Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
Extracted from the file · 69 pages · 162,167 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
Extracted from the file · 21 pages · 73,536 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Text of ES Order 2, ESS_Items 1-4.pdf
Extracted from the file · 117 pages · 290,953 characters
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Page 3 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 3 of 49 of the receiving EDC for the benefit of such EDC, and (ii) RECs, those RECs associated with the delivered energy of the Shared Clean Energy Facility as a Connecticut Class I Renewable Energy Source 1; "DEEP" means the Connecticut Department of Energy and Environmental Protection; "Development Period Security" means collateral in the form of cash, which shall be provided by the Subscriber Organization to the EDC during the development of the SCEF; "Electric Distribution Company" or "EDC" has the same meaning as provided in Section 16-1 of the General Statutes; “Environmental Attributes” shall mean each of the following that exists under the laws and regulations of the state of Connecticut, or under any other international, federal, regional, state or other law, rule or regulation as of the Effective Date or may come into existence during the twenty-year term of the purchase commitment applicable to the selected Project: (i) GIS Certificates, (ii) credits, benefits, reductions, offsets and other beneficial allowances, including, to the extent applicable and without limitation, performance based incentives or renewable portfolio standard in the state in which the Project is located or in other jurisdictions (collectively, “Allowances”) attributable to the ownership or operation of the Project or the production or sale of Energy that avoids the emission of carbon into the air, soil or water, (iii) other Allowances howsoever named or referred to, with respect to any and all fuel, emissions, air quality, or other environmental characteristics, resulting from the production of electric generation or the production or sale of Energy that avoids the emission of carbon into the air, soil or water and in which Seller has good and valid title, including any credits to be evidenced by Renewable Energy Certificates or similar laws or regulations applicable in any jurisdiction as such may be amended during the term of the Tariff applicable to the selected Project, (iv) any such Allowances related to (A) oxides of carbon or (B) the United Nations Framework Convention on Climate Change (the “UNFCCC”) or the Kyoto Protocol to the UNFCCC or crediting “early action” with a view thereto, or involving or administered by the Clear Air Markets Division of the United States Environmental Protection Agency or any successor or other agency that is given jurisdiction over a Program involving transferability of specific Environmental Attributes, and (v) all reporting rights with respect to such allowances under Section 1605(b) of the Energy Policy Act of 1992, as amended from time to time or any successor statute, or any other current or future international, federal, state or local law, regulation or bill, or otherwise; “Environmental Justice Community” means (A) a United States census block group, as determined in accordance with the most recent United States census, for which thirty (30) per cent or more of the Consistent with the SCEF Program Manual, as specified in Section 3.4.1, the EDCs will obtain the CT Class I RPS qualification and will report the generation output to the NEPOOL GIS for creation of the RECs into EDC administered batches or tranches. 1Page 4 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 4 of 49 population consists of low income persons who are not institutionalized and have an income below two hundred (200) per cent of the federal poverty level, or (B) a distressed municipality, as defined in subsection (b) of section 32-9p of the General Statutes; “Generation Footprint” means the land area occupied by the generation unit(s). For solar projects the “Generation Footprint” shall mean the land area occupied by the solar panels and the associated interrow spacing; “Hybrid Project” shall mean Projects that include those which are split between rooftops, ground-mounted systems, Solar Carports, and/or Solar Canopies. “Individual Billing Meter” is defined by Section 16-244x of the General Statutes as “an individual electric meter or a set of electric meters, when such meters are combined for billing purposes, within the service territory of the subscriber's electric distribution company.” Unmetered, temporary and seasonal electric accounts are ineligible to participate in the SCEF program. “In-Service Date” shall mean the Approval to Energize date listed on the EDC issued Approval to Energize letter to the System Owner; “Landfill” means any property that is listed on the Closed Landfills list, though this list is not intended to be exhaustive or an acknowledgement of ideal properties for renewable energy development. Only the closed, capped