  1. Page 4 of 50

    Docket No. 26-08-02 Page 2 The Authority conducted the second annual RRES Program review in Docket No. 22-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 2, issuing decisions on November 2, 2022 (Year 2 Decision), and February 8, 2023. The decisions finalized the Year 2 Program Manual, established RRES Program tariff rates for project applications received in calendar year 2023, and authorized several changes to the application process to better align the Program with the Program Objectives. The Authority conducted the third annual RRES Program review in Docket No. 2308-02, Annual Residential Renewable Energy Solutions Program Review – Year 3, issuing decisions on November 1, 2023 (Year 3 Decision), and July 10, 2024. The decisions finalized the Year 3 Program Manual, established RRES Program tariff rates for project applications received in calendar year 2024, authorized several changes to the Program to better align with the Program Objectives, and established eligibility and participation guidance for master-metered affordable housing in the RRES Program. The Authority conducted the fourth annual RRES Program review in Docket No. 24-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 4, issuing a decision on October 16, 2024 (Year 4 Decision). The decision set the RRES Program tariff rates for project applications received in calendar year 2025 and authorized changes to metering and wiring requirements. The Authority conducted the fifth annual RRES Program review in Docket No. 2508-02, Annual Residential Renewable Energy Solutions Program Review – Year 5, issuing a decision on December 17, 2025 (Year 5 Decision). The decision set the RRES Program tariff rates for project applications received in calendar year 2026 and approved several changes to the RRES Program documents. This proceeding was initiated pursuant to the Residential Tariff Decision in order to ensure the continued successful implementation of the RRES Program. C. CONDUCT OF THE PROCEEDING On April 24, 2026, the Authority issued the Notice of Proceeding in the abovecaptioned proceeding. On May 11, 2026, the Authority issued a Notice of Request for Written Comments on the following topics: rate setting; Contractor Compliance Working Group report; and solar production measurement for DC-coupled solar and storage systems. On May 28, 2026, the Authority received six sets of written comments from interested stakeholders. On August 18, 2026, the Authority held a Technical Meeting to discuss the topics outlined in the May 11, 2026 Notice of Request for Written Comments. On August 4, 2026, the Authority issued a second Notice of Request for Written Comments on the following topics: program document updates, application fees, and multi-family affordable housing eligibility requirements. On August 19, 2025, the Authority received seven sets of written comments from Program stakeholders.
  2. Page 5 of 50

    Docket No. 26-08-02 Page 3 The Authority issued a Proposed Final Decision on October 1, 2026, and provided an opportunity for Participants to file Written Exceptions. D. PARTICIPANTS A listing of all Participants to this proceeding is appended hereto as Appendix A. II. LEGAL AUTHORITY The RRES Program was established pursuant to subsections (b), (d), and (e), and portions of subsection (c) of section 3 of the Public Act 19-35, An Act Concerning a Green Economy and Environmental Protection, now codified in General Statutes § 16-244z. General Statutes § 16-244z(b)(1) required the Authority to establish tariffs for each electric distribution company (EDC) to purchase from residential customers Class I renewable energy from projects located on a residential customer’s own premises as well as rates for such tariffs. Additionally, General Statutes § 16-244z(b)(1) permits the Authority to modify the tariff rates based on changed circumstances. The Authority determined in the Residential Tariff Decision that it would initiate an annual docket to review key RRES Program metrics, including, but not limited to, deployed MW and low- and moderate-income customer participation, and to ensure the Program is “on track to at least maintain historical deployment levels and to deliver a carbon free grid by 2040.” Residential Tariff Decision, p. 40. The Authority reviews the RRES Program design documents and Program Manual, relevant compliance filings, and current tariff rates to determine if and how the RRES Program can and should be modified to better align with the direction provided in the Residential Tariff Decision. III. PROGRAM OBJECTIVES In the Residential Tariff Decision, the Authority established the following five Program Objectives to guide the development, implementation, and administration of the RRES Program. 1. The sustained, orderly development of the state’s solar industry, ensuring at a minimum that Connecticut’s annual historical deployment of residential solar is maintained (i.e., approximately 50-60 MW per year); 2. Achieve a 100% zero carbon electric grid by 2040, including by promoting additional annual deployment of residential renewable energy as needed; 3. Balance participant costs and benefits with non-participant costs and benefits and electric system costs and benefits; 4. Ensure program accessibility for customers, by providing customer protections both explicitly through resources and
