Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

ES Annual Compliance Filing Orders 1 and 2

Compliance filingFiled by Eversource Energy47 files
Part of docket 26-08-01Open
  • Electric
2026 Clean and Renewable Energy Program Data and Report

Files47

Search terms highlighted
Eversource rate increase is on 33 pages across 8 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 2.pdf

Extracted from the file · 1 page · 8,665 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 1.pdf

Extracted from the file · 6 pages · 27,557 characters

Text of ES Order 2 - ESS Order 25 from 17-12-03RE03.pdf

Extracted from the file · 106 pages · 245,530 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 3.pdf

Extracted from the file · 8 pages · 20,187 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - ESS Order 22 from 17-12-03RE03 Attachment 1.pdf

Extracted from the file · 78 pages · 214,494 characters

Text of ES Order 1 - Table 1 DN 26-08-01 Compliance Filings.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 8.pdf

Extracted from the file · 69 pages · 162,167 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 7.pdf

Extracted from the file · 1 page · 4,407 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 6.pdf

Extracted from the file · 21 pages · 73,536 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 5.pdf

Extracted from the file · 3 pages · 8,426 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 4.pdf

Extracted from the file · 4 pages · 1,020 characters

Text of ES Order 2 - EV Order 14 from 17-12-03RE04 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - EV Order 16 from 17-12-03RE04.pdf

Extracted from the file · 1 page · 1,297 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 4.pdf

Extracted from the file · 8 pages · 14,158 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 3.pdf

Extracted from the file · 28 pages · 215,422 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 2.pdf

Extracted from the file · 6 pages · 39,871 characters

Text of ES Order 2 - RRES Order 22 from 20-07-01 Attachment 1 (REDACTED).xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of ES Order 2 - NRES Order 20 from 20-07-01.pdf

Extracted from the file · 1 page · 1,427 characters

Text of ES Order 2 - NRES Order 19 from 20-07-01.pdf

Extracted from the file · 1 page · 1,354 characters

Text of ES Order 2 - NRES Order 18 from 20-07-01.pdf

Extracted from the file · 1 page · 1,557 characters

Text of ES Order 2, CEOP-VRO_Items 2 -4.pdf

Extracted from the file · 1 page · 485 characters

Text of ES Order 2, BETP-01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2, BETP-01.pdf

Extracted from the file · 6 pages · 19,114 characters

Text of ES Order 2 - SCEF Order 9 from 19-07-01.pdf

Extracted from the file · 2 pages · 3,439 characters

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 6 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 2 pages · 73,616 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 2.pdf

