Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
Extracted from the file · 69 pages · 162,167 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
Extracted from the file · 21 pages · 73,536 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Text of ES Order 2, ESS_Items 1-4.pdf
Extracted from the file · 117 pages · 290,953 characters
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Page 34 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 34 of 49 General or Individual Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities (Stormwater General Permit), and environmental surveys and reports required to support the applications. Local Building and Electrical permits may be required. Solar arrays on a closed Landfill may require a post-closure use change approval and a disruption authorization through the Solid Waste Permitting Program in the Waste Engineering and Enforcement Division of DEEP. Please use this link: Permit Information for Solar Projects, or reach out to the Client Concierge Services team at [email removed] with any questions or to schedule a pre-application meeting. B5.2. Identify any existing, preliminary, or pending claims or litigation, or matters before any federal agency or any state legislature or regulatory agency that might affect the feasibility of the proposed project or the ability to obtain or retain the required permits for the proposed project. B5.3. Bidder acknowledges that it is familiar with the Siting Council’s process and decision timeframe. Bidder further acknowledges that it has reviewed DEEP’s Stormwater General Permit and understands the requirements contained therein and the timeframe for approval. B5.4. Bidder understands that wetland buffers of 100 feet are preferable to the Connecticut Siting Council and for the Stormwater General Permit. If unable to provide this buffer, bidder understands that the DEEP and/ or the Connecticut Siting Council may ask for additional information as to the chosen layout of the project and how other alternatives were addressed and dismissed. B5.5. For a project sited on Prime Farmland, the Bidder acknowledges that Public Act 23163 requires a decommissioning bond as part of the Connecticut Siting Council process. B5.6. Confirm that the Project Site is not sited on Core Forest, in whole or in part, as defined in this procurement. B5.7. Indicate the proximity of the Project Site and interconnection route to ridgelines and ridgeline setback areas as defined in C.G.S. § 8-1aa. If this is not applicable to the location of the project, please state the reason. B5.8. Include a summary of environmental compliance history for the Bidder, including any general and limited partners, officers, directors, managers, members, shareholders, and subsidiaries, using the “Applicant Compliance Information form,” included herein as Attachment 4.Page 35 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 35 of 49 B5.9. Bidder confirms that they have checked or will check prior to commencing construction for conservation, recreation, or open space restrictions that would prohibit development on the Project Site. B6. COMMUNITY IMPACT AND ENGAGEMENT B6.1. Provide documentation of community outreach and engagement regarding the Bid conducted to date. A passing response must include documentation from at least two of the following categories: i. Copies of any agreements with local community organizations and other constituencies (including but not limited to Neighborhood Revitalization Zones, environmental non-profits, social services non-profits, or other organizations that serve the local community) that may be impacted by the proposed project; ii. Emails, letters, and/or other communications with or directed to local municipal officials; iii. Emails, letters, and/or other communications with or directed to municipality residents and/or community organizations (including but not limited to Neighborhood Revitalization Zones, environmental non-profits, social services non-profits, or other organizations that serve the local community); iv. Time, date, and materials from any in-person or virtual meeting held with local officials, property owners, abutters, community organizations, and/or other town residents to educate them about the proposed project; and/or v. Other documentation or narrative description that substantiates outreach efforts to-date with the host community (including property owners, abutters, Neighborhood Revitalization Zones, environmental non-profits, social services non-profits, or other organizations that serve the local community and/or other town residents). B6.2. The Bidder acknowledges the requirements of Public Act 21-43 for projects two MWs or greater. i. Describe how the Bidder will take appropriate actions to ensure a workforce development program is established if the Bid is selected.Page 36 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 36 of 49 ii. If the project is equal to five MWs, describe how the Bidder will take all reasonable actions to ensure that a community benefits agreement is entered into with appropriate community organizations representing the residents of the community in which the project will be located. Include