portion of the property is considered a “Landfill” for bid preference purposes; "LMI" means Low-income Customers and Moderate-income Customers; "Low-income Customer" means an in-state retail end user of an EDC (i) whose income does not exceed sixty per cent of the state median income, adjusted for family size, or (ii) that is an affordable housing facility; "Low-income Service Organization" means a for-profit or nonprofit organization that provides service or assistance to low-income individuals; "Market Price" means the hourly real-time Locational Marginal Price (as defined in the ISO-NE Tariff) for energy at the pricing node plus fifty (50) percent of the ACP for Prepaid RECs; "Maximum Hourly Purchase Amount" means the maximum quantity, in megawatt hours ("MWh") per hour, payable at the Purchase Price for any hour. This quantity will be the proposed nameplate capacity of the Shared Clean Energy Facility; "Moderate-income Customer" means an in-state retail end user of an EDC whose income is between sixty (60) percent and one hundred (100) percent of the state median income as defined by the United States Department of Housing and Urban Development, adjusted for family size;Page 5 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 5 of 49 “Non-Residential Renewable Energy Solutions Program” or “NRES” means the Non-Residential Renewable Energy Solutions Program established pursuant to Public Acts 18-50, 19-35, 22-14, and 23-102; “Ombudsperson” shall mean an independent consultant directed by PURA to efficiently resolve disputes and with the electric distribution companies (EDCs) and review and approve extension requests beyond the three year in-service time period. "On-bill Credit" means a monetized credit equal to the Subscriber Savings Rate times the production allocated to the Subscriber for each month by the EDC and reflected on the Subscriber's monthly bill from the EDC; "Operating Period Security" means collateral in the form of cash which shall be provided by the Subscriber Organization to the EDC during the operation of the SCEF; “Parcel” means the clearly defined property boundaries registered with the local municipality before January 1 of the year of the solicitation; "Payment" means an amount paid by the EDC to the Subscriber Organization to purchase the output of the SCEF as a direct payment from the EDC to the Subscriber Organization; "Prepaid RECs" means RECs expected to be created in the future that are associated with Delivered Energy and paid for at the time of payment for Delivered Energy as part of the Purchase Price or Market Price, as applicable; “Prime Farmland” means as defined in 7 CFR 657, as amended. "Procurement Price Cap" means the maximum Purchase Price allowed as part of a Bid in any given solicitation year, as established by DEEP and approved by PURA; "Program" means the Shared Clean Energy Facilities program developed by DEEP and modified and approved by PURA pursuant to the Acts; "PURA" means the Public Utilities Regulatory Authority; “Project Site” means the Generation Footprint and any other acreage where activity and discharges occur that are associated with construction of the generation unit(s) and any associated structures, including, but not limited to, perimeter fencing, or where preparation for construction, including, but not limited to, clearing, grubbing, pile driving, soil disturbance, soil compaction by construction equipment, staging and stockpiling, cleaning and washout, grading, excavation, and dewatering occurs. "Purchase Price" means the price, as selected in the procurement and approved by PURA, to be applied to Delivered Energy and Prepaid RECs;Page 6 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 6 of 49 "Qualified Bank" means a major U.S. commercial bank or a U.S. branch office of a major foreign bank, in either case, having (i) assets on its most recent audited balance sheet of at least $10,000,000,000, and (ii) a rating for its senior long-term unsecured debt obligations of at least (1) "A-" by S&P and "A3" by Moody's, if such entity is rated by both S&P and Moody's, or (2) "A-" by S&P or "A3" by Moody's, if such entity is rated by either S&P or Moody's but not both; “Renewable Energy Certificate” or “REC” shall mean a certificate created to represent one megawatt hour ("MWh") of production from a Connecticut Class I renewable generation facility and any and all other Environmental Attributes associated with the energy or otherwise produced by the SCEF; “Rooftop Project” shall mean a solar generation Project with 100% of the Nameplate Capacity of the solar photovoltaic modules used for generating power installed on top of either 1) a single building rooftop, or 2) a set of rooftops served by the same Revenue Meter, at the Project Site owned by the commercial or industrial Customer (i.e., this does not include Customers on Residential Rate codes). A Rooftop Project shall not include a Solar Canopy or Solar Carport. "Selected Bidder" means a winning Bidder selected by the EDCs resulting from the procurement consistent with this Program