Docket No. 26-08-02 Page 28 usefulness of resulting recommendations. Id. Instead of UI’s recommended solution, CGB proposes (1) certified inverter firmware disaggregation, using separately logged PV and battery flows, and (2) DC-side revenue-grade metering for new systems, using a preinverter where needed. Id., p. 5. OCC does not oppose a “reasonable interim proxy-based approach” to calculating non-bypassable charges and incentive adders for affected DC-coupled systems, as long as it is applied consistently, does not systematically overstate or understate production in ways that produce inequitable outcomes, and is treated as expressly interim until more accurate measurement solutions become available. OCC Comments, May 28, 2026, p. 6. OCC agrees with UI’s proposal to not sell RECs from DC-coupled systems until a reliable measurement solution is in place, expressing concern over potential REC noncompliance that could “undermine the credibility of the program and expose participants to market integrity issues.” Id., pp. 6-7. 3. Authority Analysis The Authority is unconvinced that DC-coupled solar and storage systems participating in the RRES Program pose significant concerns for REC integrity or proper accounting of customer compensation and charges. Moreover, UI’s proposed solution would create administrative burden and cost while reducing ratepayer benefits from REC sales. As a result, the Authority declines to approve changes to the program rules for DC-coupled systems. With respect to Class I REC integrity, the Authority finds that the UI’s concern is mitigated by the Program Manual’s requirement that REC reporting is based on the monthly net value of the production meter’s generation and consumption channels, such that that any charging from the grid would be netted against the total amount exported from the combined system. Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 1B, p. 31. Thus, the net production meter reading captures only the amount of energy generated by the PV system. The Authority does not agree that this violates requirements for Class I renewable eligibility. For the purposes of calculating REC adders and non-bypassable charges, DCcoupled system output measurements would be impacted somewhat by parasitic load and roundtrip energy losses, but these factors are unlikely to adversely impact program operations or the balance of program costs. The exception to this is configurations where load is connected behind the production meter, which would cause inaccurate production measurements for non-bypassable charge assessment and REC reporting. Notably, this configuration is prohibited in Eversource’s meter wiring diagrams and is an important safeguard to ensure that the production meter is accurately recording the full amount of energy produced. For UI, however, questions remain as to whether the metering diagrams and guidelines contain this same restriction, and if so, whether the rule is enforced. As Sunrun notes, UI’s metering diagrams indicate that both the main and alternate point of connection would be connected to the automated grid isolation system after the production meter, so that all energy produced would flow through the production meter before serving load. Tr., 51:17 – 52:6; Motion No. 7, Att. 13A, p. 4. However, UIPage 31 of 51
Docket No. 26-08-02 Page 29 reports that it is aware of systems where the production meter and revenue meter are directly in series, such that all load is behind the production meter. Tr., 52:7 - 19.7 To the extent that systems are being installed with load connected behind the production meter, this configuration would contradict the purpose of a production meter and the Program Manual’s requirement that the production meter exclusively measures the output of the system. Accordingly, to ensure that PV production is accurately recorded and for consistency with Eversource’s metering rules, UI shall adjust its metering diagrams to require that no load (except for parasitic load utilized to operate the coupled solar and storage system) is connected behind the production meter. UI shall file its updated metering diagrams for Authority review and approval no later than December 1, 2026. Additionally, UI shall meet with industry stakeholders prior to filing its updated metering diagrams with the Authority, and incorporate any stakeholder feedback, to ensure that any updated metering provisions do not impose undue barriers to program participation. Additionally, if the EDCs have evidence of a substantial number of RRES systems that have load connected behind the production meter in violation of the allowed metering configurations, the EDCs may propose a remedy for that limited number of systems rather than for the entire technology class. Based on the Authority’s review of the DC-coupled inverters in operation in the RRES Program, such inverters are technologically capable of measuring and reporting each input channel to separate PV and battery power flows. Interrog. Resp. CAE-20. As stated above, the scope of this specific issue does not warrant billing changes; however, to the extent that the EDCs are aware of customer configurations with load connected behind the production meter, inverter data may be used to verify compliance with RRES program rules. In general, the Authority is interested in ways that inverter data may be better utilized in current and future clean energy programs to provide visibility into DER operations without