  1. Page 39 of 51

    Docket No. 26-08-02 Page 37 10. Reference Decision, June 8, 2022, Docket No. 21-08-02, Order No. 9, p. 17: No later than August 1, 2023, and annually thereafter, the EDCs shall file as compliance documentation of the distribution of the incentive adders to validate that the required percentage of the benefit was received by the tenants in multifamily affordable houses in the previous year (e.g., calendar year 2022 for the August 1, 2023 filing), for both the cases of on-bill credits for individually metered units and annual checks or other approved distribution methodology for those multifamily homes where units are not individually metered. 11. Reference Year 2 Decision, Order No. 12, p. 35: On a [quarterly basis beginning on January 1, 2024] through [the duration of the RRES Program], the EDCs shall provide updates to Docket No. 21-08-02 Response to Interrogatory CAE-8. Specifically, the Authority adapts the ruling in Docket No. 21-08-02 to Motion No. 26 dated March 22, 2022, which directed the EDCs to submit as a compliance filing an update to Interrogatory CAE-8 on or before the 15th of every month through January 1, 2023 (i.e., the final filing would have been made on December 15, 2022), to instead direct the compliance filings to continue monthly through January 1, 2024. Such filings shall be made in [the annual review proceeding (i.e., in 2024, Docket No. 24-08-02)] and should also include tariff type and incentive adder status information. [Last, beginning by July 1, 2024, the quarterly filings shall include: (1) the total number of low-income customers and customers located in Distressed Municipalities, and associated project capacity, which do not receive either adder, in addition to the existing breakouts for customers enrolled in the low-income and Distressed Municipality adders; (2) the number and associated project capacity of customers who reside in environmental justice census block groups, broken out by customers that qualify for the low-income and Distressed Municipality adders and those that do not; and (3) the number and associated project capacity of RRES customers who qualify for the Federal Justice 40 disadvantaged communities definition.] 12. Reference Year 2 Decision, Order No. 15, p. 35: No later than January 1, 2023, the EDCs shall update any clean energy and hardship program webpages where dual enrollment in any clean energy programs is adversely impacted or otherwise prohibited. Specifically, Eversource shall update at least their RRES Program and New Start webpages with a disclaimer alerting customers that, until such time as a proposal to enable concurrent participation in the RRES Program and the New Start Program is submitted by Eversource and approved by the Authority, existing New Start Program participants are unable to continue to participate in New Start once enrolled in the RRES Program. Moreover, moving forward, the Authority requires Eversource and UI to provide such disclaimer(s) on the appropriate clean energy program website for any instances where hardship program enrollment is jeopardized or negatively impacted by enrollment in solar programs, or vice versa. Each disclaimer should include an explanation of why dual enrollment is adversely impacted or prohibited. Further, the EDCs shall file a copy of the disclaimer(s) as
  2. Page 40 of 51

    Docket No. 26-08-02 Page 38 compliance and provide links to the online locations where the disclaimer(s) is/are located. 13. Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit information for the prior quarter (e.g., January 1, 2023 through March 31, 2023 for the May 1, 2023 filing) on the following items related to RRES Program applications: (1) the length of time from application to submission to tariff review approval; (2) the length of time from tariff review approval to interconnection contingent approval; (3) the length of time to receive the work order number needed to apply for permits from cities and towns; (4) the length of time to process payments when applicable; (5) the length of time for any applicable witness tests; (6) the number of days between when the utility is notified of a completed inspection to meter installation; and, (6) the length of time for final issuance of the permission to operate. The RRES APWG may recommend additions to this list in their final report filed on December 14, 2022. Such filings shall be submitted in the relevant RRES Program review docket (e.g., any updates related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). 14. Reference Year 2 Decision, Order No. 22, p. 37: Through the end of the RRES Program, the EDCs shall follow the guidance provided in Section IV.N of this Decision when making administrative changes to the RRES Program without prior PURA approval. Such changes shall be clearly documented, explained, and justified in a compliance filing submitted at least ten (10) business days prior to such changes taking effect in the relevant RRES Program review docket (e.g., any changes related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). Justification must include a clear articulation of how each Program Objective may or may not be impacted and how the requested change would serve to further the Program Objectives overall. 15. Reference Decision, Feb. 8, 2023, Docket No. 22-08-02, Order No. 26, p. 17: As required, the Authority directs the EDCs to identify any required NEPOOL waivers to allow the program to continue without the utility-owned meter socket requirement through June 2024, and to request the requisite authorization from PURA. 16. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 24, p. 64: No later than February 1, 2024, and annually thereafter [through the duration of the RRES Program], the EDCs shall hold at least one webinar with solar developers to inform them of the underserved adder eligibility criteria, in addition to other Program requirements and information. Further, during the webinar to be held by
  3. Page 41 of 51

