Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

3 pages match
  1. Page 6 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 6 of 65 II. Introduction This Program Manual for Residential Renewable Energy Solutions is intended to be used by System Owners and solar PV project installers (“Solar Installers”). The Program Manual describes the program application process, payment terms, tariff structures, customer eligibility and other key program elements. It has been developed in accordance with Docket No. 20-07-01 Interim Final Decision dated February 10, 2021, and Section 3 of Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection, as codified in §16-244z(b) of the Connecticut General Statutes. This Program Manual may be updated periodically to reflect current Tariff rates offered and other changes required. In the event that any element of this Program Manual is deemed contrary to any state law or ruling from the Public Utilities Regulatory Authority (“PURA” or the “Authority”), the applicable law or ruling shall take precedence, and the Electric Distribution Companies (“EDCs”) will revise this Program Manual accordingly. A. Program Overview and Background Connecticut has a robust and growing residential solar industry that has supported the installation of more than 45,000 solar photovoltaic installations over the past decade. Additionally, the state has established aggressive goals for reducing greenhouse gas emissions that cause climate change. Residential solar installations help electric utility customers lower their energy bills while also supporting local jobs and furthering the state’s clean energy goals. Connecticut’s EDCs, The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) and The United Illuminating Company (“UI”), support the development of customer-sited solar installations by offering an opportunity to sell the energy and renewable energy certificates (“RECs”) generated by Qualified Systems at a fixed, long-term price. Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection (the “Program Statute”), created this program with the intent of growing the state’s residential renewable energy market. B. Questions and Answers • https://www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections Residential Renewable Energy Solutions - UI Questions concerning this Program Manual should be emailed to [email removed] or [email removed]. The EDCs maintain a list of frequently asked questions on their below websites. System Owners and Solar Installers are encouraged to visit these websites prior to submitting a question. •
  2. Page 7 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 7 of 65 III. Key Definitions The following are key definitions used throughout this Program Manual. Application Portal The online system maintained by each EDC that is used to allow customers to apply to Residential Renewable Energy Solutions Application to Interconnect The document to be completed by the Customer of Record and sent to the EDC prior to any Interconnection. Approval to Operate/Approval to Interconnect Approval provided to an interconnecting system permitting the system to begin operations and export power to the grid. Buy-All Tariff or Buy-All Incentive Connecticut Green Bank (“CGB”) Customer of Record Direct Payment Economically Distressed Municipality Electric Distribution Company (“EDC”) Eligible Customer of Record Eligible Property Income Eligible Customer of Record Installer or System Installer One of two residential solar incentive structures offered by the EDCs. Under the Buy-All Tariff, customers interconnect their Qualified Project directly to the EDC's grid and export power without first supplying power to electric load at a project site. Established by the Connecticut General Assembly in July 2011, the Connecticut Green Bank is a state agency that supports the Governor’s and Legislature’s energy strategy to achieve cleaner, less expensive, and more reliable sources of energy while creating jobs and supporting local economic development. A customer associated with an EDC account. The Customer of Record’s name appears on an EDC bill. A payment made by an EDC to a Residential Renewable Energy Solutions Payment Beneficiary or Tariff Payment Beneficiary, not a payment on Customer bill. Per C.G.S. Section 32-9p, a distressed municipality is a community that has high unemployment and poverty, aging housing stock and low or declining rates of growth in job creation, population, and per capita income. The Connecticut Department of Economic and Community Development utilized those criteria to create a list of towns categorized as distressed. The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) or The United Illuminating Company (“UI”). A Customer of Record who has submitted an Application to Interconnect and Renewable Energy Solutions Application after January 1, 2022. If a solar project has already received or been approved for an incentive under the Connecticut Green Bank’s Residential Solar Incentive Program, the solar project is NOT eligible to participate in the Program for the same solar PV project. A one-to-four family residential property taking electric service by an EDC. EDC customers that have verified incomes at or below 60% of State Median Income (SMI). As used in this Program Manual, this term shall have the same meaning as “Low Income Customer” as used in relevant Authority Decisions. The licensed contractor responsible for installing the Qualified System on behalf of the System Owner and Customer of Record. The Installer applies for Residential Renewable Energy Solutions on behalf of the System Owner and