  3. Page 6 of 50

    Docket No. 26-08-02 Page 4 disclosure forms, and also through simplified program and tariff designs; 5. Encourage increased inclusivity overall, as well as program participation by low- and moderate-income (LMI) customers and customers in environmental justice communities. Residential Tariff Decision, p. 7. The Authority relied on the Program Objectives in evaluating the current RRES Program design and assessing any possible changes to be ordered in this proceeding with the objective of better aligning the RRES Program with the Program Objectives and the direction provided in the Residential Tariff Decision. The Authority reaffirms that the Program Objectives shall guide the Program Administrators in their administration of the RRES Program, particularly in instances (1) not explicitly addressed through the approved RRES Program documents or through Authority direction in prior Decisions or motion rulings and (2) where the EDCs are empowered to make administrative changes without PURA approval (See Section IV.N. of the Year 2 Decision). IV. AUTHORITY ANALYSIS A. PROGRAM OVERVIEW In the Residential Tariff Decision, the Authority established a statewide, six-year residential solar program to be administered by the EDCs in their respective service territories. The RRES Program was created to ensure the continued growth of the residential renewable energy market upon the conclusion of the prior Residential Solar Investment Program (RSIP) and the sunsetting of traditional net metering on December 31, 2021. General Statutes § 16-244z. The RRES Program gives residential customers the opportunity to sell energy and renewable energy certificates (RECs) from an eligible project, such as a solar photovoltaic (PV) system, for a 20-year term under one of two tariff rate structures: (1) Buy-All; or (2) Netting. Under the Buy-All tariff, the solar project is provided fixed compensation for all energy and RECs produced over the 20-year term. Compensation is provided to customers in the form of monetary on-bill credits, with the potential for an annual cash out for credits that exceed the customer’s utility bills upon customer request. Under the Netting tariff, projects are compensated for the net energy produced (i.e., all energy production not consumed within the monthly netting period) at the retail electric rate at the time of generation. A customer’s billed energy usage is reduced by the energy produced and used onsite. The EDCs provide customers with monetary onbill credits for any excess energy exported to the grid. Additionally, the EDCs purchase all RECs generated by the project at the applicable REC incentive rate or assess a nonbypassable charge on each kilowatt-hour (kWh) produced.
  4. Page 7 of 50

    Docket No. 26-08-02 Page 5 Table 1, below, provides a summary of the RRES Program Tariff rates and adders for project applications received in calendar year 2026. Table 1: 2026 RRES Tariff Rates Eversource UI Low-Income Adder Distressed Municipality Adder See Year 5 Decision, p. 13. Buy-All Rate ($/kWh) 0.3289 0.3289 0.055 0.0275 Netting REC Rate / NonBypassable Charge ($/kWh) -0.0402 -0.0402 0.035 0.0175 Table 2 includes a summary of application data from the start of the program in 2022 through June 2026. Over that period, roughly 564 MW have been approved for the Program. Table 2: RRES Program Applications, January 2022-June 2026 2026 JanJune 2025 2024 2023 2022 Total Eversource UI Eversource UI Eversource UI Eversource UI Eversource UI Eversource UI Both EDCs Total Applications 3,259 Total Application kW 31,493 Approved Applications 3,417 Approved kW 32,901 1,006 8,338 855 7,211 12,850 3,616 12,600 3,185 17,412 3,469 12,460 2,371 58,581 13,647 72,228 114,083 29,239 101,394 25,272 137,691 27,994 100,238 16,579 484,900 107,423 592,323 12,950 3,301 11,996 2,991 17,565 3,373 11,168 1,898 57,096 12,418 69,514 114,838 26,060 96,446 21,441 138,527 23,557 89,570 13,160 472,282 91,430 563,712 Eversource Compliance, July 15, 2026, Att. 1; UI Compliance, July 15, 2026, Att. 1; UI Compliance, Jan. 17, 2023, Docket No. 22-08-02, Att. 1. Table 3 includes a summary of projects deployed from 2022 through June 2026. Over that period, roughly 456 MW of approved projects have been deployed through the program.