the names of community organizations the Bidder has already identified, any communication with the community organizations regarding the Bid to-date, and any draft community benefits agreement that exists. B6.3. Describe how the Bidder is addressing and advancing issues of Diversity, Equity, and Inclusion (DEI) with its mission, professional development, staffing, and/or Connecticut based recruiting efforts. If the Bidder has a social impact statement, submit a copy with this Appendix B response.Page 37 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 37 of 49 Attachment 1 Affidavit #1: Bidder’s Affidavit of Site Control under the SCEF Program Manual of the Shared Clean Energy Facility Program NOTE: Affidavit #1 must be completed and submitted by all Bidders. If the Bidder and Owner of the Project Site are the same individual or entity, only Affidavit #1 is required. If the Bidder and the Owner of the Project Site are not the same individual or entity, the Bidder must also submit Affidavit #2, as completed by the Owner of the Project Site. For the purposes of this affidavit, “Bidder” is defined as the individual or business submitting a proposal (“Bid”) to be considered for selection in the annual Shared Clean Energy Facility (“SCEF”) Program solicitation and “Owner of the Project Site” is defined as the legal owner of the SCEF Project Site. As a duly authorized representative of the Bidder of the SCEF project, I hereby attest that the Bidder has control of the Project Site, or an unconditional right, granted by the Owner of the Project Site, to acquire such control to use the site for the SCEF in the SCEF Bid, and any rights-of-way needed for interconnection, and is authorized to submit the Bid to locate the SCEF on the Owner of the Project Site’s property. Site control and property rights include all leases, easements, or development rights necessary to develop and/or operate the SCEF project, including any necessary leases from an applicable government authority. The Bidder understands that if it is later determined that the Bidder does not have control of the Project Site, or an unconditional right, granted by the Owner of the Project Site, to acquire such control prior to the bid deadline set forth by the relevant Request for Proposal, the Bidder, and the SCEF project, may be removed from the SCEF Program and forfeit eligibility for future participation pursuant to Section 10 of the SCEF Program Manual. The Bidder represents that it understands the requirements for site control as outlined in the SCEF Program Manual. As a duly authorized representative of the Bidder, I have reviewed the statements and certifications provided above and certify that such statements and certifications as applicable to the SCEF Bid are true and accurate to the best of my knowledge. The Bidder, or its representative, shall fill out and sign the following:Page 38 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 38 of 49 NOTE: Electronic signatures are not acceptable. The Bidder’s signature, or that of its representative, is required to be witnessed by a Notary Public and documented as such. 15 Please indicate the appropriate site control agreement selection with a checkmark or “x” in the box to the left: Signed option agreement to lease or purchase the Property. Executed lease agreement for the Property. Executed agreement to purchase the Property. License or other agreement granting exclusive right to use the Property for purposes of constructing and operating the distributed generation facility. N/A - Property Owner will own and operate the distributed generation facility Address of project site: Bidder: ____________________________________________________ (Exact legal name of the Bidder, as defined above) Signature of the Bidder (or its Representative): ____________________________________________________ Print or Type Name of Bidder (or its Representative): authorized) ____________________________________________________ (duly Title: _____________________________________________________ Date Signed: _______________________________________________ The Notary Public shall fill out and sign the following: 15 Please see Section 3 of the March 30, 2020 CT Executive Order 7Q regarding Remote Notarizations here: https://portal.ct.gov/-/media/Office-of-the-Governor/Executive-Orders/Lamont-Executive-Orders/Executive-OrderNo-7Q.pdf.Page 39 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 39 of 49 Subscribed and sworn before me, this _____ day of _________________________ 20_____ Notary Public: ________________________________________ Commission expires: __________________________________Page 40 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 40 of 49 Attachment 2 Affidavit #2: Owner of the Project Site’s Affidavit of Site Control under the SCEF Program Manual of the Shared Clean Energy Facility Program NOTE: The completion and submission of Affidavit #2 is only required if the Bidder and Owner of the Project Site are not the same individual or entity. For the purposes of this affidavit, “Bidder” is defined as the individual or business submitting a proposal (“Bid”) to be considered for selection in the annual Shared Clean Energy