Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Words on different pages
  1. Page 15 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 15 of 49 If an existing SCEF through PA 18-50, PA 19-35, PA 22-14, PA 23-102, or the pilot program, LREC/ZREC, or other NRES or SCEF tariff project is present at the Project Site and uses the same technology, the existing project must be in-service or any prior agreement must be terminated before any additional Bids are eligible for selection under this Program. There is one exception to this requirement. The exception is for projects issued a partial award in a previous SCEF solicitation. In such circumstances, a project will be eligible to submit a project bid of up to five (5) MW minus the amount the project was awarded in the previous Tariff Terms Agreement. The aggregate maximum capacity of all Bids located on a single Parcel of land, or contiguous Parcels under common ownership or with a common Bidder, shall be limited to five thousand (5,000) kW (AC), excluding any existing generation capacity that is not qualified under the Public Acts. Any subdivision of Parcels must be recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation. If multiple Bids are received for a Parcel of land that was not subdivided before January 1 of the year of the solicitation to which the Bidder is responding, or for which a subdivision was not recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation, only the lowest priced Bid will be eligible, and all other Bids will be disqualified. At the time of bidding, the Bidder offering multiple Bids at a Parcel must demonstrate such recording with the municipality to the appropriate EDC. During any single solicitation for any single Parcel of land, the EDCs will evaluate only one (1) Bid per technology or one (1) Bid that uses a combination of technologies (e.g., a wind turbine that has associated solar panels). PURA reserves the right to review and adjust these parameters to ensure competitiveness pursuant to Section 16-244z (c)(1)(A) of the General Statutes. 4.6 Project Viability The Bidder must demonstrate to DEEP through the responses in Appendix B that the technology the proposed Project will use is technically viable. Technical viability may be demonstrated by showing that the technology is commercially available and has been used successfully on a significant scale. The Bidder must demonstrate the financial viability of the proposed Eligible Project, including funding of development costs, the required development period security, reasonable estimated interconnection costs, and ability to acquire required equipment in the time frame proposed. The Bidder must demonstrate the environmental viability of the proposed Project, including a viable plan to acquire the necessary permits and licenses, an assessment of environmental impacts, and a plan to mitigate such impacts or impediments to the satisfaction of DEEP.
  2. Page 16 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 16 of 49 5. ELIGIBLE BIDDER 9 5.1. Experience Through the responses in Appendix B, a Bidder must demonstrate to DEEP its relevant experience and expertise to be able to successfully develop, finance, construct, operate, and maintain the proposed SCEF and successfully fulfill its responsibilities as provided in the Bid. Development, financing, and construction experience can be established by demonstrating that key member(s) of the Bidder's development team have undertaken project management responsibilities, including: a. Successful development and construction of a similar type of project; b. Successful development and construction of one or more projects of similar size or complexity or requiring similar skill sets; c. Successful development and management of a similar shared or community clean energy facility in another jurisdiction; and d. Experience successfully financing power generation projects (or demonstrating the means to finance the proposed SCEF on the Bidder’s balance sheet). 5.2. Operation and Maintenance Through the responses in Appendix B, a Bidder must demonstrate to DEEP its operation and maintenance plans for the proposed SCEF, including a level of funding and mechanism for funding that will ensure reliable operations during the term of the Tariff. 5.3. Bid Submission Bids must be submitted in accordance with the solicitation issued by the relevant EDC, which will set forth specific filing instructions. Each Bidder must comply with the instructions set forth by the solicitation to ensure that its Bid is complete. In addition to completion of the Bid Form, each Bidder must submit a Bid Certification Form and may be required to provide a Connecticut Licensed Professional Engineer Certification Form, Pending Connecticut Green Bank Grant and/or Rebate Disclosure Statement, interconnection application confirmation receipt, or other forms as necessary. Specific instructions will be included with the solicitation for how to provide these additional documents and the entity to which these documents shall be provided (i.e., the EDC or DEEP). Bidders must submit a non-refundable Bid Fee in accordance with the RFP at the time of Bid submission. Bids do not need to include a list of Subscribers at the time of submission. 9 Note, for 5.1 and 5.2 DEEP will be making these determinations. Please refer to Appendix B for further details.
