  1. Page 24 of 51

    Docket No. 26-08-02 Page 22 8. Timing of CDF Presentation to Customers The CCWG did not reach consensus regarding when the CDF should be presented to customers in relation to installation contract signing. CCWG Final Report, pp. 30, 48. EOE states that most contractors currently present the CDF to customers after the solar installation contract is signed because they generate the CDF in PowerClerk along with the interconnection application. Id. EOE and OCC argue that customers should instead receive the CDF days in advance of contract signing, which would allow time to review thoroughly, ask questions, and compare offers from other contractors. Id. The CCWG contractors, conversely, assert that the CDF should be presented to customers “immediately prior to and contemporaneously with the solar contract” as a summary of the contract terms. Id., p. 31. Some contractors present and close solar sales in a single visit; others include an initial visit and follow-up with the customer-specific proposal, but with insufficient time to provide the CDF in advance of contract signing. Id. Contractors also state that CDF is not completed early in the sales process because some information (such as shading or financial arrangements) may not be confirmed, and earlier presentation could increase the risk of inconsistencies with the final contract. Id. EOE opines that presenting the CDF at the time of contract signing, while not its preferred solution, would still be an improvement over current practice. Id., p. 48. The Joint Solar Parties argue that providing the CDF contemporaneously with the solar contract does not prevent customers from taking time to review or seeking additional quotes, as not all contracts are signed immediately. Joint Solar Party Comments, May 28, 2026, p. 10. Additionally, the Joint Solar Parties state that the contract must be generated to have proper information on the CDF, and the contract also contains important information for customers; thus, “it would be unwise to force customers to sit with incomplete information… for a regulated period of time before receiving the rest of the already-generated package that is necessary for them to make an informed decision.” Id. The Joint Solar Parties note that Connecticut law mandates a minimum three-day cancellation period for any home improvement contract. OCC “unequivocally” maintains that customers must receive the completed CDF in advance of signing a solar installation contract rather than at the time of signing, underscoring that solar installation is a significant, long-term financial commitment. OCC Comments, May 28, 2026, p. 5. Additionally, OCC expresses concern that some solar contractors present and close sales within a single visit. Id. OCC argues that the record demonstrates that contractors can accommodate customers who ask for more time, so advance delivery of the CDF is operationally feasible and should be the default without customers needing to request additional time to review. Id. In other states with customer disclosure form requirements, contractors report that the general practice is to provide completed disclosure forms to customers at the same time or prior to the execution of the solar installation agreement, though the timing may vary. For example, programs in Massachusetts and New Jersey do not specify when the CDF must be provided, but it must be completed before applying to the program and is typically provided to customers along with the solar contract and other materials. Sunrun Interrog. Resp. CAE-20; Earthlight Interrog. Resp. CAE-20. The Illinois Shines program
  2. Page 25 of 51

    Docket No. 26-08-02 Page 23 requires that the disclosure form is executed by the customer prior to the execution of the customer contract and commencement of the incentive application. Tesla Interrog. Resp. CAE-20. In other states, the disclosure process may occur after the customer signs a solar contract, as part of the interconnection or program application process. Ion Solar Pros Interrog. Resp. CAE-20; Tesla Interrog. Resp. CAE-20. In California, the California Solar Consumer Protection Guide is signed before the customer signs any contract, but it does not include financial or system design information; a Solar Energy System Supporting Information Document is signed after the customer signs the final contract and includes contract terms and system design information. Tesla Interrog. Resp. CAE20. The Authority determines that contractors shall be required to present the CDF contemporaneously with the solar installation contract. CDF presentation at the time of contract signing represents an improvement over current practice and will advance the fourth program objective of ensuring program accessibility by providing customer protections through resources and disclosure forms. The Authority determined that customers should have access to complete financial