Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

3 pages match
  1. Page 25 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 25 of 65 As of the date of publication of this Program Manual, the following communities are designated Economically Distressed by the CT DECD. 37 Please refer to the CT DECD website to verify that the list of communities is current at the time of application. 36F36F Connecticut DECD Economically Distressed Communities- current for January 2026 38 Ansonia North Canaan Bridgeport North Stonington Bristol Norwich Plainfield Chaplin Derby Plymouth Preston East Hartford Putnam East Haven Griswold Sprague Groton Stafford Hartford Sterling Stratford Killingly Lisbon Torrington Voluntown Mansfield Meriden Waterbury Montville West Haven Naugatuck Willington New Britain Winchester New Haven Windham New London 37F37F For customers that are automatically eligible for the adder as indicated by EDC systems or have a premise address in a designated qualifying community, the customer may still need to submit required payment forms (W9 and other utility specific payment forms) for the issuance of adder payments. The required documents shall be provided where possible at the time of application and/or may be requested by the EDCs. N. Maximum Qualified System Size As per the requirements of the Program Statute, Qualified Projects must not exceed 25kW AC as measured by the Inverter Nameplate Capacity of the Qualified System’s inverter. More than one Qualified Project may be located at a single one-to-four family property, however the total nameplate AC capacity for all qualified systems may not The EDCs will review the DECD list regularly and update information accordingly. In the event that this list and the list on the DECD website differ, the DECD website shall be the final determinant of whether a community meets the Economically Distressed qualification criteria. 38 https://portal.ct.gov/DECD/Content/About_DECD/Research-and-Publications/02_Review_Publications/DistressedMunicipalities 37
  2. Page 26 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 26 of 65 exceed 25kW. Co-located or paired energy storage system capacity does not count towards the 25 kW AC cap of Residential Renewable Energy Solutions qualified project. 39 38F38F Projects must also be sized such that the system’s expected annual production does not exceed the highest annual consumption over any 12-month period within the past 5 years by more than 5% for the Customer of Record’s existing Revenue Meter plus the expected kWh for any planned addition of up to two electric vehicles and a wholehome heat pump. For multi-family properties between 2-4 units, the systems may be sized to the combined load of up to 4 billing accounts associated with the premise and all billing accounts must be provided at the time of application. Installers must indicate in the project application whether the Customer of Record intends to size the Qualified System to exceed the existing annual load during the application process and must indicate which beneficial electrification technologies the customer intends to purchase/install and the anticipated timeline for such an installation/purchase. In scenarios where less than 12 months of historical electric usage is available for the premise with its current occupant as the Customer of Record (i.e., an existing home that was purchased and the Customer of Record has resided there for 8 months), the system may be sized up to a maximum of 9 kW AC 40 nameplate capacity without consideration of the limited available electric usage. Such systems may exceed 9 kW AC by an amount consistent with any planned future electrification measures. 39F39F The following assumptions are used for the purposes of estimating future kWh consumption from planned electric vehicles or a whole-home air source heat pump. Future Electrification Measure Electric Vehicle (per vehicle, maximum of two) Whole-Home Air Source Heat Pump Whole-Home Ground Source Heat Pump Estimated Expected Annual Load 3,285 kWh 3,608 kWh 2,458 kWh For projects at new construction homes, systems may be sized up to 9 kW AC without including an energy model with the application. If the system is sized larger than 9 kW AC, the installer will submit with the application a copy of an energy model for the proposed property estimating the design day load or annual kWh consumption at the site. Acceptable models 41 include the following: 40F40F • • REM/Rate EkoTrope 39 Any additional AC capacity attributed to an energy storage system would count in determining the applicable interconnection application level. For example, a 2022 residential application for a 20 kW AC solar PV system with an additional 10 kW AC battery would apply as a Level 2 (Eversource) or Fast Track & Study (UI) interconnection and is qualified for RRES for the solar capacity. This application would pay the $163 RRES application fee plus a $500 interconnection application fee. 40 The average system size for the 2020-2021 period in the Connecticut Green Bank’s RSIP program was 9.04 kW AC. Data source: https://www.gosolarct.com/wp-content/uploads/2022/01/RSIP-Web-Report-1-13-2022.csv. This sizing may be reevaluated annually by the EDCs based on the previous 2 years’ average installed system size. 41 Models were selected based on their ability to produce either 1) design day load for heating, which were then used in the Conservation & Load Management Program Savings Documentation equation to determine annual kWh, or 2) annual energy usage kWh for heating