the need for additional equipment installation. Moreover, for an issue that is likely minor, UI’s proposed solution would be costly and administratively burdensome. The cost and timeline to implement UI’s proposed billing solution based on a proxy production method are uncertain, but likely substantial based on previous billing upgrade projects. UI Interrog. Resp. CAE-4; Eversource Interrog. Resp. CAE-6. The Authority is also concerned that UI is unable to provide a cost estimate for a measure that it proposed on its own initiative. Id. Additionally, the proposed proxy production method may not be sufficiently accurate for the purpose of estimated compensation for individual participants. UI states that the variance between PowerClerk estimated generation and actual generation recorded by the production meter was only 1% on average, but the sample of project data provided indicates that production 7 UI states that the metering diagrams guidelines originally prevented load behind the production meter, but the relevant provision was removed following the Year 5 Decision’s direction to refile metering guidelines and subsequent discussions with developers regarding the allowance of an alternate point of connection for whole-home backup systems. Tr., 38:22 – 39:25. The Authority is unaware of whether the potential implications for load connected behind the production meter were contemplated at that time.Page 32 of 51
Docket No. 26-08-02 Page 30 estimates can vary from measured production by up to 11% for individual systems. UI Interrog. Resp. CAE-3. The RRES Program compensates participants for energy and RECs, with RECs sold into the NEPOOL GIS market and the resulting revenue credited to all ratepayers through the non-bypassable federally mandated congestion charge (NBFMCC). Gen. Stat. §§ 16-244z(b)(1), 16-244z(d); Residential Triff Decision, p. 20. As concerns around REC compliance appear to be minimal, the Authority is not inclined to approve a proposal that would forgo REC revenue and the associated ratepayer benefits, estimated at about $255,000 per year for currently operational impacted systems across both EDCs. Eversource Interrog. Resp. CAE-10; UI Interrog. Resp. CAE-10. Importantly, UI states that it has already independently ceased sales of RECs from DC-coupled systems into the NEPOOL GIS REC market. The Authority directs UI to resume selling RECs from PV systems enrolled in RRES with DC-coupled storage, effective immediately, and file compliance notifying the Authority once sales have resumed. In its filing, UI shall provide the amount of total generation (MWh) associated with DC-coupled RRES systems that has been excluded from UI’s uploads to NEPOOL GIS. F. MFAH ELIGIBILITY REQUIREMENTS The EDCs highlight that the current MFAH eligibility requirements accommodate a growing number of large, ground-mounted systems. Eversource Comments, May 28, 2026, pp. 7-8; UI Comments, May 28, 2026, pp. 4-5. The EDCs note that such projects are eligible to receive the Buy-All incentive rate and income-eligible adder, which exceeds what similar large commercial projects would receive through the Non-Residential Renewable Energy Solutions (NRES) or Shared Community Energy Facilities (SCEF) Programs. Id. As such, the EDCs suggest that the Authority consider adjusting siting or sizing requirements to focus RRES MFAH eligibility on solar PV systems that are located on or at the property they serve, potentially by restricting the system siting to the same interconnection point as the building load. Id.; Tr., 74:14 – 21. While the current RRES rules require that projects be located on the eligible property, the EDCs note that in some cases, the property is large enough that the system’s proposed siting requires a new service at a separate interconnection point from the existing building load. Eversource Comments, May 28, 2026, pp. 7-8; UI Comments, May 28, 2026, pp. 4-5. Alternatively, the EDCs recommend consideration of a different Buy-All incentive rate setting methodology for the MFAH market segment to better align with the program objective to balance participant and nonparticipant costs. Id. CGB reports that, in its experience financing and supporting affordable housing projects, larger MFAH projects (which CGB classifies as 100 kW or above) have installed costs more similar to the broader RRES market than to NRES or SCEF projects. CGB Comments, Aug. 19, 2026, pp. 1-2. Specifically, the average cost of MFAH projects over 100 kW selected in CGB’s February 2026 RFP for project installations was $3.64 per watt—comparable to the $3.69 and $4.28 installed cost per watt in the first quarter of 2026 for Eversource and UI RRES projects, respectively. Id. CGB states that the larger size of some MFAH projects “does not necessarily translate into commercial-scale economics” because MFAH projects often involve more complex building configurations;Page 33 of 51
