Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

2 pages match
  1. Page 18 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 18 of 117 Customers who wish to self-enroll in Active Dispatch via the web or app interfaces provided by their BESS Operator, BESS Aggregator, or OEM (In-App Enrollment) may do so by following the instructions provided in the interface. The Program Administrators reserve the right to grant or revoke the ability for BESS Operators, Aggregators, and OEMs to enroll customers via this channel. 1. Execute Customer Terms & Conditions and Data Release Residential Customers must agree to and sign the Residential Customer Terms & Conditions and Data Release associated with their Eligible Equipment or BESS Operator or Aggregator. Example included in Appendix B. C&I Customers must agree to and sign the Commercial and Industrial Customer Terms and Conditions and Data Release included in Appendix G. This may be done directly within the In-App Enrollment process. 2. Submit Application Fee Payment (C&I Customers Only) C&I Customers must pay a nonrefundable $350 application fee to receive a Reservation of Funds or Reservation of Capacity. Payment instructions will be provided at energystorageCT.com/contractor-resources and the Customer Enrollment Platform no later than April 1, 2026. There is no application fee for Residential customers (including MFAH). Application fees for Hybrid Projects24 will be calculated based on the proportion of the BESS capacity assigned to C&I. 3. Complete Customer Enrollment Application Customers will follow a process for In-App Enrollment managed by the BESS Operator, Aggregator, or OEM and approved by the Program Administrators. To be considered complete, each Application will include, but may not be limited to, the following information: a. Customer contact and site information b. Service address where BESS is to be installed c. System description (make, model, and quantity of battery and inverter) d. Signed Program Terms & Conditions and Data Release e. Designation of annual or seasonal Performance Incentive payments f. Designation of Performance Incentive recipient (optional) 4. Connecticut Green Bank Reviews Project for Eligibility and Technical Accuracy After Application submittal, CGB staff will review the Application for accuracy and completeness. If additional information is needed, Customer will be notified via email of any 24 See Sec. 6.1.5 17
  2. Page 19 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 19 of 117 deficiencies. The Customer may be given a time frame to correct such deficiencies, as indicated in an email communication. If after this extended time the Applicant has not provided the requested information, Program Administrators may elect to move the incentive application to an “inactive” status25. Customers may reapply at any time subject to Program availability. 5. Battery Enrollment CGB will confirm that the BESS is operational through the DERMS portal. CGB may utilize interconnection application information provided by the EDCs to enter applicant customers in the Customer Enrollment Platform. 6. Approval and Enrollment Upon confirmation that the system is energized and operational, has passed all applicable inspections (if opted-in), has received final approval from the EDC, and is reporting in the appropriate DERMS platform, a Confirmation of Enrollment will be issued by the Program Administrators confirming the customer’s enrollment in Active Dispatch. The project will be considered “Complete” and operational at this point to begin its 10-year enrollment period. 3.2.2. Customer Enrollment Platform “Self-Enrollment” Sec 3.2.2 applies only to customers enrolling in Legacy Program “Active Dispatch Only” (i.e. foregoing Passive Dispatch) prior to April 1, 2026. It does not apply to Construct 5 customers applying on or after April 1, 2026. Customers who wish to enroll in Legacy Program “Active Dispatch Only” via the Customer Enrollment Platform (and not via Self-Enrollment) must do so via an Eligible Contractor, Eligible TPO, or Eligible BESS Aggregator with access to the Customer Enrollment Platform. The Contractor will follow the following process: 1. Submit Signed Customer Terms & Conditions and Data Release Residential Customers must agree to and sign the Residential Customer Terms & Conditions and Data Release associated with their Eligible Equipment or BESS Operator. Example included in Appendix B. C&I Customers must agree to and sign the Commercial and Industrial Customer Terms and Conditions and Data Release included in Appendix E. 2. Complete Customer Enrollment Application Customers seeking participation in Energy Storage Solutions must be first deemed eligible. The Contractor or TPO must register their respective Customers using the Customer Enrollment Platform to complete the Application. The Contractor or TPO will follow instructions on the Enrollment Platform to submit a complete Application. 25 Including, but not limited to “Withdrawn” or “Cancelled”. 18
