Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files3

Search terms highlighted
Eversource rate increase is on 6 pages of the text below, highlighted. Go to the first matchClear highlighting
6 pages match
  1. Page 34 of 50

    Docket No. 26-08-02 Page 32 OCC also suggests that the Program Manual should contain clear, affirmative language directing income-eligible customers to apply for the low-income adder to improve low-income enrollment. OCC Comments, Aug. 19, 2026, pp. 1-2. Additionally, OCC argues that the Program Manual should contain a complete summary of all contractor compliance obligations, including requirements regarding marketing and training materials; currently, the manual only addresses contractor financial benefits compliance requirements. Id., p. 2. Sunrun and Goodleap support most EDC changes that reflect CCWG recommendations, but disagree with the specific definition of Estimated Year One Production (kWh) added to the CDFs. Sunrun and Goodleap Comments, Aug. 19, 2026, p. 2. Specifically, Sunrun and Goodleap note that the proposed definition references the PowerClerk production estimate as the default method and treats a contractor-provided production estimate as an alternative method requiring additional explanation. Id. Sunrun and Goodleap argue that this framing should be reversed, as the contractor-provided estimate, not the PowerClerk estimate, is the annual production value reflected in the system design and contract. Id. Additionally, Sunrun and Goodleap suggest that the Allowable Alternative Calculations box may require more space than is provided, depending on the number of variables that must be explained. Id., pp. 2-3. The Authority directs the EDCs to check all links, numbering, and internal references in the program documents, including the specific apparent errors identified by EOE, before filing updated documents in compliance with Order No. 22 of this Decision. Additionally, Section IX of the Program Manual references contractor compliance requirements for marketing materials and training materials regarding sales and communications with potential customers; nevertheless, the Authority agrees with OCC that a more complete explanation of the requirements established in the Year 3 Decision would be beneficial for participating RRES contractors, and directs the EDCs to update the Program Manual accordingly. This section shall also include all new contractor requirements approved in Section D of this Decision. In addition to incorporating the contractor compliance requirements authorized in Section D, the Authority directs the EDCs to adjust the definition of Estimated Year One Production (kWh) in the CDF as suggested by Sunrun and Goodleap. The Authority finds that the contractor-provided estimate, which matches what is provided to the customer in the installation contract and other materials, should be treated as the default production estimate. Additionally, per the direction in Section D.8, contractors will be required to provide the CDF contemporaneously with the contract rather than generating the CDF within PowerClerk, so the default annual production provided on the CDF should not be based on a PowerClerk calculation. The Authority also notes that contractors will be required to provide an explanation of the starting utility rate used, as well as the utility escalation rate and PV degradation rate, if different from the approved values; accordingly, the EDCs shall provide additional space in the Allowable Alternative Calculations fillable text box. V. CONCLUSION AND ORDERS
  2. Page 35 of 50

    Docket No. 26-08-02 A. Page 33 CONCLUSION In this Decision, the Authority explores and approves several changes to the RRES Program to better serve the Program Objectives and approves the RRES Program Tariff rates for project applications received in calendar year 2027. Further, the Decision includes the Authority’s rulings to Motion Nos. 4, 5, 6, 7, and 8 in the instant proceeding, and Motion No. 24 in Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 5. B. EXISTING AND NEW ORDERS For the following Orders, the Company shall file an electronic version through the Authority’s website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Orders must be identified by all three of the following: Docket Number, Title and Order Number. Compliance with orders shall commence and continue as indicated in each specific Order or until the Company requests and the Authority approves that the Company’s compliance is no longer required after a certain date. All Orders requiring Authority review and approval shall be submitted as a motion. The below standing orders are a summation of prior orders related to the RRES Program that continue to apply. In some instances, the Authority has amended those standing orders with redline edits. The below new orders apply on a going forward basis. 1. Standing Orders to be filed in RRES Annual Review Dockets 1. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 4, p. 44; Interim Decision, Oct. 6, 2021, Docket No. 21-08-02, Order No. 8, p. 28: No later than [August 1], 2021, the EDCs shall develop and file for the Authority’s review, modification, and approval a set of (1) Program Manual and guidelines and (2) other resources for residential utility customers and/or renewable energy contractors to explain the technical, administrative, and procedural requirements of the Residential Tariff program, including all cash out provisions. Such Program Manual, guidelines, and other resources shall strictly adhere to this Interim Decision, incorporating any direction provided herein. Any proposed rules and guidelines shall include a list of program eligibility requirements. The EDCs shall update all Program Manual, guidelines, and other resources by August 1 annually [until August 1, 2026] to reflect the most recent program information and Authority orders and/or rulings and file the aforementioned updated documents in the appropriate annual review docket (e.g., changes to be enacted in 2024 should be filed in Docket No. 23-08-02). Additionally, the EDCs shall review and update their meter wiring diagrams and guidelines as appropriate, but no less frequently than August 1 annually, and submit the revised documents in the appropriate Annual Review docket. 2. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 5, pp. 44-45: No later than [August 1], 2021, and annually thereafter [until August 1, 2026], each EDC shall file, in the annual Residential Tariff program review and rate
  3. Page 36 of 50