  3. Page 17 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 17 of 49 6. SUBSCRIBERS 6.1. Subscriber Requirements Each SCEF must have at least ten (10) Subscribers and be located within the same EDC territory as the Individual Billing Meters of all of its Subscribers. Subscribers are limited to the following classes of Customers: • • • • • • • Low-income Customers; Moderate-income Customers; Small Business Customers; State or municipal Customers; Affordable Housing Landlords, Entities, and Facilities; Commercial Customers; Residential Customers, other than LMI Customers, who either: (1) reside in a rental or leased property, or a property where the Customer does not control the property's roof, such as a multiunit condominium; or (2) reside in their own property, but are unable to install on-site solar. For any Individual Billing Meter, a Subscriber may have only one (1) Subscription to one (1) SCEF. A Subscriber may not subscribe for an amount that exceeds one hundred (100) percent of the Subscriber’s historic average annual electric use (or, for a Subscriber with less than twelve (12) months of electric use, a reasonable 10 estimate of historical use). A Subscriber may not receive, or seek to receive, any Connecticut ratepayer-funded incentives or subsidies, including, but not limited to, net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program, associated with the electric load for which there is a Subscription under this Program. If a Subscriber has load in excess of the load covered by net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program, the Subscriber may participate in this Program as a Subscriber for only that excess load. The Subscriber is responsible for demonstrating excess load to the satisfaction of the EDC to be consistent with this Program. Conversely, existing SCEF participants who were enrolled in SCEF via the opt-out or opt-in methodology and seek to receive any other Connecticut ratepayer-funded incentives or subsidies including, but not limited to, net metering, virtual net metering, or PA 18-50 tariffs other than those provided by this Program will have such SCEF subscription adjusted to cover only excess load not covered by the new generation system. The EDCs will make this SCEF subscription adjustment after there are 12 consecutive months of generation system usage to accurately determine the excess load. The EDCs will conduct a review of existing SCEF subscribers once every 12 months to determine if a SCEF subscription requires adjustment due to customer participation in alternative For customers with less than twelve (12) months of actual electric use, the reasonable estimate of historic average annual electric use is based on average usage estimates for similar customers (e.g., building square footage, type of customer, number of household members for residential customers, etc.). 10
  4. Page 18 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 18 of 49 clean energy programs. If a Subscriber utilizes net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program for the electric load associated with a Subscription under this Program, such Subscription will be terminated. For each SCEF project that enters service prior to December 6, 2023, twenty (20) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional forty (40) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Lowincome Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of the SCEF must be subscribed by Small Business Customers through an EDC-administered identification and enrollment process. For each SCEF project that enters service prior to December 6, 2023, the remaining twenty (20) percent of the estimated annual output shall be available for voluntary enrollment by any eligible customer but is not required to be subscribed. For each SCEF project that enters service after December 6, 2023, fifty (50) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional twenty 11 (20) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI 12 Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Lowincome Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of 11 Previously, the program manual stated that for each SCEF project procured in years 1-4 of the program, twenty (20) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional forty (40) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Low-income Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of the SCEF must be subscribed by Small Business Customers through an EDC administered identification and enrollment process. For each SCEF project procured in Years 1-4 of the program, the remaining twenty (20) percent of the estimated annual output shall be available for voluntary enrollment by any eligible customer but is not required to be subscribed. 12 Low- and moderate-income customer status is verified at the time of subscription sign-up only. Annual verification is not needed.