Facility (“SCEF”) Program solicitation and “Owner of the Project Site” is defined as the legal owner of the SCEF Project Site. As a duly authorized representative of the Owner of the Project Site, I hereby attest that the Bidder has control of the Project Site, and any rights-of-way needed for interconnection, or an unconditional right, granted by the Owner of the Project Site, to acquire such control. Site control and property rights include all leases, easements, or development rights necessary to develop and/or operate the SCEF project, including any necessary leases from an applicable government authority. The Owner of the Project Site understands that if it is later determined that the Bidder does not have control of the Project Site, or an unconditional right, granted by the Owner of the Project Site, to acquire such control prior to the bid deadline set forth by the relevant Request for Proposal, the Bidder, and the SCEF project, may be removed from the SCEF Program and forfeit eligibility for future participation pursuant to Section 10 of the SCEF Program Manual. The Owner of the Project Site represents that it understands the requirements for site control as outlined in the SCEF Program Manual. The Owner of the Project Site further attests that the Bidder is authorized by the Owner of the Project Site to submit the Bid to locate a SCEF project on the Owner of the Project Site’s property. As a duly authorized representative of the Owner of the Project Site, I have reviewed the statements and certifications provided above and certify that such statements and certifications as applicable to the Bid are true and accurate to the best of my knowledge. The Owner of the Project Site, or its representative, shall fill out and sign the following:Page 41 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 41 of 49 NOTE: Electronic signatures are not acceptable. The Owner of the Project Site’s signature, or that of its representative, is required to be witnessed by a Notary Public and documented as such. 16 Please indicate the appropriate site control agreement selection with a checkmark or “x” in the box to the left: Signed option agreement to lease or purchase the Property. Executed lease agreement for the Property. Executed agreement to purchase the Property. License or other agreement granting exclusive right to use the Property for purposes of constructing and operating the distributed generation facility. N/A - Property Owner will own and operate the distributed generation facility Address of project site: Owner of the Project Site: ____________________________________________________ (Exact legal name of Owner of the Project Site, as defined above) Signature of Owner of Project Site (or its Representative): ____________________________________________________ Print or Type Name of Owner of Project Site (or its Representative): authorized) ____________________________________________________ (duly Title: _____________________________________________________ Date Signed: _______________________________________________ The Notary Public shall fill out and sign the following: 16 Please see Section 3 of the March 30, 2020 CT Executive Order 7Q regarding Remote Notarizations here: https://portal.ct.gov/-/media/Office-of-the-Governor/Executive-Orders/Lamont-Executive-Orders/Executive-OrderNo-7Q.pdf.Page 42 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 42 of 49 Subscribed and sworn before me, this _____ day of _________________________ 20_____ Notary Public: ________________________________________ Commission expires: __________________________________Page 43 of 49
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 43 of 49 Attachment 3 AFFIDAVIT: “VERACITY OF STATEMENTS” That , Affiant, being duly sworn/affirmed according to law, deposes and says that: He/she is the (Office of Affiant) of (Name of Applicant); That he/she is authorized to and does make this affidavit for said Applicant; That , the Applicant herein, certifies under penalty of false statement that all statements submitted in its response to Appendix B of the SCEF Program Manual, as filed concurrently with a project bid filing in response to a Request for Proposals issued by Eversource or United Illuminating, whichever is applicable, are true and complete and that it will also amend said submission while the project bid filing is pending if any substantial changes occur regarding the information provided in the submission within ten days of any such change. That the facts above set forth are true and correct to the best of his/her knowledge, information, and belief and that he/she expects said Applicant to be able to prove the same at any hearing hereof. Signature of Affiant Date Printed Name of Affiant Title (relationship to Applicant) Address of project site: } STATE OF } ss. COUNTY OF } (Town) The foregoing was subscribed to and sworn to before me this day of (day) , (month) by . (year) (Signature of Notary Public or other official) (Printed Name of Notary Public or other official) My commission expires .
Text of ES Order 2, RRES_Items 1-4.pdf
Extracted from the file · 65 pages · 149,171 characters
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2