Extracted from the file · 1 page · 5,854 characters

Text of ES Order 2 - SCEF Order 5 from 19-07-01RE02 Attachment 1.pdf

Extracted from the file · 4 pages · 6,318 characters

Text of ES Order 2, ESS_Items 1-4.pdf

Extracted from the file · 117 pages · 290,953 characters

Text of ES Order 2, VNM_Items 2-4.pdf

Extracted from the file · 3 pages · 1,101 characters

Text of ES Order 2, SCEF_Items 1-4.pdf

Extracted from the file · 49 pages · 109,450 characters

Text of ES Order 2, RRES_Items 1-4.pdf

Extracted from the file · 65 pages · 149,171 characters

Text of ES Order 2, RPS_Items 2-4.pdf

Extracted from the file · 1 page · 1,158 characters

Text of ES Order 2, NRES_Items 1-4.pdf

Extracted from the file · 51 pages · 132,948 characters

1 page match
  1. Page 90 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 90 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators fleet electrification decisions by evaluating vehicle suitability, charging infrastructure needs, site electrical capacity, rate impacts, and managed charging opportunities. For participants choosing to participate in the Customized Option, the relevant Utility’s Fleet Advisory Service will perform a complete Fleet Assessment including management of EV charging load. If the participant’s EV charging network is capable of load balancing and the participant has the necessary internal resources (staffing and knowledge), the Utilities will collaborate with the participant to determine the load balancing solution that delivers the optimal, year-round benefit (e.g., minimize peak demand while encouraging off-peak charging) to the participant and the distribution system with the least impact to business operations. If the level of sophistication in technology and resources is such that additional building load balancing may be achieved, the Utilities may engage the resources of their conservation and load management (C&LM) programs to develop a total site load balancing plan. The two methods of participation for a light-duty fleet owner/operator are described in more detail in the remainder of this section. Note: Any light-duty fleet receiving incentives for nonpublic EVSE installations is required to participate in one or the other method of participation. Light-duty fleets receiving incentives for public EVSE installations are not required to participate in either method of participation, but may find great value in participating, as well as providing the respective Utility a great resource in optimizing the Utility’s system. Demand Response Program Integrated Demand Response This method of participation enables those participants with installed EVSE, which the Utility’s DRMS provider has existing software integrations, to receive Demand Response Event (DR Event) dispatch notifications and automatic load curtailment of EV charging without manual intervention. If customers opt out of integration, they can participate in customized managed charging. Monitoring and evaluation of automated Demand Response performance will be completed through the Utility’s DRMS platform. Non-Integrated Demand Response For those participants with installed EVSE, which the Utility’s DRMS provider does not have software integration capability, DR Event dispatch notifications will be sent to designated fleet operator contacts only. In response to such notifications, fleet operators manually curtail load to EV chargers. Monitoring and evaluation of manual demand response performance will be completed through EV charging data collection verification. This method of participation includes per plug incentives on an ongoing basis for adequate participation. The incentives and definitions of participation are outlined in the sections below. Page | 90
  2. Page 91 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 91 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators A few details to consider: − Must be able to integrate with the Utility’s DRMS provider or be able to meet the requirements of Demand Response manually − Must commit to ongoing participation in DR Events which can occur during the Demand Response season − The Demand Response season is from June through September, and DR Events can happen at any time during this season on non-holiday weekends from 3-9 p.m. − Must participate for a minimum of 24 months − Participants will earn incentives on a per-plug basis, depending on the performance of that given plug during any given month within the Demand Response season (see Section 4) − Participants can opt out of two events per plug per month of the Demand Response season Customized Managed Charging Program Where participation in Demand Response is not feasible, either due to technological or business limitations, an alternative, Customized Option is available to all light-duty fleets. This solution will be defined during a Fleet Assessment, as the unique circumstances of each light-duty fleet will determine the exact design of a customized program. A customized managed charging program can take a few shapes, including: − Programs designed to manage load around the off-peak and on-peak periods, and/or restrict on-peak charging hours − Load balancing during peak hours to reduce charges associated with high demand − Programs containing components of both the above This method of participation does not include ongoing incentives for participation. However, there are likely many savings to be had by efficient management of energy consumption through the participating EV chargers. The Fleet Assessment will help the business quantify such potential savings. Please see Section 7 for more information on how to participate in both a Customized Managed Charging Program and a Demand Response Program. Page | 91