Docket No. 26-08-02 Page 31 multiple roofs or electrical systems tenant benefit allocation requirements; affordable housing financing constraints; and coordination between property owners, housing agencies, lenders, and tenants. Id. Accordingly, CGB expresses concern that modifications to MFAH sizing or siting requirements or a reduced Buy-All rate could limit solar deployment opportunities for affordable housing properties and reduce the benefits received by low- and moderate-income tenants. CGB also suggests that changes to RRES MFAH eligibility could impact the ESS Program’s objective to deliver resilience to underserved customers. Id., pp. 2-3. Earthlight opposes the EDCs’ suggestions to adjust siting and sizing requirements or the Buy-All rate setting methodology, stating that it would introduce additional complexity into the MFAH segment of the RRES Program. Earthlight Comments, Aug. 19, 2026, pp. 3-4. In particular, Earthlight disputes the EDCs’ suggestion that MFAH projects are comparable to NRES or SCEF projects, stating that MFAH RRES projects would likely fall into the small or medium NRES size categories and would not be viable as SCEF projects. Id. Additionally, Earthlight highlights that MFAH RRES projects require the system owner to share a percentage of the tariff value (20% for individually metered, and 25% for master-metered buildings) with tenants, and are designed to benefit underserved ratepayers; a lower compensation rate for MFAH projects would directly reduce the billing credits afforded to such customers. Id. Finally, Earthlight states that requiring installers to utilize separate points of interconnection for each individual building would increase costs through additional interconnection applications, meters, and other electrical equipment, potentially making projects cost prohibitive. Id., pp. 3-4. OCC supports the adoption of sizing or siting thresholds for MFAH systems that focus MFAH eligibility on systems located on or at the property they serve, and consideration of whether “an NRES-style methodology would better reflect the cost structure” of MFAH projects. OCC Comments, Aug. 19, 2026, p. 4. OCC suggests that compensating large-commercial scale systems at the Buy-All rate and income-eligible adder risks overcompensation as the rate-setting methodology is based on average residential costs. Id. At the same time, OCC does not support adoption of changes that foreclose solar access for low-income residents, and underscores that compensation levels should remain sufficient to support solar deployment for affordable housing properties. Id. Further, OCC urges the Authority to consider the extent to which large ground-mounted MFAH projects are actually delivering bill savings to low-income tenants, as required by the program, and to consider revisions to the program structure if benefits are not actually flowing to tenants. Id. At this time, the Authority does not find it necessary to change the program rules regarding MFAH eligibility and compensation for the final year of the RRES Program. The program’s current rules limit project sizing to the historical load of the applicable housing property, including allowable future electrification measures, or up to 9 kW AC per dwelling unit if historical usage is not available. Compliance, Jan. 22, 2026, Docket No. 25-08-02, Att. 1B, p. 53. Current rules also require that the eligible solar PV system be located at the eligible property. Id., p. 20. The Authority understands that the EDCs have received interest from potential projects that would be located at a separatePage 34 of 51
Docket No. 26-08-02 Page 32 interconnection point from the existing building load, rather than at the existing interconnection points of the eligible building(s). Eversource Interrog. Resp. CAE-25. However, it is unclear whether this distinction is meaningful, if requiring separate interconnection points would likely increase project upfront costs without impacting the resulting project size or distribution of benefits. The Authority also finds insufficient evidence to justify a distinct Buy-All rate setting methodology for MFAH RRES projects. The economics of MFAH projects and similarly sized commercial NRES projects are not directly comparable, as MFAH projects are required to share at least 20% of the tariff benefit with tenants, may have more complex building and electrical configurations, and involve coordination between multiple parties. Results of CGB’s recent MFAH project installation procurement indicate that for projects larger than 100 kW AC, installed costs per watt are not substantially lower than average installed costs for the 1 to 4-unit RRES segment. Additionally, MFAH project data provided by the EDCs indicate that projects vary widely in size, from under 10 kW AC to over 100 kW AC. Eversource Interrog. Resp. CAE-25, Att. 1; UI Interrog. Resps. CAE24 and CAE-25, Att. 1. Determining a separate Buy-All rate setting methodology that reflects the costs of the variable project types in the MFAH market is unlikely to be administratively feasible. G. PROPOSED PROGRAM DOCUMENT CHANGES The EDCs filed clean and redlined updates to the Program documents for review and approval, in accordance with Order No. 1 of the Year 5 Decision. Motion No. 7, July 31, 2026. EOE identifies several broken links, numbering errors, and missing footnotes or references that should be corrected to avoid confusion and ensure participants have access to all necessary information. EOE Comments, Aug. 19, 2026, pp. 2-3. OCC similarly recommends that the EDCs conduct a thorough cleanup and consistency review of the redlined documents. OCC Comments, Aug. 19, 2026, p. 1. Additionally, EOE notes that in Attachment 8, data field number 6 should refer to income-eligible “application,” not “qualification.” Id. OCC also suggests that the Program Manual should contain clear, affirmative language directing income-eligible customers to apply for the income-eligible adder to improve enrollment. OCC Comments, Aug. 19, 2026, pp. 1-2. Additionally, OCC argues that the Program Manual should contain a complete summary of all contractor compliance obligations, including requirements regarding marketing and training materials; currently, the manual only addresses contractor financial benefits compliance requirements. Id., p. 2. Sunrun and Goodleap support most EDC changes that reflect CCWG recommendations, but disagree with the specific definition of Estimated Year One Production (kWh) added to the CDFs. Sunrun and Goodleap Comments, Aug. 19, 2026, p. 2. Specifically, Sunrun and Goodleap note that the proposed definition references the PowerClerk production estimate as the default method and treats a contractor-providedPage 35 of 51