  3. Page 27 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 27 of 65 • • • • WUFI Passive EQuest REVIT Manual J Installers may petition the EDCs to allow acceptance of alternative energy models not listed above by e-mailing [email removed] or [email removed]
  4. Page 28 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 28 of 65 VI. O. Program Processes Enrolling in Residential Renewable Energy Solutions System Installers or their agents are responsible for applying to Residential Renewable Energy Solutions on behalf of System Owners and Customers of Record. The application process is a requirement of each EDC’s interconnection application process. The EDC’s review of Program eligibility occurs concurrently with the review of a project’s interconnection application. For the purposes of the tariff application process, the EDCs will primarily communicate with the identified System Installer and will copy the identified System Owner and Customer of Record on relevant communications. System Owners and Customers of Record will be required to review and provide signatures agreeing to the Terms and Conditions of the Tariffs and attesting to the accuracy of the application submitted on their behalf. For purposes of DG Interconnection, customers will continue to follow the interconnection guidelines as outlined in the Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 25kW (ac) or Less 42. The following table provides the steps associated with both the interconnection application and the tariff application processes. 41F41F Step Number 1 2 3 4 5 6 7 8 9 10 11 12 Description of Step Collect required interconnection and Renewable Energy Solutions application documentation Complete online interconnection and tariff applications in EDC portals Sign tariff application document Review and approve interconnection and tariff applications Construct Qualified System Completion of Authority Having Jurisdiction release specific to each EDC territory Pay for meter assigned by EDC EDC installation of applicable meters EDC Inspection (i.e., Witness test) if necessary EDC issuance of Approval to Operate/Approval to Interconnect PV system turned on and begins operations Ongoing generation of monetary on-bill credits and incentive or REC payments to Customer of Record and System Owner based on system production Responsible Entity System Installer, Customer of Record, System Owner System Installer System Owner, Customer of Record EDC System Installer System Installer, AHJ System Installer EDC EDC, System Installer EDC System Installer EDC The Residential Renewable Energy Solutions Application Date is the date on which the EDC determines the System Installer has provided a complete tariff and interconnection application in the relevant application portal. An application is considered complete once all required fields and documents are submitted and applicable https://www.eversource.com/content/docs/default-source/builders-contractors/25kw-lessguidelines.pdf?sfvrsn=f630af62_2 42
  5. Page 29 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 29 of 65 application fees are paid. The Application Date is used to determine the applicable REC Incentive Rate for Netting Tariff systems and Total Incentive Payment rates for Buy-All systems. The Tariff Term Start Date is the date on which the EDC has provided Approval to Operate/Approval to Interconnect the Qualified System. A Qualified System may not be energized prior to the Approval to Operate/Approval to Interconnect date and the EDCs will not compensate any system that began operations before the applicable Approval to Operate/Approval to Interconnect Date. It is the sole responsibility of the System Installer to energize the Qualified System on or after the Approval to Operate/Approval to Interconnect Date. The EDCs will not compensate customers for lost generation in the event a System Installer fails to energize a system after receiving Approval to Operate/Approval to Interconnect. The EDC will also not credit any generation if the installer exports energy prior to receiving Approval to Operate/Approval to Interconnect. Customers will be notified to turn off their systems if they are exporting without approval. The EDC has the right to lock the disconnect OFF if the customer fails to turn off their system after 7 days. For the safety of EDC employees during the meter installation process, all relevant disconnects will be opened during the meter installation process and will be left in the open (i.e., non-generating) position upon leaving a project site. The EDC will not be liable for a disconnect that fails when an EDC employee operates it (i.e., disconnect that is unable to open or close). P. Designating Payment Beneficiaries System Owners can designate a Payment Beneficiary to receive a Direct Payment for any portion (0%-100%) of the Total Incentive Payment for Buy-All systems, or the REC Incentive Payment and applicable Adders for Netting Tariff Systems. System Owners, through their System Installers designate an initial Payment Beneficiary to receive Direct Payments as part of the initial application process. For Buy-All systems in which a Payment Beneficiary is designated to receive a Direct Payment, and for REC and Adder Incentive Payments under the Netting Tariff, the System Owner must provide Payment Beneficiary information as part of the application. 