  3. Page 92 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 92 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 4: Rebates and Incentives For participants in the Light-Duty Fleet Program, there are both upfront make-ready incentives and ongoing incentives available. The term “make-ready” refers to program or initiative that helps with preparing the infrastructure for the future installation of EV chargers, including the necessary electrical connections, circuit breakers, and other equipment. Upfront Incentives Eligible light-duty fleet sites can receive incentives through the Light-Duty Fleet Program for Level 2 and DCFC chargers. Incentives can cover up to 100% of eligible make-ready installation costs plus up to 50% of eligible EVSE charger costs. Incentives cap at a per site maximum rebate (see table below). Incentives rates are subject to change at the sole discretion of Eversource and UI, except where incentive rates have been committed in an incentive reservation letter. Customer Type EV Charger Type Per Site Maximum Rebate Level 2 $20,000 Baseline Community MakeReady Costs Up To 100% EVSE Cost Up To 50% Port Requirement Minimum of two ports DCFC $150,000 Minimum of two ports Level 2 $40,000 Minimum of two ports Underserved Community Up To 100% DCFC $250,000 Up To 50% Minimum of two ports Note: For more information on the Make-Ready Incentives available, please see the Commercial EV Charging Program Participation Guide found on your Utility’s website There are no requirements in the Light-Duty Fleet Program for making these chargers available to the public or using them exclusively for private (business) charging, the decision is up to each individual site host and determined on their specific needs. However, it is important to note, private light-duty fleet chargers are required to participate in managed charging for a period of 24 months. Site hosts should consider issues like whether customers will be parked at your location, proximity or accessibility to public access, fleet charging schedules and whether the site host would like to collect charging fees to offset some of their operating and EVSE costs. Page | 92
  4. Page 93 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 93 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Ongoing Incentives There are also ongoing incentives available for participation in Managed Charging. Note: All light-duty fleets using upfront incentives for non-public EV chargers will be required to participate in Managed Charging for a minimum of 24 months. The base maximum monthly incentives in Demand Response vary by type of charger, from $5/plug per month to $25/plug per month. The Utilities provide additional incentives for public sites ($10/plug per month) and for those sites requiring a non-integrated/manual solution ($5/plug per month). For participants in a Customized Option, there is no direct, ongoing incentive. The benefits of the Fleet Assessment, as well as any savings from more cost-effective load management and/or load balancing, could be substantial due to rate savings and/or demand charge avoidance. Please see the table below to understand the different available incentives between the different types of Light-Duty Fleet Managed Charging programs. Light-Duty Fleet Managed Charging Incentives Monthly Incentives per EVSE Plug Program Type Demand Response: Base Incentives (non-public, integrated site) Level 2 Charger (up to 10 kW) Level 2 Charger (up to 20 kW) DCFC (up to 50 kW) DCFC (> 50 kW) $5 $10 $20 $25 DR Adder: Public EVSE $10 DR Adder: Non-integrated $5 Customized Solution Cost of Fleet Services plus yearly demand savings Page | 93
  5. Page 94 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 94 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 5: Eligibility and Enrollment Prior to formal enrollment or a Fleet Assessment, fleet owners are encouraged to utilize available fleet planning tools (UI’s Fleet Assessment Tool launches in late 2026) to preliminarily evaluate vehicle electrification potential, charging needs, and operational fit. These tools help fleets prepare for enrollment discussions and maximize the value of subsequent Fleet Advisory Services. The Light-Duty Fleet Program is open to all Utility commercial and industrial customers in Connecticut with an active account with a planned or existing fleet of EVs and/or Plug-In Hybrid Electric Vehicles (PHEVs). Site hosts who receive an EVSE infrastructure charger rebate for non-public EV chargers serving light-duty fleets through the CT EV Charging Program are required to enroll in the LightDuty Fleet Program. The minimum period of participation is 24 months. Depending on the type of Managed Charging program the site host opts for, there may be both incentives and ongoing energy savings from load balancing and/or off-peak charging. Site hosts who receive an EVSE infrastructure charger rebate for public EV chargers serving light-duty fleets through the Program are not required to enroll but are encouraged to participate to potentially earn incentives and save on energy costs. Additional Eligibility Requirements The following requirements apply to all participants regardless of method of participation they choose: − Participants who leave the Program before the 24-month period ends will be required to pay back a prorated portion of the upfront incentives they received as part of the LightDuty Fleet Program − Incentives are limited to the stated incentive amount listed above or the documented project cost, whichever is less − Only new EV chargers are eligible for incentives − Electrical work must be completed by a qualified professional, in full compliance with laws and regulations − Participants are required to share EV charging data with their Utility − Please refer to the Terms and Conditions included with the Program application Page | 94
  6. Page 95 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 95 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Data Sharing and Privacy The Utilities will collect information on your EV charging behavior, such as when and how often you charge and how much energy you use each time you charge. Your Utility may share this information with third parties for the purposes of evaluating the Program. All EV charging data will be aggregated, anonymized, or otherwise encrypted if/when disclosed publicly. Enrollment Process The process of enrollment differs slightly between the two methods of participation. In both cases, the light-duty fleet owner/ operator will fill out and submit an application that can be found on their relevant Utility’s website. Within this application, the light-duty fleet owner/operator will indicate their method of participation. If Demand Response is feasible, a participant will work with the Program team to execute a Managed Charging Agreement with Terms and Conditions regarding their ongoing participation, particularly regarding how incentives are earned. On an ongoing basis, the Utilities will conduct quarterly check-ins with each participating fleet owner/operator to ensure Demand Response participation is in line with the Terms and Conditions of the Demand Response Program. If Demand Response is not a feasible option, the participant works with their Utility through a Fleet Assessment to determine which type of Customized Managed Charging Plan to pursue. They can opt to participate by managing their load based on the on-/off-peak periods exclusively, by balancing their load by reducing on-peak usage as much as possible, or by combining both load management and load balancing. With the Fleet Assessment vendor, they will determine how much peak load can be avoided and create a Peak Load Avoidance Plan to achieve this goal. The Utilities will conduct semi-annual check-ins with each participating fleet owner/operator to assess performance and discuss strategies for improvement if necessary. The specifics of participating within the Customized Option will be determined during the Fleet Assessment provided by the relevant utility’s Fleet Advisory Service. Please see Section 6 for more information. Page | 95
