Compliance Filing
ES Annual Compliance Filing Orders 1 and 2
Files47
DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
PDF · 213 KB · 2 pagesText searchable
Download DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdfRead the text of DN 26-08-01 Order 1 and 2 Compliance Filing Cvr Letter.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
PDF · 252 KB · 2 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
Excel · 67 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
PDF · 192 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Excel · 71 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
PDF · 429 KB · 6 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
PDF · 2.7 MB · 106 pagesText searchable
Download ES Order 2 - ESS Order 25 from 17-12-03RE03.pdfRead the text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
PDF · 1.3 MB · 8 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Excel · 11 MBText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsxRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
PDF · 4.0 MB · 78 pagesText searchable
Download ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdfRead the text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Excel · 5.7 MBText searchable
Download ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsxRead the text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
PDF · 5.0 MB · 69 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
PDF · 102 KB · 1 pageText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Excel · 173 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
PDF · 867 KB · 21 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Excel · 32 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
PDF · 160 KB · 3 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
PDF · 1.9 MB · 4 pagesText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdfRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Excel · 33 KBText searchable
Download ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsxRead the text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
PDF · 841 KB · 1 pageText searchable
Download ES Order 2 - EV Order 16 from 17-12-03RE04.pdfRead the text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Excel · 43 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
PDF · 204 KB · 8 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Excel · 401 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
PDF · 1.1 MB · 28 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Excel · 111 KBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
PDF · 392 KB · 6 pagesText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdfRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Excel · 27 MBText searchable
Download ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsxRead the text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
ES Order 2 - NRES Order 20 from 20-07-01.pdf
PDF · 169 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 20 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
ES Order 2 - NRES Order 19 from 20-07-01.pdf
PDF · 290 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 19 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
ES Order 2 - NRES Order 18 from 20-07-01.pdf
PDF · 494 KB · 1 pageText searchable
Download ES Order 2 - NRES Order 18 from 20-07-01.pdfRead the text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
ES Order 2, CEOP-VRO_Items 2 -4.pdf
PDF · 817 KB · 1 pageText searchable
Download ES Order 2, CEOP-VRO_Items 2 -4.pdfRead the text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
ES Order 2, BETP-01.xlsx
Excel · 74 KBText searchable
Download ES Order 2, BETP-01.xlsxRead the text of ES Order 2, BETP-01.xlsx
ES Order 2, BETP-01.pdf
PDF · 250 KB · 6 pagesText searchable
Download ES Order 2, BETP-01.pdfRead the text of ES Order 2, BETP-01.pdf
ES Order 2 - SCEF Order 9 from 19-07-01.pdf
PDF · 581 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 9 from 19-07-01.pdfRead the text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Excel · 114 KBText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsxRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
PDF · 552 KB · 2 pagesText searchable
Download ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Excel · 26 KBText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsxRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
PDF · 297 KB · 1 pageText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
PDF · 357 KB · 4 pagesText searchable
Download ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdfRead the text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
ES Order 2, ESS_Items 1-4.pdf
PDF · 6.0 MB · 117 pagesText searchable
Download ES Order 2, ESS_Items 1-4.pdfRead the text of ES Order 2, ESS_Items 1-4.pdf
ES Order 2, VNM_Items 2-4.pdf
PDF · 240 KB · 3 pagesText searchable
Download ES Order 2, VNM_Items 2-4.pdfRead the text of ES Order 2, VNM_Items 2-4.pdf
ES Order 2, SCEF_Items 1-4.pdf
PDF · 3.1 MB · 49 pagesText searchable
Download ES Order 2, SCEF_Items 1-4.pdfRead the text of ES Order 2, SCEF_Items 1-4.pdf
ES Order 2, RRES_Items 1-4.pdf
PDF · 3.1 MB · 65 pagesText searchable
Download ES Order 2, RRES_Items 1-4.pdfRead the text of ES Order 2, RRES_Items 1-4.pdf
ES Order 2, RPS_Items 2-4.pdf
PDF · 761 KB · 1 pageText searchable
Download ES Order 2, RPS_Items 2-4.pdfRead the text of ES Order 2, RPS_Items 2-4.pdf
ES Order 2, NRES_Items 1-4.pdf
PDF · 3.0 MB · 51 pagesText searchable
Download ES Order 2, NRES_Items 1-4.pdfRead the text of ES Order 2, NRES_Items 1-4.pdf
ES Order 2, EV_Items 1-4.pdf
