Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Words on different pages
  1. Page 40 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 40 of 49 Attachment 2 Affidavit #2: Owner of the Project Site’s Affidavit of Site Control under the SCEF Program Manual of the Shared Clean Energy Facility Program NOTE: The completion and submission of Affidavit #2 is only required if the Bidder and Owner of the Project Site are not the same individual or entity. For the purposes of this affidavit, “Bidder” is defined as the individual or business submitting a proposal (“Bid”) to be considered for selection in the annual Shared Clean Energy Facility (“SCEF”) Program solicitation and “Owner of the Project Site” is defined as the legal owner of the SCEF Project Site. As a duly authorized representative of the Owner of the Project Site, I hereby attest that the Bidder has control of the Project Site, and any rights-of-way needed for interconnection, or an unconditional right, granted by the Owner of the Project Site, to acquire such control. Site control and property rights include all leases, easements, or development rights necessary to develop and/or operate the SCEF project, including any necessary leases from an applicable government authority. The Owner of the Project Site understands that if it is later determined that the Bidder does not have control of the Project Site, or an unconditional right, granted by the Owner of the Project Site, to acquire such control prior to the bid deadline set forth by the relevant Request for Proposal, the Bidder, and the SCEF project, may be removed from the SCEF Program and forfeit eligibility for future participation pursuant to Section 10 of the SCEF Program Manual. The Owner of the Project Site represents that it understands the requirements for site control as outlined in the SCEF Program Manual. The Owner of the Project Site further attests that the Bidder is authorized by the Owner of the Project Site to submit the Bid to locate a SCEF project on the Owner of the Project Site’s property. As a duly authorized representative of the Owner of the Project Site, I have reviewed the statements and certifications provided above and certify that such statements and certifications as applicable to the Bid are true and accurate to the best of my knowledge. The Owner of the Project Site, or its representative, shall fill out and sign the following:
  2. Page 41 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 41 of 49 NOTE: Electronic signatures are not acceptable. The Owner of the Project Site’s signature, or that of its representative, is required to be witnessed by a Notary Public and documented as such. 16 Please indicate the appropriate site control agreement selection with a checkmark or “x” in the box to the left: Signed option agreement to lease or purchase the Property. Executed lease agreement for the Property. Executed agreement to purchase the Property. License or other agreement granting exclusive right to use the Property for purposes of constructing and operating the distributed generation facility. N/A - Property Owner will own and operate the distributed generation facility Address of project site: Owner of the Project Site: ____________________________________________________ (Exact legal name of Owner of the Project Site, as defined above) Signature of Owner of Project Site (or its Representative): ____________________________________________________ Print or Type Name of Owner of Project Site (or its Representative): authorized) ____________________________________________________ (duly Title: _____________________________________________________ Date Signed: _______________________________________________ The Notary Public shall fill out and sign the following: 16 Please see Section 3 of the March 30, 2020 CT Executive Order 7Q regarding Remote Notarizations here: https://portal.ct.gov/-/media/Office-of-the-Governor/Executive-Orders/Lamont-Executive-Orders/Executive-OrderNo-7Q.pdf.
  3. Page 42 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 42 of 49 Subscribed and sworn before me, this _____ day of _________________________ 20_____ Notary Public: ________________________________________ Commission expires: __________________________________
  4. Page 43 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 43 of 49 Attachment 3 AFFIDAVIT: “VERACITY OF STATEMENTS” That , Affiant, being duly sworn/affirmed according to law, deposes and says that: He/she is the (Office of Affiant) of (Name of Applicant); That he/she is authorized to and does make this affidavit for said Applicant; That , the Applicant herein, certifies under penalty of false statement that all statements submitted in its response to Appendix B of the SCEF Program Manual, as filed concurrently with a project bid filing in response to a Request for Proposals issued by Eversource or United Illuminating, whichever is applicable, are true and complete and that it will also amend said submission while the project bid filing is pending if any substantial changes occur regarding the information provided in the submission within ten days of any such change. That the facts above set forth are true and correct to the best of his/her knowledge, information, and belief and that he/she expects said Applicant to be able to prove the same at any hearing hereof. Signature of Affiant Date Printed Name of Affiant Title (relationship to Applicant) Address of project site: } STATE OF } ss. COUNTY OF } (Town) The foregoing was subscribed to and sworn to before me this day of (day) , (month) by . (year) (Signature of Notary Public or other official) (Printed Name of Notary Public or other official) My commission expires .