  7. Page 96 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 96 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 6: Fleet Planning Tools As an initial step in the fleet electrification journey, Eversource offers a web-based Fleet Planning Tool designed to help commercial and municipal fleets evaluate electrification potential prior to a formal Fleet Assessment. UI will launch its Fleet Planning Tool in late 2026 and we’ll update this Guide accordingly. The Eversource Fleet Planning Tool allows fleet owners to: − Screen existing vehicles for EV replacement suitability − Estimate charging demand and infrastructure needs − Explore phased electrification scenarios − Identify candidates for deeper Fleet Advisory Services Use of the Fleet Planning Tool is optional but strongly encouraged, particularly for fleets in the early planning stages. Page | 96
  8. Page 97 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 97 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 7: Fleet Advisory Services and Fleet Assessment Depending on the Light-Duty Fleet Program method of participation chosen by the fleet owner/operator, the Utilities’ Fleet Advisory Service will perform a Fleet Assessment. This Fleet Assessment will help determine the site host’s internal capabilities to meet various Managed Charging prompts to curtail charging, establish Peak Avoidance Potential, and set a baseline for the Managed Charging activities going forward. The Fleet Assessment will be an opportunity for the fleet owner/operator to determine how they are able to participate in Managed Charging with a Customized Option. For light-duty fleet owners/operators participating in the Demand Response Option, Fleet Assessments are an optional service. A Fleet Assessment is required for all light-duty fleets owner/operators participating in the Customized Option. This Assessment will provide the participant with a deeper understanding of their fleet’s electric usage and provide ways for the fleet to reduce costs and save energy. Through this Fleet Assessment, the participant determines several factors of their participation. The first step is determining what their maximum charging load could be at their site and whether the load is manageable. The participant then determines if their technology is capable of, and their business model supports, participating in a Customized Solution. The Fleet Assessment will establish a comprehensive, decision-ready foundation for fleet electrification and managed charging participation, including but not limited to: − Preliminary vehicle-by-vehicle electrification suitability analysis − Fuel costs and carbon emissions saved on a vehicle-to-vehicle basis − An estimate of the total cost to purchase your new electric fleet − An acquisition plan based on your existing vehicles’ retirement schedule − Phased fleet transition roadmap aligned with vehicle replacement cycles − Capabilities of the fleet (EVs and EV chargers) − Preliminary charging infrastructure phasing strategy − Charging station infrastructure recommendations and incentives − Maximum charging load of the fleet − Fleet’s peak avoidance potential − Identification of operational risks and mitigation strategies related to charging availability − A Peak Avoidance Plan To find more information on how to apply for a Fleet Assessment, please visit your Utility’s website (Eversource or UI). Page | 97
  9. Page 98 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 98 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Section 8: Participation in Managed Charging Participation in Managed Charging is required for any light-duty fleets receiving incentives for non-public EVSE installations and is encouraged for light-duty fleets receiving incentives for public EVSE installations. As discussed above, a light-duty fleet owner/operator will work with the Fleet Advisory Service to determine their method of participation. Below is a description of participation in either Demand Response or the Customized Option. Note: the exact dynamics of participation will be fully defined in the Terms and Conditions relevant to each business, so please consider this as a helpful guide but not a finalized list of requirements. Demand Response Participation DR Events are managed by considering the operating conditions of the electric power system. Events are called to assist in controlling the system at key times. DR Events most commonly occur on hot summer afternoons or early evenings and will last a few hours or less. These periods of high energy demand are called “on-peak” periods. For the Light-Duty Fleet Program, DR Events will be set during the peak season which is June 1 to September 30 during the times of 3-9 p.m. on non-holiday weekdays. During DR Events, participants have the option to participate or opt-out if it’s necessary for them to charge during that time. This way, participants always retain control over the use of their vehicle but can earn incentives for being flexible when they charge their vehicle. To receive DR Event incentives, participants must participate. Participants may opt-out of two events per month for the four-month Demand Response season. While it is possible for participants to opt out of events, doing so more than twice per month may impact eligibility for incentives. Demand Response Cycle Demand Response follows a regular pattern of notification, event and opting out, results, and, if applicable, distribution of incentives. Notification Participants will, in most cases, be notified well in advance of a DR Event, so there is plenty of time to plan. There may be rare occasions where the Utility will call an Emergency Event with less than 24 hours of advance notice. Please refer to the Events and Opting Out section below for more information. Notifications providing a schedule for an upcoming DR Event are issued to participants through the participant’s preferred means of contact, determined during the application process (e.g., email and/or via the Program’s mobile app provided by the Utility’s respective technology partners.) After a DR Event ends, the participant will receive a notification alerting them that the DR Event has ended. Page | 98
  10. Page 99 of 118