and production documentation, as well as the CDF, before signing a solar installation contract. Year 5 Decision, p. 20. Both the CDF and contract itself are necessary to present customers with complete financial, production, and other key terms, as well as to avoid inconsistencies between the two documents. Thus, the Authority will not mandate a specific waiting period between CDF presentation and contract signing. However, all RRES customers should be notified that they may take additional time to review the contract and CDF before signing the contract. Contractor comments suggest that this is feasible, as some customers do request time to review the contract terms before signing; the program materials should make clear that this is an option available to all customers. Accordingly, the EDCs shall update the signature portion of the CDFs to specify that customers may take time to review the contract terms before signing and, per General Statutes 42-135a, may cancel home improvement contracts with no penalty at any time prior to midnight of the third business days after signing. Beginning January 1, 2027, contractors will be required to provide the CDF to customers contemporaneously with the solar installation contract. Rather than generating the disclosure form within PowerClerk as part of the program and interconnection application, contractors must upload a signed disclosure form with the RRES application. 9. Implementation Timing EOE recommends that change to the CDFs (proposals 16, 17, 19, 21, and 22) be made as soon as possible, but no later than July 1, 2026, and that all other proposals be implemented no later than January 1, 2027. OCC recommends that the effective date for the requirement for CDF before contract signing, if adopted, and other proposals be as near-term as practicable, noting that the length of time required depends on the complexity of the changes. OCC Comments, May 28, 2026, p. 5.
  3. Page 26 of 51

    Docket No. 26-08-02 Page 24 The EDCs recommend allowing sufficient time for implementation in PowerClerk and installers’ internal processes. Eversource Comments, May 28, 2026, p. 4; UI Comments, May 28, 2026, p. 3. Eversource notes that at times, the EDCs have utilized a transition period of one to two months for accepting updating disclosure forms, during which either version of the form may be accepted. Eversource Comments, May 28, 2026, p. 4. The Joint Solar Parties argue that changes should be considered for the 2027 program year, and an appropriate amount of time should be given for contractors to adjust their business operations. Joint Solar Party Comments, May 28, 2026, p. 6. Specifically, they assert that contractors should have a minimum of 90 days from Authority approval of changes and availability of a CDF to make the necessary changes to their operations, and that there should be flexibility for contractors who may take additional time to comply. Id. The Authority determines that, for consistency, all changes to contractor requirements discussed above shall take effect at the start of the 2027 program year. However, to provide a transition period for program participants, the EDCs shall accept either the 2026 or 2027 version of the CDF until February 1, 2027. Additionally, projects with contracts signed prior to January 1, 2027 may use the 2026 version of the CDF. See Sunrun and GoodLeap Exceptions, Oct. 15, 2026, pp. 4-5. The EDCs shall file clean and updated CDFs as part of the December 1, 2026 compliance filing of updating program documents incorporating the direction in this Decision. Additionally, the EDCs shall notify participating applicants of the updated requirements through an email notification, PowerClerk banner, and updates to the information provided on the EDCs’ RRES Program webpages no later than December 1, 2026, and file compliance in the instant proceeding once complete. No later than January 1, 2026, the EDCs shall make the necessary updates to the RRES PowerClerk application and file compliance once complete. Finally, the EDCs shall include an overview of the contractor compliance requirements in the annual webinar with solar developers pursuant to Order No. 16 of this Decision. E. DC-COUPLED SOLAR AND STORAGE SYSTEMS 1. UI Motion In a motion filed with the Authority, UI requested clarification on how to apply the non-bypassable charge and incentive adders and certify Renewable Energy Credits (RECs) for customers with direct-current (DC) coupled renewable generation systems that include both solar PV and battery storage using a shared inverter. Motion No. 24, May 5, 2026, Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 5. UI states that the implementation of non-bypassable charges, which are assessed per kWh of total system production, conflicts with the requirement for
  4. Page 27 of 51