    Docket No. 26-08-02 Page 34 setting proceeding for the Authority’s review, modification, and approval a proposal for a Residential Tariff program application fee to cover the estimated administrative costs associated with processing applications. The EDCs shall provide detailed calculations and written descriptions to explain and to justify the proposed application fee. In the same filing, the EDCs shall file for the Authority’s review, modification, and approval a proposed nominal administrative fee pursuant to Section III.A. for any change orders or re-designation changes subsequent to the initial project interconnection, so long as a robust rationale for the proposed fee and fee level is provided. The 2021 submission shall provide a copy of the language to be included in the customer disclosure form informing program participants of the fee. 3. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 15, p. 46: No later than November 1, 2021, the EDCs shall file with the Authority link to their respective Residential Tariff program webpages. Such webpages shall include all relevant information regarding the “buy-all” and netting Residential Tariffs for interested residential customers and renewable energy contractors. Such website shall be made public no later than January 1, 2022 and shall be updated as frequently as is practicable, unless otherwise directed herein, to reflect the most recent program information and Authority orders and/or rulings 4. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 19, p. 47: No later than January 1, 2023, each EDC shall have in place a customer education and information webpage that shall, at a minimum, include the average installed cost ($/W) and PPA or lease price ($/kWh) for all Residential Tariff applications accepted by the EDC over the preceding 6-month period, as well as current and historical retail rates for the customer to compare their pricing and savings in real-time. Such website shall be updated at least monthly and customers shall be required to electronically acknowledge that they have reviewed the material on the customer education and information webpage as part of Residential Tariff application process. On or before January 1, 2022, each EDC shall submit a cost estimate for the development of such a webpage. On or before August 1, 2022, each EDC shall file with the Authority a working draft of such webpage. 5. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 21, p. 47: No later than [August 1], 2022, each EDC shall publicly disclose the costs of setting up and maintaining the REC metering equipment, as well as the customer acquisition costs, on their respective Residential Tariff websites. Each EDC shall update the required information at least annually. No later than [August 1], 2022, and annually thereafter [until August 1, 2026], each EDC shall submit in the abovecaptioned proceeding and in the appropriate annual review docket (e.g., changes to be enacted in 2024 should be filed in Docket No. 23-08-02) the required REC metering cost information.
  4. Page 37 of 50

    Docket No. 26-08-02 Page 35 6. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 22, p. 47: No later than August 1, 2022, and annually thereafter [through the duration of the RRES Program], the EDCs shall jointly file, in the annual Residential Tariff program review and rate setting proceeding the Excel workbooks outlined in Section III.[C].6.a. The EDCs shall each use the same Excel workbook, including the same format and the exact same data fields, as each other. The EDCs shall follow all other direction provided in Section III.[C].6.a. [The Authority further directs the EDCs to include the following in each annual filing: (1) any supplemental field data as indicated in CAE-1 and CAE-14 in Docket No. 23-08-02 and included in the EDCs’ redacted filings; (2) a list of all existing data fields collected in the RRES application; (3) information on the application submission and approval date for each RRES project; (4) both solar PV costs, and other costs (e.g., costs of associated electrical upgrades); (5) the number and percentage of LIDR customers enrolled in the RRES Program, broken out by both LIDR tier and RRES tariff; (6) the number of add-on Netting systems enrolled in the Program which are unable to support the addition of a non-bypassable charge; (7) by each developer, the number and percentage of systems by type of housing (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing); (8) by each developer, the number and percentage of total approved RRES applications which are eligible for the low-income or Distressed Municipality adder(s); (9) the housing type (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing) and metering type (e.g., master-metered or individually metered) for each RRES project; and (10) whether each RRES project received assistance through Solar for All. See, UI Interrog. Resp. CAE-14, Att. 4 Public; Eversource Compliance, Aug. 22, 2023, Att. 1. Last, the Authority also directs the EDCs to include a summary of the Program data on the RRES Program websites. These data can be provided in any reasonable fashion (e.g., attached file, web link, embedded data), and may be relocated to the PURA Data Dashboard when the dashboard is expanded to include Clean Energy Program data.] 7. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 4, p. 16: No later than August 1, 2022, and [quarterly] thereafter, PURA requests that the Agencies file as compliance in the appropriate RRES annual review docket (i.e., in Docket No. 22-08-02 on August 1, 2022, etc.) a list of housing facilities eligible under Tier I of the affordable housing definition approved in Section II.A of this Decision. [The EDCs shall post the most recent compliance with this order, along with contact information for each of the Agencies, on the RRES Program website by January 1, 2024, and quarterly thereafter.] 8. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 5, p. 16: No later than August 1, 2022, and annually thereafter, the EDCs shall file as
  5. Page 38 of 50