Docket No. 26-08-02 Page 33 production estimate as an alternative method requiring additional explanation. Id. Sunrun and Goodleap argue that this framing should be reversed, as the contractor-provided estimate, not the PowerClerk estimate, is the annual production value reflected in the system design and contract. Id. Additionally, Sunrun and Goodleap suggest that the Allowable Alternative Calculations box may require more space than is provided, depending on the number of variables that must be explained. Id., pp. 2-3. The Authority directs the EDCs to check all links, numbering, and internal references in the program documents, including the specific apparent errors identified by EOE, before filing updated documents in compliance with Order No. 22 of this Decision. Additionally, Section IX of the Program Manual references contractor compliance requirements for marketing materials and training materials regarding sales and communications with potential customers; nevertheless, the Authority agrees with OCC that a more complete explanation of the requirements established in the Year 3 Decision would be beneficial for participating RRES contractors, and directs the EDCs to update the Program Manual accordingly. This section shall also include all new contractor requirements approved in Section D of this Decision. In addition to incorporating the contractor compliance requirements authorized in Section D, the Authority directs the EDCs to adjust the definition of Estimated Year One Production (kWh) in the CDF as suggested by Sunrun and Goodleap. The Authority finds that the contractor-provided estimate, which matches what is provided to the customer in the installation contract and other materials, should be treated as the default production estimate. Additionally, per the direction in Section D.8, contractors will be required to provide the CDF contemporaneously with the contract rather than generating the CDF within PowerClerk, so the default annual production provided on the CDF should not be based on a PowerClerk calculation. The Authority also notes that contractors will be required to provide an explanation of the starting utility rate used, as well as the utility escalation rate and PV degradation rate, if different from the approved values; accordingly, the EDCs shall provide additional space in the Allowable Alternative Calculations fillable text box. V. CONCLUSION AND ORDERS A. CONCLUSION In this Decision, the Authority explores and approves several changes to the RRES Program to better serve the Program Objectives and approves the RRES Program Tariff rates for project applications received in calendar year 2027. Further, the Decision includes the Authority’s rulings to Motion Nos. 4, 5, 6, 7, and 8 in the instant proceeding, and Motion No. 24 in Docket No. 25-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 5. B. EXISTING AND NEW ORDERS For the following Orders, the Company shall file an electronic version through the Authority’s website at www.ct.gov/pura. Submissions filed in compliance with thePage 36 of 51
Docket No. 26-08-02 Page 34 Authority’s Orders must be identified by all three of the following: Docket Number, Title and Order Number. Compliance with orders shall commence and continue as indicated in each specific Order or until the Company requests and the Authority approves that the Company’s compliance is no longer required after a certain date. All Orders requiring Authority review and approval shall be submitted as a motion. The below standing orders are a summation of prior orders related to the RRES Program that continue to apply. In some instances, the Authority has amended those standing orders with redline edits. The below new orders apply on a going forward basis. 1. Standing Orders to be filed in RRES Annual Review Dockets 1. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 4, p. 44; Interim Decision, Oct. 6, 2021, Docket No. 21-08-02, Order No. 8, p. 28: No later than [August 1], 2021, the EDCs shall develop and file for the Authority’s review, modification, and approval a set of (1) Program Manual and guidelines and (2) other resources for residential utility customers and/or renewable energy contractors to explain the technical, administrative, and procedural requirements of the Residential Tariff program, including all cash out provisions. Such Program Manual, guidelines, and other resources shall strictly adhere to this Interim Decision, incorporating any direction provided herein. Any proposed rules and guidelines shall include a list of program eligibility requirements. The EDCs shall update all Program Manual, guidelines, and other resources by August 1 annually [until August 1, 2026] to reflect the most recent program information and Authority orders and/or rulings and file the aforementioned updated documents in the appropriate annual review docket (e.g., changes to be enacted in 2024 should be filed in Docket No. 23-08-02). Additionally, the EDCs shall review and update their meter wiring diagrams and guidelines as appropriate, but no less frequently than August 1 annually, and submit the revised documents in the appropriate Annual Review docket. 2. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 5, pp. 44-45: No later than [August 1], 2021, and annually thereafter [until August 1, 2026], each EDC shall file, in the annual Residential Tariff program review and rate setting proceeding for the Authority’s review, modification, and approval a proposal for a Residential Tariff program application fee to cover the estimated administrative costs associated with processing applications. The EDCs shall provide detailed calculations and written descriptions to explain and to justify the proposed application fee. In the same filing, the EDCs shall file for the Authority’s review, modification, and approval a proposed nominal administrative fee pursuant to Section III.A. for any change orders or re-designation changes subsequent to the initial project interconnection, so long as a robust rationale for the proposed fee and fee level is provided. The 2021 submission shall provide a copy of the language to be included in the customer disclosure form informing program participants of the fee.Page 37 of 51
Docket No. 26-08-02 Page 35 3. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 15, p. 46: No later than November 1, 2021, the EDCs shall file with the Authority link to their respective Residential Tariff program webpages. Such webpages shall include all relevant information regarding the “buy-all” and netting Residential Tariffs for interested residential customers and renewable energy contractors. Such website shall be made public no later than January 1, 2022 and shall be updated as frequently as is practicable, unless otherwise directed herein, to reflect the most recent program information and Authority orders and/or rulings 4. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 19, p. 47: No later than January 1, 2023, each EDC shall have in place a customer education and information webpage that shall, at a minimum, include the average installed cost ($/W) and PPA or lease price ($/kWh) for all Residential Tariff applications accepted by the EDC over the preceding 6-month period, as well as current and historical retail rates for the customer to compare their pricing and savings in real-time. Such website shall be updated at least monthly and customers shall be required to electronically acknowledge that they have reviewed the material on the customer education and information webpage as part of Residential Tariff application process. On or before January 1, 2022, each EDC shall submit a cost estimate for the development of such a webpage. On or before August 1, 2022, each EDC shall file with the Authority a working draft of such webpage. 5. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 21, p. 47: No later than [August 1], 2022, each EDC shall publicly disclose the costs of setting up and maintaining the REC metering equipment, as well as the customer acquisition costs, on their respective Residential Tariff websites. Each EDC shall update the required information at least annually. No later than [August 1], 2022, and annually thereafter [until August 1, 2026], each EDC shall submit in the abovecaptioned proceeding and in the appropriate annual review docket (e.g., changes to be enacted in 2024 should be filed in Docket No. 23-08-02) the required REC metering cost information. 6. Reference Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, Order No. 22, p. 47: No later than August 1, 2022, and annually thereafter [through the duration of the RRES Program], the EDCs shall jointly file, in the annual Residential Tariff program review and rate setting proceeding the Excel workbooks outlined in Section III.[C].6.a. The EDCs shall each use the same Excel workbook, including the same format and the exact same data fields, as each other. The EDCs shall follow all other direction provided in Section III.[C].6.a. [The Authority further directs the EDCs to include the following in each annual filing: (1) any supplemental field data as indicated in CAE-1 and CAE-14 in Docket No. 23-08-02 and included in the EDCs’ redacted filings; (2) a list of all existing data fields collected in the RRES application; (3) information on the application submission and approval date for each RRES project;Page 38 of 51
