Docket No. 26-08-02 Page 17 Contractors must inform customers that the calculation does not include the value of RECs, if any, but may provide an additional calculation based on the above methodology that adds the estimated value of RECs if the customer will receive the value of RECs. CCWG Final Report, pp. 19-20. Proposal 9 was supported nearly unanimously by CCWG members. CCWG Final Report, p. 42. Earthlight opposed the portion of the proposal that stated that the value of RECs, if any, would not be included in the calculation. The Authority approves EOE’s recommendation contained in Proposal 9, as it provides a consistent framework for estimating customers’ Year One Net Savings while excluding REC benefits that may not be provided directly to customers. Accordingly, contractors will be required to use the above method for estimating Year 1 Net Savings for customers enrolling under the Netting tariff. EOE also recommended that the standardized calculation methodology be carried over to the RRES successor program. CCWG Final Report, p. 43. Successor program rules, including the continuation or adjustment of any contractor compliance requirements, will be established in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. The Authority has previously indicated its intent to design the residential successor programs to accelerate paired solar and storage deployment. Corresp., Feb. 27, 2026, Docket No. 25-02-14, Renewable Energy Tariff Program Successor Study, p. 15. Methods for presenting the financial proposition of solar-only and paired solar and storage installation to customers may require additional consideration in that proceeding. 6. Estimated Multi-Year Net Savings EOE does not recommend requiring contractors to provide Estimated Multi-Year Net Savings, in part because of unresolved questions around how to calculate multi-year savings for projects that include storage. CCWG Final Report, p. 43. If contractors choose to provide Estimated Multi-Year Net Savings, EOE recommends the Authority adopt Proposal 14 as the standardized calculation methodology for the CDF and contractor compliance filing, which received majority approval from the CCWG and states: Start with the Estimated Year One Net Savings and over the 20-year tariff term, (i) increase the utility rate by the defined utility escalation rate; (ii) decrease the annual production by the defined PV degradation rate; and (iii) If the system is financed (loan, lease, or PPA), adjust the financing payments by the applicable financial escalations, including any balloon payments. Id., p. 44. Additionally, EOE recommends that any net savings calculation should include the full costs of the customer’s financial products, even if some payments (such as end-ofterm balloon payments) are not due within the 20-year term, as many financing agreements have a 25-year term. Id. EOE recommends that in addition to the language above, the Authority require contractors to provide a total calculation (not broken down by year like the 20-year net savings) that provides the full costs of the customer’s financialPage 20 of 51
Docket No. 26-08-02 Page 18 product. Id. EOE notes that this addition was not voted on in the CCWG but was raised by several members. The Joint Solar Parties oppose this addition, arguing that systems would continue to provide value after the 20-year tariff term (as Gen. Stat. 16-244z requires the Authority to establish a tariff for compensating RRES customers after the expiration of the 20-year term), but EOE’s proposed calculation would incorporate only costs. Joint Solar Party Comments, May 28, 2026, p. 7. Sunrun and GoodLeap further explain that including only costs beyond year 30 would “heavily skew the multi-year savings estimate in a way that is both confusing and misleading for customers,” because both bill savings and solar costs are expected to increase over the contract term. Sunrun and GoodLeap Exceptions, Oct. 15, 2026, pp. 3-4. OCC supported EOE’s suggested approach for calculating but not requiring multiyear net savings estimates. OCC Comments, May 28, 2026, p. 4. The Authority approves the adoption of Proposal 14 with modification. Customers should be aware of the full extent of financing costs, even if some costs extend past the end of the 20-year RRES tariff term. Therefore, estimates of multi-year net savings shall be required to include the full cost of the customer’s financial products. Nevertheless, the Authority recognizes that incorporating only costs and excluding projected bill savings after the 20-year term could result in misleading savings estimates. General Statute 16244z(c)(1)(E) requires the Authority to establish a tariff for the purchase of energy on a cents-per-kWh basis from existing RRES systems after the expiration of the tariff term, but a specific tariff has not yet been established, making the full customer value uncertain. Netting systems that continue to operate after the 20-year RRES term would, at a minimum, provide utility bill savings by reducing the customer’s billed usage by the amount of solar generation directly consumed onsite.4 Contractors may include this value (i.e., the amount of solar generation consumed behind the meter, multiplied by the assumed utility rate in effect) in the multi-year net savings estimates provided to customers, and shall provide an explanation in the CDF and their annual contractor compliance filings describing how the estimate was derived and the components included. 