Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
Extracted from the file · 69 pages · 162,167 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
Extracted from the file · 21 pages · 73,536 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Page 10 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 10 of 117 Customer participation benefits and requirements will be determined by Customer Class as detailed in Table 1 below. Table 1: Legacy Program Elements Customer Description Residential or Commercial – Fully Enrolled (Legacy) Priority Customers67 – Residential or Commercial – Fully Enrolled (Legacy) Residential or Commercial – Legacy Active Dispatch Only8 Passive Dispatch Will receive upfront incentives Required to participate in Passive Dispatch events according to established guidelines. Will receive upfront incentives, including applicable adder(s) Required to participate in Passive Dispatch events according to established guidelines. Active Dispatch Will receive performance incentives As a pay-for-performance program, participation in Active events is optional5 Will not receive Upfront Incentives Will not participate in Passive Dispatch events Table 2: Construct 5 Program Elements Customer Description Active Dispatch Residential Customers (standard and grid-edge) 910 May receive Enrollment Incentives where applicable Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional Commercial Customers (nonPriority) Will not receive Enrollment Incentives Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional Commercial Priority Customers13 14 May receive Enrollment Incentives where applicable Will receive Performance Incentives As a pay-for-performance program, participation in Active events is optional 5 See Section 6.1.2 Passive Dispatch Season Performance and Claw Back for additional details. Customers receiving incentive adder as defined in Section 6.1.1.1 to 6.1.1.4. 7 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets (FCM) with approval from Program Administrators. Customers with a legacy approval for this benefit may request to exchange their FCM rights for a one-time 25% upfront incentive adder, provided the project has not yet received utility approval to energize. Requests must be made in writing to the Program Administrators ([email removed]) before the project has received approval to energize from the utility. 8 This category includes ConnectedSolutions transfer customers. Transfer Customer BESS must meet all Program requirements to be eligible. 9 Customers receiving incentive adder as defined in Section 6.1.1.1 to 6.1.1.4. 10 Priority Customers that applied to ESS prior to January 1, 2023 may participate in ISO-NE Forward Capacity Markets (FCM) with approval from Program Administrators. Customers with a legacy approval for this benefit may request to exchange their FCM rights for a one-time 25% upfront incentive adder, provided the project has not yet received utility approval to energize. Requests must be made in writing to the Program Administrators ([email removed]) before the project has received approval to energize from the utility. 6 9Page 11 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 11 of 117 Equipment cannot be simultaneously enrolled in Energy Storage Solutions and ConnectedSolutions. Customers may enroll separate equipment in both Programs if desired (i.e. one BESS with legacy enrollment in ConnectedSolutions and, if technically feasible, a second BESS enrolled in ESS). ConnectedSolutions has ended new enrollments as of December 1st, 2023. Table 3 below is a Program summary of the dispatch parameters for the Legacy Program: Table 3: Legacy Program Elements (Effective 1/1/22 through 3/31/26)11 Program Element Passive Dispatch Design Item Winter Declining-Block Upfront Incentive Varies by Program step, customer type, and building type. See “Passive Dispatch and Upfront Incentives” section Events per Season All non-holiday weekdays (~60) unless overridden for Active or Emergency event. N/A June, July & August N/A Event Duration 3 Hours (uniform dispatch) N/A Anticipated Dispatch Window Between 5 PM and 8 PM N/A Reserve Capacity 20% Required Reserve N/A Flat Block Performance Incentive Varies by customer size based on peak demand. See “Active Dispatch and Performance Incentives” section Months Events per Season Active Dispatch12 Summer Months13 Event Duration Potential Dispatch Window Reserve Capacity 30 to 60 1 to 5 June through September November through March 1 to 3 hours 1 to 3 hours 12 PM to 9 PM (All Days) 12 PM to 9 PM (All Days) OEM Minimum recommended capacity 11 The Program Administrators may choose to alter the dispatch schedule for both Passive and Active Dispatch programs to better achieve RIM targets based on annual EM&V reports. In the event that the Program Administrators determine that an alternate schedule is prudent, customers will be notified of the change before the start of a dispatch season and storage assets will be remotely reprogramed to a modified schedule. 12 To the extent possible, EDCs will provide Program Participants notice of Active Dispatch Events to relevant stakeholders (customer, system owner, OEM, Operator, Contractor) 24 hours ahead of an event. 13 EDCs may need to dispatch in off season months, on an as-needed basis. 