    Docket No. 26-08-02 Page 25 metering configurations to accommodate DC-coupled batteries that provide home backup during grid outages.6 UI asserts that because the solar and storage operate on the DC side of a shared inverter with a single alternating-current (AC) output delivered at the point of interconnection, there is no revenue-quality metering on the DC side capable of independently measuring (1) PV generation delivered to the grid, (2) battery charging from the PV array, (3) battery discharging energy delivered to the inverter or grid, (4) battery charging from the grid, and (5) emergency load backup during outages. Id., pp. 2-3. UI states that this “materially impacts” the assessment of REC adders and nonbypassable charges, which are determined based on solar PV production. Id., pp. 2, 4. UI also claims that the DC-coupled configuration introduces uncertainty to the certification of Class I RECs, because metering configurations cannot distinguish between renewable generation delivered to the grid and energy discharged from storage. Id., pp. 3-4. If batteries charge from the grid, then the energy discharged is not solely generated from a Class I source. Id. Thus, unless the charging source is clearly restricted so that storage is charged exclusively from renewable generation, there is a risk of conflicting with statutory Class I REC requirements. Id., p. 4. Finally, UI notes that its metering diagrams require that “Islanding accomplished by multiple isolation devices must be open transition and synchronized… [t]he production and billing meter cannot be energized during islanding.” Motion No. 24, May 5, 2026, Docket No. 25-08-02, p. 5; Motion No. 7, Att. 13A, p. 3. UI states that installers must implement open transition devices on the line side of the production meter to comply with this requirement. Motion No. 24, May 5, 2026, Docket No. 25-08-02, p. 5. As a result, UI states that any backup load served by these devices is also on the line side, causing the production meter to record combined inverter output and backup load, rather than solely solar generation. Id. UI proposes that for impacted DC-coupled systems, until a viable solution exists to measure solar production separately from battery storage or other loads, (1) nonbypassable charges and incentive adders be calculated using a proxy production quantity based on the approved inverter nameplate rating and a standard production factor, and (2) RECs associated with these projects not be sold into the NEPOOL GIS market to avoid potential noncompliance with the sale of Class I RECs in the market. Id., pp. 7-11. UI does not recommend the use of inverter data to calculate non-bypassable charges and incentive adders, stating that it would be unable to validate the accuracy of third-party 6 UI cites Order No. 23 of the Year 5 Decision, which directed the EDCs to file updated RRES program documents incorporating the approved program modifications in the Year 5 Decision. UI states that Order No. 23 “requested proposals for system configurations to provide home backup during grid outages.” Motion No. 24, Docket No. 25-08-02. However, the Year 5 Decision did not direct any changes to the metering diagrams or request proposals for system configurations to provide home backup during grid outages. Order No. 18 of the Year 2 Decision, which was due May 1, 2023, did direct the EDCs to provide at least one proposal for system configurations with the ability to provide home backup during grid outages, including DC-coupled solar plus storage systems under the Buy-All tariff. Year 2 Decision, p. 36.
  5. Page 28 of 51

    Docket No. 26-08-02 Page 26 owned, customer-sited inverters; would be required to manually enter data in different vendor formats into its billing system; and would be unable to gather inverter data from developers that go out of business. Id., pp. 8-9. Finally, UI is unable to provide an estimated cost for adjustments to its billing systems for automated calculation and tracking using the proposed proxy production method, and states that it “could administer the proxy through an auditable external calculation and periodic bill adjustment or true-up process” pending updates to enable full automation. Id., pp. 9-10; Interrog. Resp. CAE4. UI identifies 160 operational RRES projects, or approximately 1.8% percent of the current RRES project population as of April 2026, that are potentially affected by this issue. Motion No. 24, Docket No. 25-08-02, p. 4. In Eversource territory, 325 projects are DC-coupled solar and storage systems, about 1.5% of the 20,900 total RRES projects with applications submitted in 2024 or later (when Eversource began tracking whether storage systems are AC- or DC-coupled). Interrog. Resp. CAE-5. Both EDCs state that they currently treat DC-coupled solar and storage systems no differently than typical RRES systems, where non-bypassable charges and adders are applied based on production meter reads. Eversource Interrog. Resp. CAE-9; UI Interrog. Resp. CAE-9. However, UI reports that, since October of 2025, it has stopped uploading the RECs associated with DC-coupled RRES systems into the NEPOOL GIS system. Tech Mt’g Tr., Aug. 18, 2026, 53:20 – 54:9. 