and approved by PURA; "Shared Clean Energy Facility" or “SCEF” is defined by Section 16-244x of the General Statutes; “Small Business Customer” means a commercial or industrial electric customer with less than a 200 kW peak load. ”Solar Canopy” or “Solar Canopies” or “Solar Carport” shall mean a solar generation Project where the alternating current (AC) Nameplate Capacity of a Project used for generating power is installed above a permeable and/or nonpermeable existing or new parking/driving area, pedestrian walkway, courtyard, canal, or other utilized surface that requires shade, which is installed in a manner that maintains the function of the area beneath the structure and continues to be used or available for use for such purposes for the term of Program participation. "Subscribed Energy" means energy and RECs associated with the output of a SCEF for which Subscribers have been enrolled; "Subscriber" is defined by Section 16-244x of the General Statutes; "Subscription Summary Form" means a summary provided by the EDC to new Subscribers detailing the disclosures and other material terms and conditions of a SCEF tariff and program rules, as outlined in Appendix A; "Subscriber Organization" is defined by Section 16-244x of the General Statutes. For the purposes of the SCEF Program Manual, the term Subscriber Organization refers to the Selected Bidder;Page 7 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 7 of 49 "Subscriber Savings" means, on a monthly basis, the On-bill Credit applied to a Subscriber's EDC account; “Subscriber Savings Rate” means the cents/kWh rate used to calculate the On-bill Credit; "Subscription" is defined by Section 16-244x of the General Statutes; "Tariff" means the tariff developed by Eversource Energy ("Eversource") or The United Illuminating Company ("UI") (together, "the EDCs"), whichever is applicable to the SCEF, consistent with this Program and approved by PURA. 3. PROCUREMENT PROCESS On an annual basis for a total of two (2) years, beginning with the release of the seventh RFP on January 21, 2026, the EDCs shall conduct a procurement process for the solicitation of Bids for SCEF facilities up to a predetermined budgetary cap, consistent with this Program Manual 2. The authorized annual budgets shall be apportioned to the EDCs as determined by the Authority. The EDCs will issue one solicitation in January of each year, filing Selected Bids by July 1. If an EDC does not fulfill the budgetary allotment for the procurement, they will run another round of the solicitation as laid out in Section 3.4. Bids submitted into the annual solicitation will be only for the energy and RECs associated with the eligible SCEF project. The EDCs will separately administer and maintain an identification and enrollment process, as well as a voluntary enrollment process, as outlined in Section 6 of this Program Manual. The Subscriber Savings Rate for all Subscribers will be $0.025/kWh and shall not be included in any Bid. DEEP reserves the right to modify this Program Manual and submit such modifications to PURA for review and approval or modification. In addition, DEEP reserves the right to audit any Selected Bidders to ensure compliance with the Program and shall have explicit enforcement rights pursuant to the Program. DEEP may remove any Selected Bidder from the Program for failure to comply with the requirements of the Program. 3.1. Program Structure Previously, on an annual basis for a total of three (3) years, beginning with the release of the first Request for Proposals (RFP) on April 30, 2020, the EDCs shall conduct a procurement process for the solicitation of Bids for Shared Clean Energy Facilities for an aggregate total of twenty-five (25) megawatts ("MWs") of capacity per year, consistent with these Program requirements. Previously on an annual basis for a total of five (5) years, beginning with the release of the fourth RFP on January 21, 2023, the EDCs shall conduct a procurement process for the solicitation of Bids for SCEF facilities for a total of fifty (50 megawatts of capacity per year, consistent with this Program Manual. 2Page 8 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 8 of 49 Under the Program, an EDC will purchase the energy and associated RECs produced by a selected Shared Clean Energy Facility at the Purchase Price approved by PURA for the SCEF. The EDC will remit payment for that purchase in accordance with the Tariff. Additionally, the EDC will allocate the dollar value of the On-bill Credits to the Subscribers of the SCEF on a monthly basis through the Subscribers’ electric bills with the EDC. 3.2. Subscriber Enrollment Form Any Customer, not already enrolled through the EDC-administered identification and enrollment process, wishing to become a Subscriber must use the Subscriber Enrollment Form developed by the EDCs. The Subscriber Enrollment Form may require the Customer to provide: the Customer of record; customer account number; address associated with the Individual Billing Meters assigned to the Customer of record; and any other information deemed necessary by DEEP and/or PURA. The Subscriber Enrollment Form is subject to approval by PURA. Based on the information provided in the Subscriber Enrollment Form, the EDC will verify the Customer’s eligibility pursuant the customer eligibility and verification processes put in place to comply with subsection 6.1 and will utilize the Subscriber’s historic average annual electric use at the premises or a reasonable 3 estimate if the Subscriber has less than twelve (12) months of actual electric use to determine the Subscriber’s share of the estimated annual output from the SCEF, to be used in calculating the On-bill Credit. Appendix A outlines further Subscriber terms and conditions. 