  3. Page 8 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 8 of 65 Inverter Nameplate Capacity Monetary On-Bill Credit Cash-Out Payment Monetary On-Bill Credits Customer of Record. May also be referred to as “authorized agent”, “contractor”, or “developer” The maximum amount of electric energy, in kilowatts, that a generator can produce under specific conditions, as rated by the manufacturer. A payment made by an EDC to a Renewable Energy Solutions payee. Cashout payments are made for accumulated bill credits are available to Buy-All incentive Customers of Record annually. Netting incentive Cash-Out Payments are only made when a Customer of Record closes their account with an EDC. Credits appearing on a Customer of Record’s bill denominated in US dollars. A three-tier methodology is used for determining when multi-family housing is “affordable housing,” and, therefore, is considered a residential customer pursuant to Conn. Gen. Stat. § 16-244z(b)(2): 1 0F0F Tier I: Multi-family properties with 5 or more units that participate in the Low-Income Housing Tax Credit Program (“LIHTC”) or that contain a majority of households earning 80% or less of Area Median Income (“AMI”) as set by the U.S. Department of Housing and Urban Development (“HUD”) Multi-family Affordable Housing Tier II: Multi-family properties with 5 or more units where more than 66% of the residents have a household income at or below 60% of State Median Income (“SMI”) Naturally Occurring Affordable Housing (“NOAH”): 2 Multi-family properties with 5 or more units located in a HUD Qualified Census Tract (“QCT”). 3, NOAH are considered Tier II. 4 1F1F 2F2F 3F3F Tier III: Multi-family properties with 5 or more units that apply for review by the Agencies, 5 are determined to meet the eligibility requirements of an affordable multi-family dwelling by the Agencies, and are approved as an affordable housing facility by PURA 4F4F Net Excess Generation Netting Tariff or Netting Incentive 1 The total electricity measured in kWh exported to the grid by a Qualified System in real time over a month as registered on the Point of Interconnection “POI” Meter minus any energy consumed (including parasitic load of the PV system equipment) in real time over a month as registered at the POI meter. Calculation of Net Excess Generation in this manner is sometimes referred to as Monthly Netting. A type of incentive under which both renewable energy excess production and a residential customer’s electricity consumption are metered together, using a bi-directional meter. All renewable energy production consumed within the PURA Final Decision in Docket 21-08-02 dated June 8, 2022 3 Census tracts where more than 50% of households have incomes below 60% of the Area Median Gross Income (AMGI) or where the poverty rate is 25 percent or more. 4 PURA Final Decision in Docket 22-08-02 dated November 2, 2022 5 The “Agencies” consist of the CT Department of Energy and Environmental Protection (DEEP), CT Green Bank, CT Department of Housing (DOH) and CT Housing Finance Authority, co-led by DEEP and DOH
  4. Page 9 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 9 of 65 Netting Tariff Export Rate New Construction Project Ombudsperson Parties Payment Beneficiary Payment Beneficiary Form Payment Portal (Eversource only) Production Meter Program Statute Public Utility Regulatory Authority (“PURA” or the “Authority”) Qualified Project REC Incentive Rates established netting interval is financially netted against the appropriate rate components under a customer’s applicable tariff. All renewable energy production not consumed within the established netting interval is compensated at an established rate. Netting systems may also qualify for payments for RECs produced as measured at the Qualified System’s Production Meter. The Export Rate is the monetary value given to monthly Net Excess Generation for Netting Tariff systems. This is the currently applicable Retail Rate inclusive of Standard Service energy supply charges. One-to-four unit residential structure that is built entirely new and/or goes through significant extensions to existing structures whether or not the site was previously occupied. An independent consultant directed by PURA to efficiently resolve disputes with the EDCs Those who are undertaking and agreeing to the requirements of this Program Manual and its Terms and Conditions, includes the Customer of Record, System Owner, System Installer, Renewable Energy Solutions Payment Beneficiary and the EDC. An individual or entity designated by a System Owner to