  5. Page 19 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 19 of 49 the SCEF must be subscribed by Small Business Customers through an EDC-administered identification and enrollment process. For each SCEF project that enters service after December 6, 2023, the remaining ten (10) percent of the estimated annual output shall be available for voluntary enrollment by any eligible customer but is not required to be subscribed. A Subscriber may not have a Subscription that exceeds forty (40) percent of the estimated annual output of the SCEF based on the historic average annual electric use of such Subscriber. 6.2. Subscription Method On or before the commercial operation date of each SCEF, the EDC shall enroll customers, as identified by the EDC and directed by PURA, to meet the minimum requirements detailed in subsection 6.1. All enrolled subscribers shall receive a Subscription Summary Contract from the EDC prior to participation in the SCEF program. Any remaining output of the SCEF shall be available for subscription by all eligible Customers as defined in subsection 6.1. In addition to any measures specifically directed by DEEP and PURA, the EDC shall make reasonable and cost-effective efforts to promote the available SCEF subscriptions to all eligible Customers. Such efforts may include, but are not limited to, proactive engagement and/or partnership with municipalities and/or low-income service organizations (such as community action agencies and Operation Fuel) to assist with the identification and recruitment of subscribers, providing information on SCEF subscriptions in planned online and paper marketing materials, and providing call center representatives with the appropriate information and training to subscribe Customers. The EDC shall annually review SCEF subscriptions in aggregate for the preceding year, matching actual SCEF production with SCEF Subscribed Energy. If the EDC identifies that enrollment has dropped below the aggregate minimum requirements for any category detailed in subsection 6.1, the EDC shall enroll eligible customers to meet or exceed the aggregate minimum requirement. The EDC shall report to DEEP and PURA in November of each year, starting in 2022, as to the status of aggregate SCEF subscriptions by Customer type. PURA will specifically review SCEF program voluntary enrollment two years after the first SCEF is placed in service. PURA will determine at that time if penalties or other incentives are necessary to encourage greater voluntary participation. 7. ON-BILL CREDIT 7.1. Subscriber Credit
  6. Page 20 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 20 of 49 The EDC will credit each Subscriber on the monthly bill based on one-twelfth of the Subscriber’s share of the estimated annual output from the SCEF (i.e. annual Subscription kWhs). The On-bill Credit each month will equal the Subscriber Savings Rate times one-twelfth of the Subscriber’s annual Subscription kWhs. 13 The Subscriber Savings Rate will be $0.025/kWh. Any On-bill Credit will be applied first to the Subscriber’s late payment charges and arrearages, as applicable. Any On-bill Credit in excess of the Subscriber’s electric bill shall roll over from month to month. 7.2. Purchases of Energy The EDC shall purchase the Delivered Energy, inclusive of Prepaid RECs, from a Selected Bidder’s SCEF at the price(s) bid by the Bidder and approved by PURA (the “Purchase Price”). An EDC’s obligation to purchase the Delivered output from the SCEF is contingent upon the Subscriber Organization's compliance with the terms of the Program. For Projects sited on Prime Farmland, the Subscriber Organization must provide proof that they have followed any rules developed by DOAG and/or CSC 14. Upon Delivery, ownership of RECs, energy, and all other Energy and Environmental Attributes shall transfer to the EDCs. The Delivered output will be paid directly to the Subscriber Organization by the EDC on a quarterly basis. 7.3. Bidding of Purchase Prices Bidders shall not offer a Purchase Price that exceeds the applicable Procurement Price Cap established by DEEP and approved by PURA. Purchase Prices must remain the same for the entire Tariff Term. The Purchase Price shall not exceed applicable the Procurement Price Cap for any year over the Tariff Term. Purchase Prices must be bid on a fixed, dollar per megawatt-hour ($/MWh) basis for energy and RECs, subject to the applicable Procurement Price Cap, over the Tariff term. Proposed Purchase Prices shall not include any Subscriber Savings or On-bill Credit and cannot be conditioned upon or subject to adjustment based upon the availability of the Federal Production Tax Credit or the Federal Investment Tax Credit, or the availability, receipt, or continuation of any other tax treatment or government grant or subsidy. 