7. Starting Average Utility Rate EOE reports that standardization of the starting utility rate used to calculate estimated Year One and Multi-Year Net Savings was the most challenging topic discussed in the CCWG, with no consensus reached. CCWG Final Report, p. 45. Several methodologies could be used to standardize the Average Starting Utility Rate, each with benefits and drawbacks. Id. In general, the starting utility rate selection can either prioritize consistency across customers or accuracy in reflecting an individual customer’s actual utility costs, but not both. Id., p. 46. 4 Based on hourly load and generation profiles, for a typical residential customer, Eversource previously estimated that about 40% of generation annually would be directly consumed onsite. See Eversource Comments, Aug. 5, 2025, Docket No. 25-02-14, Renewable Energy Tariff Program Successor Study, p. 2.Page 21 of 51
Docket No. 26-08-02 Page 19 The main methodologies discussed by the CCWG, both based on historical data, were (1) calculation of an average rate across all customers (or a subset of customers), and (2) a customer-specific calculation based on each customer’s average rates. Id., p. 45. An average historical rate offers consistency across customers and reduces the risk of errors but may not reflect a customer’s actual electricity costs (particularly for customers on third-party supply rates) or capture variability in rates. Id. EOE also noted that the choice of starting utility rate must consider whether to calculate an all-in rate or break out rate components; for example, applying the standard service rate for customers who utilize a third-party supplier. Id., pp. 45-46. As the CCWG did not reach consensus, EOE proposes that the Authority authorize several methodologies for the Starting Average Utility Rate and mandate that contractors transparently describe the approach used in writing to customers and in their contractor compliance filings. CCWG Final Report, p. 47. EOE suggests allowing the following methodologies: 1. Standardized rates set by the Authority in the RRES Program annual review docket: per-EDC rate forecast used in the Residential Tariff Model for the following calendar year. 2. Customer-specific 12-month historical average: based on the all-in utility rate over the past 12 months of usage, using the customer’s actual utility bills. If the customer uses a third-party supplier, contractors must explain how that rate will affect net savings calculations. 3. Software calculation methodology: any reasonably accurate methodology used by software designed to calculate an average starting utility rate for the customer based on their location and usage history. CCWG Final Report, p. 47. To ensure transparency, EOE recommends that (a) if a contractor uses the standardized rate described in option 1 above, no explanation other than the source of the rate is required; and (b) if a contractor uses a customer-specific historical average rate or a software methodology, as described in options 2 and 3 above, they must explain in writing to the customer and in their compliance filings the methodology used, including detailing all parameters of the methodology and any parameters that are not included in the methodology. CCWG Final Report, pp. 47-48. The parameters that must be explained include distribution rate, transmission rate, supply rate, non-bypassable charges, discounts (including LIDR), sources of the information, and whether the customer’s rate is different than the current standard service rate. Id.; Interrog. Resp. CAE-13. The EDCs argue that the starting utility rate should be required to be based on historical rates rather than third-party supplier rates, which can exceed standard service rates and can be variable. Eversource Comments, May 28, 2026, p. 3; UI Comments, May 28, 2026, p. 3. Additionally, the ECCs recommend careful consideration of allowablePage 22 of 51
Docket No. 26-08-02 Page 20 methods for calculating the starting utility rate for customers enrolled in a LIDR; Eversource states that customers on a LIDR should not be provided with a savings estimate based on non-LIDR utility rates. Id. OCC opposes allowing solar providers to calculate savings based on a customer’s specific rate over the prior 12 months, asserting that a customer could achieve a significant portion of those calculating savings by returning to standard service or contracting with a lower-cost supplier. OCC Comments, May 28, 2026, pp. 4-5. OCC asserts that solar savings should be measured against a realistic and consistent baseline rate. Id. The Joint Solar Parties emphasized that no method for determining a starting utility rate is perfect, and multiple defensible approaches each have benefits and drawbacks. Joint Solar Parties Comments, May 28, 2026, pp. 7-8. The Joint Solar parties state that a rigid methodology that cannot account for variability in utility rates will inevitably be “wrong” at some point during the year, creating risks for participants and contractors. Id. Regarding the proposal to require the use of utility rates set by the Authority in the annual RRES docket, the Joint Solar Parties note that the Eversource rate used on the customer disclosure form and other materials in 2026 would have been $0.31 per kWh, compared to an actual rate in July 2026 of under $0.24 per kWh.5 Id. Conversely, using the current utility rate from recent bills may not properly account for changes