receive tariff-related Direct Payments. For the Netting Tariff, the Payment Beneficiary may, but is not required to be, the System Owner or the Customer of Record. For the BuyAll Tariff, the Payment Beneficiary, cannot be the Customer of Record, but may be the System Owner or another individual or entity. A form submitted to an EDC when applying to Residential Renewable Energy Solutions that designates the Payment Beneficiaries. The online system Eversource Payment Beneficiaries use to register for Direct Payments and to update payment information. A Revenue Grade meter that allows the EDCs to track total electricity production from a project. For Buy-All systems, the Production Meter is the meter at the project’s point of interconnection. For Netting systems, the Production Meter is behind the customer’s revenue/net meter and solely measures the production of the Qualified Project. Connecticut Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection The Connecticut authority charged with overseeing the EDC’s implementation of the Program Statute and regulating the EDCs. A residential renewable energy project that meets all the requirements of the Program Statute, the Authority’s applicable decision and rulings, the program tariffs, this Program Manual and the program Terms and Conditions. Qualified Projects must have a nameplate capacity of 25 kW or less and the technologies must be eligible for the Connecticut Class I renewable portfolio standard as defined in §16-1(a)(20) of the General Statutes of Connecticut. The per kWh rate provided to Netting Tariff projects for production registered on a Qualified Project’s Production Meter. REC Incentive Rates are determined by the Authority. The Authority may determine through a
  5. Page 10 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 10 of 65 Renewable Energy Certificates (“RECs”) Residential Renewable Energy Tariff Program Residential Renewable Energy Solutions Application Residential Renewable Energy Solutions Application Submission Date Eversource: Solar Energy Adjustment UI: Solar Production Charge (SPC) Standard Service Statement of Qualification System Owner Tariff Term Start Date Tariff Program Entities Total Buy-All Incentive Payment Rate regulatory proceeding that REC Incentive Rates are not available to systems submitting Tariff Applications during certain program years. A market-based instrument that represents the property rights to the environmental, social and other non-power attributes of renewable electricity generation. RECs are issued when one megawatt-hour (MWh) of electricity is generated and delivered to the electricity grid from a renewable energy resource. Residential Renewable Energy Tariff Program is the formal program name used within the regulatory environment. This program, which is branded publicly as “Residential Renewable Energy Solutions,” is operated by each EDC supporting the implementation of the Buy-All and Netting Tariffs authorized by the Program Statute. Residential Renewable Energy Tariff and Residential Renewable Energy Solutions are synonymous. The document to be completed by the Customer and System Owner and sent to the EDC requesting qualification under the EDCs Residential Renewable Energy Solutions. By signing the Application, the Customer of Record and System Owner acknowledge acceptance of all terms and conditions of the Residential Renewable Energy Solution program and this Program Manual. The Application Document may be generated by the EDC’s respective Application Portal. The date on which a completed Application, including all applicable fees, are received by the EDC. The non-bypassable per kWh rate charged to Netting Tariff projects for electricity production registered on a Qualified Project’s Production Meter, appearing as a line item on the customer’s bill. Solar Energy Adjustment / Solar Production Charge rates are determined by the Authority annually, and the Authority may determine through a regulatory proceeding that a Solar Energy Adjustment / Solar Production Charge will not be assessed to systems submitting Tariff Applications during certain program years. The energy supply rates authorized under §16-244c(c) of the Connecticut General Statutes offered to customers not receiving competitive energy supply. A document provided to a System Owner by the EDC detailing the Residential Renewable Energy Solutions and tariff terms applicable to a Qualified System. Any person or entity that, alone or in conjunction with others, has legal ownership of a Qualified Project. The System Owner may, but is not required to be, the Customer of Record. The first date on which a Qualified System may generate tariff-eligible electricity. The Tariff Term Start Date is the date the EDC issues Approval to Operate/Approval to Interconnect. The Public Utility Regulatory Authority (PURA), the Connecticut Department of Energy and Environmental Protection (DEEP), the Connecticut Green Bank (CGB) and the EDCs (collectively “the Tariff Program Entities”) The incentive rate, in $/kWh, designated by the Authority for Buy-All Qualified Systems.