PDF · 9.6 MB · 118 pagesText searchable
Download ES Order 2, EV_Items 1-4.pdfRead the text of ES Order 2, EV_Items 1-4.pdf
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf
Extracted from the file · 1 page · 8,665 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf
Extracted from the file · 6 pages · 27,557 characters
Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf
Extracted from the file · 106 pages · 245,530 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf
Extracted from the file · 8 pages · 20,187 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf
Extracted from the file · 78 pages · 214,494 characters
Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf
Extracted from the file · 69 pages · 162,167 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf
Extracted from the file · 1 page · 4,407 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf
Extracted from the file · 21 pages · 73,536 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf
Extracted from the file · 3 pages · 8,426 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf
Extracted from the file · 4 pages · 1,020 characters
Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf
Extracted from the file · 1 page · 1,297 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf
Extracted from the file · 8 pages · 14,158 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf
Extracted from the file · 28 pages · 215,422 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf
Extracted from the file · 6 pages · 39,871 characters
Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf
Extracted from the file · 1 page · 1,427 characters
Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf
Extracted from the file · 1 page · 1,354 characters
Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf
Extracted from the file · 1 page · 1,557 characters
Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf
Extracted from the file · 1 page · 485 characters
Text of ES Order 2, BETP-01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2, BETP-01.pdf
Extracted from the file · 6 pages · 19,114 characters
Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf
Extracted from the file · 2 pages · 3,439 characters
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 2 pages · 73,616 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx
Sheet names, column headings and text cells; numbers left out
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf
Extracted from the file · 1 page · 5,854 characters
Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf
Extracted from the file · 4 pages · 6,318 characters
Text of ES Order 2, ESS_Items 1-4.pdf
Extracted from the file · 117 pages · 290,953 characters
Text of ES Order 2, VNM_Items 2-4.pdf
Extracted from the file · 3 pages · 1,101 characters
Text of ES Order 2, SCEF_Items 1-4.pdf
Extracted from the file · 49 pages · 109,450 characters
Page 41 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 41 of 65 Residential Renewable Energy Solutions Netting Tariff Statement of Qualifications This Statement of Qualification, provided by the Eversource Energy/United Illuminating, signifies that the renewable energy project identified below meets the requirements for eligibility as a Qualified Project under Residential Renewable Energy Solutions. Qualified Project Unique ID#: Date of Statement of Qualification Issuance: System Capacity: System Location: System Owner and Address: The project’s qualification as a tariff-eligible generator will be in effect for 20 years, starting upon the project’s EDC Approval to Operate/Approval to Interconnect. This Statement of Qualification may expire in the event the Qualified Project is not interconnected within 12 months of issuance of this Statement of Qualification. The Qualified Project has been approved for the following tariff compensation rates. Tariff Type Netting Tariff Export Rate* REC Incentive Rate 48** Income-Eligible Adder ** Economically Distressed Municipality Adder ** Solar Energy Adjustment Rate / Solar Production Charge*** Netting Tariff Rate Currently Applicable Retail Rate 47F47F *The Netting Export Rate is the Customer’s current retail rate at the time of application approval, though the retail rate and therefore Netting Export Rate will vary periodically according to rate changes. Production from the solar system will be netted with the customer’s consumption and excess production is compensated at this rate on the customer’s bill. Credits for excess production cannot be cashed out until the customer closes their electric account. **If applicable, the REC Incentive Rate, Income-Eligible Adder or Economically Distressed Municipality Adder will be paid as quarterly Direct Payments to the Payment Beneficiary. ***If a value greater than zero is assessed, the Solar Energy Adjustment / Solar Production Charge will appear as a line item on customers’ bills. 48 The REC Incentive rate used is an illustrative example.Page 42 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 42 of 65 XIII. Appendix C. Metering Diagrams For metering diagrams and guidance visit: • Eversource: www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections • UI: RRES Meter Diagrams Netting/Buy-AllPage 43 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 43 of 65 XIV. Appendix D. Meter Costs Eversource Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Bridge Form 12S Bridge $183.00 $234.00 UI Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Form 25S $348.00 $348.00Page 44 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 44 of 65 XV. Appendix E: Residential Renewable Energy Solutions Terms and Conditions RESIDENTIAL RENEWABLE ENERGY SOLUTIONS TERMS AND CONDITIONS 1. Definitions 1.1 As used throughout these Terms and Conditions, the capitalized terms shall have the definitions set forth in the Residential Renewable Energy Solutions Program Manual. 