2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

3 pages match
  1. Page 35 of 65Match

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 35 of 65 IX. Consumer Protection and Customer Disclosures Each Tariff Application must include a completed Customer Disclosure Form signed by all applicable parties. Customer Disclosure Forms shall be presented to and signed by the customer prior to entering a contract for solar. Copies of these forms are available on the EDC’s websites below: • • https://www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections Residential Renewable Energy Solutions - UI Two types of Customer Disclosure Forms are available. The Third-Party Ownership Customer Disclosure Form should be used in instances where the System Owner is not the Customer of Record. The Direct Ownership Customer Disclosure Form should be used when a Customer of Record is also the System Owner. Note cost information on the Customer Disclosure, and any other RRES forms, should only include the qualified project and battery (if applicable) costs. Additional costs, such as roof repairs or electrical upgrades, should not be included, even if they are within the same customer contract. Applicants are required to file annual Compliance Documents with PURA in the annual Program review docket for contractor education and enforcement. The Compliance Documents required are (1) all marketing materials, (2) training materials regarding sales and communications with potential customers, and (3) Financial Benefits Compliance. The first annual filing is due June 1, 2024, with subsequent filings due by April 1 annually. The Financial Benefits Compliance must include the following information for all projects deployed in the previous calendar year: 1. All customer disclosure forms 2. An unlocked Excel file summarizing key information from the customer disclosure forms, as well as other information provided to customers, such as contracts and promotional materials, for each project as detailed below (Financial Benefits Summary Sheet) 3. A narrative explanation of any calculation methodologies included in the Financial Benefits Summary Sheet (Sheet Narrative) 4. A single customer-facing point of contact that EOE can connect with regarding questions or issues received by EOE’s customer affairs unit The Financial Benefits Summary Sheet shall include one row each for every project deployed by the developer under the RRES program in the previous calendar year. For each project, the following information shall be provided (i.e., each of the following should be a column in the Financial Benefits Summary Sheet): (1) site address; (2) utility account number associated with the project; (3) annual contract rate increase amount; (4) estimated year one production (kWh) as a percentage of estimated annual utility customer usage (kWh); (5) estimated year one customer net savings; (6) starting utility rate used to estimate net year one savings; (7) estimated net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated form the customer disclosure data; and (8) utility rate used to estimate net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data. The Sheet Narrative may be a simple summary document (e.g., as brief as a couple of pages) outlining the methodology used to calculate the above required information to be included in the Financial Benefits Summary
  2. Page 36 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 36 of 65 Sheet, as applicable, along with a general list of the documents needed for such calculations (e.g., a customer’s electric bill and sales contract are needed to verify the methodology for the fourth requirement, etc.). Developers should retain all documents listed in the Sheet Narrative at least through the end of the calendar year following the deployment of the system (i.e., for systems deployed in 2023, relevant documents should be maintained until December 31, 2024), as they may be requested by the Authority or EOE in reviewing such annual filings. Each contractor’s annual financial benefit tracking filing may contain sensitive customer information not suitable for public disclosure. All confidential material must be provided in accordance with the instructions outlined in the annual docket’s Notice of Proceeding. Currently, such instructions require the materials to be emailed to the Authority’s Executive Secretary, [email removed], contemporaneously with the motion. The email’s subject line shall state in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” Contractors may file a Motion for Protective Order requesting that portions of their annual filing be protected. The Motion and accompanying affidavit shall be filed publicly along with the redacted version of the submission. Each contractor may file one Motion for Protective Order for their entire annual filing. Any Compliance Documents may be audited by EOE, and EOE can request additional documentation or evidence as needed to verify a contractor’s Financial Benefits Compliance calculations. Additionally, EOE annually audits a percentage of the Compliance Documents for each developer through the annual Program review docket for contractor education and enforcement. Any false or misleading information provided in in the Compliance Documents could result in enforcement action by PURA up to and including termination of eligibility, removal from Residential Renewable Energy Solutions or other consequences within PURA’s discretion. The Guideline on Connecticut Residential Solar Tariff Consumer Protection provides specific information on the consumer protection enforcement process overseen by the PURA Office of Education, Outreach, and Enforcement (EOE) under Residential Renewable Energy Solutions.
  3. Page 37 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 37 of 65 X. Ombudsperson Matters involving program disputes should be emailed to [email removed] using the subject line format: RRES – [Stakeholder name] – [Short description of the issue]. If the dispute can be handled by the Ombudsperson, the Ombudsperson will work to address a request or resolve the issue at hand. This may, as appropriate, include additional requests for clarification and documentation via email, phone call, shared screen meeting, etc. If the Ombudsperson determines that the request or dispute should not or cannot be resolved by them, the Ombudsperson will direct the stakeholder to first bring the issue to the relevant EDC, or in other cases, work with the stakeholder to submit a filing to PURA requesting a ruling.
