Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

1 page match
  1. Page 81 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 81 of 118 2026 Participant Guide for Commercial Customers and Vendors Page | 81
  2. Page 82 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 82 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators 2026 Participant Guide for Light-Duty Fleet Owners and Operators Revision: May 18, 2026 Page | 82
  3. Page 83 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 83 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Table of Contents 2026 Participant Guide for Light-Duty Fleet Owners and Operators ...................... 82 Section 1: Background ............................................................................................... 84 Section 2: Definitions and Key Terms ........................................................................ 85 Section 3: Program Overview and Customer Eligibility .............................................. 89 Section 4: Rebates and Incentives............................................................................. 92 Section 5: Eligibility and Enrollment ........................................................................... 94 Section 6: Fleet Planning Tools ................................................................................. 96 Section 7: Fleet Advisory Services and Fleet Assessment ........................................ 97 Section 8: Participation in Managed Charging ........................................................... 98 Section 9: Program Support ..................................................................................... 103 Appendix A: Eversource Terms and Conditions....................................................... 104 Appendix B: UI Terms and Conditions ..................................................................... 107 Page | 83
  4. Page 84 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 84 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 1: Background Welcome to the Connecticut Electric Vehicle (EV) Charging Program Modern technology like EVs raises questions and Eversource and Avangrid subsidiary United Illuminating, your “Utilities,” know informed consumers drive great partnerships. In this Program Guide (Guide), the Utilities explain the new Connecticut Light-Duty EV Fleet Managed Charging Program (Light-Duty Fleet Program or Program) and help you understand just how easy it can be to create or update your light-duty fleet with EVs, how you will save money through EV charging programs, pay less for your usage during designated charging times, get faster charging options to streamline your business, and understand how smart choices can protect the future of our environment. EVs produce less lifetime pollution than gaspowered vehicles, and, as sources of electricity become cleaner, these emissions will continue to decline. The Program offers eligible commercial and industrial fleet owners the opportunity to earn rebates and incentives to install EV chargers and charge their EV fleets smarter, avoid costly peak time energy use, and help the Utilities manage the additional electricity demand from EVs now and into the future. Charging EVs at your business can offer many benefits, from convenience to cost savings and vehicle emission reductions. So, how does it work? This Guide will provide all the information you need to participate successfully and receive the Program incentives that are applicable to you. This includes eligibility criteria, the Fleet Assessment and enrollment process, project planning, and postenrollment requirements. We’ll revise this Guide as the Program and/or the application process evolves. Fleet owners may engage with the Program at various stages of fleet electrification, from initial planning and vehicle screening to infrastructure deployment and ongoing managed charging participation. Eversource currently provides a formal Fleet Assessment Tool, and UI offers other planning support and is working toward launching a similar assessment offering by the end of 2026. We will post revised versions of this Guide on our websites, so check those sites frequently as you plan your fleet. Overall, interested customers should read this Guide and direct any follow up questions to the relevant Program team mentioned in Section 8. Page | 84
  5. Page 85 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 85 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 2: Definitions and Key Terms The definitions in this section will help existing and prospective light-duty fleet owners/operators to understand some of the terms used throughout this Guide. When we refer to customers participating in the Program, we’ll call them participants. Demand Response This term refers to actions taken by the Utilities during times when there is more demand on the electric system. This system strain typically occurs on the hottest days of the summer but can also happen any time of the year, such as in emergency situations or when electricity supply is limited. By initiating Demand Response Events (DR Events), the Utilities act with their customers and through their technology partners to reduce electric usage for short periods of time. When customers respond to a DR Event, it helps maintain a stable electric system. In most cases advanced notification up to 24 hours can be provided. Demand Response Management System (DRMS) The platform each Utility uses to coordinate all demand response activities and the system that the fleet’s technology will integrate with (if possible). Demand Response Season The Demand Response Season is the season in which DR Events may be called. This season runs from June 1st through September 30th. Direct Load Control The capability of the Utility to manage the electrical load of the participant’s EV or EV charger in collaboration with the Utility’s technology partner. This enables the Utilities to reduce demand on the grid system by turning charging on/off when the system is experiencing times of high demand. Page | 85