  6. Page 11 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 11 of 65 IV. C. Incentive Description, Timing and Values Description of Incentives Eligible customers with Qualified Projects receive a 20-year payment commitment from the EDCs starting from the system’s Approval to Operate/Approval to Interconnect 6 date. After the 20-year term, customers may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. Different incentive values are provided for the Buy-All or Netting incentive structures. These incentive structures are described in more detail below. By participating in either Buy-All or Netting option, the System Owner agrees that the Company takes title to all energy delivered to the distribution system by the Customer, all available Capacity Rights, and ownership to all RECs and Environmental Attributes produced by their Qualified Project. . 7 The incentive structure will be selected at the time of Application submission and cannot be modified once selected, either before or after the system receives Approval to Operate/Approval to Interconnect from the utility. Residential Renewable Energy Solutions will provide Payment Beneficiaries who have received Direct Payments of $2,000 or more in a calendar year with an IRS Form 1099-MISC tax form on an annual basis as required. The EDCs do not provide tax advice and are not in a position to determine whether such payments constitute taxable income. 5F5F 6F6F Buy-All Incentive Under this structure, the EDC purchases all the energy and RECs generated by the Qualified Project. The Qualified Project exports all its energy to the EDC’s electric grid and all Net Excess Generation 8 will be compensated at the Total Incentive Payment Rate. The Total Incentive Payment Rates are established by PURA through a rate setting regulatory process and will be identified in the Statement of Qualification issued to the project. The Total Incentive Payment Rate, once established for a project, will be fixed for the life of the 20-year project. The System Owner may determine how the Total Incentive Payment will be divided between two compensation options: 7F7F i) ii) a Monetary On-Bill Credit that will be applied to the Customer of Record’s EDC billing account for the Project Site to offset their electric bill, and/or a Direct Payment provided to a Payment Beneficiary. The Payment Beneficiary cannot be the Customer of Record but may be the System Owner or another individual or entity. At application, the System Owner will designate the percentage of the system’s Total Incentive Payment that will be provided as Monetary On-Bill Credits to the Customer of Record and the percentage of total incentive that will be provided as Direct Payments to the designated beneficiary. Once a project has received a Statement of Qualification, the Total Incentive Payment Rate will not change for the 20-year Tariff term. The Tariff Payment Beneficiary is specified on the application form. For UI projects, the W-9 and additional payment forms will also be required as part of the application and may include Vendor Set-up Form, Business Classification Form, ACH or Each EDC uses separate terms for the date at which the EDC has approved an interconnecting project’s permission to begin operations and exporting power to the grid. UI refers to this date as the Approval to Operate date while Eversource refers to this date as the Approval to Interconnect date. 7 The Tariff Terms and Conditions provide more information on the EDCs rights related to RECs and other environmental attributes associated with Systems participating in the Tariff. 8 Buy-All systems may have limited electricity consumption associated with the parasitic load of the PV system equipment. The EDCs will net this limited energy consumption against the Qualified System’s total generation monthly. 6
  7. Page 12 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 12 of 65 Wire Authorization Form and either a Voided Check or Banking Information on Company Letterhead. For Eversource projects requiring a W-9, the W-9 should not be uploaded during application and will be requested via e-signature following Permission to Operate. In the event the Customer of Record accrues a balance of Monetary On-Bill Credits on their account, the Customer of Record may elect to receive a Monetary On-Bill Credit Cash Out Payment. Customers can request a Monetary On-Bill Credit Cash Out Payment no more than once annually. The first day a Customer of Record will be eligible to receive a Monetary On-Bill Credit Cash Out Payment is the one-year anniversary of the Approval to Operate/Approval to Interconnect date. Customers can request a Monetary On-Bill Credit Cash Out Payment by contacting [email removed] or [email removed]. Netting Incentive Under this incentive or tariff type, the EDC purchases all RECs generated by a Qualified Project at the REC Incentive Rate 9 and/or assesses a Solar Energy Adjustment / Solar Production charge on production as measured by the system’s Production Meter at the Solar Energy Adjustment / Solar Production rate. REC Incentive Rates and Solar Energy Adjustment / Solar Production rates are established by PURA through an annual rate setting process and will be noted in the Statement of Qualification issued to the project. REC Incentive Rates and Solar Energy Adjustment / Solar Production rates may be greater than zero