Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Words on different pages
  1. Page 9 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 9 of 49 applicants will subsequently have to provide evidence to the EDCs as to the cause of such errors, to ensure the accuracy and reliability of the cure process. Upon acknowledgement of such error(s), the EDCs shall provide a notice of deficiency to the Project applicant, with a statement describing the reasons for the deficiency, in a timely manner to the proper contact(s) of the Project applicant. Upon receipt of such deficiencies, the Project applicant shall have no more than five (5) business days to cure both human-caused and communication errors. Human-caused errors will consequently be defined as any error that was unintentional in nature, including and not limited to, typographical errors, forgetting to attach a required document, missing or incomplete data or form entries, submitting an ineligible or incorrect data point or form, and submitting a form that cannot be opened or read. Errors in communication will be defined as any error that was caused by incorrect, unclear, or inadequate information or communications from the EDCs. In addition, DEEP will evaluate Bids to ensure they comply with the requirements established in Appendix B to the satisfaction of DEEP. Bidders must submit the information requested in Appendix B to DEEP at [email removed] on or before the Bid due date established by the EDCs in the applicable procurement. Following the submission of proposals, DEEP may request clarifications and additional information and documents from Bidders at any time during the evaluation process so long as such documents were available before the bid deadline but were not provided due to a clerical or other error that can reasonably be demonstrated, at DEEP’s sole discretion. DEEP will provide all Bidders with a uniform amount of time to respond to any such requests by DEEP. Bidders who do not respond within such timeframe to the information requests or do not provide all required information may be eliminated from further consideration at DEEP’s sole discretion. DEEP will continue to assess the information required in Appendix B and reserves the right to modify the requirements. Any such changes shall be submitted to PURA by September 1 before the next solicitation. Each EDC shall evaluate and select Bids independently and separately. The EDCs will rank Bids in order from lowest to highest unit price. The EDCs will then use the Bid Preferences to weigh the bid prices based on the weighting established by DEEP. If any Bid does not comply with the requirements established in Appendix B, DEEP will direct the EDCs to remove the Bid from the ranking. Each EDC will select Bids with the lowest unit price proposals first, after factoring in the Bid Preferences, and will continue until the annual budget cap allocated to the EDC is met. If, prior to reaching the annual budget cap established in the Authority’s December 17, 2025 Decision, the next Bid in the queue would mean the total annual budget impact selected would exceed the budget cap, the EDC will offer the remaining available budget to the next Bidder in the queue, at the Purchase Price the Bidder offered in response to the procurement. This process will continue until a Bidder accepts the offer, or until no Bids remain in the queue. Any eligible Bid that is not selected in the initial selection round shall be placed on standby. The annual budget commitment will be based on the as-Bid size of the Project, estimated average annual production, and Bid price. Upon the initial selection of Bids for each solicitation, the EDCs shall notify each Bidder individually as to whether its Bid was selected, not selected, or placed on standby. Bidders may elect to
  2. Page 10 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 10 of 49 forego standby status by opting to withdraw their Bid. If a selected Bidder chooses not to move forward with its Bid, then the budget amount committed to that Bid's Project will be released then offered to the next Bid on the standby list, when applicable. If, after the approval of the EDCs’ July 1 filing, there are insufficient projects on the standby list to use the entire annual budget amount authorized under the Acts and the Authority’s December 17, 2025 Decision, each EDC with remaining budget amount shall open a new bid window for 4 weeks to solicit bids from additional projects. The bids received in this subsequent bid event shall be evaluated in accordance with Section 3.4 herein. Subsequent rounds of project selections will conclude on the earlier of either the selection of all authorized budget amounts or by November 1 to allow enough time for the EDCs to file any additional project selections by November 30 enabling the selected bids to be filed two months prior to the start of the subsequent Program year and meet the filing deadline of January 1 of the following year. Additional projects selected must also comply with the