Page 10 of 51
Docket No. 26-08-02 Page 8 to the program for the 2027 program year as it will be the final full year of the RRES Program. Id., p. 1. Office of Consumer Counsel (OCC) expresses concern that the loss of the investment tax credit (ITC), which has historically contributed about 11 cents per kWh to residential solar project economics, will put upward pressure on upfront costs. OCC Comments, May 28, 2026, p. 2. OCC argues that the residential solar industry is now mature and robust, and it would not be appropriate to transfer the loss of the ITC to Connecticut ratepayers by increasing compensation rates. Id. If upfront costs continue to increase, OCC recommends PURA consider approving a more limited volume of MW in 2027 rather than increasing ratepayer support per project. Id. 3. Rate Setting Calculations As in past years, the Authority based its rate setting process on the Residential Tariff Model adopted in the Year 1 Decision. To reflect updated market conditions, the Authority updated the following inputs in the model since it was last used to set 2026 compensation rates in the Year 5 Decision: (1) retail electric rates and historical escalation factor; and (2) average installed cost, using an average of the EDCs’ reported RRES project costs per watt in 2025 and 2026. An updated version of the Residential Tariff Model is appended to this Decision as Appendix B, Residential Tariff Model – 2027. Consistent with the approach taken in the Year 5 Decision, the Authority sets baseline tariff rates based on the model outputs for TPO systems, which remain eligible for the ITC (with certain restrictions) through 2027. Year 5 Decision, pp. 11-12. Additionally, the Authority maintains the 10% target IRR for both Netting and Buy-All systems used in the Year 5 Decision. Id., p. 11. Additionally, the Authority adjusted the utility escalation rate to be calculated based on a 20-year historical average rather than the 16-year average used in the 2026 Residential Tariff Model. This change was made for consistency with the adoption of a standardized maximum utility escalation rate for contractor use, which is based on a 20year average of utility rates (see Section D.3). Applying an IRR of 10% for the Buy-All tariff, the Residential Tariff Model returns a compensation rate of $0.3289, reflecting minimal change in the average installed cost of solar compared to the previous year. Using a target IRR of 10% for the Netting tariff, the Residential Tariff Model returns a non-bypassable charge of $0.0067 per kWh for Eversource and $0.0657 per kWh for UI. For Eversource, this non-bypassable charge value is below the required $0.0325 per kWh pursuant to Public Act 25-173, Section 9. Accordingly, the Authority authorizes the required $0.0325 non-bypassable charge for RRES systems that apply to the program in Eversource territory in 2027. The Residential Tariff Model returns a higher non-bypassable charge for UI due to UI’s higher residential retail rates. In previous years, the Authority has maintainedPage 11 of 51
Docket No. 26-08-02 Page 9 equivalent Netting rates for both EDCs despite UI’s higher retail rates, largely because RRES Program deployment in UI service territory has historically lagged that of Eversource. Year 3 Decision, pp. 9-10; Year 5 Decision, p. 11. However, recent RRES data indicate that deployment in UI territory has reached or surpassed 20% of the program total, the expected proportion based on each EDCs’ total annual load. Projects in UI territory made up about 18% and 25% of the total number of deployed projects in 2025 and the first half of 2026, respectively, and about 20% of total program approved applications in 2025 and the first half of 2026. As a result, the Authority concludes that program maturity and financial value to participants have supported an increased proportion of program deployment in UI service territory despite an increase in the nonbypassable charge in 2026. Accordingly, the Authority authorizes a non-bypassable charge of $0.0657 per kWh for systems that apply to the program in UI territory in 2027. a. Adder Values Finally, to promote continuity in the final year of the RRES Program and absent stakeholder comments to the contrary, the Authority will maintain the current incomeeligible and distressed municipality adder values for both the Buy-All and Netting tariffs. 4. Summary – 2027 Compensation Rates A summary of the RRES Year 6 compensation rates is available in Table 4 below. Table 4: 2027 RRES Tariff Rates Buy-All Rate ($/kWh) Eversource 0.3289 Netting REC Rate / NonBypassable Charge ($/kWh) -0.0325 UI Income-Eligible Adder Distressed Municipality Adder 0.3289 0.055 0.0275 -0.0657 0.035 0.0175 C. PROPOSED APPLICATION FEES Order No. 2 of the Year 5 Decision directed the EDCs to file annually, by August 1, a proposed application fee to cover the estimated administrative costs associated with processing applications, including detailed calculations to justify the proposed fee. Year 5 Decision, pp. 29-30. Eversource proposes no changes to the current application fee of $163. Motion No. 4, July 28, 2026, Att. 1. Eversource states that it collected $1,520,126 in fees from approximately 9,985 applications over the 12 months ending June 30, 2026 and expects to incur $1,760,735 in program operation costs for 2026. Id. Based on these amounts, Eversource’s administrative cost per application is about $176, with a cost of approximately $5 per application for services to enable integrated payment of application fees within the application portal and about $0.75 per application for independentPage 12 of 51
