administrators ([email removed]) before the project has received approval to energize from the utility. 8 This category includes ConnectedSolutions transfer customers. Transfer Customer BESS must meet all Program requirements to be eligible. 9 Customers receiving incentive adder as defined in Section 6.1.1.1 to 6.1.1.4. 10 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets (FCM) with approval from Program Administrators. Customers with a legacy approval for this benefit may request to exchange their FCM rights for a one-time 25% upfront incentive adder, provided the project has not yet received utility approval to energize. Requests must be made in writing to the Program Administrators ([email removed]) before the project has received approval to energize from the utility. 6 9

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)