3.3. Timing Starting September 2021, DEEP shall submit the Procurement Price Cap and Bid Preferences to PURA no later than September 1 in each subsequent year to allow for public input on those elements of the Program through the docket proceeding established by PURA. 4 The Procurement Price Cap and the categories of Bid Preferences may be made public for the benefit of all Bidders; the weighting of the Bid Preferences may be kept confidential to maintain the competitiveness of the procurement. 3.4. Evaluation and Selection Process The Purchase Price for each SCEF will be based on a competitive bidding process. The EDCs will issue one solicitation each year. The EDCs will evaluate Bids based on fixed Bid prices considering any applicable Bid Preferences as established by DEEP and submitted to PURA. The EDCs will determine whether Bids have curable errors which may be able to be corrected before the selection of Bids for the given solicitation. Curable errors can fall under two categories of human-caused and errors in communication. Project For customers with less than twelve (12) months of actual electric use, the reasonable estimate of historic average annual electric use is based on average usage estimates for similar customers (e.g., building square footage, type of customer, number of household members for residential customers, etc.). 4 Previously, the Program Manual stated that DEEP shall submit the Procurement Price Cap and the Bid Preferences to PURA no later than January 31, 2020 for the first program year and no later than January 31, 2021 for the second program year. 3Page 9 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 9 of 49 applicants will subsequently have to provide evidence to the EDCs as to the cause of such errors, to ensure the accuracy and reliability of the cure process. Upon acknowledgement of such error(s), the EDCs shall provide a notice of deficiency to the Project applicant, with a statement describing the reasons for the deficiency, in a timely manner to the proper contact(s) of the Project applicant. Upon receipt of such deficiencies, the Project applicant shall have no more than five (5) business days to cure both human-caused and communication errors. Human-caused errors will consequently be defined as any error that was unintentional in nature, including and not limited to, typographical errors, forgetting to attach a required document, missing or incomplete data or form entries, submitting an ineligible or incorrect data point or form, and submitting a form that cannot be opened or read. Errors in communication will be defined as any error that was caused by incorrect, unclear, or inadequate information or communications from the EDCs. In addition, DEEP will evaluate Bids to ensure they comply with the requirements established in Appendix B to the satisfaction of DEEP. Bidders must submit the information requested in Appendix B to DEEP at [email removed] on or before the Bid due date established by the EDCs in the applicable procurement. Following the submission of proposals, DEEP may request clarifications and additional information and documents from Bidders at any time during the evaluation process so long as such documents were available before the bid deadline but were not provided due to a clerical or other error that can reasonably be demonstrated, at DEEP’s sole discretion. DEEP will provide all Bidders with a uniform amount of time to respond to any such requests by DEEP. Bidders who do not respond within such timeframe to the information requests or do not provide all required information may be eliminated from further consideration at DEEP’s sole discretion. DEEP will continue to assess the information required in Appendix B and reserves the right to modify the requirements. Any such changes shall be submitted to PURA by September 1 before the next solicitation. Each EDC shall evaluate and select Bids independently and separately. The EDCs will rank Bids in order from lowest to highest unit price. The EDCs will then use the Bid Preferences to weigh the bid prices based on the weighting established by DEEP. If any Bid does not comply with the requirements established in Appendix B, DEEP will direct the EDCs to remove the Bid from the ranking. Each EDC will select Bids with the lowest unit price proposals first, after factoring in the Bid Preferences, and will