  6. Page 86 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 86 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Electric Vehicle Supply Equipment (EVSE) This term refers to devices used to supply EVs with electricity. These devices fall into two categories – Level 1 and Level 2: − Level 1 (L1): The lowest speed charger, these chargers plug into the average 3-prong, 120V plug. These plugs charge a vehicle very slowly, and the time required varies depending on the size of a vehicle’s battery. A L1 charging plug was likely included in the EV purchase. These chargers are not eligible for this Program − Level 2 (L2): These chargers are a step up in power from L1 chargers and connect to either a 240v outlet or are hardwired directly. L2 chargers are most often purchased separately from the EV, although more EVs are beginning to come with an L2 charger as standard equipment as an option at purchase. An L2 charger can have “smart” features that can be accessed through a mobile app and/or web portal and are available in several power levels. L2 chargers can fully charge a vehicle from empty between three and seven hours, depending on the size of an EV’s battery and power rating of the EV Charger − Networked L2 (or “Smart Charger”): These chargers can connect to the internet (via Wi-Fi or cellular connection) and participants can usually control them through a mobile app − Non-Networked L2: These chargers don’t connect to the internet (via Wi-Fi or cellular connection) but do charge a vehicle as quickly as a Networked L2 − Direct Current Fast Charger (DCFC): DCFC chargers, sometimes referred to as a Level 3 DC charger, are a step up in power from L2 chargers. DCFC chargers use a 3phase 480-volt AC electric circuit but deliver direct current (DC) to the vehicle. DCFC equipment can charge a BEV to 80% in just 20 minutes to one hour. For this Program, DCFC charging stations must be dual port with both SAE J1772 Combined Connector System (CCS) and IEEE 2030.1.1 (CHAdeMO) charging ports. Support of simultaneous charging on both ports is not a requirement; however, to qualify as a two-plug charging site, DCFC stations must support simultaneous charging of at least 50 kW Page | 86
  7. Page 87 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 87 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Fleet Section 14-164b of the Connecticut General Statutes defines “fleet” as “a group of owned or leased motor vehicles owned or leased by one person, firm, corporation, or governmental entity.” These fleets include but are not limited to federal, state, and local fleets, service fleets, and last mile delivery fleets. Fleet Advisory Service The entity that provides Fleet Assessments. This entity/entities partner(s) with your Utility to provide this third-party service. Fleet Assessment An assessment that identifies fleet vehicles ready for electrification. This assessment provides site feasibility, rate analysis, estimate billing impacts, and related recommendations to assist fleets with making informed decisions when transitioning their fleet to EVs. This assessment will also provide the appropriate method of participation for your fleet regarding Managed Charging. Fleet Owner/ Operator The employer/ fleet manager that acts as the decision maker and individual or group of individuals that control the operations of a given fleet. Light-Duty Cars and trucks with maximum Gross Vehicle Weight Rating (GVWR) < 8,500 lbs. Managed Charging Managed Charging refers to coordination between EV owners/operators and the Utilities or Utility third-party partners to shift EV charging to off-peak hours. This can be done by either using behavioral signals to prompt EV owners to adjust their own charging behavior, or by the utility sending direct load control signals to the EV or EV charger during those times of high demand. This Program uses both approaches. Managed Charging allows the Utilities to adequately integrate the growing, new demand on their systems from EVs, and allows the Utilities to use the flexibility of EVs to reduce costs. Page | 87
  8. Page 88 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 88 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Non-Public Those light-duty fleet chargers are intended solely for the private use of a fleet. Public Access Unrestricted site access to the public to charge EVs at any time the EV charger is unoccupied for seven days per week, at least 12 hours per day. Telematics Like many of the appliances, communications, and entertainment systems we use today, vehicles have also become “connected devices.” Telematics is the capability of a vehicle to wirelessly communicate with other systems like those used to administer the Program. This communication allows important vehicle and charging data to be shared with our technology partners and can be used to enable control signals that can slow the rate of charge or turn the EV charging station on or off as needed by the grid during DR Events. Page | 88