2. Stakeholder Comments Eversource does not share UI’s concerns regarding DC-coupled solar and storage systems, asserting that metering the combined output of a DC-coupled system is generally acceptable and consistent with Connecticut’s clean energy goals. Eversource Comments, May 28, 2026, p. 5. Eversource notes that the combined operation of these resources will generally result in less output recorded due to roundtrip ESS losses, but such losses are “fairly negligible” and would have commensurate impacts on both credits and non-bypassable charges for customers enrolled in the netting tariff. Id. Eversource also points out that, although the RRES Program rules do not prohibit systems from charging from the grid, customers do not have a financial incentive to do so during normal operations as they would incur roundtrip energy losses on energy purchased from the grid. Tr., 35:2 – 19. In Eversource’s view, the only situation that would create significant impacts on the balance of program costs is a configuration where a customer is serving load (other than parasitic load) behind the production meter, which would reduce the amount of RECs reported and allow the customer to avoid non-bypassable charges while still benefitting from reducing load and exporting excess generation through the revenue meter. Eversource Comments, May 28, 2026, p. 6; Tr., 36:7 – 23. However, Eversource states that this operation is already prohibited by the RRES Program rules and metering requirements, which require that “[e]xcept for the parasitic load utilized to operate the coupled solar and storage system, there shall be no load connected behind the Utility production meter.” Id.; Order No. 23 Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 12, p. 4. Finally, Eversource does not consider it necessary to meter the output of
  6. Page 29 of 51

    Docket No. 26-08-02 Page 27 combined solar and storage systems to credit or charge customers for operating distributed energy resources during power outages as outage periods represent small portion of expected operations, a position with which UI agreed. Eversource Comments, May 28, 2026, pp. 6-7; Interrog. Resp. CAE-29. While Eversource notes that it is possible customers have installed configurations that do not comply with the Program requirements, the current impacts of such systems that adhere to current RRES Program requirements are likely not significant enough to justify the costs and time required to implement the UI’s proposed alternative billing solution. Id. The Joint Solar Parties dispute UI’s characterization of the issues posed by DCcoupled systems, asserting that the RRES Program requirements for wiring and charging controls already allow for measurement of all generation produced by PV systems. Joint Solar Party Comments, pp. 14-15. The Joint Solar Parties state that installers place the production meter directly upstream of the shared inverter and commission the battery to only charge from the DC-connected solar PV array, ensuring that only PV-generated energy passes across the production meter. Id., p. 15. Sunrun subsequently clarified that, although systems generally charge from solar by default because significant grid charging is not economically advantageous, storage does charge from the grid in advance of storm events. Tr., 88:4 – 22. However, any grid charging would be recorded by the bidirectional production meter and netted against the total export from the combined system, mitigating concerns that energy imported from the grid would be reported as Class I renewable generation. Tr., 47:15 – 49:23. In accordance with Section T of the Program Manual, the net production meter reading is used for the assessment of REC adders and non-bypassable charges as well as REC reporting, such that any grid imports would be excluded when using the net read of the production meter between the two channels. Sunrun Corresp., Aug. 18, 2026, p. 4. The Joint Solar Parties argue that all three of UI’s concerns are unfounded, as the wiring and charging configuration already required for RRES participation (1) ensures that the only energy measured by the production meter is Class I REC compliant, except for the minimal amount of energy the storage system had when it was installed; (2) captures all energy produced by the PV system for the purposes of non-bypassable charge calculation, with the exceptions of parasitic load and the minimal amount of PV generation that the battery has stored but not yet discharged; and (3) counteracts the islanding concerns raised in UI’s motion. Id. Finally, the Joint Solar Parties argue that not selling RECs from any DC-coupled system is “unnecessary and would reduce ratepayer benefits,” and express concern about how a standardized capacity factor approach would be implemented and potentially affect customers. Id., p. 16. The Connecticut Green Bank (CGB) notes that DC-coupled systems “deliver cost and efficiency benefits by routing solar energy directly to the battery before a shared inverter converts it to alternating current,” and recommended against measures that would unfairly disadvantage DC-coupled systems or slow solar and storage deployment. CGB Comments, May 28, 2026, p. 4. CGB has been authorized to create a pilot program to support solar and storage deployment among customers with existing solar, and argues that excluding DC-coupled systems from full participation would limit the