Docket No. 26-08-02 Page 10 ombudsperson costs. Id. Eversource notes that the current fee “is offsetting a substantial portion” of its costs to manage the RRES program and does not recommend changes for the final program year. Id. UI, in contrast, proposes increasing the application fee from $200 to $240. Motion No. 5, July 31, Att. 1. UI reports that it collected $546,149 in application fees across 3,217 applications over the 12 months ending June 2026, and estimates administrative costs of $1,001,682 related to labor and administrative support for processing RRES applications, similar to costs in 2025. Id. UI notes that this reflects lower application volumes in 2026 compared to 2025, resulting in an estimated cost per application of $312. UI proposes increasing the application fee to partially offset the lower fee revenue. Id. OCC reiterates its position from past RRES Program proceedings that application fees should be set to fully recover each EDC’s actual administrative costs without shifting any under-recovery to non-participating ratepayers. OCC Comments, Aug. 19, 2026, p. 3. OCC does not oppose Eversource’s proposals to maintain the existing fees, but notes that UI’s per-application costs are already significantly higher than Eversource’s; thus, OCC argues that UI should provide a clearer breakdown of its fixed and variable administrative cost components and an explanation of why total administrative costs remain fixed despite a decline in application volume. Id. Sunrun and Goodleap state that the proposed application fees are reasonable. Sunrun and Goodleap Comments, Aug. 19, 2026, p. 2. Save the Sound also supports the proposed fees as striking the appropriate balance among the Program Objectives. Save the Sound Comments, August 19, 2026, pp. 1-2. The Authority approves Eversource’s proposal to maintain the current application fee of $163, as the application fee currently covers a large portion of the company’s program administrative costs. The Authority also approves UI’s proposed application fee increase from $200 to $240, finding that an increase in the application fee is appropriate to partially offset the shortfall in application fee revenue compared to administrative costs. Although the proposed application fees do not fully cover all RRES Program administrative costs, the Authority’s expectation in previous program years has been that application fees will cover most EDC costs associated with administering the Program, to ensure that non-participating customers do not incur undue cost impacts, without creating a barrier to program participation. See Residential Tariff Decision, p. 26; Year 3 Decision, p. 41; Year 4 Decision, p. 15. No stakeholder argued that UI’s proposed application fee increase would pose a barrier to participation. Nevertheless, both EDCs anticipate that similar administrative costs related to application processing in 2026 compared to those incurred in 2025. The Authority presumes that, while some administrative costs are fixed, certain cost components should vary based on application volumes. Thus, lower application volumes should result in lower application processing costs. Additionally, questions remain regarding the extent to which UI’s higher administrative costs per project compared to Eversource’s are warranted. The EDCs annually recover RRES Program costs through the annual ratePage 13 of 51
Docket No. 26-08-02 Page 11 adjustment mechanism (RAM) proceedings (e.g., for 2026, Docket Nos. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company and 26-01-04, Annual Review of the Rate Adjustment Mechanisms of The United Illuminating Company), where the components of administrative costs and their drivers may be considered more fully. The EDCs may be directed to provide additional justification of the fixed and variable components of RRES Program administrative costs in the relevant RAM proceeding. 