  9. Page 89 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 89 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 3: Program Overview and Customer Eligibility Overview The Light-Duty Fleet Managed Charging Program (Light-Duty Fleet Program or Program) offers ongoing incentives and load shifting benefits to promote consistent participation in Managed Charging over time. These incentives are given for both public chargers and nonpublic chargers. Which option you select will determine the requirements for much of this Program. The Program is designed for light-duty fleets with non-public chargers or light-duty fleets with public access chargers. Non-public chargers receiving upfront incentives through the Program are required to participate in one of the Managed Charging program designs described in this section for a minimum of 24 months. Chargers with public access receiving incentives through the Light-Duty Fleet Program are not required to participate in Managed Charging, but are able to join, earn incentives (if applicable), and optimize their charging to potentially save energy. Therefore, it is worth considering the business implications of this selection. You can find more information on the upfront incentives in Section 4. The business use of light-duty fleets is broad and varied. As such, there is not a “one-size-fitsall” program design for every business. For example, a program design that requires curtailment of charging at specific times that work for one business might significantly interfere with or interrupt the business use of the fleet at a second business. Furthermore, as hardware and software in the managed charging space is nascent and evolving, there are certain combinations of technologies that are not compatible, though they may be in the future. This means that certain types of technologies may only be able to participate in the Light-Duty Fleet Program in specific ways, just by virtue of what is technologically feasible at the time of enrollment. Program Participation and Application Effective April 1, 2023, the Utilities began offering the Light-Duty Fleet Program which provides customers with two potential methods of participation: (1) Demand Response or (2) a Customized Managed Charging Option (Customized Option). The method that the light-duty fleet owner/operator chooses will depend on their technical and business capabilities. These capabilities are determined by the participant in the case of Demand Response, or during a Fleet Assessment, through the Fleet Advisory Service in the case of the Customized Option. Interested light-duty fleet owners/ operators may apply for the Program and indicate if they will participate in Demand Response or the Customized Option. Fleet Assessments Light-Duty Fleet Assessments are available to any light-duty fleet owner/operator as part of the Program and serve as a foundational planning resource. Assessments support informed Page | 89
  10. Page 90 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 90 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators fleet electrification decisions by evaluating vehicle suitability, charging infrastructure needs, site electrical capacity, rate impacts, and managed charging opportunities. For participants choosing to participate in the Customized Option, the relevant Utility’s Fleet Advisory Service will perform a complete Fleet Assessment including management of EV charging load. If the participant’s EV charging network is capable of load balancing and the participant has the necessary internal resources (staffing and knowledge), the Utilities will collaborate with the participant to determine the load balancing solution that delivers the optimal, year-round benefit (e.g., minimize peak demand while encouraging off-peak charging) to the participant and the distribution system with the least impact to business operations. If the level of sophistication in technology and resources is such that additional building load balancing may be achieved, the Utilities may engage the resources of their conservation and load management (C&LM) programs to develop a total site load balancing plan. The two methods of participation for a light-duty fleet owner/operator are described in more detail in the remainder of this section. Note: Any light-duty fleet receiving incentives for nonpublic EVSE installations is required to participate in one or the other method of participation. Light-duty fleets receiving incentives for public EVSE installations are not required to participate in either method of participation, but may find great value in participating, as well as providing the respective Utility a great resource in optimizing the Utility’s system. Demand Response Program Integrated Demand Response This method of participation enables those participants with installed EVSE, which the Utility’s DRMS provider has existing software integrations, to receive Demand Response Event (DR Event) dispatch notifications and automatic load curtailment of EV charging without manual intervention. If customers opt out of integration, they can participate in customized managed charging. Monitoring and evaluation of automated Demand Response performance will be completed through the Utility’s DRMS platform. Non-Integrated Demand Response For those participants with installed EVSE, which the Utility’s DRMS provider does not have software integration capability, DR Event dispatch notifications will be sent to designated fleet operator contacts only. In response to such notifications, fleet operators manually curtail load to EV chargers. Monitoring and evaluation of manual demand response performance will be completed through EV charging data collection verification. This method of participation includes per plug incentives on an ongoing basis for adequate participation. The incentives and definitions of participation are outlined in the sections below. Page | 90

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)