10Page 12 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 12 of 117 Beginning April 1, 2026, the Program will transition to a performance-based, Active Dispatchonly model for all new applicants, herein referred to as Construct 514. Construct 5 removes the Passive Dispatch track and existing Upfront Incentives, while increasing Active Dispatch Performance Incentives for new customers. All new residential enrollments will receive a targeted Enrollment Incentive, with residential Grid-Edge customers receiving an additional Enrollment Incentive adder. New commercial enrollments must pay a $350 non-refundable application fee, and priority commercial customers will receive a modest Enrollment Incentive. There is no Enrollment Incentive for non-priority commercial customers. Both residential and commercial customer groups will receive new, elevated performance incentive rates during the winter and summer seasons, with the option of receiving an annual or biannual (twice yearly) Active Dispatch Performance Incentive disbursement. Table 4 below references the programmatic changes effective April 1, 2026. Table 4: Construct 5 Program Elements (Effective 4/1/26) Program Element Design Item Enrollment and Performance Incentives Events per Season Construct 5 – Active Dispatch Months Event Duration Anticipated Dispatch Window Reserve Capacity Summer Winter Varies by customer type, grid-edge eligibility, and building type. See “Section 6: Program Dispatch and Incentive Structure” for additional details. 30-60 1-10 June through September November through March 1 to 3 Hours 1 to 3 Hours 12 PM to 9 PM (All Days) 12 PM to 9 PM (All Days) OEM minimum recommended capacity Remainder of this page intentionally left blank 14 Connecticut Public Utility Regulatory Authority, Final Decision, Docket 25-08-05, Annual Energy Storage Solutions Program Review – Year 5, issued Dec 17, 2025, available online at: https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/b1de90d5e52b43d185258d630056a8bf?OpenDocu ment 11Page 13 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 13 of 117 Section 3: Enrollment On December 17, 2025, PURA directed the Program Administrators to eliminate Passive Dispatch from Energy Storage Solutions for new customers effective no later than April 1, 2026. Please read this section carefully and consider which Program design is in effect at the point of sale or the time of enrollment (Legacy Program or Construct 5). Visit energystorageCT.com for the current Program status. Customers may enroll in Energy Storage Solutions via their Eligible Contractor (Contractor) or ThirdParty Owner (TPO) or Aggregator completing a project application (Application) on the Customer’s behalf through the Customer Enrollment Platform. Enrollment in Energy Storage Solutions requires two steps: Customer Enrollment and Battery Enrollment. Customer Enrollment for most customers is completed in two stages via the Customer Enrollment Platform, which only Eligible Contractors and TPOs can access. The application stage collects the information necessary to issue a Reservation of Funds or Reservation of Capacity letter. The completion stage confirms the project is complete and operational, and provides information necessary to issue a Confirmation of Enrollment letter. Battery Enrollment can either be completed by the customer through their equipment’s mobile app or website, or by the contractor or OEM as part of the commissioning process (not all OEMs support customer-led battery enrollment). This stage collects the customer’s name and address, utility account number, and device information, which are automatically communicated and matched in the Customer Enrollment Platform. Alternatively, Customers may Self-Enroll via their BESS OEM, Operator, or Aggregator as described in Sec. 3.2.1 below. The Self-Enrollment process combines the Customer Enrollment and Battery Enrollment processes into a single step but does not allow the customer to access Upfront or Enrollment Incentives. In the event that an Application is submitted for Upfront-, Enrollment-, or Performance-based Incentives that are outside the scope of use case examples within the Program Manual, or that were not discussed or presented within the regulatory process, then the Program Administrators have discretion to determine the appropriate incentive consistent with the public policy objectives of PURA. Additionally, for alternative energy storage technologies (see Sec. 4.1) that may be approved on a case-by-case basis, Program Administrators will work with the applicant to develop the appropriate enrollment route. Supplemental materials detailing such enrollment processes may be made available on www.energystorageCT.com. 3.1. Customer Enrollment Process–Legacy Program15 and Construct 5 Sec 3.1 applies to all Energy Storage Solutions applicants (both Legacy Program and Construct 5) The following steps outline the process flow for a typical project in Energy Storage Solutions from Customer Enrollment through Battery Enrollment and the onset of the performance period. 15 Where applicable 12Page 14 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 14 of 117 1. Execute Customer Contract or LOI, Terms & Conditions and Data Release Residential Customers must sign and execute a Customer Contract 16 , with an Eligible Contractor and/or Third-Party Owner (TPO), noting the designation of associated parties responsible for administration of the project. The Customer Contract must comply with the requirements set forth in Sec. 4.3. C&I Customers may sign a Letter of Intent (LOI) rather than a complete contract at the Application stage. Customers must agree to and sign the Residential Customer Terms & Conditions and Data Release associated with their application type. Examples included in Appendix B and Appendix E17. 