1. Interconnection Fee Adder Order No. 3 of the Decision in Docket No. 22-06-29, PURA Investigation into Distributed Energy Resource Interconnection Cost Allocation (Residential Interconnection Cost Allocation Decision), directs the EDCs to annually file a proposed application fee adder for interconnection applications received the following calendar year. Decision, Dec. 20, 2023, Docket No. 22-06-29, pp. 20-21. Neither EDC recommends changes to the current application fee adder of $25. Motion No. 6, July 31, 2026, p. 2; Motion No. 7, Aug. 3, 2026, p. 1. Eversource reports that it incurred $1,435,045 in capital costs associated with residential transformer upgrades from July 2025 to June 2026, and collected $157,991 in fee adder revenue over the same period. Motion No. 7, p. 1. While transformer upgrade costs substantially exceeded adder fee revenue, Eversource recommends maintaining the current fee for the final year of the RRES Program and reviewing the allocation of costs for residential DER interconnection as part of a holistic review of renewable energy program design in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. Id., pp. 12. Eversource notes that fee changes “require further updates to program materials and company systems, require communications, education and outreach to program participants, and may have further impacts on participant business operations,” and does not recommend undertaking changes that may be in effect for only one year. Id., p. 2. UI reports that it collected $41,025 in interconnection fee adder revenue from July 1, 2025, through June 30, 2026, while transformer upgrade costs for 14 DER-triggered upgrades over the same period were $236,756, or an annual revenue requirement of $195,688. Motion No. 6, p. 2; Compliance, Aug. 19, 2026, p. 2. UI notes that Order No. 5 of the Residential Interconnection Cost Allocation Decision directs the Interconnection Working Group to assess the effectiveness of the residential DER interconnection cost allocation policy, including potential refinements to the application fee adder and alternative cost allocation approaches. Motion No. 6, p. 1. UI therefore recommends maintaining the existing fee pending completion of the Interconnection Working Group’s assessment. Id. The Interconnection Working Group reviewed the EDCs’ interconnection fee data and concludes that no change to the fee adder is necessary at this time. Compliance, Aug. 19, 2026, p. 2. The Interconnection Working Group notes that although the fee adder does not fully cover transformer upgrade costs for UI or Eversource, the monthly bill increase for an average ratepayer to recover transformer upgrade costs is minimal ($0.003 per month for Eversource and $0.0006 per month for UI). Id. Additionally,Page 14 of 51
Docket No. 26-08-02 Page 12 Interconnection Working Group members conclude that changes to the current RRES program may not be in customers’ interest as the program is ending soon; instead, the implementation of renewable energy successor programs in Docket No. 26-06-04 provides a better opportunity to consider necessary changes to the fee adder and the full cost allocation policy. Id. Earthlight argues that the definition of “Residential DER” as set forth in the Residential Interconnection Cost Allocation Decision, should be expanded to include multifamily affordable housing (MFAH) projects. Earthlight Comments, Aug. 19, 2026, pp. 1-2. Earthlight asserts that MFAH projects fall within the scope of the RRES Program and are required to pay the same fee adder but do not benefit from the socialization of transformer upgrade costs. Id. The Authority finds it appropriate to maintain the current $25 interconnection fee adder for the remainder of the RRES Program in order to maintain consistency in the final year. However, the persistent under-collection of fee revenue compared to transformer upgrade costs warrants additional scrutiny to ensure that the residential cost allocation program is achieving its intended objectives. The Authority may consider potential changes to the residential cost allocation policy, including the fee adder, in either Docket No. 26-06-04 or Docket No. 25-03-21, PURA Investigation of Non-Residential Distributed Energy Resource Interconnection Upgrades and Cost Allocation. Additionally, the Authority declines to expand the residential cost allocation program to include larger MFAH RRES projects, which may incur more significant upgrade costs compared to 1 to 4-unit residential projects, without a detailed evaluation of the cost allocation implications. D. CONTRACTOR COMPLIANCE In Order No. 25 of the Year 5 Decision, the Authority requested that the Office of Education, Outreach, and Enforcement (EOE) convene and lead a stakeholder working group (Contractor Compliance Working Group, or CCWG) to develop recommendations regarding specific inputs, assumptions, and calculation methodologies that should be standardized across RRES project applications. The CCWG was directed to file a final report of recommendations by March 31, 2026, including proposals for standardizing the starting utility rate used to estimate net year one savings, annual utility rate escalation, and degradation rate; the process and frequency of updating such inputs; the incorporation of standardized calculations and assumptions into the Customer Disclosure Form (CDF) and annual contractor filing requirements; the process for verifying and auditing contractor compliance with standardized calculation requirements; and the date that any proposed standardized calculation requirements should take effect for installers in the RRES Program. Year 5 Decision, pp. 19-20, 36. On March 31, 2026, EOE submitted the CCWG’s final report of recommendations. EOE Corresp., March 31, 2026, CCWG Report FINAL (CCWG Final Report). The CCWG consisted of fifteen members: CGB, ConnSSA, Earthlight Technologies, Eversource, GoodLeap, Ion Solar, Ion Solar Pros (ISP), OCC, SAVKAT, SEIA, SunRun, Tesla, Trinity Solar, and UI, as well as DEEP-BETP as a non-voting member. Id., p. 2. Over the course of ten meetings between January and March 2026, the CCWG discussed and voted onPage 15 of 51