  3. Page 20 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 20 of 117 Communications and notifications for activity throughout the process will be sent via email to the email addresses on file in the Application. To be considered complete, each Application will include, but may not be limited to, the following information submitted directly or via attached files in the Enrollment Platform: a. Customer, Contractor, and TPO (if applicable) detailed contact and site information b. Service address where BESS is to be installed c. Designation of incentive recipient (default is system owner) and point of contact responsible for Application accuracy d. Signed Program Terms & Conditions and Data Release 3. Connecticut Green Bank Reviews Project for Eligibility and Technical Accuracy After Application submittal, CGB staff will review the Application for accuracy and completeness. If additional information is needed, Contractor or TPO will be notified via email of any deficiencies. The Applicant may be given a time frame to correct such deficiencies, as indicated in an email communication. If after this extended time the Applicant has not provided the requested information, CGB may elect to move the incentive application to an “inactive” status26. Applicants may reapply at any time subject to Program availability. 4. Battery Enrollment CGB will confirm that the BESS is operational through the DERMS portal. CGB may utilize interconnection application information provided by the EDCs. 5. Approval and Enrollment Upon confirmation that the system is energized and operational, has passed all applicable inspections (if opted-in), has received final approval from the EDC, and is reporting in the appropriate DERMS platform, a Confirmation of Enrollment will be issued by CGB confirming the customer’s enrollment in Active Dispatch and applicable Performance Incentive rate. The project will be considered “Complete” and operational at this point to begin its 10-year enrollment period. 3.3. Customer Enrollment Process – Transfer from ConnectedSolutions The following steps outline the expected process flow for how Transfer Customers will be enrolled into Energy Storage Solutions. Note that Transfer Customers do not qualify for Passive Dispatch, Upfront Incentives, or Enrollment Incentives; Transfer Customers may only qualify for Active Dispatch performance incentives. Note: Transfer Customers are included in the Residential and Commercial – Active Dispatch Only Customer Class shown in Table 4. 26 Including, but not limited to “Withdrawn” or “Cancelled”. 19
  4. Page 21 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 21 of 117 Transfer Battery Enrollment Steps and Milestones 1. Application Approval and Acceptance The system owner or BESS Operator or OEM may request transfer by contacting the Program Administrators directly. All relevant data will be inputted into or transferred within the DERMS platform and the project will be registered. All customers seeking participation in Energy Storage Solutions must submit a signed Program Terms & Conditions and Data Release applicable to their BESS OEM or customer class. See Appendix B and Appendix G for more information. 2. Connecticut Green Bank Reviews Project for Eligibility CGB will verify the signed Program Terms & Conditions and Data Release and verify that the customer’s BESS is listed as Eligible Equipment in Energy Storage Solutions and meets all other eligibility requirements for Active Dispatch in Energy Storage Solutions. Note that export interconnection approval is not required for Transfer Customers who interconnected their system prior to January 1, 2026. 3. Transfer and Enrollment Upon verification of eligibility, the Program Administrators will work with the EDCs and the appropriate DERMS provider to transfer the customer’s enrollment into Energy Storage Solutions. The customer will receive a Welcome Letter via email confirming the transfer. 3.4. Enrollment Deadlines and Milestones Customers may enroll at any time for a period of ten (10) full years. See Section 6.1 for more information. 3.5. Project Verification 3.5.1. Project Inspections To qualify for an Upfront or Enrollment Incentive, Contractors or TPOs must agree to provide the CGB with a Self-Inspection report (including all required photos) at project completion, along with all other project completion paperwork. CGB staff will review Self-Inspection report submission and follow up with the Contractor or TPO as needed. Contractors or TPOs will submit Self-Inspection reports via the Customer Enrollment Platform in accordance with guidelines described in the current Process Guides. A copy of the Third-Party Inspection Checklist is posted at the Energy Storage Solutions website for reference when a customer elects to have their project inspected. The Program Administrators reserve the right to have a representative of the Program Administrator conduct a field inspection of the completed system to verify information submitted in the selfinspection report and Application materials, as well as inspect the system with respect to: battery system communication status to assure that the battery can dispatch to meet Program requirements as well as meet customer backup power needs, equipment verification, safety considerations, workmanship, and other considerations such as local and state codes, laws and regulations (though adherence to applicable codes are primarily the purview of municipal inspections). Contractors or TPOs must allow this representative to inspect the completed and interconnected BESS, though 20