2. Pay Application Fee (C&I Customers Only) C&I Customers must pay a non-refundable $350 application fee to receive a Reservation Letter. Payment instructions will be provided at energystorageCT.com/contractor-resources and the Customer Enrollment Platform no later than April 1, 2026. There is no application fee for Residential customers of any kind (including MFAH). Application fees for Hybrid Projects18 will be calculated based on the proportion of the BESS capacity assigned to C&I. 3. Submit Interconnection Application The Contractor, TPO, or Aggregator must submit a completed Interconnection Application to the applicable EDC in order to receive a Reservation Letter. Applicants must maintain an active interconnection application for the BESS. Applicants who subsequently withdraw their interconnection application or otherwise have the interconnection application cancelled risk losing Reservation. Program Administrators will work with Contractors, TPOs, or Aggregators as needed and reserve the right to determine whether projects with a withdrawn or cancelled interconnection application status should be cancelled. C&I customers with base load19 higher than the BESS maximum dispatch capability may request exemption from exporting requirements. Approval of such exemption will be at the discretion of Program Administrators. Projects that apply for Active Dispatch enrollment after April 1, 2026 but that received interconnection approval before January 1, 2026 are not required to have an export interconnection. Any project with an interconnection approval dated January 1, 2026 or later must be approved for export. 4. Complete Customer Enrollment Application 16 See definition of Customer Contract in Section 1 (Acronyms and Glossary) Visit energystorageCT.com/contractor-resources for more information. 18 See Sec. 6.1.5 19 Commercial and industrial customer base load will be set equal to the C&I customer’s average demand during April-May and October-November from the previous 12 months. 17 13Page 15 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 15 of 117 Customers seeking participation in Energy Storage Solutions must be first deemed eligible. The Contractor, TPO, or Aggregator must register their respective Customers using the Customer Enrollment Platform to complete the Application. The Contractor, TPO, or Aggregator will follow instructions on the Enrollment Platform to submit a complete Application. Communications and notifications for activity throughout the process will be sent via email to the email addresses on file in the Application. To be considered complete, each Application will include, but may not be limited to, the following information submitted directly or via attached files in the Enrollment Platform: a. Customer, Contractor, Aggregator (if applicable) and TPO (if applicable) detailed contact and site information b. Service address where BESS is to be installed c. Designation of Performance Incentive recipient (default is system owner) and point of contact responsible for Application accuracy d. Signed Customer Contract or LOI for BESS i. For Residential projects, a signed sales agreement, lease, or power purchase agreement between the Customer and Contractor, TPO, or Aggregator is required. ii. For C&I projects, a signed Letter of Intent (LOI) between the Customer and Contractor, TPO, or Aggregator will be accepted during the initial application stage to receive a ROF. e. System description (make, model, and quantity of battery and inverter) f. Signed Program Terms & Conditions and Data Release g. Customer’s choice of seasonal or annual Performance Incentive payments 5. Connecticut Green Bank Reviews Project for Eligibility and Technical Accuracy After Application submittal, CGB staff will review the Application for accuracy and completeness. If additional information is needed, Contractor, TPO, or Aggregator will be notified via email of any deficiencies. The Applicant may be given a time frame to correct such deficiencies, as indicated in an email communication. If the Applicant has not corrected the deficiencies identified within the time allotted, CGB may move the incentive application to an “inactive” status20. Applicants may reapply at any time subject to Program availability. 6. Connecticut Green Bank Approves Project Application and Upfront Incentive All C&I Projects with an estimated Upfront or Enrollment incentive below $500,000 require a Project Approval Form (PAF) that must be approved by Connecticut Green Bank Senior Staff. All C&I projects with an estimated Upfront or Enrollment incentive greater than or equal 20 Including, but not limited to “Withdrawn” or “Cancelled”. 