    Docket No. 26-08-02 Page 39 February 1, 2024, the EDCs shall update Program installers on the implementation of LIDR and provide information and examples of how installers can identify LIDRenrolled customers, to ensure that LIDR customers are receiving bill savings from participation in the RRES Program. [The EDCs shall also include an overview of the contractor requirements regarding standardized inputs, allowable methodologies, and timing of disclosure form presentation to customers.] At least 30 days’ notice shall be provided to Program stakeholders prior to the date of the webinar on the Program website. As compliance, the EDCs shall file the date, time, and location of the webinar with the Authority in the applicable annual review proceeding at least 21 days prior to the webinar. 17. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 33, p. 66: No later than June 1, 2024, and April 1 and annually thereafter [through the duration of the RRES Program, inclusive of April 1, 2028], all renewable energy contractors participating in the RRES Program shall file in the reopener to the annual Program Review docket for contractor education and enforcement (e.g., Docket No. 23-0802RE01 for 2024, etc.), their marketing scripts and training materials generated for or provided to anyone engaging with a customer. Last, the Authority clarifies that the collection of marketing materials shall be administered and enforced by EOE. 18. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 34, p. 67: No later than June 1, 2024, and April 1 annually thereafter [through the duration of the RRES Program, inclusive of April 1, 2028], all Program developers shall file in the reopener to the annual Program review docket for contractor education and enforcement (e.g., Docket No. 23-08-02RE01 for the 2024 filing, etc.), a Financial Benefits Compliance, in accordance with Section IV.D. Specifically, the Authority directs each developer participating in the RRES Program to annually file with the Authority the following for all RRES projects deployed in the previous calendar year: (1) All customer disclosure forms; (2) An unlocked Excel file summarizing key information from the customer disclosure forms, as well as other information provided to customers such as contracts and promotional materials, for each project as detailed below (Financial Benefits Summary Sheet); and (3) A narrative explanation of any calculation methodologies included in the Financial Benefits Summary Sheet (Sheet Narrative). The Financial Benefits Summary Sheet shall include one row each for every project deployed by the developer under the RRES Program in the previous calendar year. For each project, the following information shall be provided (i.e., each of the following should be a column in the Financial Benefits Summary Sheet): (1) site address; (2) utility account number associated with the project; (3) annual contract rate increase amount; (4) estimated year one production (kWh) as a percentage of estimated annual utility customer usage (kWh);
  4. Page 42 of 51

    Docket No. 26-08-02 Page 40 (5) estimated year one customer net savings; (6) starting utility rate used to estimate net year one savings; (7) estimated net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data; and (8) utility rate used to estimate net savings over the RRES tariff term (i.e., 20 years) if provided by the developer to customers in a contract or promotional materials, or if it can be easily extrapolated from the customer disclosure data. The Sheet Narrative may be a simple summary document (e.g., as brief as a couple of pages) outlining the methodology used to calculate the above required information to be included in the Financial Benefits Summary Sheet, as applicable, along with a general list of the documents needed for such calculations (e.g., a customer’s electric bill and sales contract are needed to verify the methodology for the fourth requirement, etc.). Last, the Authority clarifies that the collection of financial benefit documentation shall be administered and enforced by EOE. EOE may audit a contractor’s Financial Benefits Summary Sheet and Sheet Narrative and can request additional documentation or evidence as needed to verify a contractor’s Financial Benefits Summary Sheet calculations, particularly for lowincome customers. 19. Reference Decision, Nov. 1, 2023, Docket No. 23-08-02, Order No. 36, p. 68: No later than October 1, 2024, and annually by August 1 thereafter [through the duration of the RRES Program], EOE shall complete its audit of the Financial Benefits Compliance filings and a sampling of RRES developer marketing materials and file any findings with the Authority as directed in Section IV.D.3. of this Decision following the “four strike” system authorized in the Residential Tariff Decision as necessary. 20. Reference Decision, Oct. 16, 2024, Docket No. 24-08-02, Order No. 27, p. 33: Upon the Authority’s approval of the March 31, 2025 Order No. 26 filing, the EDCs shall begin reviewing any requests for the approval of a specific model of MSA in the EDCs’ service area. Within 90 business days of receiving a request for approval of a specific MSA model for installation in the EDCs’ service area, the EDCs shall review and approve or disapprove the request. Upon approving an MSA model, the EDCs shall post the decision publicly on their webpages and update the relevant electric service guidelines. If an MSA model is disapproved, the EDCs shall provide an explanation of the reason(s) to the requesting vendor. 21. Reference Decision, Dec. 17, 2025, Docket No. 25-08-02, Order No. 24: No later than January 15, 2026, and annually thereafter in the most recent RRES annual review proceeding [through the duration of the RRES Program], the Authority requests that the MFH WG file a rent roll template in unlocked Excel format containing fields for the property address, number of units, rent for each unit, and
  5. Page 43 of 51