from seasonal supply rates or RAM charges. Id. As a result, the Joint Solar Parties do not support EOE’s recommendation to authorize a set of allowable methodologies, because such methodologies would already be wide-ranging but may still preclude contractors from using potentially equally valid methodologies. Id., p. 9. The Joint Solar Parties support EOE’s recommendation for transparency regarding the starting utility rate chosen, but express concern that EOE’s proposed language in the fillable text box on the CDF may be too complicated for customers to understand and may be better suited for contractor compliance filings. Id. The Authority appreciates the CCWG’s thoughtful discussion of the merits of various options for starting utility rates. As discussed by several stakeholders, there are tradeoffs between standardization of the starting utility rate, which offers consistency across customers, and flexibility, which can allow for more accuracy in reflecting an individual customer’s value proposition and adjusting to changes in utility rate components. First, the Authority shares stakeholders’ position that customers enrolled in LIDR should not be presented with savings estimates based on a non-discounted starting utility rate, which would inflate savings estimate and present consumer protection concerns for vulnerable customers. Accordingly, the Authority will require that the starting average utility rate used for customers enrolled in LIDR reflect the customer’s actual discounted rate, whether through a manual adjustment to the starting utility rate or a software methodology that accounts for the customer’s specific discount level. 5 The Authority notes that the Eversource average rate over the entire year in 2026 used in the Residential Tariff Model – 2027 is $0.27 per kWh.Page 23 of 51
Docket No. 26-08-02 Page 21 Next, the Authority finds that contractors should have flexibility to choose either option 1 above (the standardized rate set by the Authority in the RRES Program annual review docket) or option 3 (a reasonable software methodology). As argued by OCC and the EDCs, the Authority determines that net savings estimates should not be based on third-party supply rates, which can be variable and may overestimate the savings attributable to solar. Thus, the Authority does not approve option 2 (a customer-specific historical 12-month average based on actual utility bills), as the primary purpose of a customer-specific average appears to be to account for either third-party supply rates or LIDR. The Authority finds it appropriate to allow contractors to use either a standardized average starting utility rate set by the Authority or a reasonable software methodology, as each method has benefits and drawbacks. A requirement for contractors to use a single starting utility rate in all cases poses risks that the rate may become out of date over the course of a year. The Residential Tariff Model uses projected average rates based on each EDCs’ average rates over the previous year plus escalation factor applied; if the previous year’s rates are anomalous, this would skew the starting utility rate assumption and resulting net savings estimates for the following calendar year. Although the average starting utility rate from the Residential Tariff Model may often be a reasonable assumption, the model’s purpose is to generate average compensation rates for the program, not to provide detailed financial savings estimates to customers. Contractors may have more up-to-date information available when presenting solar proposals to customers. Software approaches for determining starting utility rates can address these concerns by updating rates more frequently than once per year, and can also offer starting rates more tailored to an individual customer’s usage profile (for example, if a customer uses more electricity in the winter than in the summer). The Authority does not deem it appropriate to prevent the use of such methods. Nevertheless, transparency in disclosing the assumptions used by software methods is important, for both presentation to customers and in contractor annual compliance filings. Accordingly, whether contractors use the starting utility rate set by the Authority in the Residential Tariff Model for the following calendar year or a reasonable alternative software methodology, contractors shall be required to clearly explain which starting utility rate is used and how it may differ from the rate seen on the customer’s utility bills. If a software methodology is used, contractors must also include an explanation of what the starting utility rate reflects (e.g., current utility rates or an average over a period of time), and whether any customer discounts are included in the starting rate. Additionally, contractors should provide a more detailed explanation of the software methodology used, including all inputs and assumptions used and their sources, in their annual compliance filed with EOE. Such explanations shall be provided in the narrative explanation of any calculation methodologies included in the Financial Benefits Summary Sheet (Sheet Narrative).Page 24 of 51