14Page 16 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 16 of 117 to $500,000 will require approval from the Connecticut Green Bank Board of Directors (BOD). Upon all Application requirements being satisfied, including applicable PAF or BOD approvals, CGB staff will electronically send a Reservation of Funds (ROF) or Reservation of Capacity (ROC) letter (“Reservation Letter”) describing the estimated Upfront or Enrollment incentive (where applicable), the Performance Incentive rate reserved, and the expiration date of the Reservation Letter. All residential projects shall have up to 24 months to reach operation upon issuance of Reservation Letter. CGB may approve extension requests beyond 24 months if the Extension Criteria below are met. For commercial projects, CGB may approve extension requests beyond 24 months (if no System Impact Study) or 36 months (if the first extension request was granted) if the Extension Criteria below are met. Extension Criteria CGB may approve Reservation extension requests based on need. CGB may grant a second extension request if at least one of the following five criteria are met: (1) the project is unique and more complex than ordinary BTM distributed generation installation projects, such as having additional technology-specific regulatory or local siting requirements; (2) the project developer has worked diligently and in good faith in developing the project since inception; (3) the project is near completion or likely to begin commercial operation within the requested extended deadline; (4) a significant portion of the total project investment has already been made and would potentially be stranded if the contract is terminated; and/or (5) the interconnection process extended beyond the utilities’ initial estimates and/or significantly beyond the average interconnection process timeline. It should be noted that extension requests will prolong the project completion deadline proportional to the delay experienced and/or the amount of time demonstrated that is needed to complete the project. Extension requests should be submitted via email to [email removed] with the subject line “Extension Request: ESS-#####21” and will be reviewed on a per-project basis by CGB. 7. Construction Phase The Contractor or TPO may pursue the construction schedule that best suits the project needs, although the Program Administrators anticipate that the majority of projects will not 21 Where “ESS-######” refers to the project’s unique project ID as shown in the Enrollment Platform. 15Page 17 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 17 of 117 begin construction until the Customer Contract has been executed22 . Upon construction completion and within the allowable timeframe if the extensions are granted, the Contractor or TPO will notify the Program Administrators of the commercial operation date (COD) via the Customer Enrollment Platform and that the system is ready for verification via submission of project completion materials in the Enrollment Platform. Connection to any building’s electrical service or utility meter can only be performed by a licensed Connecticut E-1. 8. Inspection Battery inspections are optional and inspections will be conducted only upon customer request. Customers interested in having their batteries inspected must indicate their preference by opting in during the incentive application process, and the inspection will take place after the project is built and submitted for completion. 9. Battery Enrollment As part of the Construction Phase, the Eligible Contractor or other party responsible for installation of the BESS will facilitate enrollment of the BESS in the relevant DERMS platform. The method by which this is performed will vary depending on the BESS OEM or Operator. Once successfully enrolled, the Program Administrators will be able to confirm that the BESS is operational through the DERMS portal. 10. Approval and Payment of Upfront Incentive Upon confirmation that the system is energized and operational, has passed all applicable inspections (if opted-in), has received final approval from the EDC, and is reporting in the appropriate DERMS platform, a Confirmation of Enrollment letter will be issued by the Program Administrators confirming the final approved Upfront or Enrollment Incentive amount (where applicable) and the approved Performance Incentive rate. The Upfront or Enrollment Incentive will be approved for payment as described in Section 6. The project will be considered “Complete” and operational at this point to begin its 10-year enrollment period. 3.2. Customer Enrollment Process–Legacy Program Active Dispatch Only (No Upfront Incentive) or Construct 5 Active Dispatch (No Enrollment Incentive) Customers who wish to self-enroll in Active Dispatch and forego Upfront or Enrollment Incentives may do so through multiple channels23. Customer-Led Enrollment in Active Dispatch should be done after the system is installed, operational, has received utility approval to energize, and is connected to the relevant DERMS platform. 3.2.1. BESS Operator, BESS Aggregator, or OEM-Led Self-Enrollment 22 Customers requesting an Upfront Incentive may not install systems prior to Reservation of Funds (ROF). The enrollment options offered in Section 3.2 were originally created for customers who elected not to participate in Passive Dispatch, foregoing the Upfront Incentive. As Passive Dispatch enrollment ends on April 1, 2026, the Program Administrators do not expect the processes described in Section 3.2 will be utilized for regular enrollments. However, they will remain available for customers who do not qualify for an Enrollment Incentive (i.e. customers applying more than 6 months post-interconnection approval). See Section 4.1, Customer and Site Eligibility for more information. 