  5. Page 44 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 44 of 49 Attachment 4 Applicant Compliance Information Applicant Name: Mailing Address: City/Town: State: Business Phone: ext.: Contact Person: Phone: Zip Code: ext. *E-mail: If you answer yes to any of the questions below, you must complete the Table of Enforcement Actions on the reverse side of this sheet as directed in the instructions for your permit application. A. During the five years immediately preceding submission of this application, has the applicant been convicted in any jurisdiction of a criminal violation of any environmental law? Yes No B. During the five years immediately preceding submission of this application, has a civil penalty been imposed upon the applicant in any state, including Connecticut, or federal judicial proceeding for any violation of an environmental law? Yes No C. During the five years immediately preceding submission of this application, has a civil penalty exceeding five thousand dollars been imposed on the applicant in any state, including Connecticut, or federal administrative proceeding for any violation of an environmental law? Yes No D. During the five years immediately preceding submission of this application, has any state, including Connecticut, or federal court issued any order or entered any judgement to the applicant concerning a violation of any environmental law? Yes No E. During the five years immediately preceding submission of this application, has any state, including Connecticut, or federal administrative agency issued any order to the applicant concerning a violation of any environmental law? Yes No
  6. Page 45 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 45 of 49 Table of Enforcement Actions (1) (2a) (2b) Type of Action Date Commenced Date Terminated (3) Jurisdiction (4) Case/Docket/ Order No. (5) Description of Violation Check the box if additional sheets are attached. Copies of this form may be duplicated for additional space.
  7. Page 46 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 46 of 49 RFP Schedule* Action Item Date Release of RFP January 21, 2026 Bidders Conference – Webinar Only On or about January 28, 2026 Deadline for Submission of Questions On or about February 4, 2026 Bid Forms Due March 4, 2026 by 1:00 p.m. (Eastern Prevailing Time “EPT”), at which time the Pricing shall become firm, irrevocable and binding. Selection and Notification of Winning Bidders On or about April 22, 2026 Tariff Terms Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed Tariff Terms Agreements by the due date established by the Companies which is expected to be approximately 10 businesses days after selection and notification of winning bidders. Subsequent Rounds of Selection and Notification of Winning Bidders Approximately 5 business days after Tariff Terms Agreement Execution date (date on which executed Tariff Terms Agreement is due to the EDC for each round of selection). After each Tariff Terms Agreement Execution Date, each EDC will re-evaluate its available annual budget caps and reallocate to the next project(s) in the queue as necessary and notify selected Bidders accordingly. This process will continue until the earlier of 1) all available annual budget is allocated, or 2) May 1, to allow enough time for the EDCs to submit selected bids by July 1. Tariff Terms Agreement(s) Filed with PURA for review and approval Within two weeks following the completion of the annual Procurement process. Commencement of Service In accordance with Tariff Terms Agreements * Pursuant to Section 2.1 of the RFP, Schedule, the Companies, at their sole discretion, may modify the schedule at any time. Eversource - Internal Use