    Docket No. 26-08-02 Page 36 compliance in the appropriate RRES annual review docket (i.e., in Docket No. 2208-02 on August 1, 2022, etc.) a list of housing facilities eligible under Tier II of the affordable housing definition approved in Section II.A of this Decision. 9. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 6, p. 16: No later than August 1, 2022, and annually thereafter, PURA requests that the Agencies file as compliance in the appropriate RRES annual review docket (i.e., in Docket No. 22-08-02 on August 1, 2022, etc.) the DEEP and DOH contact information for a housing facility seeking to be defined as “affordable housing” that does not meet the Tier I or Tier II thresholds of the affordable housing definition approved in Section II.A of this Decision. [The EDCs shall post the most recent compliance with this order on the RRES Program website by January 1, 2024, and annually thereafter.] 10. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 9, p. 17: No later than August 1, 2023, and annually thereafter, the EDCs shall file as compliance documentation of the distribution of the incentive adders to validate that the required percentage of the benefit was received by the tenants in multifamily affordable houses in the previous year (e.g., calendar year 2022 for the August 1, 2023 filing), for both the cases of on-bill credits for individually metered units and annual checks or other approved distribution methodology for those multifamily homes where units are not individually metered. 11. Reference Year 2 Decision, Order No. 12, p. 35: On a [quarterly basis beginning on January 1, 2024] through [the duration of the RRES Program], the EDCs shall provide updates to Docket No. 21-08-02 Response to Interrogatory CAE-8. Specifically, the Authority adapts the ruling in Docket No. 21-08-02 to Motion No. 26 dated March 22, 2022, which directed the EDCs to submit as a compliance filing an update to Interrogatory CAE-8 on or before the 15th of every month through January 1, 2023 (i.e., the final filing would have been made on December 15, 2022), to instead direct the compliance filings to continue monthly through January 1, 2024. Such filings shall be made in [the annual review proceeding (i.e., in 2024, Docket No. 24-08-02)] and should also include tariff type and incentive adder status information. [Last, beginning by July 1, 2024, the quarterly filings shall include: (1) the total number of low-income customers and customers located in Distressed Municipalities, and associated project capacity, which do not receive either adder, in addition to the existing breakouts for customers enrolled in the low-income and Distressed Municipality adders; (2) the number and associated project capacity of customers who reside in environmental justice census block groups, broken out by customers that qualify for the low-income and Distressed Municipality adders and those that do not; and (3) the number and associated project capacity of RRES customers who qualify for the Federal Justice 40 disadvantaged communities definition.]
  6. Page 39 of 50