Docket No. 26-08-02 Page 13 24 proposals. Id., p. 4. Of those proposals, six received consensus agreement, and eight of the 17 non-consensus proposals received “overwhelming support” (e.g., at least 11 votes in favor out of the 14 total votes). Id. The proposals ultimately recommended by EOE on behalf of the CCWG, stakeholder comments, and Authority analysis are summarized below. 1. Standardized Terminology and Changes to CDF EOE notes that CCWG members iterated on the terminology to be used in the CDFs and contractor compliance filings throughout the working group process. CCWG Final Report, p. 33. While no formal vote was taken, EOE believes that the CCWG ultimately agreed on appropriate terms to be used. Id. Accordingly, EOE recommends that the following terminology be used consistently throughout the CDFs and contractor compliance filings: Average Starting Utility Rate ($/kWh); Utility Escalation Rate (%), PV Degradation Rate (%), Estimated Year One Net Savings ($), Estimated Multi-Year Net Savings ($), and Estimated Year One Production (kWh). Id. The Joint Solar Parties, OCC, and Save the Sound supported the proposed standardized terminology. Joint Solar Party Comments, May 28, 2026, p. 6; OCC Comments, May 28, 2026, p. 4; Save the Sound Comments, May 28, 2026, p. 1. Additionally, EOE recommends that the Authority implement consensus Proposals 16, 21, and 22, and Proposals 17 and 19 (in part), all of which propose changes to certain line items on the CDFs. CCWG Final Report, pp. 33-34. These five proposals are as follows: Proposal 16: Add line item to the CDFs with a Yes/No checkbox for “Are multiyear net savings estimates provided?” Proposal 21: On the Direct Owner CDF, replace “estimated net average monthly savings” on the with “Customer Estimated Year One Net Savings.” Proposal 22: On the Third-Party Owner CDF, replace “Escalator rate used to estimate net year one savings” with “Utility Escalator Rate used to estimate MultiYear Net Savings.” Proposal 17 (in part): Add terms and definitions section to the CDFs, and a fillable text box to detail software calculations and/or calculation methodologies Proposal 19 (in part): Add a Yes/No checkbox to the Direct Owned and ThirdParty Owned Customer Disclosure Forms (CDFs) for “Is the system being financed through a financing option provided by the contractor? If yes, contractor confirms the financing terms have been discussed with customer.” Providing specific financial terms on the CDF is not required. Id., pp. 33-37. The EDCs opposed Proposal 19, citing concerns that the CDFs are long and should not be made longer. Id., p. 34. No other stakeholder opposed the proposedPage 16 of 51
Docket No. 26-08-02 Page 14 changes to the CDFs.1 However, Sunrun and Goodleap disagreed with several of specific changes proposed in the EDCs’ redlined CDFs filed in compliance with Order No. 1 of the Year 5 Decision; Sunrun and Goodleap’s proposed changes are discussed further in Section G of this Decision. Sunrun and Goodleap Comments, Aug. 19, 2026, pp. 2-3. EOE also noted that some of the EDCs’ proposed changes to the CDFs must be altered to the extent that the Authority does not adopt all changes proposed in the CCWG Final Report. EOE Comments, Aug. 19, 2026, p. 1. The Authority agrees that the standardized terminology and related changes to the CDFs will enhance clarity for RRES participants and contractors. Accordingly, the Authority approves EOE-recommended Proposals 16, 21, and 22, and the partial adoption of Proposals 17 and 19. 2. Customer’s Annual Electricity Usage EOE recommends adoption of Proposal 3, which would standardize the methodology for calculating a customer’s annual electricity usage for the purpose of determining the percentage of the customer’s usage the installed solar system is estimated to offset. CCWG Final Report, p. 9. For customers with 12 months of usage at the property at which the solar is being installed, it must be actual usage over the prior 12 months based on the customer’s utility bills; for customers with less than 12 months of usage, contractors may use “any reasonably accurate methodology” and explain in writing to the customer and in compliance filings; and in either case, the customer’s annua electricity usage may include allowable additional electrification measures per the RRES Program Manual for the applicable year. Id. UI opposed the proposal, citing potential conflicts with the Program Manual, which establishes standardized methodology for calculating customer's annual usage. CCWG Final Report, pp. 10, 38; Interrog. Resp. CAE-2. However, EOE denies any conflict