Docket No. 26-08-02 Page 22 8. Timing of CDF Presentation to Customers The CCWG did not reach consensus regarding when the CDF should be presented to customers in relation to installation contract signing. CCWG Final Report, pp. 30, 48. EOE states that most contractors currently present the CDF to customers after the solar installation contract is signed because they generate the CDF in PowerClerk along with the interconnection application. Id. EOE and OCC argue that customers should instead receive the CDF days in advance of contract signing, which would allow time to review thoroughly, ask questions, and compare offers from other contractors. Id. The CCWG contractors, conversely, assert that the CDF should be presented to customers “immediately prior to and contemporaneously with the solar contract” as a summary of the contract terms. Id., p. 31. Some contractors present and close solar sales in a single visit; others include an initial visit and follow-up with the customer-specific proposal, but with insufficient time to provide the CDF in advance of contract signing. Id. Contractors also state that CDF is not completed early in the sales process because some information (such as shading or financial arrangements) may not be confirmed, and earlier presentation could increase the risk of inconsistencies with the final contract. Id. EOE opines that presenting the CDF at the time of contract signing, while not its preferred solution, would still be an improvement over current practice. Id., p. 48. The Joint Solar Parties argue that providing the CDF contemporaneously with the solar contract does not prevent customers from taking time to review or seeking additional quotes, as not all contracts are signed immediately. Joint Solar Party Comments, May 28, 2026, p. 10. Additionally, the Joint Solar Parties state that the contract must be generated to have proper information on the CDF, and the contract also contains important information for customers; thus, “it would be unwise to force customers to sit with incomplete information… for a regulated period of time before receiving the rest of the already-generated package that is necessary for them to make an informed decision.” Id. The Joint Solar Parties note that Connecticut law mandates a minimum three-day cancellation period for any home improvement contract. OCC “unequivocally” maintains that customers must receive the completed CDF in advance of signing a solar installation contract rather than at the time of signing, underscoring that solar installation is a significant, long-term financial commitment. OCC Comments, May 28, 2026, p. 5. Additionally, OCC expresses concern that some solar contractors present and close sales within a single visit. Id. OCC argues that the record demonstrates that contractors can accommodate customers who ask for more time, so advance delivery of the CDF is operationally feasible and should be the default without customers needing to request additional time to review. Id. In other states with customer disclosure form requirements, contractors report that the general practice is to provide completed disclosure forms to customers at the same time or prior to the execution of the solar installation agreement, though the timing may vary. For example, programs in Massachusetts and New Jersey do not specify when the CDF must be provided, but it must be completed before applying to the program and is typically provided to customers along with the solar contract and other materials. Sunrun Interrog. Resp. CAE-20; Earthlight Interrog. Resp. CAE-20. The Illinois Shines programPage 25 of 51
Docket No. 26-08-02 Page 23 requires that the disclosure form is executed by the customer prior to the execution of the customer contract and commencement of the incentive application. Tesla Interrog. Resp. CAE-20. In other states, the disclosure process may occur after the customer signs a solar contract, as part of the interconnection or program application process. Ion Solar Pros Interrog. Resp. CAE-20; Tesla Interrog. Resp. CAE-20. In California, the California Solar Consumer Protection Guide is signed before the customer signs any contract, but it does not include financial or system design information; a Solar Energy System Supporting Information Document is signed after the customer signs the final contract and includes contract terms and system design information. Tesla Interrog. Resp. CAE20. The Authority determines that contractors shall be required to present the CDF contemporaneously with the solar installation contract. CDF presentation at the time of contract signing represents an improvement over current practice and will advance the fourth program objective of ensuring program accessibility by providing customer protections through resources and disclosure forms. The Authority determined that customers should have access to complete financial and production documentation, as well as the CDF, before signing a solar installation contract. Year 5 Decision, p. 20. Both the CDF and contract itself are necessary to present customers with complete financial, production, and other key terms, as well as to avoid inconsistencies between the two documents. Thus, the Authority will not mandate a specific waiting period between CDF presentation and contract signing. However, all RRES customers should be notified that they may take additional time to review the contract and CDF before signing the contract. Contractor comments suggest that this is feasible, as some customers do request time to review the contract terms before signing; the program materials should make clear that this is an option available to all customers. Accordingly, the EDCs shall update the signature portion of the CDFs to specify that customers may take time to review the contract terms before signing and, per General Statutes 42-135a, may cancel home improvement contracts with no penalty at any time prior to midnight of the third business days after signing. Beginning January 1, 2027, contractors will be required to provide the CDF to customers contemporaneously with the solar installation contract. Rather than generating the disclosure form within PowerClerk as part of the program and interconnection application, contractors must upload a signed disclosure form with the RRES application. 