7.4. Delivery of Energy Energy must be delivered to the applicable ISO-NE node on behalf of the EDC. The Subscriber Organization is responsible for all costs associated with scheduling and delivery of the SCEF’s energy to the applicable ISONE node, and the EDC will not be responsible for any costs associated with such Delivery, including but not limited to wheeling charges. The On-bill Credit will be a fixed amount each month for the duration of the Subscription. Pursuant to Motion No. 6 ruling, Docket No. 24-08-04, the Authority affirms that compliance with such requirements is not a condition for bid eligibility under the SCEF Program and remains exclusively within DoAG’s regulatory authority. 13 14
  7. Page 21 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 21 of 49 7.5. Delivery of RECs Payment by the EDC for Prepaid RECs at the Purchase Price creates a firm obligation on the part of the Subscriber Organization to Deliver RECs associated with the Delivered energy at the time that they are produced in the NEPOOL GIS. It is the Subscriber Organization’s responsibility to ensure that: (1) the SCEF is qualified and registered as a Connecticut Class I renewable energy source; and (2) all RECs associated with Delivered energy are Delivered in a timely manner upon creation in NEPOOL GIS. An EDC’s obligation to purchase the Delivered output from the SCEF is contingent upon the Subscriber Organization compliance with the terms of this Program. 7.6. Reimbursement for Failure to Deliver RECs If the SCEF fails to qualify or Deliver the Prepaid RECs associated with the Delivered energy, the EDC will recover the cost of those undelivered RECs by: (1) first, netting an amount equal to the ACP multiplied by the quantity of Prepaid RECs not Delivered from the next quarterly payment(s) made to the Subscriber Organization; and (2) , if (1) does not result in timely reimbursement, by drawing down on the Operating Period Security at an amount equal to the ACP, multiplied by the quantity of Prepaid RECs not Delivered. 8. CERTIFICATION A Bidder must certify compliance with all Program requirements in submitting a Bid to any procurement under this Program. 9. COMPLIANCE FILINGS Each EDC shall report the following to DEEP via [email removed] and PURA via its web filing system: 1) The EDC shall annually review SCEF subscriptions in aggregate for the preceding year. The EDC shall report to DEEP and PURA in November of each year, starting in 2022, as to the status of aggregate SCEF subscriptions by Customer type, specifically providing: a) Annual aggregate SCEF production; b) Annual aggregate SCEF Subscribed Energy by Customer eligibility type, including opt-in Subscribers; c) Information on each Subscriber who was a Subscriber in the preceding year, including the Subscriber’s meter address, customer class, date of entry and exit, as applicable; d) The number of residential Subscribers and corresponding Subscription kWhs in the preceding year that were subscribed by way of the Non-feasible Solar Self Attestation Form; e) The number of Subscribers and corresponding Subscription kWhs in the preceding year that are in excess of the load covered by net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program, for such Subscriber; f) All marketing materials used to recruit opt-in Subscribers in the preceding year, including but not limited to the website used by the EDC; and
  8. Page 22 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 22 of 49 g) The number of Subscriptions, and kWhs associated with any such Subscriptions, which were: (1) transferred to another location when a Subscriber moved; (2) terminated; or (3) resized in the preceding year. 2) No later than November 30, 2022, and annually thereafter, each EDC shall provide an aggregate list of eligible LMI customers readily identifiable in the EDC’s billing system, by number of customers and annual electricity consumption, not currently subscribed through the SCEF program. These and all other compliance filings required by PURA will be included as part of any Decision(s) in Docket No. 19-07-01, Review of Statewide Shared Clean Energy Facility Program Requirements and all other relevant Dockets. 