terms and conditions of the Tariff. Any budget amounts not allocated in the calendar year shall roll into the next year’s available budget cap. Any allocated Program budget foregone by a selected Bidder choosing not to move forward with their bid shall be reallocated to the Program budget cap of the next upcoming solicitation following the Bidder notifying the EDC of its intention not to move forward with their project, using the applicable guidelines for that solicitation. The Purchase Prices for all Selected Bids shall be publicly filed at PURA. 3.4.1 REC Aggregation For simplicity and ease in Program administration that minimizes overall costs and maximizes benefits to ratepayers, the EDCs will aggregate the RECs into “batches” (or “tranches”) in a manner similar to how the Green Bank currently aggregates RECs produced from Solar Home Renewable Energy Credit Facilities (SHREC Facilities). 5 Each REC batch will be created based on in-service vintage year (and/or quarter) and class of technology. To illustrate, for Projects that are successfully in-service in 2022, the EDC may have an aggregation batch for “2022 SCEF” (or “Q4 2022 SCEF”). The EDCs shall seek approval from PURA to have a single NEPOOL GIS NONID (e.g., “NON102218”) assigned to each of the full batches. Also, the EDC will submit one Connecticut Class I Renewable Energy Source Bid per batch to the Authority. The EDC will be responsible for submission of aggregated Production Meter reads for each batch to NEPOOL GIS, and the appropriate RECs will be created and deposited into the EDC NEPOOL GIS account on the date of creation (“creation date”) in accordance with the NEPOOL GIS Operating Rules. 5 See, e.g., Bid of the Connecticut Green Bank for Qualification of Solar Home Renewable Energy Credit (SHREC) Facilities as Class I Renewable Energy Sources - Q3 2016 - 6.1 MW, PURA Docket No. 17-03-40 (filed Mar. 17, 2017).
  3. Page 11 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 11 of 49 Pursuant to the Public Acts, the EDCs will manage RECs as directed by PURA, specifically whether to dispose of RECs through retirement and related prospective reduction of supplier/EDC RPS requirements, or through resale into the regional market. Any net revenues from the resale of RECs created under this Program shall be credited to Customers through a nonbypassable fully reconciling component of electric rates for all Customers of the EDC, consistent with the Acts. 3.5. Security Bidders will be required to post Development Period Security and Operating Period Security. The required level of Development Period Security is twenty-five dollars ($25) per kW (AC) of the nameplate capacity of the proposed facility. The Development Period Security must be provided to the EDC at the time of Bid submission. The EDC shall return the Development Period Security to the bidder if at least one of the following conditions is met: (i) the Selected Project enters commercial operation in a timely fashion and begins producing energy consistent with these Program requirements; (ii) the Project’s eligibility under the Tariff is terminated for failure to receive regulatory approval satisfactory in substance to the EDC; or (iii) the Project’s eligibility under the Tariff is terminated due to a force majeure event; or (iv) the Bid is not selected under the procurement for which the Bid was submitted. Failure by a Bidder/Subscriber Organization to provide Development Period Security as required shall result in immediate and automatic termination of the Project’s eligibility under the Tariff, and also trigger reallocation of budget allocation when appropriate. Development Period Security is forfeited if the Project’s eligibility under the Tariff is terminated by the EDC for an event of default, including, but not limited to, the SCEF failing to enter commercial operation within the required timeframe of three calendar years from the date of PURA approval of the Tariff award, or a Bidder choosing to not move forward with their Bid after the Bid has been submitted. No more than thirty (30) days after a SCEF achieves commercial operation, the associated Selected Bidder/Subscriber Organization shall provide Operating Period Security in an amount equal to the ACP multiplied by fifty (50) percent of the expected annual production of the facility (in MWh). This amount is intended to secure the Prepaid RECs included in the Purchase Price or to cure any conditions of default. Development Period Security may be converted to Operating Period Security at the Subscriber Organization’s election. If the EDC draws on Development Period Security or Operating Period Security for any reason, the Selected Bidder/Subscriber Organization shall replenish such security within ten (10) business days. Any unused Operating Period Security shall be returned to the Subscriber Organization only after any such security has been used to satisfy any outstanding obligations of the Subscriber Organization in existence at the end of the term of the Tariff. 3.6. Tariffs Each Selected Bid will have its own Tariff rate based on its accepted Purchase Price, as approved by PURA. Tariff rates will be paid quarterly to Subscriber Organizations based on a cents/kWh calculation of the