2. Tariff Qualification, Tariff Structure Payment Rates, Payment Timing and Tariff Term 2.1 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Buy-All Tariff for energy and RECs produced by a Qualifying Project consistent with the tariff structure, rates and practices described in the Residential Renewable Energy Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.2 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Netting Tariff for energy and RECs produced by a Qualifying System consistent with the tariff structure, rates and practices described in the Residential Renewable Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.3 The Total Tariff Rate for a Qualified Project shall be the compensation rate listed on the Statement of Qualification issued by the EDC. 2.4 The Tariff Term shall commence as of the date Authorization to Interconnect is issued by the EDC and shall remain in effect for twenty (20) years. 2.5 System Owners, Customers of Record and/or Tariff Payment Beneficiaries enrolled in the Buy-All Tariff or Netting Tariff whose term has expired may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. The EDC is not under any obligation to purchase RECs after the tariff term from the Projects. 2.6 At the time of Application, the Customer of Record must acknowledge review of the Renewable Energy Solutions customer information webpage on its respective EDC’s website, which contains information about historic electric rates and system costs.Page 45 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 45 of 65 2.7 The EDCs shall assume all right, title and interest in, and to, the Qualified System’s generation, and environmental attributes, including, without limitation, all RECs for the Tariff Term. The EDCs shall take title to all energy delivered to the distribution system by the Qualified System, all available capacity rights and all Environmental Attributes at the time of production. 2.8 At the time of Application the Customer of Record and System Owner must designate a Payment Beneficiary. For the Buy-All Tariff, a Payment Beneficiary, other than a Customer of Record, can be designated to receive a percentage of the total tariff compensation. Any compensation not assigned to a third party will result in Monetary On-Bill Credits to the Customer of Record. The Netting Tariff Payment Beneficiary, which may be the Customer of Record or a third-party, can be designated to receive the Renewable Energy Certificate (REC) Incentive Payment and/or Adder paid out once every quarter. 3. Qualified Projects 3.1 The Qualified Project is as described in the Statement of Qualification and in the tariff and interconnection applications filed with the EDC. 3.2 The Qualified Project shall be constructed substantially as described in the tariff and interconnection applications filed with the EDC. In the event the as-built system differs in a manner that would make the system ineligible for Residential Renewable Energy Solutions, the EDC may revoke the Qualified Project’s Statement of Qualification. 3.3 The final Qualified Project size shall be based on the as-built configuration and shall not exceed 25 kW (AC). If final Qualified Project size differs from original description as set forth in the Statement of Qualification: 3.4 3.3.1 any increase that results in a Qualified Project size exceeds 25 kW (AC) will result in immediate and automatic disqualification of the Qualified Project from Residential Renewable Energy Solutions. 3.3.2 any increase that results in a Qualified Project’s size exceeding the expected Customer of Record’s annual energy consumption, after accounting for expected electrification, will result in immediate and automatic disqualification from Residential Renewable Solutions. The Qualified Project must meet energy assessment requirements and sizing requirements based on the Customer of Record’s annual energy consumption. Data on the Customer of Record’s energy assessment participation and historical annual energy consumption may be shared with the Applicant and with the Installer as part of the application process. 4. Limitation of Liability 4.1 Each Party’s liability to the other Parties for any loss, cost, claim, injury, liability, or expense, including reasonable attorney’s fees, relating to or arising from any act or omission in its performance of its obligations under Residential Renewable Energy Solutions, shall be limited to the amount of direct damage actually incurred. In no event shall either party be liable to the other party for any indirect, incidental,Page 46 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 46 of 65 special, consequential, or punitive damages of any kind whatsoever, including, but not limited to, lost profits, lost revenue, or failure to realize expected savings. 5. Regulatory Changes, Regulatory Approval and Cost Recovery 5.1 If the statutory and/or regulatory framework governing the Tariffs in effect is amended or suspended by any Governmental Authority and/or is otherwise no longer in force (collectively, a "Change" in the regulatory framework), the EDC may choose to qualify the Qualified System in another state or federal program, whether for renewable energy certificates or other Environmental Attributes, and the System Owner shall at such time provide to the EDC any documentation and other support as may be needed for such qualification. 