10. TERMINATION OF ELIGIBILITY UNDER TARIFF PURA reserves the right to remove a Subscriber Organization from the Program for failure to meet any compliance filings ordered by DEEP or PURA. DEEP and PURA reserve the right to perform an audit of records, data, information, or other material relative to any required compliance filings. In addition, DEEP or PURA may conduct periodic audits of the Subscriber Organization to ensure continued compliance with the Program Manual. If a violation of these Program requirements is found during an audit, PURA reserves the right to terminate eligibility under the Tariff. 11. OMBUDSPERSON Requests for an extension of time for a project’s in-service date or resolution of Program disputes that do not require a ruling from the Authority will be addressed by the Authority’s selected Ombudsperson. Any extension requests should be emailed to [email removed] or submitted through the Extension Request Information Form. Following receipt of a project extension request, or a matter that is ripe for mediation or resolution of Program questions after contacting the EDCs, the Ombudsperson will subsequently contact the filer as needed to address the request. Any motions for an extension of a project’s in-service date filed with the Authority will be denied without prejudice with direction to file the request with the Ombudsperson. Matters involving program disputes should be emailed to [email removed]. If the dispute can be handled by the Ombudsperson, the Ombudsperson will work to address a request or resolve the issue at hand. This may, as appropriate, include additional requests for additional clarification and documentation via email, phone call, shared screen meeting, etc. If the Ombudsperson determines that the request or dispute should not or cannot be resolved by the Ombudsperson, the Ombudsperson will direct the stakeholder to first bring the issue to the relevant EDC, or in other cases, work with the stakeholder to submit a filing to PURA requesting a ruling.
  9. Page 23 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 23 of 49 APPENDIX A: SUBSCRIBER TERMS AND CONDITIONS A1. SUBSCRIBER TERM 1. Subscriptions shall continue for the duration of the contract term of the associated SCEF unless or until the Subscriber’s service is terminated or the Subscriber chooses to end the Subscription, such action shall be subject to subsection A3. below. A2. SUBSCRIPTION PORTABILITY AND TRANSFERABILITY 1. Portability (a) A Subscriber may change premises and continue a Subscription at the new premises, so long as: (1) An Individual Billing Meter for electric service exists at the new premises; (2) The Individual Billing Meter at the new premises is within the same service territory as the EDC serving the associated Shared Clean Energy Facility; and (3) The Subscriber is established as the Customer of record for electric service at the new premises. (b) If such Subscriber elects to continue the Subscription at the new premises, the Subscriber shall continue to receive the same monthly On-bill Credit. (c) If such Subscriber is eligible to continue the Subscription at the new premises but elects not to do so, such action shall be subject to subsection A3 below. 2. Transferability (a) A Subscriber may not transfer a Subscription, in whole or in part, to another Customer. A3. CANCELLATION OR TERMINATION OF SUBSCRIPTION 1. Cancellation of Subscription by the Subscriber (a) Notification to the EDC of Cancellation (1) A Subscriber seeking cancellation of a Subscription must provide written notification at least thirty (30) days in advance to the EDC of any cancellation.
  10. Page 24 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 24 of 49 (2) Cancellation of a Subscription shall take effect at the start of the next billing cycle of the Subscriber’s EDC account. 2. Termination of Subscription by an EDC (a) An EDC may only terminate a Subscription due to: (1) The termination of a Subscriber’s electric service with that EDC. (2) The termination of the SCEF contract associated with the Subscription. A4. SUBSCRIPTION SUMMARY CONTRACT Prior to the Subscription, the EDC shall provide a completed Subscription Summary Contract that contains the following information: • The length of the Subscription, and its effective date and ending date; • The amount of the monthly On-bill Credit; • The estimated kWhs the Subscriber is subscribing to each month over the term of the Subscription; • The terms for portability and transferability; and • The terms for early cancellation by the Subscriber and cancellation by the EDC. • The right to cancel the Subscription within three days of receipt of the Subscription Summary Contract if the Subscriber does not wish to participate in the Subscription. SHARED CLEAN ENERGY FACILITY (SCEF) PROGRAM YEAR 7 APPENDIX B: SUBMITTAL TO DEEP INSTRUCTIONS

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)