  5. Page 22 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 22 of 117 Customers may decline the Inspection if they choose. Contractor or TPO and Customer will have the right to be present for the Program Administrators’ Field Inspection as safety allows and at the discretion of the inspector. The Program Administrators and inspectors will coordinate inspection following Contractor or TPO’s submission of proof of project completion if Host Customer opted into a Third-Party Inspection. Upon the second instance of a re-inspection at one (1) or more sites, the Contractor or TPO may be required to pay the costs of follow-up inspection. Discrepancies found between incentive applications and inspection reports will be reviewed by CGB. CGB reserves the right to adjust Upfront or Enrollment Incentive calculations based on inspection reports or other submitted documentation and will make a final decision on incentive adjustments due to inspection failures. Incentive adjustments made as a result of inspection reports may only decrease the total incentive level; never increase. Contractor or TPO is responsible for the original Incentive calculation and will therefore be held responsible for any reduction in incentive amount as a result of the inspection report or other submitted documentation. Reduction in incentive as a result of Contractor or TPO mistake or negligence shall not be passed on to customers. CGB may decide to inspect a completed system based on the installer history, the Self Inspection Checklist, the customer availability, and if the Host Customer opted into an inspection. The Program Administrators will work to ensure that inspections are performed in a reasonable timeframe and do not impose an excessive burden or inconvenience on customers, or Contractors and TPOs in good standing. Customers may still decline the inspection. The Program Administrators may modify its inspection policy to better accommodate Contractors or TPOs. Adjustments to the policy and/or processes will be detailed at energystorageCT.com. 3.6. Project Completion Policy To ensure good stewardship of Energy Storage Solutions incentive funds, the Program Administrators will enforce a Project Completion policy. Approval of new incentive applications may be suspended and/or projects considered cancelled by the Program Administrators for projects that are non-compliant based on any of the eligibility requirements outlined above or any of the following rules: 1. Project Expiration 2. Inspection Failures and Delays 3. Completion Deficiencies Project Expiration Reservations may be cancelled for projects if their incentive approvals expire. Projects will be considered expired when a Contractor or TPO has projects that have passed the timeframe (as specified in Reservation of Funds letter) listed in incentive reservation letters or on the Energy Storage Solutions website, where applicable, whichever is later. Projects are Expired if all completion paperwork has not been submitted. Expired Projects may have their project status changed to “Cancelled”. Contractor or TPO may resubmit for approval at then-current incentive level unless the incentive level has increased and if project has not yet been installed. Incentive payments 21
  6. Page 23 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 23 of 117 that were already received for cancelled projects must be returned to the Program Administrators within 30 days of cancellation. The Program Administrators reserve the right to modify schedule, deadlines, and timelines associated with Project Expiration and will post notice via the Enrollment Platform in the event of any changes. Inspection Failures and Delays Incentive reservations may be cancelled if projects fail to meet inspection deadlines: 1. Failed Inspection of 90+ days – Any projects in “Failed Inspection” status for 90 days or more. Contractor or TPOs may be granted an exemption if they can demonstrate a delay outside Contractor or TPO control. 2. Delayed Self-Inspection – Consistent failure to submit Self-Inspection documentation. 3. Fail to report energy data to the Program Administrator’s Performance Data Monitoring platform Completion Deficiencies Projects will be rejected if responsible party fails to submit complete project completion information and paperwork, including but not limited to: inspection documentation, updated system specifications, certificates, change orders, signatures, audit trails and document revisions. 3.7. Unenrolling from Energy Storage Solutions Customers who enroll in Energy Storage Solutions will remain enrolled for 10 years from the date of Commercial Operation or until they provide written notice to the Program Administrators that they want to be removed from the Program. Unenrolling from Active Dispatch Once a season (summer or winter) starts, the customer must stay enrolled for the entire season to receive the performance incentive. A customer cannot un-enroll midway through a season and receive a performance incentive averaged for fewer events than all the other Program participants. Once customers are unenrolled from Active Dispatch, they will have no obligation to participate in dispatch events. For customers who enrolled on or after April 1, 2026 and received an Enrollment Incentive, there is no requirement to return any portion of the Enrollment Incentive. Unenrolling from Passive Dispatch Unenrolling from Passive Dispatch before 10 years of system operation will result in non-compliance with Program requirements27 and the customer will be required to return a prorated portion of the un-earned Upfront Incentive as determined by CGB. Once funds have been returned as requested, the customer will have no obligation to participate in Passive Dispatch events. 3.8. Upfront Incentive Buyback and Transition to Construct 5 27 See Section 6.1.2 22