5.2 If during a change in Connecticut laws or regulations occurs that creates value in Environmental Attributes, then the System Owner shall cooperate to register such Environmental Attributes or take other action necessary to obtain the value of such Environmental Attributes for the EDC. "Governmental Authority" means the federal government, any state or local government or other political subdivision thereof (whether federal, state or local), any court and any administrative agency or other regulatory body, instrumentality, authority or entity exercising executive, legislative, judicial, regulatory or administrative functions of or pertaining to government. 5.3 If the EDC receives an order from the Authority that a Qualified System is not eligible for Residential Renewable Energy Solutions, the EDC shall terminate the Qualified System’s tariff eligibility. Upon such termination, the Parties shall not have any further liability hereunder. 5.4 The Parties recognize and agree that the amounts to be paid to the System Owner, and the reasonable and prudently incurred costs and fees incurred by the EDC associated with the Tariffs and set forth in the Program Manual, are premised upon Authority approval. If the Authority fails to authorize the EDCs cost recovery of these reasonable and prudently incurred costs and fees, the EDC may immediately terminate the Qualified System’s Tariff participation. 6. Dispute Resolution 6.1 The Parties shall agree to attempt to resolve all disputes promptly, equitably and in a good faith manner. If Parties are unable to informally resolve their dispute, the following formal three step dispute resolution process must be followed: 6.1.1 Negotiation: Upon receipt of written request for formal dispute resolution, the Parties shall negotiate in good faith for ten (10) Business Days in an attempt to resolve the disputed issues. The negotiation will take place between appropriate representatives of each Party. An appropriate representative is a vice-president or a member of senior management with sufficient authority to resolve the dispute.Page 47 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 47 of 65 6.1.2 Mediation: If the Parties have not resolved the dispute through negotiation, the Parties agree to attempt to resolve their dispute through non-binding mediation. The Parties shall agree to a mutually agreeable mediation process and mediator. Each party will select a mediator within five (5) Business Days of the end of the negotiation period and the two selected mediators will attempt to, within five (5) Business Days, select a third, mutually agreeable mediator. The Parties shall share the cost of mediation equally. Once the three mediators are selected and the mediation commences, the Parties agree to engage in mediation in good faith for a period of not less than 30 days. 6.1.3 PURA Dispute Resolution: If the Parties cannot resolve their dispute through mediation within 30 days, either Party may commence an action at PURA for resolution of the dispute. All timeframes in this process and the Dispute Resolution Process itself may be modified by mutual written agreement of the Parties. 7. Audits, Inspections and Public Records 7.1 As a public policy program, authorized for implementation by the Authority, all documents submitted to the EDC must be in compliance with all applicable statutes, municipal, state and federal regulations and laws, corresponding program requirements, standards, terms and conditions. Accordingly, the Authority, the Connecticut Department of Energy and Environmental Protection (DEEP), the Connecticut Green Bank (CGB) and the EDCs (collectively “the Tariff Program Entities”), or their respective authorized agents or representatives, may each audit the accuracy of all information submitted related to the Residential Renewable Energy Solutions program. Tariff Program Entities may request and obtain from any System Owner, Customer of Record, Installer, or Payment Beneficiary any information determined necessary to monitor compliance with and enforce any requirements related to the Residential Renewable Energy Solutions, any associated Authority Order, or the Program Statute. 7.2 Upon reasonable notice to a System Owner and/or a Customer of Record, any of the Tariff Program Entities may conduct audits, which may include inspection and copying of records and/or site visits to a Qualified Project’s facilities, including, but not limited to, all files and documents that the Tariff Program Entity determines are related to compliance with the Residential Renewable Energy Solutions program, any associated PURA Orders, or the Program Statute. 7.3 Other than Personally Identifiable Information and any other information explicitly protected by Connecticut or Federal law (“Protected Information”), all information submitted as part of the tariff application process may be treated as a public record which may be shared amongst the Tariff Program Entities or may be made public. By agreeing to take part in Residential Renewable Energy Solutions, all participants acknowledge and agree that the EDC cannot be held liable for any release of program related information other than Protected Information. 8. MiscellaneousPage 48 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 48 of 65 8.1 The rights and duties of the Parties hereunder shall be governed by and shall be construed, enforced and performed in accordance with the laws of the State of Connecticut, without regard to principles of conflicts of law. Parties waive the right to a trial by jury. Any dispute arising out of Residential Renewable Energy Solutions shall be governed by Article 6 of these Terms and Conditions. 