  4. Page 38 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 38 of 65 XI. Appendix A Program Required Documents Checklist The following documents are required to submit an application to Residential Renewable Energy Solutions. Required Documents on all Applications or Applications with Adders Document Proof of 1-4 Family Property Proof of Alternate Assessment (if HES or HES-IE not completed or scheduled) Signed Customer Disclosure Form Income Eligible Adder Eligibility Documentation Qualifying Documents • HES/HES-IE assessment previously completed, no document required. • Copy of property assessors’ card for projects not qualifying for the HES/HES-IE assessment. • Screen clip of real estate webpage (i.e. Zillow or Realtor.com) showing property type and must show the year the property was built. • Department of Energy Home Energy Score Report • Weatherization Assistance Program proof (e-mail from State Agency or other documentation confirming date of completed assessment) • Copy of property assessors’ card for home built on/after January 1, 1980 • Direct Ownership Disclosure Form, or • Third-party Ownership Disclosure Form Customers who have completed a HES-IE assessment within the past three years or who currently participate in EDC Hardship programs require no additional documentation. Customers of Record seeking to qualify via other means (see list in Section IV E) should reach out to Eversource or UI directly: • Eversource Hardship Program Enrollment [phone removed] https://www.eversource.com/content/ct-c/residential/my-account/billingpayments/help-pay-my-bill • UI: [phone removed] or Contact Us - UI (uinet.com) Required Documents When a Tariff Payment Beneficiary is Designated to Receive Direct Payments Available at: https://www.irs.gov/pub/irs-pdf/fw9.pdf Signed W-9 for Tariff Payment Beneficiary Note: Eversource projects submit this to Payment Portal, not PowerClerk.
  5. Page 39 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 39 of 65 UI Only – Forms to Establish Payee Information 46 • Vendor Creation Form 45F45F 46 UI Payment Forms are required when a Tariff Payment Beneficiary is designated in order to establish direct payments.
  6. Page 40 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 40 of 65 XII. Appendix B: Sample Statements of Qualification Residential Renewable Energy Solutions Buy-All Tariff Statement of Qualifications This Statement of Qualification, provided by the Eversource Energy/United Illuminating, signifies that the renewable energy project identified below meets the requirements for eligibility as a Qualified Project under Residential Renewable Energy Solutions. Qualified Project Unique ID#: Date of Statement of Qualification Issuance System Capacity: System Location: System Owner and Address: The project’s qualification as a tariff-eligible generator will be in effect for 20 years, starting upon the project’s EDC Approval to Operate/Approval to Interconnect. This Statement of Qualification may expire in the event the Qualified Project is not interconnected within 12 months of issuance of this Statement of Qualification. The Qualified Project has been approved for the following tariff compensation rates. Tariff Type Base Buy-All Rate 47 Income-Eligible Customer Adder Economically Distressed Municipality Adder Total Buy-All Rate Percent to Customer* Percent to Tariff Payment Beneficiary* Buy-All 46F46F *The Percentage of the Total Buy-All Rate payable to the Customer will be delivered on the Customer’s bill as a dollar denominated credit. **The Percentage of the Total Buy-All Rate payable to the Customer Tariff Payment Beneficiary will be delivered to the Tariff Payment Beneficiary 47 The Base Buy-All Tariff Rate noted is an illustrative example.
  7. Page 41 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 41 of 65 Residential Renewable Energy Solutions Netting Tariff Statement of Qualifications This Statement of Qualification, provided by the Eversource Energy/United Illuminating, signifies that the renewable energy project identified below meets the requirements for eligibility as a Qualified Project under Residential Renewable Energy Solutions. Qualified Project Unique ID#: Date of Statement of Qualification Issuance: System Capacity: System Location: System Owner and Address: The project’s qualification as a tariff-eligible generator will be in effect for 20 years, starting upon the project’s EDC Approval to Operate/Approval to Interconnect. This Statement of Qualification may expire in the event the Qualified Project is not interconnected within 12 months of issuance of this Statement of Qualification. The Qualified Project has been approved for the following tariff compensation rates. Tariff Type Netting Tariff Export Rate* REC Incentive Rate 48** Income-Eligible Adder ** Economically Distressed Municipality Adder ** Solar Energy Adjustment Rate / Solar Production Charge*** Netting Tariff Rate Currently Applicable Retail Rate 47F47F *The Netting Export Rate is the Customer’s current retail rate at the time of application approval, though the retail rate and therefore Netting Export Rate will vary periodically according to rate changes. Production from the solar system will be netted with the customer’s consumption and excess production is compensated at this rate on the customer’s bill. Credits for excess production cannot be cashed out until the customer closes their electric account. **If applicable, the REC Incentive Rate, Income-Eligible Adder or Economically Distressed Municipality Adder will be paid as quarterly Direct Payments to the Payment Beneficiary. ***If a value greater than zero is assessed, the Solar Energy Adjustment / Solar Production Charge will appear as a line item on customers’ bills. 48 The REC Incentive rate used is an illustrative example.
  8. Page 42 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 42 of 65 XIII. Appendix C. Metering Diagrams For metering diagrams and guidance visit: • Eversource: www.eversource.com/content/ct-c/about/about-us/doing-business-with-us/builderscontractors/interconnections/renewable-energy-solutions-interconnections • UI: RRES Meter Diagrams Netting/Buy-All
  9. Page 43 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 43 of 65 XIV. Appendix D. Meter Costs Eversource Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Bridge Form 12S Bridge $183.00 $234.00 UI Meter Types and Fees: Voltage / Meter Type Main Service Meter Form Meter Fee 120/240V Single Phase 120/208V Single Phase (Network) Under 400A Under 400A Form 2S Form 25S $348.00 $348.00
  10. Page 44 of 65