  8. Page 47 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 47 of 49 Please find below hyperlinks to key program resources for the Eversource SCEF Program: Hyperlink Description of https://www.eversource.com/residential/save-money-energy/clean-energyoptions/scef-program https://youtu.be/o3CgLBrkY7U https://www.eversource.com/docs/default-source/save-money-energy/scefrfp-bidders-webinar-slides.pdf?sfvrsn=ecb85621_2 https://www.eversource.com/docs/default-source/about/scef-yearlyrfp.pdf?sfvrsn=7ed96c90_1 https://www.eversource.com/docs/default-source/about/scef-yearlymanual.pdf?sfvrsn=4e05a282_1 https://www.eversource.com/docs/default-source/save-money-energy/sceftrariff-rider.pdf?sfvrsn=34e657c8_4 https://www.eversource.com/docs/default-source/about/scef-yearly-termsconditions.pdf?sfvrsn=f14c8c41_1 https://www.eversource.com/docs/default-source/save-money-energy/scefyearly-bid-certification.pdf?sfvrsn=c10c98ab_1 https://www.eversource.com/docs/default-source/save-money-energy/scefct-licensed-professional-engineer-certification.pdf?sfvrsn=4312d562_2 https://portal.ct.gov/DEEP/Energy/Shared-Clean-Energy-Facilities/SharedClean-Energy-Facilities Eversource - Internal Use Resource General Program Website Year 7 Bidders Webinar Recording Year 7 Bidders Webinar Slides Year 7 RFP Program Manual Subscriber Organization Tariff Rider Subscriber Organization Terms and Conditions Bid Certification Form CT Licensed Professional Engineer Certification Appendix B – Submittal to DEEP
  9. Page 48 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 48 of 49 Summary of Required Bidding Information https://www.eversource.com/docs/default-source/save-money-energy/scefAcceptable acceptable-forms-methods.pdf?sfvrsn=5ab9ccb1_3 Forms of Development & Operating Period Security https://www.eversource.com/security/Account/login?ReturnUrl=/clp/recbid SCEF Bid Portal Link https://www.eversource.com/residential/save-money-energy/clean-energy- SCEF options/scef-program Subscriber Benefits Page https://www.eversource.com/residential/about/doing-business-withResources & us/interconnections/connecticut/scef-program-development/resourcesAdministration information General Page https://www.eversource.com/docs/default-source/save-money-energy/scefsummary-required-bidding-information.pdf?sfvrsn=7492bf89_1 https://www.eversource.com/docs/default-source/save-money-energy/scefquestions-answers.pdf?sfvrsn=550b50d_9 https://portal.ct.gov/doag/adarc/programs/solar-and-farmingoverview?language=en_US https://www.eversource.com/docs/default-source/save-moneyenergy/getting-to-scef-project-payment.pdf?sfvrsn=f54f21e_2 https://www.eversource.com/docs/default-source/save-money-energy/scefprerequisites-for-purchase-certification-statementform.pdf?sfvrsn=cd6d61f4_2 https://www.eversource.com/docs/default-source/save-moneyenergy/instructions-for-submitting-consents-to-assignment-and-notices-ofchange-in-control.pdf?sfvrsn=1de4516a_1 Eversource - Internal Use Q&A DOAG Resources Getting to SCEF Project Payment Prerequisites for Purchase Certification Statement Form Instructions for submitting an assignment & notice of change in control
  10. Page 49 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 49 of 49 https://www.eversource.com/docs/default-source/save-moneyenergy/assignment-cover-sheet.pdf?sfvrsn=fd2cd9f0_1 https://www.eversource.com/docs/default-source/save-moneyenergy/exhibit-a---form-of-request-for-assignment.pdf?sfvrsn=83195230_2 https://www.eversource.com/docs/default-source/save-moneyenergy/exhibit-c---notice-of-change-of-control.pdf?sfvrsn=31f628aa_1 https://www.eversource.com/docs/default-source/save-moneyenergy/exhibit-d---all-attachments.pdf?sfvrsn=26a1207b_1 Assignment cover sheet Request for assignment Notice of change of control Exhibit D – Assignment Attachments Key Program Changes for the Shared Clean Energy Facility Program in 2025 for Program Year 7 1. Fuel Cells and Anaerobic Digester projects are no longer eligible in accordance with P.A. 25-173. a. Only Zero Emission projects are eligible. 2. Updated Buy-All Price Cap 3. Budgetary Cap a. Projects are awarded until a budgetary or a MW cap is reached, whichever occurs first. 4. New Prime Farmland/Dual-Use Agrivoltaic Requirements 5. Slope rules have been removed Eversource - Internal Use

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)