  7. Page 24 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 24 of 117 Residential customers enrolled in Legacy Passive Dispatch may elect to repay the unearned portion of the original Upfront Incentive in order to transition from Legacy Passive Dispatch to Construct 5 Active Dispatch, subject to the requirements of Section 3.8 and any other application Program rules. This option is not available to C&I customers. The unearned portion of the Upfront Incentive may be repaid by the System Owner, OEM, Eligible Contractor, financing entity, TPO, or another Program Administrator-approved third party on behalf of the Customer. Repayment of the required amount shall permit the project to transition from Legacy Passive Dispatch to Construct 5. Projects utilizing an Upfront Incentive Buyback to transition into Construct 5 are not eligible to receive Construct 5 Enrollment Incentives. Such projects may remain eligible for applicable Performance Incentives under Construct 5, subject to all other Program requirements. The required repayment amount shall be calculated based on the remaining term of the Customer’s original ten (10) year enrollment obligation, inclusive of any applicable Clawback amounts resulting from noncompliance that have been approved, or not waived, by PURA. For example, a Customer with five (5) years remaining in the original enrollment term shall repay fifty percent (50%) of the original Upfront Incentive, plus any outstanding non-waived Clawback Fees. The PAs will make an effort to accommodate mid-season switch requests, but program acceptance may be delayed due to other commitments at that time. Where repayment is proposed by a third party, the Program Administrators shall require written approval from the system owner prior to approving the transition to Construct 5. Any project transitioning from Legacy Passive Dispatch to Construct 5 is expected to remain operational and capable of participation in Active Dispatch for ten (10) years. Upon receipt and verification of the required repayment amount, and satisfaction of all other applicable Program requirements, the Customer’s enrollment will be transitioned from Legacy Passive Dispatch to Construct 5. Upon such transition, the Customer will no longer be subject to Legacy Passive Dispatch participation requirements or future Passive Dispatch clawback exposure.28 3.9. Extending Energy Storage Solutions Enrollment After 10 years of system operation, BESS may still have useful life. Customers wishing to continue participation in Active Dispatch (and associated performance incentives) may apply for an extension (subject to Program availability) and will be eligible to receive performance incentives at the rate applicable at the time of re-enrollment. 3.10. Transfer of Enrollment The Program Administrators will allow customers to transfer Program enrollment to other customers. If a customer moves out of their residence/facility leaving their BESS behind, the new occupant and BESS owner will be required to notify the EDCs of the change in ownership in order to ensure future performance payments will be processed to the new owner. The new owner will complete a BESS Ownership Transfer Form (See Appendix D) through the Enrollment Platform. Information required will include contact information (name, email, phone), address, and the new 28 https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/f443e4a4254e016585258dee0065d70c/$FILE/2508-05%20Motion%20No.%2018%20Ruling.pdf 23
  8. Page 25 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 25 of 117 utility electric account number. For installations where the seller financed a portion of the BESS and a direct payment recipient was named during the application process, the seller will be responsible for notifying the direct payment recipient of the transfer or decision to unsubscribe from the program. If a customer moves out of their residence/facility leaving their BESS behind, and the new occupant does not participate in Passive Dispatch (where applicable), then the original customer who entered into the Program Contract is responsible for returning a prorated portion of the Upfront Incentive (where applicable) upon property transfer. 3.11. Electronic Signatures Contractors and TPOs may use and allow their retail customers to use electronic signatures in lieu of wet signatures for contracts and other documents in the Program and create such contracts and other documents in electronic form. Electronic signatures must (a) use logically attached or associated with the electronic contract or other document being created and is verifiable, (b) include a date and time stamp of the electronic signature and an electronic audit trail of the electronic signature and the electronic contract or other document that is created, and (c) be sure the electronic contract or other document is created and retained in a secure electronic environment that preserves the integrity of the electronic contract and all the information contained therein and can be made available to the Program Administrators upon its request. Examples of electronic signature technology systems that are acceptable to the Program Administrators include DocuSign, HelloSign and Adobe Sign. Only commercially available thirdparty platforms are accepted. The Program Administrators will not accept electronic signatures that have been digitally altered, copied, or placed using computer software that does not provide a verifiable electronic audit trail. Remainder of this page intentionally left blank 24