  7. Page 30 of 51

    Docket No. 26-08-02 Page 28 usefulness of resulting recommendations. Id. Instead of UI’s recommended solution, CGB proposes (1) certified inverter firmware disaggregation, using separately logged PV and battery flows, and (2) DC-side revenue-grade metering for new systems, using a preinverter where needed. Id., p. 5. OCC does not oppose a “reasonable interim proxy-based approach” to calculating non-bypassable charges and incentive adders for affected DC-coupled systems, as long as it is applied consistently, does not systematically overstate or understate production in ways that produce inequitable outcomes, and is treated as expressly interim until more accurate measurement solutions become available. OCC Comments, May 28, 2026, p. 6. OCC agrees with UI’s proposal to not sell RECs from DC-coupled systems until a reliable measurement solution is in place, expressing concern over potential REC noncompliance that could “undermine the credibility of the program and expose participants to market integrity issues.” Id., pp. 6-7. 3. Authority Analysis The Authority is unconvinced that DC-coupled solar and storage systems participating in the RRES Program pose significant concerns for REC integrity or proper accounting of customer compensation and charges. Moreover, UI’s proposed solution would create administrative burden and cost while reducing ratepayer benefits from REC sales. As a result, the Authority declines to approve changes to the program rules for DC-coupled systems. With respect to Class I REC integrity, the Authority finds that the UI’s concern is mitigated by the Program Manual’s requirement that REC reporting is based on the monthly net value of the production meter’s generation and consumption channels, such that that any charging from the grid would be netted against the total amount exported from the combined system. Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 1B, p. 31. Thus, the net production meter reading captures only the amount of energy generated by the PV system. The Authority does not agree that this violates requirements for Class I renewable eligibility. For the purposes of calculating REC adders and non-bypassable charges, DCcoupled system output measurements would be impacted somewhat by parasitic load and roundtrip energy losses, but these factors are unlikely to adversely impact program operations or the balance of program costs. The exception to this is configurations where load is connected behind the production meter, which would cause inaccurate production measurements for non-bypassable charge assessment and REC reporting. Notably, this configuration is prohibited in Eversource’s meter wiring diagrams and is an important safeguard to ensure that the production meter is accurately recording the full amount of energy produced. For UI, however, questions remain as to whether the metering diagrams and guidelines contain this same restriction, and if so, whether the rule is enforced. As Sunrun notes, UI’s metering diagrams indicate that both the main and alternate point of connection would be connected to the automated grid isolation system after the production meter, so that all energy produced would flow through the production meter before serving load. Tr., 51:17 – 52:6; Motion No. 7, Att. 13A, p. 4. However, UI
  8. Page 31 of 51

    Docket No. 26-08-02 Page 29 reports that it is aware of systems where the production meter and revenue meter are directly in series, such that all load is behind the production meter. Tr., 52:7 - 19.7 To the extent that systems are being installed with load connected behind the production meter, this configuration would contradict the purpose of a production meter and the Program Manual’s requirement that the production meter exclusively measures the output of the system. Accordingly, to ensure that PV production is accurately recorded and for consistency with Eversource’s metering rules, UI shall adjust its metering diagrams to require that no load (except for parasitic load utilized to operate the coupled solar and storage system) is connected behind the production meter. UI shall file its updated metering diagrams for Authority review and approval no later than