43 In instances where the Netting Incentive REC value is $0, a Tariff Payment Beneficiary must be designated as part of the application. Anytime an individual or entity, including the Customer of Record, is receiving the Direct Payment under either incentive structure, the Payment Beneficiary information must be designated on the Application Form at the time of the application. For UI projects, a W-9 and Vendor Creation Form are required. For Eversource projects, the W-9 should not be uploaded during the application and will be requested via e-signature following Permission to Operate when necessary. 42F42F Q. Changing Payee or Direct Payment Allocation Percentage R. Application Cancellation Period and Duplicate Management A System Owner may submit a revised Payment Beneficiary Form once per calendar year. As part of this revision, the System Owner may change the allocation of Direct Payments vs. Monetary On-Bill Credits for BuyAll systems, as well as the Payment Beneficiary and/or any relevant payment information. As discussed in the Application Fee section of this Program Manual, an administrative fee will be charged for any updates to the Tariff Payment Beneficiary forms. Level 1 Applications (25 kW and less) that remain in a status requiring customer/applicant action for 12 months or more may be automatically withdrawn by the EDCs. The applicant and customer will both be provided no less UI has additional forms required for direct payments: the Vendor Set-Up Form, the ACH Authorization Form or Wire Authorization Form, and Business Classification Form 43
  6. Page 30 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 30 of 65 than 15 business days' notice, via email, prior to the automatic withdrawal of their application, and the EDCs will maintain the application in its current status at the request of either the customer or the applicant. Duplicate applications may also be automatically withdrawn by the EDCs, particularly if they are preventing the efficient enrollment of customers in the RRES tariff. The applicant and customer will both be provided no less than 15 business days' notice, via email, prior to the automatic withdrawal of the application and during this notice period, the customer or applicant may direct the EDCs to retain a project and withdraw a subsequent duplicate application. Review of subsequent duplicate RRES and interconnection applications will remain on hold during the notice period.
  7. Page 31 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 31 of 65 VII. Metering Eversource and United Illuminating will install and own all meters required to participate in Residential Renewable Energy Solutions. System Owners and Installers are responsible for ensuring that all meter equipment is installed consistent with EDC requirements and that systems are wired in conformance with published EDC Residential Renewable Energy Solutions metering specifications and are installed in accordance with all state and local electrical codes and approved for use by the local electrical inspector. System Owners and Installers are also responsible for reporting valid generation data when production is not measured by a utility meter 44. The EDC cannot inspect individual system wiring configurations on a customer’s premises and are not responsible for any lost tariff payments or revenue associated with meter configuration wiring that does not conform to published EDC standards. Appendix C includes links to approved Residential Renewable Energy Solutions Meter Diagrams and Supplemental written Guidance. 43F43F The program requires adherence to UI’s Interconnection guidelines and RRES program requirements, or the project may be withdrawn or delayed. For applications submitted on or after January 1, 2025, all new Netting and Buy-All projects must have a utility-owned production meter, ideally with an approved bypass socket. Non-bypass sockets will, however, be permitted on Netting projects. S. Buy-All Metering T. Netting Metering Approved Buy-All metering configurations are provided in Appendix C of this Program Manual. Buy-All Tariff systems are configured to export the entirety of their production to the grid, less any applicable parasitic load associated with the system. The single bi-directional meter at the Point of Interconnection (POI) measures all system production. The EDC will net any parasitic load associated with the system against the total value of energy exported over the