    Docket No. 26-08-02 Page 37 12. Reference Year 2 Decision, Order No. 15, p. 35: No later than January 1, 2023, the EDCs shall update any clean energy and hardship program webpages where dual enrollment in any clean energy programs is adversely impacted or otherwise prohibited. Specifically, Eversource shall update at least their RRES Program and New Start webpages with a disclaimer alerting customers that, until such time as a proposal to enable concurrent participation in the RRES Program and the New Start Program is submitted by Eversource and approved by the Authority, existing New Start Program participants are unable to continue to participate in New Start once enrolled in the RRES Program. Moreover, moving forward, the Authority requires Eversource and UI to provide such disclaimer(s) on the appropriate clean energy program website for any instances where hardship program enrollment is jeopardized or negatively impacted by enrollment in solar programs, or vice versa. Each disclaimer should include an explanation of why dual enrollment is adversely impacted or prohibited. Further, the EDCs shall file a copy of the disclaimer(s) as compliance and provide links to the online locations where the disclaimer(s) is/are located. 13. Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit information for the prior quarter (e.g., January 1, 2023 through March 31, 2023 for the May 1, 2023 filing) on the following items related to RRES Program applications: (1) the length of time from application to submission to tariff review approval; (2) the length of time from tariff review approval to interconnection contingent approval; (3) the length of time to receive the work order number needed to apply for permits from cities and towns; (4) the length of time to process payments when applicable; (5) the length of time for any applicable witness tests; (6) the number of days between when the utility is notified of a completed inspection to meter installation; and, (6) the length of time for final issuance of the permission to operate. The RRES APWG may recommend additions to this list in their final report filed on December 14, 2022. Such filings shall be submitted in the relevant RRES Program review docket (e.g., any updates related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). 14. Reference Year 2 Decision, Order No. 22, p. 37: Through the end of the RRES Program, the EDCs shall follow the guidance provided in Section IV.N of this Decision when making administrative changes to the RRES Program without prior PURA approval. Such changes shall be clearly documented, explained, and justified in a compliance filing submitted at least ten (10) business days prior to such changes taking effect in the relevant RRES Program review docket (e.g., any changes related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). Justification must include a clear articulation
  7. Page 40 of 50

    Docket No. 26-08-02 Page 38 of how each Program Objective may or may not be impacted and how the requested change would serve to further the Program Objectives overall. 15. Reference Decision, Feb. 8, 2023, Docket No. 22-08-02, Order No. 26, p. 17: As required, the Authority directs the EDCs to identify any required NEPOOL waivers to allow the program to continue without the utility-owned meter socket requirement through June 2024, and to request the requisite authorization from PURA. 16. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 24, p. 64: No later than February 1, 2024, and annually thereafter [through the duration of the RRES Program], the EDCs shall hold at least one webinar with solar developers to inform them of the underserved adder eligibility criteria, in addition to other Program requirements and information. Further, during the webinar to be held by February 1, 2024, the EDCs shall update Program installers on the implementation of LIDR and provide information and examples of how installers can identify LIDRenrolled customers, to ensure that LIDR customers are receiving bill savings from participation in the RRES Program. [The EDCs shall also include an overview of the contractor requirements regarding standardized inputs, allowable methodologies, and timing of disclosure form presentation to customers.] At least 30 days’ notice shall be provided to Program stakeholders prior to the date of the webinar on the Program website. As compliance, the EDCs shall file the date, time, and location of the webinar with the Authority in the applicable annual review proceeding at least 21 days prior to the webinar. 17. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 33, p. 66: No later than June 1, 2024, and April 1 and annually thereafter [through the duration of the RRES Program, inclusive of April 1, 2028], all renewable energy contractors participating in the RRES Program shall file in the reopener to the annual Program Review docket for contractor education and enforcement (e.g., Docket No. 23-0802RE01 for 2024, etc.), their marketing scripts and training materials generated for or provided to anyone engaging with a customer. Last, the Authority clarifies that the collection of marketing materials shall be administered and enforced by EOE. 18. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 34, p. 67: No later than June 1, 2024, and April 1 annually thereafter [through the duration of the RRES Program, inclusive of April 1, 2028], all Program developers shall file in the reopener to the annual Program review docket for contractor education and enforcement (e.g., Docket No. 23-08-02RE01 for the 2024 filing, etc.), a Financial Benefits Compliance, in accordance with Section IV.D. Specifically, the Authority directs each developer participating in the RRES Program to annually file with the Authority the following for all RRES projects deployed in the previous calendar year: (1) All customer disclosure forms;
  8. Page 41 of 50