  4. Page 12 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 12 of 49 Purchase Price multiplied by the metered kWh applicable to the SCEF. The EDC will separately provide Onbill Credits to the Subscribers on a monthly basis through Subscribers’ electric bills with the EDC. Provisions for service, rates, and other terms and conditions applicable to a Selected Bid(s) will be established in the form of Tariff riders developed by each EDC and reviewed and approved by PURA. 4. ELIGIBLE PROJECTS 4.1 Facility Type A Shared Clean Energy Facility must be a new Class I renewable generation project, as defined in Section 161 of the General Statutes, must emit no pollutants 6, and must be located in Connecticut. Facilities already constructed or under construction are excluded. For a facility to qualify as new, construction must commence after the date of the solicitation to which the Bidder is responding. For facilities constructed prior to the solicitation date but uprated with new production equipment (e.g., new solar panels or turbines) after the solicitation date, the new incremental production equipment may be eligible to the extent that it meets all of the eligibility criteria and is separately metered and compensated. A SCEF may use federal subsidies, incentives, or tax benefits. However a facility is ineligible if it receives, or seeks to receive, any Connecticut ratepayer-funded incentives or subsidies, including, but not limited to, net metering, virtual net metering, Public Utility Regulatory Policies Act (“PURPA”) tariffs, LREC/ZREC contracts, NRES tariff agreements, and any other contract or program of any kind in which an EDC purchases the facility’s energy, capacity, or renewable attributes, and grants or rebates from the Connecticut Green Bank and any of its predecessors or the Conservation and Load Management Program. Bids must gain approval to interconnect to the EDC’s distribution system (via the EDCs’ standard interconnection process) and must be metered by the EDC. Bids must meet Distribution Company Guidelines for Interconnection (“Guidelines”) as approved by PURA. The interconnection process is separate and distinct from the SCEF Program. 4.2. Facility Size A Shared Clean Energy Facility must have a nameplate capacity rating greater than one hundred (100) kW (AC) and not exceed five thousand (5,000) kW (AC) pursuant to Section 16-244z (a)(2)(C) and 16-244x of the General Statutes. The final as-built size of the SCEF shall not exceed the awarded nameplate capacity or the capacity on the Tariff Terms Agreement. 6 As stated in Public Act 25-173.
  5. Page 13 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 13 of 49 A proposed facility over five thousand (5,000) kW (AC) cannot be split into smaller Bids to enable that facility to qualify. However, new generation may be added to an existing generation facility or facilities. In such case, the total onsite generation may exceed the five thousand (5,000) kW (AC) size limit as long as the installed capacity for the new generation proposed under this Program does not, and any new generation must be separately metered in accordance with the EDC’s metering requirements. 4.3 In-Service Date A Shared Clean Energy Facility for a Selected Bid shall have three (3) calendar years from the date of PURA approval of the Tariff award to receive an In-Service Date from the EDC. If the Approval to Energize letter is not issued by such date, the EDC’s twenty-year (20) purchase commitment will immediately and automatically terminate. No EDC-issued extensions will be granted to the three-(3) year deadline for achieving the In-Service Date with the exception of extensions granted by the SCEF ombudsperson. Extension requests shall be granted in proportion to the delay experienced and/or the amount of time that is needed, up to one year, to complete the project. A Shared Clean Energy Facility shall be eligible for an extension to the three (3) year deadline if at least one of the following five criteria are met: (1) the generation facility or project is unique and more complex than ordinary customer-sided distributed generation installation projects, such as having additional technology-specific regulatory or local siting requirements; (2) the project developer has worked diligently and in good faith in developing the project since inception; (3) the project is near completion or likely to begin commercial operation within the requested extended deadline; (4) a significant portion of the total project investment has already been made and would potentially be stranded if the contract is terminated; and/or (5) the interconnection process extended beyond the utilities’ initial estimates and/or significantly (e.g., one month) beyond the average interconnection process timeline. Any Shared Clean Energy Facility