course of the month to determine the tariff eligible kWh on which monetary on-bill credits and cash payments will be calculated. Applicable fees for procuring and installing meters for Buy-All systems are listed in Appendix D. Approved Netting Tariff configurations are provided in Appendix C of this Program Manual. Each Netting Tariff System will be interconnected behind the customer’s revenue meter and load such that system production first serves onsite load and any generation in excess of customer load is exported to the EDC’s grid through a bidirectional meter. At the time of interconnection, the EDC will replace the customer’s existing meter with a bi-directional net revenue meter that will register real time power delivered to the grid on one channel and power received from the grid on a separate channel. The monthly net of these two channels will be used to determine the customer’s monthly on-bill credit valued at the customer’s retail rate, if applicable. No fees will be charged for the procurement and installation of the customer’s net revenue meter at the POI. Each Netting System, unless otherwise authorized by the EDC, 45 will also have a Production Meter that will exclusively measure the output of the Qualified System and will be located behind the customer’s net revenue meter. 44F44F This will only be allowable on a temporary basis with authorization from the utility. Visit the EDCs respective webpages for a list of Temporary Approved Non-bypass Sockets and additional up-to-date guidance around this topic. 44 45
  8. Page 32 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 32 of 65 This bi-directional meter will measure both the production from the PV system and any parasitic load associated with the PV system. The monthly net value of any reads on the generation and consumption meter channels will be the basis for the calculation of REC Payment Incentives, if applicable. The System Owner will be responsible for the costs associated with the procurement and installation of any system’s Production Meter. Meter fees are listed in Appendix D of this Program Manual. Meter wiring diagrams, including battery storage configurations, are included in Appendix C of this Program Manual.
  9. Page 33 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 33 of 65 VIII. U. Application, Metering and Payment Change Fees Application Fees Application fees are collected by the EDCs to pay for the administrative costs associated with application review. Fees are used to reduce costs charged to non-participating ratepayers who would otherwise bear the costs of the program. Application fees are collected at the initial application phase. Application fees are non-refundable. Application fees as of the publication date of this Program Manual are listed below for each EDC. Application fees are in addition to any fees charged as part of an Interconnection Application. Electric Distribution Company Eversource United Illuminating V. Application Fee $163.00 $200.00 Metering Fees Metering fees are collected to cover the costs associated with procuring and installing Production Meters for Qualified Systems taking service under the Netting Tariff and Buy-All Tariff. Production meter fees are paid once a Qualified Project is deemed ready to receive Approval to Operate/Approval to Interconnect. If a qualified project is authorized to operate without a utility production meter for any period, meter fees may be paid when a qualified project is deemed ready to receive a Production Meter. Meter fees are refundable should a System Owner not move forward with a project. Current Production Meter fees are provided for each EDC below. Note that these options represent the vast majority of Production Meter installations expected as part of Residential Renewable Energy Solutions, however, in rare cases, a different meter may be required. Meter Fees are subject to change based on industry and supply chain factors and any changes will be communicated as soon as practicable by the EDCs to the industry. Eversource Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Bridge Form 12S Bridge $183.00 $234.00 Main Service Meter Form Meter Fee Form 2S Form 25S $348.00 $348.00 UI Meter Types and Fees: Voltage / Meter Type 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A W. Change in Payment Beneficiary Form Once per 12-month period, System Owners may request a change to the Payment Beneficiary form on file with the EDC or the EDC’s Payment Vendor. Changes can be made to payee information, or, for Buy-All customers, changes can be made to the proportion of the total incentive that is provided as a Monetary On-Bill Credit or a Direct Payment. Fees associated with such changes are provided below. These fees may be deducted from the next
  10. Page 34 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 34 of 65 REC Payment or Direct Payment provided to the Payment Beneficiary or may be paid through another EDCapproved process. Electric Distribution Company Eversource United Illuminating Payment Beneficiary Change Fee $22.00 $22.00

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)