  5. Page 8 of 50

    Docket No. 26-08-02 Page 6 Table 3: RRES Program Deployment January 2022-June 2026 2026 Jan-June 2025 2024 2023 2022 Total Eversource UI Eversource UI Eversource UI Eversource UI Eversource UI Eversource UI Both EDCs Systems Deployed 3,934 1,290 11,569 2,573 11,195 2,347 14,855 2,612 5,533 579 47,086 9,401 56,487 Capacity Deployed (kW) 34,743 10,101 99,200 20,301 87,146 17,825 119,534 19,438 44,242 3,894 384,865 71,558 456,423 Eversource Compliance, July 15, 2026, Att. 1; UI Compliance, July 15, 2026, Att. 1; UI Compliance, Jan. 17, 2023, Docket No. 22-08-02, Att. 1. B. RATE SETTING 1. General Methodology General Statutes § 16-244z(b)(1) specifies that the Authority establish rates for renewable energy tariffs based on either competitive solicitations or “the average cost of installing the generation project and a reasonable rate of return that is just, reasonable and adequate”, and permits the Authority to “modify such rate for new customers under this subsection based on changed circumstances.” In setting tariff rates for future Program years, the Authority is guided by the three rate-setting objectives outlined in the Residential Tariff Decision. First, the Authority seeks to foster the sustained, orderly development of the state’s solar industry. Residential Tariff Decision, p. 37. Second, the Authority seeks to deploy residential renewable energy systems through the RRES Program to help achieve a 100% zero carbon grid by 2040. Id. Third, the Authority seeks to balance RRES Program participant costs and benefits with the costs and benefits to non-participating ratepayers and the electric system as a whole. Id. Ultimately, the Authority weighs all three objectives in establishing RRES Program Tariff rates but errs on the side of setting such rates no higher than necessary to achieve these objectives. Year 1 Decision, p. 5.
  6. Page 9 of 50Match

    Docket No. 26-08-02 Page 7 When authorizing the Program, the Authority relied on analysis from the Connecticut Green Bank (CGB) to determine the appropriate rate of return needed to meet the rate-setting objectives. Residential Tariff Decision, p. 38. Based on CGB data and stakeholder testimony, the Authority subsequently determined that the rate of return that was necessary to achieve these objectives was 9 – 11%. Id. Finally, to calculate the ratepayer support necessary to achieve this rate of return, the Authority found the following values necessary to consider: “1) Average upfront installed system cost; 2) the federal Investment Tax Credit (ITC); 3) Ongoing operations and maintenance (O&M) costs; 4) System performance (e.g., capacity factor); 5) Retail electricity rates, including an assumed escalation factor; and 6) the unlevered [internal rate of return (IRR)] for each tariff (i.e., the buy-all and netting tariffs).” Year 1 Decision, p. 6. In addition, Public Act 25-173, An Act Concerning Energy Affordability, Access, and Accountability, requires the Authority, beginning January 1, 2026, to establish a nonbypassable charge for the Netting tariff of at least 3.25 cents per kWh and adjust the BuyAll tariff rate to be “substantially similar” in value. 2. Stakeholder Comments Eversource reports that the average installed cost of RRES systems, calculated from PowerClerk application data, was $3.71 per watt DC in 2025 and $3.69 per watt in the first quarter of 2026. Eversource Comments, May 28, 2026, p. 2. For RRES systems installed in UI territory, the average cost was $4.30 per watt DC in 2025 and $4.28 per watt in the first quarter of 2026. UI Comments, May 28, 2026, p. 2. Sunrun Inc. (Sunrun), Tesla, GoodLeap, IGS, the Connecticut Solar & Storage Association (ConnSSA), and Earthlight Technologies (collectively, the Joint Solar Parties) note several factors creating a challenging market environment for residential solar and impacting RRES deployment figures. Joint Solar Party Comments, May 28, 2026, pp. 12. Notably, the 25D Residential Clean Energy Credit for homeowner-owned systems is no longer available as of 2026, which created a “small surge in applications in the second half of 2025” and an expected market contraction in 2026. Id., p. 2. While the section 48E Clean Electricity Investment