pursuing an extension request that does not meet at least one of the five criteria established shall be subject to a case-by-case review from the Program’s ombudsperson. Any extension requests should be emailed to [email removed] or submitted through the Extension Request Information Form. A SCEF that does not achieve its In-Service Date on a timely basis and has its purchase commitment terminated may be re-offered into any solicitation for which bidding occurs one (1) calendar years after the date of termination of the purchase commitment. If the SCEF becomes ineligible for the Tariff due to a Bidder event of default, including failure to meet any of the in-service date requirements above, the Development Period Security is forfeited and will not be returned to the Bidder. 4.4 Term A Shared Clean Energy Facility for a Selected Bid approved by PURA to receive Tariff payments will be eligible for compensation for energy produced as defined herein and Delivered to the EDC at the approved Tariff Rate for a twenty- (20) year term commencing on the first day of the month following the In-Service Date. For Projects located on Prime Farmland, Subscriber Organizations must follow any rules developed by
  6. Page 14 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 14 of 49 the Connecticut Department of Agriculture (“DoAG”) and/or the Connecticut Siting Council (“CSC”) for developing projects on Prime Farmland as a condition of receiving payment under the SCEF Program. 7 4.5 Generation Site A Shared Clean Energy Facility and its associated interconnection route cannot be located, in whole or in part, on Core Forest, as defined in Section 2. The Bidder must demonstrate that locating the SCEF at the generation site will not significantly affect any endangered, threatened, and special concern species, or significant natural communities based on DEEP’s Natural Diversity Data Base. Selection in the SCEF program does not guarantee approval by the Connecticut Siting Council. If CSC approval is required, projects must ensure they meet all CSC requirements in addition to SCEF program rules. Selection in the SCEF program does not guarantee approval of a project by DEEP or DOAG. Bidders are responsible to obtain any additional approvals that may be still required to move forward with projects after selection in the SCEF program. Any solar photovoltaic Bidder must submit to DEEP on or before the Bid due date/time, documentation consistent with Appendix B that proves the generation site and interconnection route are not located along ridgelines or within ridgeline setback areas (as defined in Section 8-1aa of the General Statutes. A Bid for any solar project must include a commitment to pay for the relevant Connecticut Soil and Water Conservation District to perform site inspections on behalf of DEEP. The Bidder must demonstrate to DEEP 8, as a part of Appendix B, that it has control of the generation site, or an unconditional right, granted by the property owner, to acquire such control. In all cases, site control and property rights must include all necessary leases, easements, or development rights necessary to operate or develop the project, including any necessary leases from an applicable government authority. In order to demonstrate site control under this Program Manual, a Bidder must itself submit an affidavit, as part of Appendix B, that the Bidder has control of the generation site, or an unconditional right, granted by the property owner, to acquire such control. Where the Bidder is not the owner of the property (i.e. lease, option to lease, etc.), the Bidder must also include an affidavit, as part of Appendix B, by the owner of the Project Site representing that the Bidder (a) has control of the generation site, or an unconditional right, granted by the property owner, to acquire such control to use the site for the SCEF, and any rights of way needed for interconnection and (b) is authorized to submit the Bid for the project located on the owner of the Project Site’s property. If it is later determined that the Bidder did not have control of the generation site, or an unconditional right, granted by the property owner, to acquire such control prior to the bid deadline, the Bidder may be removed from the Program and have its eligibility for future participation under the Tariff terminated by the Authority under section 10 of this Program Manual. DoAG resources are available via this website: https://portal.ct.gov/doag/adarc/programs/solar-and-farmingoverview/shared-clean-energy-facility . CSC resources are available via this website: https://portal.ct.gov/CSC 8 DEEP will determine if a Bidder has site control as a part of its Appendix B evaluation process. 7