December 1, 2026. Additionally, UI shall meet with industry stakeholders prior to filing its updated metering diagrams with the Authority, and incorporate any stakeholder feedback, to ensure that any updated metering provisions do not impose undue barriers to program participation. Additionally, if the EDCs have evidence of a substantial number of RRES systems that have load connected behind the production meter in violation of the allowed metering configurations, the EDCs may propose a remedy for that limited number of systems rather than for the entire technology class. Based on the Authority’s review of the DC-coupled inverters in operation in the RRES Program, such inverters are technologically capable of measuring and reporting each input channel to separate PV and battery power flows. Interrog. Resp. CAE-20. As stated above, the scope of this specific issue does not warrant billing changes; however, to the extent that the EDCs are aware of customer configurations with load connected behind the production meter, inverter data may be used to verify compliance with RRES program rules. In general, the Authority is interested in ways that inverter data may be better utilized in current and future clean energy programs to provide visibility into DER operations without the need for additional equipment installation. Moreover, for an issue that is likely minor, UI’s proposed solution would be costly and administratively burdensome. The cost and timeline to implement UI’s proposed billing solution based on a proxy production method are uncertain, but likely substantial based on previous billing upgrade projects. UI Interrog. Resp. CAE-4; Eversource Interrog. Resp. CAE-6. The Authority is also concerned that UI is unable to provide a cost estimate for a measure that it proposed on its own initiative. Id. Additionally, the proposed proxy production method may not be sufficiently accurate for the purpose of estimated compensation for individual participants. UI states that the variance between PowerClerk estimated generation and actual generation recorded by the production meter was only 1% on average, but the sample of project data provided indicates that production 7 UI states that the metering diagrams guidelines originally prevented load behind the production meter, but the relevant provision was removed following the Year 5 Decision’s direction to refile metering guidelines and subsequent discussions with developers regarding the allowance of an alternate point of connection for whole-home backup systems. Tr., 38:22 – 39:25. The Authority is unaware of whether the potential implications for load connected behind the production meter were contemplated at that time.
  9. Page 32 of 51

    Docket No. 26-08-02 Page 30 estimates can vary from measured production by up to 11% for individual systems. UI Interrog. Resp. CAE-3. The RRES Program compensates participants for energy and RECs, with RECs sold into the NEPOOL GIS market and the resulting revenue credited to all ratepayers through the non-bypassable federally mandated congestion charge (NBFMCC). Gen. Stat. §§ 16-244z(b)(1), 16-244z(d); Residential Triff Decision, p. 20. As concerns around REC compliance appear to be minimal, the Authority is not inclined to approve a proposal that would forgo REC revenue and the associated ratepayer benefits, estimated at about $255,000 per year for currently operational impacted systems across both EDCs. Eversource Interrog. Resp. CAE-10; UI Interrog. Resp. CAE-10. Importantly, UI states that it has already independently ceased sales of RECs from DC-coupled systems into the NEPOOL GIS REC market. The Authority directs UI to resume selling RECs from PV systems enrolled in RRES with DC-coupled storage, effective immediately, and file compliance notifying the Authority once sales have resumed. In its filing, UI shall provide the amount of total generation (MWh) associated with DC-coupled RRES systems that has been excluded from UI’s uploads to NEPOOL GIS. F. MFAH ELIGIBILITY REQUIREMENTS The EDCs highlight that the current MFAH eligibility requirements accommodate a growing number of large, ground-mounted systems. Eversource Comments, May 28, 2026, pp. 7-8; UI Comments, May 28, 2026, pp. 4-5. The EDCs note that such projects are eligible to receive the Buy-All incentive rate and income-eligible adder, which exceeds what similar large commercial projects would receive through the Non-Residential Renewable Energy Solutions (NRES) or Shared Community Energy Facilities (SCEF) Programs. Id. As such, the EDCs suggest that the Authority consider adjusting siting or sizing requirements to focus RRES MFAH eligibility on solar PV systems that are located on or at the property they serve, potentially by restricting the system siting to the same interconnection point as the building load. Id.; Tr., 74:14 – 21. While the current RRES rules require that projects be located on