Credit for third-party-owned (TPO) systems remains available through 2027, the Joint Solar Parties state that the lack of clarity regarding elements of the Foreign Entity of Concern (FEOC) requirements and federal trade policies continue to create uncertainty and price increases. Id. Additionally, the Joint Solar Parties assert that the $0.402 cent per kWh non-bypassable charge and utility rate decreases, in combination, result in the lowest RRES Netting tariff value for participants since the start of the program in 2022. Id., p. 3. RRES applications in the first quarter of 2026 were significantly lower than the first quarter of recent program years (2023-2025), a drop that parallels the national residential solar market trend. Id., p. 4. The Joint Solar Parties state that Eversource’s and UI’s residential rates as of July 1 will be approximately $0.236 and $0.266 per kWh, respectively, which are lower than what was modeled in the Year 5 Residential Tariff Model and, if incorporated into the model, would result in a recommended REC adder rather than a non-bypassable charge. Accordingly, the Joint Solar Parties assert that a non-bypassable charge of $0.0325/kWh,
  7. Page 10 of 50Match

    Docket No. 26-08-02 Page 8 as required by Public Act 25-173, would be appropriate for 2027. Id., p. 5. In general, the Joint Solar Parties argue that the Authority should limit significant structural changes to the program for the 2027 program year as it will be the final full year of the RRES Program. Id., p. 1. Office of Consumer Counsel (OCC) expresses concern that the loss of the investment tax credit (ITC), which has historically contributed about 11 cents per kWh to residential solar project economics, will put upward pressure on upfront costs. OCC Comments, May 28, 2026, p. 2. OCC argues that the residential solar industry is now mature and robust, and it would not be appropriate to transfer the loss of the ITC to Connecticut ratepayers by increasing compensation rates. Id. If upfront costs continue to increase, OCC recommends PURA consider approving a more limited volume of MW in 2027 rather than increasing ratepayer support per project. Id. 3. Rate Setting Calculations As in past years, the Authority based its rate setting process on the Residential Tariff Model adopted in the Year 1 Decision. To reflect updated market conditions, the Authority updated the following inputs in the model since it was last used to set 2026 compensation rates in the Year 5 Decision: (1) retail electric rates and historical escalation factor; and (2) average installed cost, using an average of the EDCs’ reported RRES project costs per watt in 2025 and 2026. An updated version of the Residential Tariff Model is appended to this Decision as Appendix B, Residential Tariff Model – 2027. Consistent with the approach taken in the Year 5 Decision, the Authority sets baseline tariff rates based on the model outputs for TPO systems, which remain eligible for the ITC (with certain restrictions) through 2027. Year 5 Decision, pp. 11-12. Additionally, the Authority maintains the 10% target IRR for both Netting and Buy-All systems used in the Year 5 Decision. Id., p. 11. Additionally, the Authority adjusted the utility escalation rate to be calculated based on a 20-year historical average rather than the 16-year average used in the 2026 Residential Tariff Model. This change was made for consistency with the adoption of a standardized maximum utility escalation rate for contractor use, which is based on a 20year average of utility rates (see Section D.3). Applying an IRR of 10% for the Buy-All tariff, the Residential Tariff Model returns a compensation rate of $0.3289, reflecting minimal change in the average installed cost of solar compared to the previous year. Using a target IRR of 10% for the Netting tariff, the Residential Tariff Model returns a non-bypassable charge of $0.0067 per kWh for Eversource and $0.0657 per kWh for UI. For Eversource, this non-bypassable charge value is below the required $0.0325 per kWh pursuant to Public Act 25-173, Section 9. Accordingly, the Authority authorizes the required $0.0325 non-bypassable charge for RRES systems that apply to the program in Eversource territory in 2027.