  7. Page 15 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 15 of 49 If an existing SCEF through PA 18-50, PA 19-35, PA 22-14, PA 23-102, or the pilot program, LREC/ZREC, or other NRES or SCEF tariff project is present at the Project Site and uses the same technology, the existing project must be in-service or any prior agreement must be terminated before any additional Bids are eligible for selection under this Program. There is one exception to this requirement. The exception is for projects issued a partial award in a previous SCEF solicitation. In such circumstances, a project will be eligible to submit a project bid of up to five (5) MW minus the amount the project was awarded in the previous Tariff Terms Agreement. The aggregate maximum capacity of all Bids located on a single Parcel of land, or contiguous Parcels under common ownership or with a common Bidder, shall be limited to five thousand (5,000) kW (AC), excluding any existing generation capacity that is not qualified under the Public Acts. Any subdivision of Parcels must be recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation. If multiple Bids are received for a Parcel of land that was not subdivided before January 1 of the year of the solicitation to which the Bidder is responding, or for which a subdivision was not recorded with the municipality in which such Parcel is located prior to January 1 of the year of the solicitation, only the lowest priced Bid will be eligible, and all other Bids will be disqualified. At the time of bidding, the Bidder offering multiple Bids at a Parcel must demonstrate such recording with the municipality to the appropriate EDC. During any single solicitation for any single Parcel of land, the EDCs will evaluate only one (1) Bid per technology or one (1) Bid that uses a combination of technologies (e.g., a wind turbine that has associated solar panels). PURA reserves the right to review and adjust these parameters to ensure competitiveness pursuant to Section 16-244z (c)(1)(A) of the General Statutes. 4.6 Project Viability The Bidder must demonstrate to DEEP through the responses in Appendix B that the technology the proposed Project will use is technically viable. Technical viability may be demonstrated by showing that the technology is commercially available and has been used successfully on a significant scale. The Bidder must demonstrate the financial viability of the proposed Eligible Project, including funding of development costs, the required development period security, reasonable estimated interconnection costs, and ability to acquire required equipment in the time frame proposed. The Bidder must demonstrate the environmental viability of the proposed Project, including a viable plan to acquire the necessary permits and licenses, an assessment of environmental impacts, and a plan to mitigate such impacts or impediments to the satisfaction of DEEP.
  8. Page 16 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 16 of 49 5. ELIGIBLE BIDDER 9 5.1. Experience Through the responses in Appendix B, a Bidder must demonstrate to DEEP its relevant experience and expertise to be able to successfully develop, finance, construct, operate, and maintain the proposed SCEF and successfully fulfill its responsibilities as provided in the Bid. Development, financing, and construction experience can be established by demonstrating that key member(s) of the Bidder's development team have undertaken project management responsibilities, including: a. Successful development and construction of a similar type of project; b. Successful development and construction of one or more projects of similar size or complexity or requiring similar skill sets; c. Successful development and management of a similar shared or community clean energy facility in another jurisdiction; and d. Experience successfully financing power generation projects (or demonstrating the means to finance the proposed SCEF on the Bidder’s balance sheet). 5.2. Operation and Maintenance Through the responses in Appendix B, a Bidder must demonstrate to DEEP its operation and maintenance plans for the proposed SCEF, including a level of funding and mechanism for funding that will ensure reliable operations during the term of the Tariff. 5.3. Bid Submission Bids must be submitted in accordance with the solicitation issued by the relevant EDC, which will set forth specific filing instructions. Each Bidder must comply with the instructions set forth by the solicitation to ensure that its Bid is complete. In addition to completion of the Bid Form, each Bidder must submit a Bid Certification Form and may be required to provide a Connecticut Licensed Professional Engineer Certification Form, Pending Connecticut Green Bank Grant and/or Rebate Disclosure Statement, interconnection application confirmation receipt, or other forms as necessary. Specific instructions will be included with the solicitation for how to provide these additional documents and the entity to which these documents shall be provided (i.e., the EDC or DEEP). Bidders must submit a non-refundable Bid Fee in accordance with the RFP at the time of Bid submission. Bids do not need to include a list of Subscribers at the time of submission. 9 Note, for 5.1 and 5.2 DEEP will be making these determinations. Please refer to Appendix B for further details.