    Docket No. 26-08-02 Page 41 number of bedrooms in each unit for the property requesting approval. The template shall also include easily referenced rent limits affordable to households with income at or below 80% AMI for each unit size, based on the most recent HUD published data. 2. New Orders 22. No later than December 1, 2026, the EDCs shall file as compliance updated RRES Program documents, including the Program Manual, RRES Metering Diagrams, Frequently Asked Question document, and Fact Sheet, incorporating all the approved modifications authorized in this Decision. Such filing shall include both a clean and a redlined version of all RRES Program documents. 23. No later than December 1, 2026, UI shall update its metering diagrams and guidelines to require that no load (except for parasitic load utilized to operate the coupled solar and storage system) is connected behind the production meter for DC-coupled solar and storage systems, and file the updated diagrams for Authority review and approval. Additionally, UI shall meet with industry stakeholders to discuss the updated metering diagrams and incorporate stakeholder feedback prior to filing with the Authority. 24. No later than December 1, 2026, the EDCs shall notify participating RRES Program applicants of the updated contractor requirements through an email notification, PowerClerk banner, and the EDCs’ RRES program webpages, and file compliance in the instant proceeding once complete. 25. No later than January 1, 2027, the EDCs shall complete the necessary updates to the RRES PowerClerk application to incorporate the direction in Section D, Contractor Compliance, and file compliance in the instant proceeding once complete. 26. No later than January 1, 2027, all Program developers shall begin adhering to the compliance requirements specified in this decision. Specifically, Program developers shall utilize the allowable methods for determining customers’ annual electricity usage, estimated year one net savings, estimated multi-year net savings, and starting average utility rate; utilize the standardized values for utility escalation rate and PV degradation rate, or an approved alternative; and present the customer disclosure form to customers immediately prior to and contemporaneously with the solar installation contract. 27. Effective immediately, UI shall resume reporting and selling RECs from RRES solar PV systems paired with DC-coupled storage. UI shall file compliance in the instant proceeding once REC sales have resumed.
  6. Page 44 of 51

    DOCKET NO. 26-08-02 ANNUAL RESIDENTIAL RENEWABLE ENERGY SOLUTIONS PROGRAM REVIEW AND RATE SETTING – YEAR 6 This decision is adopted by the following commissioners: Thomas H. Wiehl David Arconti, Jr. Janice A. Beecher Holly H. Cheeseman Everett Smith, III CERTIFICATE OF SERVICE The foregoing is a true and correct copy of the decision issued by the Public Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail to all parties of record in this proceeding on the date indicated. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority October 28, 2026 Date
  7. Page 45 of 51

    Docket No. 26-08-02 – Appendix A Page 1 Participant Nicole Licata Grant Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Representing PURA/EOE Obinna Anugweje, Esq. Staff Attorney Department of Energy & Environmental Protection DEEP/BETP 10 Franklin Square New Britain, CT 06051 Eric Annes Department of Energy & Environmental Protection DEEP/BETP Ten Franklin Square New Britain, CT 06051 Joel M. Kopylec Director, Regulatory Services & Policy UIL Holdings Corporation 180 Marsh Hill Road Orange, CT 06477 UI Christie Prescott UIL Holdings Corporation 180 Marsh Hill Road, MS AD-2A Orange, CT 06477 UI Emma Cimino Acting Commissioner Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 DEEP Bryan Garcia President & CEO Connecticut Green Bank 75 Charter Oak Avenue Hartford, CT 06106 CT Green Bank Sergio Carrillo Connecticut Green Bank 845 Brook Street, Building #2 Rocky Hill, CT 06067 CT Green Bank Alex Kovtunenko Connecticut Green Bank 845 Brook Street Rocky Hill, CT 06067 CT Green Bank
  8. Page 46 of 51