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance RRES_Items 1-4 Page 44 of 65 XV. Appendix E: Residential Renewable Energy Solutions Terms and Conditions RESIDENTIAL RENEWABLE ENERGY SOLUTIONS TERMS AND CONDITIONS 1. Definitions 1.1 As used throughout these Terms and Conditions, the capitalized terms shall have the definitions set forth in the Residential Renewable Energy Solutions Program Manual. 2. Tariff Qualification, Tariff Structure Payment Rates, Payment Timing and Tariff Term 2.1 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Buy-All Tariff for energy and RECs produced by a Qualifying Project consistent with the tariff structure, rates and practices described in the Residential Renewable Energy Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.2 The EDC shall compensate System Owners, Customers of Record and/or Tariff Payment Beneficiaries participating in the Netting Tariff for energy and RECs produced by a Qualifying System consistent with the tariff structure, rates and practices described in the Residential Renewable Solutions Program Manual in effect on the date the Qualified System’s tariff application was deemed complete by the EDC. 2.3 The Total Tariff Rate for a Qualified Project shall be the compensation rate listed on the Statement of Qualification issued by the EDC. 2.4 The Tariff Term shall commence as of the date Authorization to Interconnect is issued by the EDC and shall remain in effect for twenty (20) years. 2.5 System Owners, Customers of Record and/or Tariff Payment Beneficiaries enrolled in the Buy-All Tariff or Netting Tariff whose term has expired may be eligible to be compensated for energy exported to the distribution system through the company’s purchase power tariff, if available. The EDC is not under any obligation to purchase RECs after the tariff term from the Projects. 2.6 At the time of Application, the Customer of Record must acknowledge review of the Renewable Energy Solutions customer information webpage on its respective EDC’s website, which contains information about historic electric rates and system costs.

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

Text of ES Order 2, EV_Items 1-4.pdf

Extracted from the file · 118 pages · 178,717 characters

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2