  9. Page 17 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 17 of 49 6. SUBSCRIBERS 6.1. Subscriber Requirements Each SCEF must have at least ten (10) Subscribers and be located within the same EDC territory as the Individual Billing Meters of all of its Subscribers. Subscribers are limited to the following classes of Customers: • • • • • • • Low-income Customers; Moderate-income Customers; Small Business Customers; State or municipal Customers; Affordable Housing Landlords, Entities, and Facilities; Commercial Customers; Residential Customers, other than LMI Customers, who either: (1) reside in a rental or leased property, or a property where the Customer does not control the property's roof, such as a multiunit condominium; or (2) reside in their own property, but are unable to install on-site solar. For any Individual Billing Meter, a Subscriber may have only one (1) Subscription to one (1) SCEF. A Subscriber may not subscribe for an amount that exceeds one hundred (100) percent of the Subscriber’s historic average annual electric use (or, for a Subscriber with less than twelve (12) months of electric use, a reasonable 10 estimate of historical use). A Subscriber may not receive, or seek to receive, any Connecticut ratepayer-funded incentives or subsidies, including, but not limited to, net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program, associated with the electric load for which there is a Subscription under this Program. If a Subscriber has load in excess of the load covered by net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program, the Subscriber may participate in this Program as a Subscriber for only that excess load. The Subscriber is responsible for demonstrating excess load to the satisfaction of the EDC to be consistent with this Program. Conversely, existing SCEF participants who were enrolled in SCEF via the opt-out or opt-in methodology and seek to receive any other Connecticut ratepayer-funded incentives or subsidies including, but not limited to, net metering, virtual net metering, or PA 18-50 tariffs other than those provided by this Program will have such SCEF subscription adjusted to cover only excess load not covered by the new generation system. The EDCs will make this SCEF subscription adjustment after there are 12 consecutive months of generation system usage to accurately determine the excess load. The EDCs will conduct a review of existing SCEF subscribers once every 12 months to determine if a SCEF subscription requires adjustment due to customer participation in alternative For customers with less than twelve (12) months of actual electric use, the reasonable estimate of historic average annual electric use is based on average usage estimates for similar customers (e.g., building square footage, type of customer, number of household members for residential customers, etc.). 10
  10. Page 18 of 49

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance SCEF_Items 1-4 Page 18 of 49 clean energy programs. If a Subscriber utilizes net metering, virtual net metering, LREC/ZREC contracts, or NRES tariffs other than those in this Program for the electric load associated with a Subscription under this Program, such Subscription will be terminated. For each SCEF project that enters service prior to December 6, 2023, twenty (20) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional forty (40) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Lowincome Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of the SCEF must be subscribed by Small Business Customers through an EDC-administered identification and enrollment process. For each SCEF project that enters service prior to December 6, 2023, the remaining twenty (20) percent of the estimated annual output shall be available for voluntary enrollment by any eligible customer but is not required to be subscribed. For each SCEF project that enters service after December 6, 2023, fifty (50) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional twenty 11 (20) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI 12 Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Lowincome Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of 11 Previously, the program manual stated that for each SCEF project procured in years 1-4 of the program, twenty (20) percent of the estimated annual output must be subscribed by Low-income Customers through an EDC-administered identification and enrollment process. An additional forty (40) percent of the estimated annual output of the SCEF must be subscribed through an EDC-administered identification and enrollment process by: LMI Customers; Customers who serve as landlords or entities responsible for an affordable housing facility, with subscriptions applicable only to such affordable housing facility; and/or Customers who qualify as Low-income Service Organizations. Lastly, an additional twenty (20) percent of the estimated annual output of the SCEF must be subscribed by Small Business Customers through an EDC administered identification and enrollment process. For each SCEF project procured in Years 1-4 of the program, the remaining twenty (20) percent of the estimated annual output shall be available for voluntary enrollment by any eligible customer but is not required to be subscribed. 12 Low- and moderate-income customer status is verified at the time of subscription sign-up only. Annual verification is not needed.

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)