    Docket No. 26-08-02 – Appendix A Page 2 Participant Representing Brad Mondschein Deputy Exec. Dir - Regulatory Affairs Akiro Consulting, LLC 4 Open Square Way, Suite 310 Holyoke, MA 01104 Solar Connecticut, Inc. Vincent Pace Assistant General Counsel Eversource Energy Service Company P. O. Box 270 Hartford, CT 06141-0270 Eversource Claire E. Coleman Consumer Counsel Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Anubhav Kumaria Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Paschaline Poku Staff Attorney Office of Consumer Counsel 10 Franklin Square New Britain, CT 06050 OCC John R. Viglione Office of Consumer Counsel Ten Franklin Square New Britain, CT 06051 OCC Andrew Minikowski Legal Director Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Megan J. Sullo Office of Consumer Counsel Ten Franklin Square New Britain, CT 06051 OCC Mike Trahan Executive Director Solar Connecticut P.O. Box 515 Higganum, CT 06441 ConnSSA Ed Merrick Trinity Solar, Inc.
  9. Page 47 of 51

    Docket No. 26-08-02 – Appendix A Page 3 Participant Representing Corporate Vice President Trinity Solar, Inc. 2211 Allenwood Road Wall, NJ 07719 Sean Riel Director of Sales Operations Earthlight Technologies, LLC 128 West Road Ellington, CT 06029 Earthlight Technologies, LLC Bronte Payne Senior Manager, Policy and Strategy SunPower Corporation 880 Harbour Way South, Suite 600 Richmond, CA 94804 SunPower Corp. Paul R. Michaud, Esq. Renewable Energy and Efficiency Business Association, Inc. 515 Centerpoint Drive, Suite 502 Middletown, CT 06457 Ion Solar Pros, LLC Paul R. Michaud Michaud Law Group, LLC 515 Centerpoint Drive, Suite 502 Middletown, CT 06457 Tritec Americas, LLC Paul R. Michaud, Esq. Michaud Law Group, LLC 515 Centerpoint Drive, Suite 502 Middletown, CT 06457 TRIAD Paul R. Michaud, Esq. Michaud Law Group, LLC 515 Centerpoint Drive, Suite 502 Middletown, CT 06457 Kinsley Energy Systems Bernadette Antaki Attorney Michaud Law Group LLC 515 Centerpoint Drive Suite 503 Middletown, Connecticut 06457 Ion Solar Pros, LLC Dominic Gatti Policy Analyst, Energy Policy Tesla, Inc. 1333 H Street NW, Suite 1100 West Washington, DC 20006 Tesla, Inc. Annie Gilleo Principal The Ad Hoc Group 2
  10. Page 48 of 51

    Docket No. 26-08-02 – Appendix A Participant Page 4 Representing The Ad Hoc Group 2 77 South Washington Street, Suite 210 Alexandria, VA 22314 Jonathan Knauer VP, Policy & Market Strategy ConnectDER, Inc. 2037 Washington Avenue Philadelphia, PA 19146 ConnectDER, Inc. Kyle Wallace VP, Public Policy & Government Affairs PosiGen, Inc. 145 James Drive East, Suite 300 St. Rose, LA 70087 PosiGen, Inc. Kyle Wallace Senior Manager, Public Policy Sunrun, Inc. 225 Bush Street, Suite 1400 San Francisco, CA 94104 Sunrun, Inc. Christopher Worley Director of Public Policy Sunrun, Inc. aka Sunrun Installation Services, Inc. Sunrun, Inc. 225 Bush Street, Suite 1400 San Francisco, CA 94104 Jake Assael Senior Manager of Policy GoodLeap GoodLeap Matthew Billson Picto Energy 251 Little Falls Drive Wilmington, DE 19808 Picto Energy Alex Ghanem Picto Energy 251 Little Falls Drive Wilmington, DE 19808 Picto Energy Julian Boggs Manager, Regulatory & Policy Affairs Key Capture Energy 25 Monroe Street, 3rd. Floor Albany, NY 12210 Key Capture Energy Adrian Caesar Consultant - Clean Energy NV5, Inc. 225 Dyer Street, 2nd. Floor NV5, Inc.

As listed on the current system

Final Decision, 10/28/2026 [26-08-02]