continue until the annual budget cap allocated to the EDC is met. If, prior to reaching the annual budget cap established in the Authority’s December 17, 2025 Decision, the next Bid in the queue would mean the total annual budget impact selected would exceed the budget cap, the EDC will offer the remaining available budget to the next Bidder in the queue, at the Purchase Price the Bidder offered in response to the procurement. This process will continue until a Bidder accepts the offer, or until no Bids remain in the queue. Any eligible Bid that is not selected in the initial selection round shall be placed on standby. The annual budget commitment will be based on the as-Bid size of the Project, estimated average annual production, and Bid price. Upon the initial selection of Bids for each solicitation, the EDCs shall notify each Bidder individually as to whether its Bid was selected, not selected, or placed on standby. Bidders may elect toPage 10 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 10 of 49 forego standby status by opting to withdraw their Bid. If a selected Bidder chooses not to move forward with its Bid, then the budget amount committed to that Bid's Project will be released then offered to the next Bid on the standby list, when applicable. If, after the approval of the EDCs’ July 1 filing, there are insufficient projects on the standby list to use the entire annual budget amount authorized under the Acts and the Authority’s December 17, 2025 Decision, each EDC with remaining budget amount shall open a new bid window for 4 weeks to solicit bids from additional projects. The bids received in this subsequent bid event shall be evaluated in accordance with Section 3.4 herein. Subsequent rounds of project selections will conclude on the earlier of either the selection of all authorized budget amounts or by November 1 to allow enough time for the EDCs to file any additional project selections by November 30 enabling the selected bids to be filed two months prior to the start of the subsequent Program year and meet the filing deadline of January 1 of the following year. Additional projects selected must also comply with the terms and conditions of the Tariff. Any budget amounts not allocated in the calendar year shall roll into the next year’s available budget cap. Any allocated Program budget foregone by a selected Bidder choosing not to move forward with their bid shall be reallocated to the Program budget cap of the next upcoming solicitation following the Bidder notifying the EDC of its intention not to move forward with their project, using the applicable guidelines for that solicitation. The Purchase Prices for all Selected Bids shall be publicly filed at PURA. 3.4.1 REC Aggregation For simplicity and ease in Program administration that minimizes overall costs and maximizes benefits to ratepayers, the EDCs will aggregate the RECs into “batches” (or “tranches”) in a manner similar to how the Green Bank currently aggregates RECs produced from Solar Home Renewable Energy Credit Facilities (SHREC Facilities). 5 Each REC batch will be created based on in-service vintage year (and/or quarter) and class of technology. To illustrate, for Projects that are successfully in-service in 2022, the EDC may have an aggregation batch for “2022 SCEF” (or “Q4 2022 SCEF”). The EDCs shall seek approval from PURA to have a single NEPOOL GIS NONID (e.g., “NON102218”) assigned to each of the full batches. Also, the EDC will submit one Connecticut Class I Renewable Energy Source Bid per batch to the Authority. The EDC will be responsible for submission of aggregated Production Meter reads for each batch to NEPOOL GIS, and the appropriate RECs will be created and deposited into the EDC NEPOOL GIS account on the date of creation (“creation date”) in accordance with the NEPOOL GIS Operating Rules. 5 See, e.g., Bid of the Connecticut Green Bank for Qualification of Solar Home Renewable Energy Credit (SHREC) Facilities as Class I Renewable Energy Sources - Q3 2016 - 6.1 MW, PURA Docket No. 17-03-40 (filed Mar. 17, 2017).Page 11 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 11 of 49 Pursuant to the Public Acts, the EDCs will manage RECs as directed by PURA, specifically whether to dispose of RECs through retirement and related prospective reduction of supplier/EDC RPS requirements, or through resale into the regional market. Any net revenues from the resale of RECs created under this Program shall be credited to Customers through a nonbypassable fully reconciling component of electric rates for all Customers of the EDC, consistent with the Acts. 3.5. Security Bidders will be required to post Development Period Security and Operating Period Security. The required level of Development Period Security is twenty-five dollars ($25) per kW (AC) of the nameplate capacity of the proposed facility. The Development Period Security must be provided to the EDC at the time of Bid submission. The EDC shall return the Development Period Security to the bidder if at least one of the following conditions is met: (i) the Selected Project enters commercial operation in a timely fashion and begins producing energy consistent with these Program requirements; (ii) the Project’s eligibility under the Tariff is terminated for failure to receive regulatory approval satisfactory in substance to the EDC; or (iii) the Project’s eligibility under the Tariff is terminated due to a force majeure event; or (iv) the Bid is not selected under the procurement for which the Bid was submitted. Failure by a Bidder/Subscriber Organization to provide Development Period Security as required shall result in immediate and automatic termination of the Project’s eligibility under the Tariff, and also trigger reallocation of budget allocation when appropriate. Development Period Security is forfeited if the Project’s eligibility under the Tariff is terminated by the EDC for an event of default, including, but not limited to, the SCEF failing to enter commercial operation within the required timeframe of three calendar years from the date of PURA approval of the Tariff award, or a Bidder choosing to not move forward with their Bid after the Bid has been submitted. No more than thirty (30) days after a SCEF achieves commercial operation, the associated Selected Bidder/Subscriber Organization shall provide Operating Period Security in an amount equal to the ACP multiplied by fifty (50) percent of the expected annual production of the facility (in MWh). This amount is intended to secure the Prepaid RECs included in the Purchase Price or to cure any conditions of default. Development Period Security may be converted to Operating Period Security at the Subscriber Organization’s election. If the EDC draws on Development Period Security or Operating Period Security for any reason, the Selected Bidder/Subscriber Organization shall replenish such security within ten (10) business days. Any unused Operating Period Security shall be returned to the Subscriber Organization only after any such security has been used to satisfy any outstanding obligations of the Subscriber Organization in existence at the end of the term of the Tariff. 3.6. Tariffs Each Selected Bid will have its own Tariff rate based on its accepted Purchase Price, as approved by PURA. Tariff rates will be paid quarterly to Subscriber Organizations based on a cents/kWh calculation of thePage 12 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 12 of 49 Purchase Price multiplied by the metered kWh applicable to the SCEF. The EDC will separately provide Onbill Credits to the Subscribers on a monthly basis through Subscribers’ electric bills with the EDC. Provisions for service, rates, and other terms and conditions applicable to a Selected Bid(s) will be established in the form of Tariff riders developed by each EDC and reviewed and approved by PURA. 4. ELIGIBLE PROJECTS 4.1 Facility Type A Shared Clean Energy Facility must be a new Class I renewable generation project, as defined in Section 161 of the General Statutes, must emit no pollutants 6, and must be located in Connecticut. Facilities already constructed or under construction are excluded. For a facility to qualify as new, construction must commence after the date of the solicitation to which the Bidder is responding. For facilities constructed prior to the solicitation date but uprated with new production equipment (e.g., new solar panels or turbines) after the solicitation date, the new incremental production equipment may be eligible to the extent that it meets all of the eligibility criteria and is separately metered and compensated. A SCEF may use federal subsidies, incentives, or tax benefits. However a facility is ineligible if it receives, or seeks to receive, any Connecticut ratepayer-funded incentives or subsidies, including, but not limited to, net metering, virtual net metering, Public Utility Regulatory Policies Act (“PURPA”) tariffs, LREC/ZREC contracts, NRES tariff agreements, and any other contract or program of any kind in which an EDC purchases the facility’s energy, capacity, or renewable attributes, and grants or rebates from the Connecticut Green Bank and any of its predecessors or the Conservation and Load Management Program. Bids must gain approval to interconnect to the EDC’s distribution system (via the EDCs’ standard interconnection process) and must be metered by the EDC. Bids must meet Distribution Company Guidelines for Interconnection (“Guidelines”) as approved by PURA. The interconnection process is separate and distinct from the SCEF Program. 4.2. Facility Size A Shared Clean Energy Facility must have a nameplate capacity rating greater than one hundred (100) kW (AC) and not exceed five thousand (5,000) kW (AC) pursuant to Section 16-244z (a)(2)(C) and 16-244x of the General Statutes. The final as-built size of the SCEF shall not exceed the awarded nameplate capacity or the capacity on the Tariff Terms Agreement. 6 As stated in Public Act 25-173.
Text of ES Order 2, RRES_Items 1-4.pdf
Extracted from the file · 65 pages · 149,171 characters
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2