9. Implementation Timing EOE recommends that change to the CDFs (proposals 16, 17, 19, 21, and 22) be made as soon as possible, but no later than July 1, 2026, and that all other proposals be implemented no later than January 1, 2027. OCC recommends that the effective date for the requirement for CDF before contract signing, if adopted, and other proposals be as near-term as practicable, noting that the length of time required depends on the complexity of the changes. OCC Comments, May 28, 2026, p. 5.Page 26 of 51
Docket No. 26-08-02 Page 24 The EDCs recommend allowing sufficient time for implementation in PowerClerk and installers’ internal processes. Eversource Comments, May 28, 2026, p. 4; UI Comments, May 28, 2026, p. 3. Eversource notes that at times, the EDCs have utilized a transition period of one to two months for accepting updating disclosure forms, during which either version of the form may be accepted. Eversource Comments, May 28, 2026, p. 4. The Joint Solar Parties argue that changes should be considered for the 2027 program year, and an appropriate amount of time should be given for contractors to adjust their business operations. Joint Solar Party Comments, May 28, 2026, p. 6. Specifically, they assert that contractors should have a minimum of 90 days from Authority approval of changes and availability of a CDF to make the necessary changes to their operations, and that there should be flexibility for contractors who may take additional time to comply. Id. The Authority determines that, for consistency, all changes to contractor requirements discussed above shall take effect at the start of the 2027 program year. However, to provide a transition period for program participants, the EDCs shall accept either the 2026 or 2027 version of the CDF until February 1, 2027. Additionally, projects with contracts signed prior to January 1, 2027 may use the 2026 version of the CDF. See Sunrun and GoodLeap Exceptions, Oct. 15, 2026, pp. 4-5. The EDCs shall file clean and updated CDFs as part of the December 1, 2026 compliance filing of updating program documents incorporating the direction in this Decision. Additionally, the EDCs shall notify participating applicants of the updated requirements through an email notification, PowerClerk banner, and updates to the information provided on the EDCs’ RRES Program webpages no later than December 1, 2026, and file compliance in the instant proceeding once complete. No later than January 1, 2026, the EDCs shall make the necessary updates to the RRES PowerClerk application and file compliance once complete. Finally, the EDCs shall include an overview of the contractor compliance requirements in the annual webinar with solar developers pursuant to Order No. 16 of this Decision. E. DC-COUPLED SOLAR AND STORAGE SYSTEMS 1. UI Motion In a motion filed with the Authority, UI requested clarification on how to apply the non-bypassable charge and incentive adders and certify Renewable Energy Credits (RECs) for customers with direct-current (DC) coupled renewable generation systems that include both solar PV and battery storage using a shared inverter. Motion No. 24, May 5, 2026, Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 5. UI states that the implementation of non-bypassable charges, which are assessed per kWh of total system production, conflicts with the requirement forPage 27 of 51
Docket No. 26-08-02 Page 25 metering configurations to accommodate DC-coupled batteries that provide home backup during grid outages.6 UI asserts that because the solar and storage operate on the DC side of a shared inverter with a single alternating-current (AC) output delivered at the point of interconnection, there is no revenue-quality metering on the DC side capable of independently measuring (1) PV generation delivered to the grid, (2) battery charging from the PV array, (3) battery discharging energy delivered to the inverter or grid, (4) battery charging from the grid, and (5) emergency load backup during outages. Id., pp. 2-3. UI states that this “materially impacts” the assessment of REC adders and nonbypassable charges, which are determined based on solar PV production. Id., pp. 2, 4. UI also claims that the DC-coupled configuration introduces uncertainty to the certification of Class I RECs, because metering configurations cannot distinguish between renewable generation delivered to the grid and energy discharged from storage. Id., pp. 3-4. If batteries charge from the grid, then the energy discharged is not solely generated from a Class I source. Id. Thus, unless the charging source is clearly restricted so that storage is charged exclusively from renewable generation, there is a risk of conflicting with statutory Class I REC requirements. Id., p. 4. Finally, UI notes that its metering diagrams require that “Islanding accomplished by multiple isolation devices must be open transition and synchronized… [t]he production and billing