    Docket No. 26-08-02 Page 39 (2) An unlocked Excel file summarizing key information from the customer disclosure forms, as well as other information provided to customers such as contracts and promotional materials, for each project as detailed below (Financial Benefits Summary Sheet); and (3) A narrative explanation of any calculation methodologies included in the Financial Benefits Summary Sheet (Sheet Narrative). The Financial Benefits Summary Sheet shall include one row each for every project deployed by the developer under the RRES Program in the previous calendar year. For each project, the following information shall be provided (i.e., each of the following should be a column in the Financial Benefits Summary Sheet): (1) site address; (2) utility account number associated with the project; (3) annual contract rate increase amount; (4) estimated year one production (kWh) as a percentage of estimated annual utility customer usage (kWh); (5) estimated year one customer net savings; (6) starting utility rate used to estimate net year one savings; (7) estimated net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data; and (8) utility rate used to estimate net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data. The Sheet Narrative may be a simple summary document (e.g., as brief as a couple of pages) outlining the methodology used to calculate the above required information to be included in the Financial Benefits Summary Sheet, as applicable, along with a general list of the documents needed for such calculations (e.g., a customer’s electric bill and sales contract are needed to verify the methodology for the fourth requirement, etc.). Last, the Authority clarifies that the collection of financial benefit documentation shall be administered and enforced by EOE. EOE may audit a contractor’s Financial Benefits Summary Sheet and Sheet Narrative and can request additional documentation or evidence as needed to verify a contractor’s Financial Benefits Summary Sheet calculations, particularly for low-income customers. 19. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 36, p. 68: No later than October 1, 2024, and annually by August 1 thereafter [through the duration of the RRES Program], EOE shall complete its audit of the Financial Benefits Compliance filings and a sampling of RRES developer marketing materials and file any findings with the Authority as directed in Section IV.D.3. of
  9. Page 42 of 50

    Docket No. 26-08-02 Page 40 this Decision following the “four strike” system authorized in the Residential Tariff Decision as necessary. 20. Reference Decision, Oct. 16, 2024, Docket No. 24-08-02, Order No. 27, p. 33: Upon the Authority’s approval of the March 31, 2025 Order No. 26 filing, the EDCs shall begin reviewing any requests for the approval of a specific model of MSA in the EDCs’ service area. Within 90 business days of receiving a request for approval of a specific MSA model for installation in the EDCs’ service area, the EDCs shall review and approve or disapprove the request. Upon approving an MSA model, the EDCs shall post the decision publicly on their webpages and update the relevant electric service guidelines. If an MSA model is disapproved, the EDCs shall provide an explanation of the reason(s) to the requesting vendor. 21. Reference Decision, Dec. 17, 2025, Docket No. 25-08-02, Order No. 24: No later than January 15, 2026, and annually thereafter in the most recent RRES annual review proceeding [through the duration of the RRES Program], the Authority requests that the MFH WG file a rent roll template in unlocked Excel format containing fields for the property address, number of units, rent for each unit, and number of bedrooms in each unit for the property requesting approval. The template shall also include easily referenced rent limits affordable to households with income at or below 80% AMI for each unit size, based on the most recent HUD published data. 2. New Orders 22. No later than December 1, 2026, the EDCs shall file as compliance updated RRES Program documents, including the Program Manual, RRES Metering Diagrams, Frequently Asked Question document, and Fact Sheet, incorporating all the approved modifications authorized in this Decision. Such filing shall include both a clean and a redlined version of all RRES Program documents. 23. No later than December 1, 2026, UI shall update its metering diagrams and guidelines to require that no load (except for parasitic load utilized to operate the coupled solar and storage system) is connected behind the production meter for DC-coupled solar and storage systems, and file the updated diagrams for Authority review and approval. Additionally, UI shall meet with industry stakeholders to discuss the updated metering diagrams and incorporate stakeholder feedback prior to filing with the Authority. 24. No later than December 1, 2026, the EDCs shall notify participating RRES Program applicants of the updated contractor requirements through an email notification, PowerClerk banner, and the EDCs’ RRES program webpages, and file compliance in the instant proceeding once complete.
  10. Page 43 of 50

    Docket No. 26-08-02 Page 41 25. No later than January 1, 2027, the EDCs shall complete the necessary updates to the RRES PowerClerk application to incorporate the direction in Section D, Contractor Compliance, and file compliance in the instant proceeding once complete. 26. No later than January 1, 2027, all Program developers shall begin adhering to the compliance requirements specified in this decision. Specifically, Program developers shall utilize the allowable methods for determining customers’ annual electricity usage, estimated year one net savings, estimated multi-year net savings, and starting average utility rate; utilize the standardized values for utility escalation rate and PV degradation rate, or an approved alternative; and present the customer disclosure form to customers immediately prior to and contemporaneously with the solar installation contract. 27. Effective immediately, UI shall resume reporting and selling RECs from RRES solar PV systems paired with DC-coupled storage. UI shall file compliance in the instant proceeding once REC sales have resumed.
Words on different pages
Words on different pages

As listed on the current system

Draft Decision, 10/01/2026 [26-08-02]

This filing on the current system (opens in a new tab)