but may also be set by PURA at $0 per kWh. 10 Once a project has received a Statement of Qualification designating a particular REC Incentive Rate and/or Solar Energy Adjustment / Solar Production rate, those rates will not change for the 20-year Tariff term. REC Payments are made as quarterly Direct Payments. For the Netting incentive structure, REC payments will be issued to a Tariff Payment Beneficiary, who may be either the Customer of Record or third party. When a Tariff Payment Beneficiary is designated to receive Direct Payments, the Tariff Payment Beneficiary fields must be completed at the time of application. For UI projects, a W-9 and a Vendor Creation Form is required and must be completed. For Eversource projects requiring a W-9, the W-9 should not be uploaded during application and will be requested via e-signature following Permission to Operate. 8F8F 9F9F In addition to REC Incentives, the EDCs also provide Monetary On-Bill Credits on a Customer of Record’s electric bill for any energy exported to the electric grid and not consumed on-site (“Net Excess Generation”). The Netting Tariff Export Rate is defined as the Customer of Record’s currently applicable Retail Rate inclusive of Standard Service energy supply charges. In the event a customer’s Retail Rate changes or the structure of the Retail Rate changes, the customer will receive Monetary On-Bill Credits based on the customer’s new Retail Rate. Monetary On-Bill Credits are calculated based on a customer’s monthly Net Excess Generation. Excess Monetary On-Bill Credits appearing on a customer’s bill will carry forward from month to month and can be used to offset customer, supply, and delivery charges. Customers may receive an On-Bill Credit Cash Out payment for any accrued Monetary Bill Credits at the time they close their EDC account. Incentive Adders Effective January 1, 2026, Qualified Projects serving Customers of Record who have incomes 60% or below of State Median Income are eligible to receive an additional $0.035 per net kWh for Netting projects and $0.055 per kWh for Buy-All projects, as registered on the system Production Meter. Eligibility requirements for incentive Appendix C provides illustrative examples of metering configurations available under the EDC’s respective solar tariffs. In future regulatory proceedings, PURA may establish negative REC Incentive Rates for projects installed after 2022. This Program Manual will be updated to include negative REC Incentive Rates should PURA establish such a mechanism. 9 10
  8. Page 13 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 13 of 65 adders are found in Section IV E of this document. Projects located in Economically Distressed Municipalities 11 are eligible to receive an additional incentive of $0.0175 per net kWh for Netting Projects and $0.0275 per kWh for Buy-All projects, as registered on the system Production Meter. Qualified Systems are only eligible for one adder and cannot receive both adders. Adders should be applied for within the Application process and cannot be added or removed once the project has received Permission to Operate/Approval to Energize if a customer’s income status changes. In cases where the adder was not applied for and the Customer of Record is the Payment Beneficiary, if the EDCs confirm that the Customer of Record is eligible for either adder (by enrollment in a utility hardship program, participation in Home Energy Solutions Income Eligible, or the project is located in an Economically Distressed Municipality), the EDCs will automatically apply the relevant adder to the project, designating the Customer of Record as the Tariff Payment Beneficiary/Adder recipient. If a customer is Income Eligible and also located in an Economically Distressed Municipality, the higher of the two adders will be applied. Adders are applied to net generation at the Production Meter for both the Buy-All Tariff and Netting Tariff and dispersed as a Direct Payment included with the REC incentive (when there is a $0 REC incentive for the project year, the Adders will only be provided as a Direct Payment). For UI projects, a W-9 and Vendor Creation Form are required for residential customers to receive Adder incentives. For Eversource projects requiring a W-9, the W-9 should not be uploaded during the application and will be requested via e-signature following Permission to Operate. 10F10F D. Incentive Payment, Bill Credits and Cash-Out Timing The following sections provide an overview of the timing of incentive payments for each tariff structure. Buy-All The following table provides information on the frequency and type of incentives available under the Buy-All Tariff. The Total Incentive Payment rate is applied to Net Excess Generation registered at the Production Meter. Incentive payments can be split between Monetary On-Bill Credits applied to Customer of Record’s main onpremise billing account and Direct Payments to the Payment Beneficiary. Cash-out payments are made for accumulated bill credits and are available to Buy-All incentive Customers of Record annually upon request. 11 Economically Distressed Municipalities are defined as the most recent list developed by the Connecticut Department of Economic and Community Development, see https://portal.ct.gov/DECD/Content/About_DECD/Research-andPublications/02_Review_Publications/Distressed-Municipalities.