8.2 Each Party agrees to indemnify, defend and hold harmless the other Party, and any of said other Party’s affiliates directors, officers, employees, agents and permitted assigns, from and against all third party claims, losses, injuries, liabilities, damages, judgments, awards, fines, penalties, costs and expenses (including reasonable attorneys’ fees and disbursements) (each, a “Claim”) incurred in connection with, or arising out of Residential Renewable Energy Solutions, except to the extent that such Claim may be attributable to the gross negligence or willful misconduct of the Party seeking to be indemnified. This indemnity shall survive the expiration or termination of the Residential Renewable Energy Solutions for the full statutory period allowable by applicable law. 8.3 No delay or omission by a Party in the exercise of any right under Residential Renewable Energy Solutions shall be taken, construed or considered as a waiver or relinquishment thereof, and any such right may be exercised from time to time and as often as may be deemed expedient. If any of the terms and conditions hereof are breached and thereafter waived by a Party, such waiver shall be limited to the particular breach so waived and is not deemed to waive any other breach hereunder. 8.4 If any article, section, phrase or portion of Residential Renewable Energy Solutions is, for any reason, held or adjudged to be invalid, illegal or unenforceable by any court of competent jurisdiction, such article, section, phrase, or portion so adjudged will be deemed separate, severable and independent and the remainder of Residential Renewable Energy Solutions shall remain in full force and effect and shall not be invalidated or rendered illegal or unenforceable or otherwise affected by such adjudication, provided that the basic purpose of Residential Renewable Energy Solutions and the benefits to the Parties are not substantially impaired.Page 49 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 49 of 65 XVI. Appendix F: Payment Beneficiary Forms (OPTIONAL) Payment Beneficiary Form Residential Renewable Energy Solutions Eversource/United Illuminating will make any Residential Renewable Energy Solutions payments to the Payment Beneficiary indicated below. This form must be completed as part of the initial Residential Renewable Energy Solutions application process. For the Buy-All Tariff, a Payment Beneficiary, other than a Customer of Record, can be designated to receive a percentage of the total tariff compensation. Any compensation not assigned to a third party will result in Monetary On-Bill Credits to the Customer of Record. The Netting Tariff Payment Beneficiary, which may be the Customer of Record or a third-party, can be designated to receive the Renewable Energy Certificate (REC) Incentive Payment and/or Adder paid out once every quarter. Type: Buy-All or Netting Is the Payment Beneficiary an Individual or a Corporate Entity? Payment Beneficiary First Name (or Corporate Entity Name) Individual or Corporate Entity Payment Beneficiary Last Name Payment Address Payment City/State/Zip Beneficiary Phone Beneficiary Email Has a W-9 Form for this Payment Beneficiary been provided previously? Percent of Buy-All Incentive to be provided as Payment to Payment Beneficiary (for Buy-All projects only) Name of System Owner Signature of System Owner Yes or No Name of Customer of Record Date Signature of Customer of Record DatePage 50 of 65
CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 50 of 65 Payment Beneficiary Revision Form Residential Renewable Energy Solutions Eversource/United Illuminating will make any required Residential Renewable Energy Solutions program payments to the Payment Beneficiary indicated below. For the Buy-All Tariff a Payment Beneficiary, other than the Customer of Record, can be designated to receive a percentage of the total tariff compensation and any compensation not assigned to a third party will result in Monetary On-Bill Credits to the Customer of Record. The Netting Tariff Payment Beneficiary, which may be the Customer of Record or a third-party, can be designated to receive the Renewable Energy Certificate (REC) Incentive Payment and/or Adder paid out once every quarter. System Owners may submit a revised System Payment Beneficiary Form no more than once per year. A fee of $22 will be collected for each Payment Beneficiary Form revision. Form revisions fees may be deducted from the Payment Beneficiary’s next incentive payment. Qualified Project Unique ID # Type 49 Buy-All or Netting 48F48F Is the Beneficiary an Individual or a Corporate Entity? Payment Beneficiary First Name (or Corporate Entity Name) Individual or Corporate Entity Payment Beneficiary Last Name Payment Address Payment City/State/Zip Beneficiary Phone Beneficiary Email Has a W-9 Form for this Payment Beneficiary been provided previously? Percent of Buy-All to be provided as Payment to Payment Beneficiary (for Buy-All projects only) Name of System Owner of Record Signature of System Owner of Record 49 Yes or No Name of Customer of Record Date Tariff Type selected on original Application cannot be changed. Signature of Customer of Record Date
Text of ES Order 2, RPS_Items 2-4.pdf
Extracted from the file · 1 page · 1,158 characters
Text of ES Order 2, NRES_Items 1-4.pdf
Extracted from the file · 51 pages · 132,948 characters
Text of ES Order 2, EV_Items 1-4.pdf
Extracted from the file · 118 pages · 178,717 characters
As listed on the current system
Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2