  8. Page 11 of 50Match

    Docket No. 26-08-02 Page 9 The Residential Tariff Model returns a higher non-bypassable charge for UI due to UI’s higher residential retail rates. In previous years, the Authority has maintained equivalent Netting rates for both EDCs despite UI’s higher retail rates, largely because RRES Program deployment in UI service territory has historically lagged that of Eversource. Year 3 Decision, pp. 9-10; Year 5 Decision, p. 11. However, recent RRES data indicate that deployment in UI territory has reached or surpassed 20% of the program total, the expected proportion based on each EDCs’ total annual load. Projects in UI territory made up about 18% and 25% of the total number of deployed projects in 2025 and the first half of 2026, respectively, and about 20% of total program approved applications in 2025 and the first half of 2026. As a result, the Authority concludes that program maturity and financial value to participants have supported an increased proportion of program deployment in UI service territory despite an increase in the nonbypassable charge in 2026. Accordingly, the Authority authorizes a non-bypassable charge of $0.0657 per kWh for systems that apply to the program in UI territory in 2027. a. Adder Values Finally, to promote continuity in the final year of the RRES Program and absent stakeholder comments to the contrary, the Authority will maintain the current distressed municipality and low-income adder values for both the Buy-All and Netting tariffs. 4. Summary – 2027 Compensation Rates A summary of the RRES Year 6 compensation rates is available in Table 4 below. Table 4: 2027 RRES Tariff Rates Buy-All Rate ($/kWh) Eversource 0.3289 Netting REC Rate / NonBypassable Charge ($/kWh) -0.0325 UI Low-Income Adder Distressed Municipality Adder 0.3289 0.055 0.0275 -0.0657 0.035 0.0175 C. PROPOSED APPLICATION FEES Order No. 2 of the Year 5 Decision directed the EDCs to file annually, by August 1, a proposed application fee to cover the estimated administrative costs associated with processing applications, including detailed calculations to justify the proposed fee. Year 5 Decision, pp. 29-30. Eversource proposes no changes to the current application fee of $163. Motion No. 4, July 28, 2026, Att. 1. Eversource states that it collected $1,520,126 in fees from approximately 9,985 applications over the 12 months ending June 30, 2026 and expects to incur $1,760,735 in program operation costs for 2026. Id. Based on these amounts, Eversource’s administrative cost per application is about $176, with a cost of
  9. Page 12 of 50

    Docket No. 26-08-02 Page 10 approximately $5 per application for services to enable integrated payment of application fees within the application portal and about $0.75 per application for independent ombudsperson costs. Id. Eversource notes that the current fee “is offsetting a substantial portion” of its costs to manage the RRES program and does not recommend changes for the final program year. Id. UI, in contrast, proposes increasing the application fee from $200 to $240. Motion No. 5, July 31, Att. 1. UI reports that it collected $546,149 in application fees across 3,217 applications over the 12 months ending June 2026, and estimates administrative costs of $1,001,682 related to labor and administrative support for processing RRES applications, similar to costs in 2025. Id. UI notes that this reflects lower application volumes in 2026 compared to 2025, resulting in an estimated cost per application of $312. UI proposes increasing the application fee to partially offset the lower fee revenue. Id. OCC reiterates its position from past RRES Program proceedings that application fees should be set to fully recover each EDC’s actual administrative costs without shifting any under-recovery to non-participating ratepayers. OCC Comments, Aug. 19, 2026, p. 3. OCC does not oppose Eversource’s proposals to maintain the existing fees, but notes that UI’s per-application costs are already significantly higher than Eversource’s; thus, OCC argues that UI should provide a clearer breakdown of its fixed and variable administrative cost components and an explanation of why total administrative costs remain fixed despite a decline in application volume. Id. Sunrun and Goodleap state that the proposed application fees are reasonable. Sunrun and Goodleap Comments, Aug. 19, 2026, p. 2. Save the Sound also supports the proposed fees as striking the appropriate balance among the Program Objectives. Save the Sound Comments, August 19, 2026, pp. 1-2. The Authority approves Eversource’s proposal to maintain the current application fee of $163, as the application fee currently covers a large portion of the company’s program administrative costs. The Authority also approves UI’s proposed application fee increase from $200 to $240, finding that an increase in the application fee is appropriate to partially offset the shortfall in application fee revenue compared to administrative costs. Although the proposed application fees do not fully cover all RRES Program administrative costs, the Authority’s expectation in previous program years has been that application fees will cover most EDC costs associated with administering the Program, to ensure that non-participating customers do not incur undue cost impacts, without creating a barrier to program participation. See Residential Tariff Decision, p. 26; Year 3 Decision, p. 41; Year 4 Decision, p. 15. No stakeholder argued that UI’s proposed application fee increase would pose a barrier to participation. Nevertheless, both EDCs anticipate that similar administrative costs related to application processing in 2026 compared to those incurred in 2025. The Authority presumes that, while some administrative costs are fixed, certain cost components should vary based on application volumes. Thus, lower application volumes should result in lower application processing costs. Additionally, questions remain regarding the extent
  10. Page 13 of 50

    Docket No. 26-08-02 Page 11 to which UI’s higher administrative costs per project compared to Eversource’s are warranted. The EDCs annually recover RRES Program costs through the annual rate adjustment mechanism (RAM) proceedings (e.g., for 2026, Docket Nos. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company and 26-01-04, Annual Review of the Rate Adjustment Mechanisms of The United Illuminating Company), where the components of administrative costs and their drivers may be considered more fully. The EDCs may be directed to provide additional justification of the fixed and variable components of RRES Program administrative costs in the relevant RAM proceeding. 1. Interconnection Fee Adder Order No. 3 of the Decision in Docket No. 22-06-29, PURA Investigation Into Distributed Energy Resource Interconnection Cost Allocation (Residential Interconnection Cost Allocation Decision), directs the EDCs to annually file a proposed application fee adder for interconnection applications received the following calendar year. Decision, Dec. 20, 2023, Docket No. 22-06-29, pp. 20-21. Neither EDC recommends changes to the current application fee adder of $25. Motion No. 6, July 31, 2026, p. 2; Motion No. 7, Aug. 3, 2026, p. 1. Eversource reports that it incurred $1,435,045 in capital costs associated with residential transformer upgrades from July 2025 to June 2026, and collected $157,991 in fee adder revenue over the same period. Motion No. 7, p. 1. While transformer upgrade costs substantially exceeded adder fee revenue, Eversource recommends maintaining the current fee for the final year of the RRES Program and reviewing the allocation of costs for residential DER interconnection as part of a holistic review of renewable energy program design in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. Id., pp. 12. Eversource notes that fee changes “require further updates to program materials and company systems, require communications, education and outreach to program participants, and may have further impacts on participant business operations,” and does not recommend undertaking changes that may be in effect for only one year. Id., p. 2. UI reports that it collected $41,025 in interconnection fee adder revenue from July 1, 2025 through June 30, 2026, while transformer upgrade costs for 14 DER-triggered upgrades over the same period were $236,756, or an annual revenue requirement of $195,688. Motion No. 6, p. 2; Compliance, Aug. 19, 2026, p. 2. UI notes that Order No. 5 of the Residential Interconnection Cost Allocation Decision directs the Interconnection Working Group to assess the effectiveness of the residential DER interconnection cost allocation policy, including potential refinements to the application fee adder and alternative cost allocation approaches. Motion No. 6, p. 1. UI therefore recommends maintaining the existing fee pending completion of the Interconnection Working Group’s assessment. Id. The Interconnection Working Group reviewed the EDCs’ interconnection fee data and concludes that no change to the fee adder is necessary at this time. Compliance, Aug. 19, 2026, p. 2. The Interconnection Working Group notes that although the fee adder does not fully cover transformer upgrade costs for UI or Eversource, the monthly