  9. Page 14 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 14 of 65 Incentive Type Direct Payment Monetary On-Bill Credits Monetary On-Bill Credit Cash Out Payment Netting Type of Incentive Cash payment Dollar denominated bill credits Cash payment Entity or Individual Receiving Incentive Payment Beneficiary as designated by Customer/System Owner. May not be Customer of Record but may be the System Owner or another individual or entity Percentage of Incentive X% Minimum amount to issue a Direct Payment is $5.00. Payment increments of less than $5.00 for any given Quarter will be rolled into the next Quarter. Customer of Record X% to 100% Monthly on the customer’s electric bill for the premises Customer of Record N/A Frequency of Incentive Once every quarter. Not more than annually The following table provides information on the frequency and type of incentives and/or bill adjustments available under the Netting Tariff. Monetary On-Bill Credits, which are valued at the customer’s retail rate, are applied to Net Excess Generation registered at the retail meter. In addition, the REC incentive payment rate and/or Solar Energy Adjustment / Solar Production charge is applied to solar production registered at the Production Meter.
  10. Page 15 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 15 of 65 REC incentive payments, including adders, are issued to the Tariff Payment Beneficiary. Netting incentive CashOut Payments are only made when a Customer of Record closes their account with an EDC. 12 11F11F Incentive Type Type of Incentive Entity or Individual Receiving Incentive Percentage of Incentive REC Incentive Payment Cash payment Tariff Payment Beneficiary as designated by the Customer/System Owner. Beneficiary may be Customer of Record, System Owner or a third party. Monetary On-Bill Credits Dollar denominated bill credits Customer of Record 100% Customer of Record N/A Customer of Record N/A Monetary On-Bill Credit Cash Out Cash payment Payment Solar Energy Dollar denominated Adjustment / Solar bill charge Production Charge E. 100% Frequency of Incentive Once every quarter. Minimum amount to issue a Direct Payment is $5.00. Payment increments of less than $5.00 for any given Quarter will be rolled into the next Quarter. Monthly on the customer’s electric bill for the premises Once when a Customer of Record closes an account Monthly on the customer’s electric bill for the premise How Incentive Values are Determined Incentive values for projects applying to the Tariff are determined through a process by PURA that evaluates whether the program is achieving its objectives. Incentive rates are established annually using an incentive rate setting model that is intended to provide System Owners with a target 9-11% rate of return on their project and a total annual deployment of at least 50 to 60 MW to the grid. The rates established each year are applicable for projects that submit a completed Application to both Residential Renewable Energy Solutions and to interconnect that same year. For example, all projects submitting a completed application in 2023 will receive the incentive rates established by PURA for 2023. Applications are considered complete for rate assignment purposes once all required fields and documents have been submitted and the application fee has been paid. Once an incentive rate is established for an individual project, the incentive rate will not change over the 20-year incentive term. After the incentive term reaches expiration customers may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. The EDC is not under any obligation to purchase RECs after the tariff term from the Projects. More information about the incentive rate setting process is available on the PURA website 13 under Docket 21-08-02 and 22-08-02. 12F12F 12 13 For UI, a cash-out must be specifically requested by the Customer of Record when they close the account. http://www.dpuc.state.ct.us/dockcurr.nsf/(Web+Main+View/All+Dockets)?OpenView&StartKey=21-08-02

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)