as the two calculations have different purposes; the RRES Program Manual specifies the calculation of annual usage for the purpose of system sizing, while Proposal 3 is intended for the estimate of the percentage of annual usage that the system will offset. CCWG Final Report, p. 10. No other stakeholder opposed EOE’s recommended standardized approach for calculating the customer’s annual electricity usage. The Authority is unaware of any conflict between Proposal 3 and the Program Manual. As noted by EOE above, the requirements in the Program Manual regarding electricity usage calculation are included for the purpose of system sizing, not for estimating a customer’s savings. The Authority approves Proposal 3’s methodology for calculating customers’ annual electricity usage. 1 Tesla initially opposed Proposal 19, but upon further consideration agreed with EOE’s recommendation include the checkbox but exclude financial terms on the CDFs. CCWG Final Report, p. 29; Interrog. Resp. CAE-21.Page 17 of 51
Docket No. 26-08-02 Page 15 3. Utility Escalation Rate EOE recommends that the Authority standardize the Utility Escalation Rate used in the CDFs and contractor compliance filings based on the language of Proposal 7, which was approved by 12 of 14 CCWG members. CCWG Final Report, pp. 38-39. Proposal 7 specifies that the Utility Escalation Rate used in the CDFs and contractor compliance filings may be no greater than the 20-year historical compound annual growth rate for Connecticut set by the Authority in the RRES annual review docket, based on EDC reported data. Id. EOE recommends that the standardized Utility Escalation Rate be rounded to one decimal point and that the same rate be used for both EDCs. Id. OCC opposed permitting solar providers to use an escalation rate below the number established by the Authority in its annual RRES docket. OCC Comments, May 28, 2026, p. 4. In general, OCC raised concerns over proposals that would allow optionality for contractors, limiting customers’ ability to compare offers on a consistent basis. Id. The Authority approves EOE’s recommendation to adopt Proposal 7. Based on the historical utility rate data provided in this docket, the 20-year historical compound annual growth rate, rounded to one decimal point, is 2.8%. Eversource Interrog. Resp. CAE-31; UI Interrog Resp. CAE-31. Accordingly, contractors may utilize a utility escalation rate no greater than 2.8% for calculating net savings estimates presented to customers. The Authority acknowledges OCC’s opposition to allowing contractors to choose different escalation rates, which could limit customers’ ability to compare offers on a consistent basis. However, the Authority is concerned with the risk of contractors using higher escalation rates that unrealistically inflate net savings estimates and finds that allowing contractors the option to use a lower escalation poses a comparatively minimal consumer protection risk. Given the uncertainty inherent in estimating future utility rates, the Authority finds it preferable to implement a cap on the assumed escalation rate but maintain flexibility regarding the specific value used. Finally, the Authority notes that program design for the successor to the RRES Program will be considered in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs, and a methodology for determining and updating compensation rates has not yet been determined. Although the successor program to RRES may not involve the use of the Residential Tariff Model, in which escalation rates, starting utility rates, and other assumptions are updated annually, the Authority may consider the utility of approving annual updates to the allowed assumptions outside of a rate setting model. More broadly, EOE recommended that several of the requirements discussed in this section be carried over to the successor program. The Authority will evaluate and solicit stakeholder feedback on maintaining or adjusting the existing contractor compliance requirements for the successor residential program in Docket No. 26-06-04, which will likely be informed by the implementation of new requirements for the final year of the RRES Program.Page 18 of 51
Docket No. 26-08-02 Page 16 4. PV Degradation Rate EOE recommends that the Authority standardize the PV Degradation Rate by combining Proposals 4 and 5. CCWG Final Report, pp. 40-41. Under these two proposals, the Authority would set the standardized PV Degradation Rate based on the analysis of ISO-NE regarding PV lifetime performance in the most recent NREL Annual Report, rounded to one decimal point, which is currently 0.5%. Id. Alternatively, contractors would be allowed to use the degradation rate of the specific panels chosen by the customer based on the manufacturer’s data sheet. Id. As with Proposal 7, OCC opposed EOE’s recommendation to allow solar providers to use panel-specific degradation rates that have not been independently verified against NREL benchmarks. OCC Comments, May 28, 2026, p. 4. The Authority approves EOE’s recommendation for the standardized PV Degradation Rate to be set annually based on the most recent NREL PV Lifetime Project report cited by ISO-NE in its annual DER Forecast, which is currently 0.5%;2 alternatively, contractors may use the degradation rate of the specific panels used in a project based on the manufacturer’s data sheet. The Authority finds that the use of a PV degradation rate for specific panels substantiated by the manufacturer poses little risk that customers would be provided with inaccurate information. 