meter cannot be energized during islanding.” Motion No. 24, May 5, 2026, Docket No. 25-08-02, p. 5; Motion No. 7, Att. 13A, p. 3. UI states that installers must implement open transition devices on the line side of the production meter to comply with this requirement. Motion No. 24, May 5, 2026, Docket No. 25-08-02, p. 5. As a result, UI states that any backup load served by these devices is also on the line side, causing the production meter to record combined inverter output and backup load, rather than solely solar generation. Id. UI proposes that for impacted DC-coupled systems, until a viable solution exists to measure solar production separately from battery storage or other loads, (1) nonbypassable charges and incentive adders be calculated using a proxy production quantity based on the approved inverter nameplate rating and a standard production factor, and (2) RECs associated with these projects not be sold into the NEPOOL GIS market to avoid potential noncompliance with the sale of Class I RECs in the market. Id., pp. 7-11. UI does not recommend the use of inverter data to calculate non-bypassable charges and incentive adders, stating that it would be unable to validate the accuracy of third-party 6 UI cites Order No. 23 of the Year 5 Decision, which directed the EDCs to file updated RRES program documents incorporating the approved program modifications in the Year 5 Decision. UI states that Order No. 23 “requested proposals for system configurations to provide home backup during grid outages.” Motion No. 24, Docket No. 25-08-02. However, the Year 5 Decision did not direct any changes to the metering diagrams or request proposals for system configurations to provide home backup during grid outages. Order No. 18 of the Year 2 Decision, which was due May 1, 2023, did direct the EDCs to provide at least one proposal for system configurations with the ability to provide home backup during grid outages, including DC-coupled solar plus storage systems under the Buy-All tariff. Year 2 Decision, p. 36.Page 28 of 51
Docket No. 26-08-02 Page 26 owned, customer-sited inverters; would be required to manually enter data in different vendor formats into its billing system; and would be unable to gather inverter data from developers that go out of business. Id., pp. 8-9. Finally, UI is unable to provide an estimated cost for adjustments to its billing systems for automated calculation and tracking using the proposed proxy production method, and states that it “could administer the proxy through an auditable external calculation and periodic bill adjustment or true-up process” pending updates to enable full automation. Id., pp. 9-10; Interrog. Resp. CAE4. UI identifies 160 operational RRES projects, or approximately 1.8% percent of the current RRES project population as of April 2026, that are potentially affected by this issue. Motion No. 24, Docket No. 25-08-02, p. 4. In Eversource territory, 325 projects are DC-coupled solar and storage systems, about 1.5% of the 20,900 total RRES projects with applications submitted in 2024 or later (when Eversource began tracking whether storage systems are AC- or DC-coupled). Interrog. Resp. CAE-5. Both EDCs state that they currently treat DC-coupled solar and storage systems no differently than typical RRES systems, where non-bypassable charges and adders are applied based on production meter reads. Eversource Interrog. Resp. CAE-9; UI Interrog. Resp. CAE-9. However, UI reports that, since October of 2025, it has stopped uploading the RECs associated with DC-coupled RRES systems into the NEPOOL GIS system. Tech Mt’g Tr., Aug. 18, 2026, 53:20 – 54:9. 2. Stakeholder Comments Eversource does not share UI’s concerns regarding DC-coupled solar and storage systems, asserting that metering the combined output of a DC-coupled system is generally acceptable and consistent with Connecticut’s clean energy goals. Eversource Comments, May 28, 2026, p. 5. Eversource notes that the combined operation of these resources will generally result in less output recorded due to roundtrip ESS losses, but such losses are “fairly negligible” and would have commensurate impacts on both credits and non-bypassable charges for customers enrolled in the netting tariff. Id. Eversource also points out that, although the RRES Program rules do not prohibit systems from charging from the grid, customers do not have a financial incentive to do so during normal operations as they would incur roundtrip energy losses on energy purchased from the grid. Tr., 35:2 – 19. In Eversource’s view, the only situation that would create significant impacts on the balance of program costs is a configuration where a customer is serving load (other than parasitic load) behind the production meter, which would reduce the amount of RECs reported and allow the customer to avoid non-bypassable charges while still benefitting from reducing load and exporting excess generation through the revenue meter. Eversource Comments, May 28, 2026, p. 6; Tr., 36:7 – 23. However, Eversource states that this operation is already prohibited by the RRES Program rules and metering requirements, which require that “[e]xcept for the parasitic load utilized to operate the coupled solar and storage system, there shall be no load connected behind the Utility production meter.” Id.; Order No. 23 Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 12, p. 4. Finally, Eversource does not consider it necessary to meter the output of