Docket No. 26-08-02 Page 36 (4) both solar PV costs, and other costs (e.g., costs of associated electrical upgrades); (5) the number and percentage of LIDR customers enrolled in the RRES Program, broken out by both LIDR tier and RRES tariff; (6) the number of add-on Netting systems enrolled in the Program which are unable to support the addition of a non-bypassable charge; (7) by each developer, the number and percentage of systems by type of housing (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing); (8) by each developer, the number and percentage of total approved RRES applications which are eligible for the low-income or Distressed Municipality adder(s); (9) the housing type (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing) and metering type (e.g., master-metered or individually metered) for each RRES project; and (10) whether each RRES project received assistance through Solar for All. See, UI Interrog. Resp. CAE-14, Att. 4 Public; Eversource Compliance, Aug. 22, 2023, Att. 1. Last, the Authority also directs the EDCs to include a summary of the Program data on the RRES Program websites. This data can be provided in any reasonable fashion (e.g., attached file, web link, embedded data), and may be relocated to the PURA Data Dashboard when the dashboard is expanded to include Clean Energy Program data.] 7. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 4, p. 16: No later than August 1, 2022, and [quarterly] thereafter, PURA requests that the Agencies file as compliance in the appropriate RRES annual review docket (i.e., in Docket No. 22-08-02 on August 1, 2022, etc.) a list of housing facilities eligible under Tier I of the affordable housing definition approved in Section II.A of this Decision. [The EDCs shall post the most recent compliance with this order, along with contact information for each of the Agencies, on the RRES Program website by January 1, 2024, and quarterly thereafter.] 8. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 5, p. 16: No later than August 1, 2022, and annually thereafter, the EDCs shall file as compliance in the appropriate RRES annual review docket (i.e., in Docket No. 2208-02 on August 1, 2022, etc.) a list of housing facilities eligible under Tier II of the affordable housing definition approved in Section II.A of this Decision. 9. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 6, p. 16: No later than August 1, 2022, and annually thereafter, PURA requests that the Agencies file as compliance in the appropriate RRES annual review docket (i.e., in Docket No. 22-08-02 on August 1, 2022, etc.) the DEEP and DOH contact information for a housing facility seeking to be defined as “affordable housing” that does not meet the Tier I or Tier II thresholds of the affordable housing definition approved in Section II.A of this Decision. [The EDCs shall post the most recent compliance with this order on the RRES Program website by January 1, 2024, and annually thereafter.]Page 39 of 51
Docket No. 26-08-02 Page 37 10. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 9, p. 17: No later than August 1, 2023, and annually thereafter, the EDCs shall file as compliance documentation of the distribution of the incentive adders to validate that the required percentage of the benefit was received by the tenants in multifamily affordable houses in the previous year (e.g., calendar year 2022 for the August 1, 2023 filing), for both the cases of on-bill credits for individually metered units and annual checks or other approved distribution methodology for those multifamily homes where units are not individually metered. 11. Reference Year 2 Decision, Order No. 12, p. 35: On a [quarterly basis beginning on January 1, 2024] through [the duration of the RRES Program], the EDCs shall provide updates to Docket No. 21-08-02 Response to Interrogatory CAE-8. Specifically, the Authority adapts the ruling in Docket No. 21-08-02 to Motion No. 26 dated March 22, 2022, which directed the EDCs to submit as a compliance filing an update to Interrogatory CAE-8 on or before the 15th of every month through January 1, 2023 (i.e., the final filing would have been made on December 15, 2022), to instead direct the compliance filings to continue monthly through January 1, 2024. Such filings shall be made in [the annual review proceeding (i.e., in 2024, Docket No. 24-08-02)] and should also include tariff type and incentive adder status information. [Last, beginning by July 1, 2024, the quarterly filings shall include: (1) the total number of low-income customers and customers located in Distressed Municipalities, and associated project capacity, which do not receive either adder, in addition to the existing breakouts for customers enrolled in the low-income and Distressed Municipality adders; (2) the number and associated project capacity of customers who reside in environmental justice census block groups, broken out by customers that qualify for the low-income and Distressed Municipality adders and those that do not; and (3) the number and associated project capacity of RRES customers who qualify for the Federal Justice 40 disadvantaged communities definition.] 12. Reference Year 2 Decision, Order No. 15, p. 35: No later than January 1, 2023, the EDCs shall update any clean energy and hardship program webpages where dual enrollment in any clean energy programs is adversely impacted or otherwise prohibited. Specifically, Eversource shall update at least their RRES Program and New Start webpages with a disclaimer alerting customers that, until such time as a proposal to enable concurrent participation in the RRES Program and the New Start Program is submitted by Eversource and approved by the Authority, existing New Start Program participants are unable to continue to participate in New Start once enrolled in the RRES Program. Moreover, moving forward, the Authority requires Eversource and UI to provide such disclaimer(s) on the appropriate clean energy program website for any instances where hardship program enrollment is jeopardized or negatively impacted by enrollment in solar programs, or vice versa. Each disclaimer should include an explanation of why dual enrollment is adversely impacted or prohibited. Further, the EDCs shall file a copy of the disclaimer(s) as