5. Estimated Year One Net Savings EOE recommends adoption of Proposal 9, which would require contractors to use the following method for estimating Year One Net Savings in the CDF and contractor compliance filings:3 a. Estimated Year One Net Savings = [Pre-Solar Utility Costs] - [Post-Solar Utility Costs] + [Solar Cost], where i. Pre-Solar Utility Costs = [Customer’s Annual Electricity Usage] X [Average Starting Utility Rate] ii. Post-Solar Utility Costs = ((Customer’s Annual Electricity Usage – Estimated Year One Production) X Average Starting Utility Rate) + (Solar Production Charge X Estimated Year One Production) iii. Solar Cost = • For Direct Owned without financing: Cost of the system • For Direct Owned with financing: Total of payments in Year One • For Third-Party Owned: Total of payments in Year One 2 The Authority referenced the 2024 NREL Annual Report, available at: https://docs.nlr.gov/docs/fy24osti/90651.pdf, and the ISO-NE Final 2026 DER Forecast, available at: https://www.iso-ne.com/static-assets/documents/100033/2026_final_der_forecast.pdf. 3 For clarity, both the Estimated Year One Net Savings and Estimated Multi-Year Net Savings methodologies apply only to systems enrolling under the Netting tariff, as Buy-All projects do not directly reduce utility costs and are instead compensated at the approved Buy-All rate for all production. See Earthlight Exceptions, Oct. 15, 2026, p. 9.Page 19 of 51
Docket No. 26-08-02 Page 17 Contractors must inform customers that the calculation does not include the value of RECs, if any, but may provide an additional calculation based on the above methodology that adds the estimated value of RECs if the customer will receive the value of RECs. CCWG Final Report, pp. 19-20. Proposal 9 was supported nearly unanimously by CCWG members. CCWG Final Report, p. 42. Earthlight opposed the portion of the proposal that stated that the value of RECs, if any, would not be included in the calculation. The Authority approves EOE’s recommendation contained in Proposal 9, as it provides a consistent framework for estimating customers’ Year One Net Savings while excluding REC benefits that may not be provided directly to customers. Accordingly, contractors will be required to use the above method for estimating Year 1 Net Savings for customers enrolling under the Netting tariff. EOE also recommended that the standardized calculation methodology be carried over to the RRES successor program. CCWG Final Report, p. 43. Successor program rules, including the continuation or adjustment of any contractor compliance requirements, will be established in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. The Authority has previously indicated its intent to design the residential successor programs to accelerate paired solar and storage deployment. Corresp., Feb. 27, 2026, Docket No. 25-02-14, Renewable Energy Tariff Program Successor Study, p. 15. Methods for presenting the financial proposition of solar-only and paired solar and storage installation to customers may require additional consideration in that proceeding. 6. Estimated Multi-Year Net Savings EOE does not recommend requiring contractors to provide Estimated Multi-Year Net Savings, in part because of unresolved questions around how to calculate multi-year savings for projects that include storage. CCWG Final Report, p. 43. If contractors choose to provide Estimated Multi-Year Net Savings, EOE recommends the Authority adopt Proposal 14 as the standardized calculation methodology for the CDF and contractor compliance filing, which received majority approval from the CCWG and states: Start with the Estimated Year One Net Savings and over the 20-year tariff term, (i) increase the utility rate by the defined utility escalation rate; (ii) decrease the annual production by the defined PV degradation rate; and (iii) If the system is financed (loan, lease, or PPA), adjust the financing payments by the applicable financial escalations, including any balloon payments. Id., p. 44. Additionally, EOE recommends that any net savings calculation should include the full costs of the customer’s financial products, even if some payments (such as end-ofterm balloon payments) are not due within the 20-year term, as many financing agreements have a 25-year term. Id. EOE recommends that in addition to the language above, the Authority require contractors to provide a total calculation (not broken down by year like the 20-year net savings) that provides the full costs of the customer’s financial
As listed on the current system
Final Decision, 10/28/2026 [26-08-02]