    CL&P dba Eversource Energy Docket No. 26-08-01 November 15, 2026 Order No. 2, Cross Posted Compliance EV_Items 1-4 Page 99 of 118 2026 Participant Guide for Light-Duty Fleet Owners and Operators Events and Opting Out DR Events may occur in June, July, August, and/or September, on non-holiday weekdays. A typical Event may be up to three hours in duration and occur between the hours of 3-9 p.m. During Events, EV charging will be curtailed. The Utilities will call a maximum of 15 Events per month. Once a notification has been received, participants have the option of: 1. Participating in the event (default) 2. Opting out of the event, meaning their charging device will be unaffected by the event During the event, the power delivered to any device that hasn’t been opted out will be reduced or suspended. Opting out can be completed through the fleet owner/operator’s network provider, and participants may opt out of any event at any time. At the end of the event, power delivery should resume at its normal level. In some cases, devices fail to return to their normal operating mode at the end of an event. We therefore recommend that participants check the status of their device after receiving the end of event notification. Individual charging ports managed by a site host are considered participating in the event if the ports are not opted out of the event (i.e., not charging during an event). For example, if no car is plugged into the EV charger at the time of the event, but the charger did not opt out, the EV charger will be considered participating. Emergency Demand Response Events If required to maintain the safety and reliability of the electric grid, the Utilities may issue Emergency DR Events without prior notice. Critical system events that impact system voltage levels, system stability and safety, or distribution system events that are considered emergencies by the Utilities may require override of a customer’s EV charger. While such conditions are rare, the Utilities will attempt to provide advance notification whenever possible, dependent on the nature of the event. Participants do retain the right to opt out of these types of events, but the above rules on opting out of no more than two events per month still apply. Unlike normal DR Events, these can happen on weekends and holidays. Emergency DR Events will receive no incentives for participation and no penalties for not participating. Site hosts will be notified through the Utility’s DRMS platform (i.e., phone application, web portal, email, and/or text message). Typically, site hosts receive day-ahead notification except for emergency events. Site hosts may opt out of any event at any time. Page | 99

As listed on the current system

Compliance Filings, 11/16/2026 [26-08-01] Order No.Nos 1 and 2 Section IIA.1 / Eversource Energy / ES Annual Compliance Filing Orders 1 and 2

This filing on the current system (opens in a new tab)