the eligible property, the EDCs note that in some cases, the property is large enough that the system’s proposed siting requires a new service at a separate interconnection point from the existing building load. Eversource Comments, May 28, 2026, pp. 7-8; UI Comments, May 28, 2026, pp. 4-5. Alternatively, the EDCs recommend consideration of a different Buy-All incentive rate setting methodology for the MFAH market segment to better align with the program objective to balance participant and nonparticipant costs. Id. CGB reports that, in its experience financing and supporting affordable housing projects, larger MFAH projects (which CGB classifies as 100 kW or above) have installed costs more similar to the broader RRES market than to NRES or SCEF projects. CGB Comments, Aug. 19, 2026, pp. 1-2. Specifically, the average cost of MFAH projects over 100 kW selected in CGB’s February 2026 RFP for project installations was $3.64 per watt—comparable to the $3.69 and $4.28 installed cost per watt in the first quarter of 2026 for Eversource and UI RRES projects, respectively. Id. CGB states that the larger size of some MFAH projects “does not necessarily translate into commercial-scale economics” because MFAH projects often involve more complex building configurations;
  10. Page 33 of 51

    Docket No. 26-08-02 Page 31 multiple roofs or electrical systems tenant benefit allocation requirements; affordable housing financing constraints; and coordination between property owners, housing agencies, lenders, and tenants. Id. Accordingly, CGB expresses concern that modifications to MFAH sizing or siting requirements or a reduced Buy-All rate could limit solar deployment opportunities for affordable housing properties and reduce the benefits received by low- and moderate-income tenants. CGB also suggests that changes to RRES MFAH eligibility could impact the ESS Program’s objective to deliver resilience to underserved customers. Id., pp. 2-3. Earthlight opposes the EDCs’ suggestions to adjust siting and sizing requirements or the Buy-All rate setting methodology, stating that it would introduce additional complexity into the MFAH segment of the RRES Program. Earthlight Comments, Aug. 19, 2026, pp. 3-4. In particular, Earthlight disputes the EDCs’ suggestion that MFAH projects are comparable to NRES or SCEF projects, stating that MFAH RRES projects would likely fall into the small or medium NRES size categories and would not be viable as SCEF projects. Id. Additionally, Earthlight highlights that MFAH RRES projects require the system owner to share a percentage of the tariff value (20% for individually metered, and 25% for master-metered buildings) with tenants, and are designed to benefit underserved ratepayers; a lower compensation rate for MFAH projects would directly reduce the billing credits afforded to such customers. Id. Finally, Earthlight states that requiring installers to utilize separate points of interconnection for each individual building would increase costs through additional interconnection applications, meters, and other electrical equipment, potentially making projects cost prohibitive. Id., pp. 3-4. OCC supports the adoption of sizing or siting thresholds for MFAH systems that focus MFAH eligibility on systems located on or at the property they serve, and consideration of whether “an NRES-style methodology would better reflect the cost structure” of MFAH projects. OCC Comments, Aug. 19, 2026, p. 4. OCC suggests that compensating large-commercial scale systems at the Buy-All rate and income-eligible adder risks overcompensation as the rate-setting methodology is based on average residential costs. Id. At the same time, OCC does not support adoption of changes that foreclose solar access for low-income residents, and underscores that compensation levels should remain sufficient to support solar deployment for affordable housing properties. Id. Further, OCC urges the Authority to consider the extent to which large ground-mounted MFAH projects are actually delivering bill savings to low-income tenants, as required by the program, and to consider revisions to the program structure if benefits are not actually flowing to tenants. Id. At this time, the Authority does not find it necessary to change the program rules regarding MFAH eligibility and compensation for the final year of the RRES Program. The program’s current rules limit project sizing to the historical load of the applicable housing property, including allowable future electrification measures, or up to 9 kW AC per dwelling unit if historical usage is not available. Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 1B, p. 53. Current rules also require that the eligible solar PV system be located at the eligible property. Id., p. 20. The Authority understands that the EDCs have received interest from potential projects that would be located at a separate

As listed on the current system