  9. Page 26 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 26 of 117 Section 4: Eligibility 4.1. Customer and Site Eligibility To be eligible for Energy Storage Solutions, the customer must have a UI or Eversource electric service account located in Connecticut and the BESS must be located at the electric service account location.29 Additionally, the residential, commercial, or industrial building must be connected to the grid by agreement with the EDCs. Systems energized or installed prior to January 1, 2022 are not eligible for the Upfront Incentive but may apply to participate in Energy Storage Solutions as an Active Dispatch Only or Transfer Customer per Section 3. Such customers will only be eligible for Performance Incentives. Systems energized after January 1, 2022, but prior to the contractor or equipment receiving Program approval (for up to one year) may still qualify for an Upfront or Enrollment Incentive, ensuring that early adopters are not penalized for moving forward before contractor approval processes were finalized. Beyond this, only systems energized no more than six months prior to Program enrollment will remain eligible for the Construct 5 Enrollment Incentive. The Program Administrators reserve the right to audit such applications and decide whether the project meets the criteria for approval. Eligible customers can receive Upfront or Enrollment Incentives and Performance Incentives at the rates in effect at the time of Reservation of Funds or Reservation of Capacity. Add-On Systems Additional capacity added to existing BESS may be eligible for Energy Storage Solutions, subject to the discretion of the Program Administrators and an analysis of the proposed system to include age and functionality verification of the existing BESS components. Total Upfront Incentives provided for BESS(s) enrolled in Passive Dispatch at a single residential unit shall not exceed $16,000. There is no cap on Enrollment Incentives. Enrollment start/end dates may be adjusted at the Program Administrators’ discretion. Additionally, Customers who received an Upfront Incentive and install an additional complete BESS can qualify for an Enrollment Incentive under Construct 5 for the additional system at the discretion of the Program Administrators. Ownership BESS’s may be owned by: (1) the customer or (2) a third-party operator (TPO) with the customer’s permission as indicated in the Application. All Energy Storage Solutions rules must be met regardless of the BESS’s owner. In the instance that there is a change in TPO or Contractor, the Customer must notify the Program Administrators in writing to request an evaluation of the new agreement and/or new TPO. For customers purchasing a BESS from a qualified Contractor, the customer will retain title to the equipment purchased. The Contractor is responsible for ensuring all equipment is installed in accordance with manufacturer specifications and warranty provisions when system is placed in 29 New construction or new service customers may submit proof that a new service has been requested at application. Incentive payments will not be issued until the Program Administrators have confirmed that electric service has been established with Eversource or UI. 25
  10. Page 27 of 117

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance ESS_Items 1-4 Page 27 of 117 service. The Contractor will be held responsible for any actions that void equipment warranties due to workmanship. If the BESS is owned by a TPO, the equipment title shall remain with the TPO. Energy Efficiency Audits For residential customers at the time of Completion, the Customer must have either completed a Home Energy Solutions (HES), Home Energy Solutions Income-Eligible (HES-IE), or an equivalent energy assessment30 after 2011 or must have scheduled such an assessment. Information on scheduling HES and HES-IE assessments is available at: Home Energy Solutions-Income Eligible: https://energizect.com/your-home/solutionslist/save-energy-and-money-all-year-long/ Home Energy Solutions: https://energizect.com/your-home/solutions-list/home-energysolutions-core-services/ In certain limited circumstances, one-to-four family homes are not required to have HES or HES-IE assessments. Exemptions to the HES audit requirement are permitted in only the following instances: 1. BESS is co-located with solar and is participating in the Residential Renewable Energy Solutions (RRES) Program or the solar portion participated in the Residential Solar Investment Program (RSIP). 2. Homes built on or after January 1, 1980 are not required to have an energy assessment in order to apply for the Program. If the applicant would like to waive the energy assessment requirement due to the home being built in 1980 or more recently, the applicant needs to provide a property assessor’s card verifying the built date with the application submission. Partial new construction or renovations will not be considered for waiving the energy assessment requirement. 3. Gut Rehabilitation: if the home has been or will be completely stripped to its frame and rebuilt, then at minimum, Contractor or Homeowner may follow exception listed above, if applicable. 4. Health and Safety Concern: Technician cannot perform energy efficiency audit due to health and/or safety concerns (i.e., mold, asbestos, vermiculite, etc.). In this case, a letter should be provided specifying the issues that prevent the audit or certain measures from being performed. 5. If a home built before January 1, 1980 was not able to move forward with a HES or HES-IE assessment due to the existence of a Health and Safety Concern described above, or if the home is not eligible for efficiency measures to be installed due to the age of the home per HES technician documentation, the Program Administrators will accept proof of completion of a Department of Energy Home Energy Score (DOE HE Score) performed at the residence. In addition, the Program Administrators will also accept proof that a 30 Program Administrator will accept energy efficiency audits conducted in-person by a technician certified by the Building Performance Institute (BPI), HERS, or Home Performance with Energy Star. A copy of the audit report must be provided to the Program Administrator. The Program Administrators must approve “HES equivalent” energy audit types. 26

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)