23 16Page 18 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 18 of 117 Customers who wish to self-enroll in Active Dispatch via the web or app interfaces provided by their BESS Operator, BESS Aggregator, or OEM (In-App Enrollment) may do so by following the instructions provided in the interface. The Program Administrators reserve the right to grant or revoke the ability for BESS Operators, Aggregators, and OEMs to enroll customers via this channel. 1. Execute Customer Terms & Conditions and Data Release Residential Customers must agree to and sign the Residential Customer Terms & Conditions and Data Release associated with their Eligible Equipment or BESS Operator or Aggregator. Example included in Appendix B. C&I Customers must agree to and sign the Commercial and Industrial Customer Terms and Conditions and Data Release included in Appendix G. This may be done directly within the In-App Enrollment process. 2. Submit Application Fee Payment (C&I Customers Only) C&I Customers must pay a nonrefundable $350 application fee to receive a Reservation of Funds or Reservation of Capacity. Payment instructions will be provided at energystorageCT.com/contractor-resources and the Customer Enrollment Platform no later than April 1, 2026. There is no application fee for Residential customers (including MFAH). Application fees for Hybrid Projects24 will be calculated based on the proportion of the BESS capacity assigned to C&I. 3. Complete Customer Enrollment Application Customers will follow a process for In-App Enrollment managed by the BESS Operator, Aggregator, or OEM and approved by the Program Administrators. To be considered complete, each Application will include, but may not be limited to, the following information: a. Customer contact and site information b. Service address where BESS is to be installed c. System description (make, model, and quantity of battery and inverter) d. Signed Program Terms & Conditions and Data Release e. Designation of annual or seasonal Performance Incentive payments f. Designation of Performance Incentive recipient (optional) 4. Connecticut Green Bank Reviews Project for Eligibility and Technical Accuracy After Application submittal, CGB staff will review the Application for accuracy and completeness. If additional information is needed, Customer will be notified via email of any 24 See Sec. 6.1.5 17Page 19 of 117
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 19 of 117 deficiencies. The Customer may be given a time frame to correct such deficiencies, as indicated in an email communication. If after this extended time the Applicant has not provided the requested information, Program Administrators may elect to move the incentive application to an “inactive” status25. Customers may reapply at any time subject to Program availability. 5. Battery Enrollment CGB will confirm that the BESS is operational through the DERMS portal. CGB may utilize interconnection application information provided by the EDCs to enter applicant customers in the Customer Enrollment Platform. 6. Approval and Enrollment Upon confirmation that the system is energized and operational, has passed all applicable inspections (if opted-in), has received final approval from the EDC, and is reporting in the appropriate DERMS platform, a Confirmation of Enrollment will be issued by the Program Administrators confirming the customer’s enrollment in Active Dispatch. The project will be considered “Complete” and operational at this point to begin its 10-year enrollment period. 3.2.2. Customer Enrollment Platform “Self-Enrollment” Sec 3.2.2 applies only to customers enrolling in Legacy Program “Active Dispatch Only” (i.e. foregoing Passive Dispatch) prior to April 1, 2026. It does not apply to Construct 5 customers applying on or after April 1, 2026. Customers who wish to enroll in Legacy Program “Active Dispatch Only” via the Customer Enrollment Platform (and not via Self-Enrollment) must do so via an Eligible Contractor, Eligible TPO, or Eligible BESS Aggregator with access to the Customer Enrollment Platform. The Contractor will follow the following process: 1. Submit Signed Customer Terms & Conditions and Data Release Residential Customers must agree to and sign the Residential Customer Terms & Conditions and Data Release associated with their Eligible Equipment or BESS Operator. Example included in Appendix B. C&I Customers must agree to and sign the Commercial and Industrial Customer Terms and Conditions and Data Release included in Appendix E. 2. Complete Customer Enrollment Application Customers seeking participation in Energy Storage Solutions must be first deemed eligible. The Contractor or TPO must register their respective Customers using the Customer Enrollment Platform to complete the Application. The Contractor or TPO will follow instructions on the Enrollment Platform to submit a complete Application. 25 Including, but not limited to “Withdrawn” or “Cancelled”. 18
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Text of ES Order 2, SCEF_Items 1-4.pdf
Extracted from the file · 49 pages · 109,450 characters
Text of ES Order 2, RRES_Items 1-4.pdf
Extracted from the file · 65 pages · 149,171 characters
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2