  1. Page 7 of 28

    Docket No. 26-08-03 Page 5 Table 1: NRES Solicitation Data to Date (2022 – February 2026)2 Size Category Eversource Small Zero Emission Medium Zero Emission Large Zero Emission Low Emission School Solar Eversource Total UI Small Zero Emission Medium Zero Emission Large Zero Emission Low Emission School Solar UI Total Total, both EDCs Number of Executed Agreements MW of Executed Agreements 687 145 39 14 3 888 83.78 105.14 133.95 27.64 0.93 351.44 162 53 8 5 0 228 1116 21.52 29.78 14.84 6.43 0.00 72.58 424.02 Eversource Compliance, June 18, 2026, Docket No. 25-08-03, Att. 25-08-03 Order 7 Compliance - February RFP; UI Compliance, June 24, 2026, Docket No. 25-08-03, Att. 1; Motion No. 18, Sept. 9, 2026, Docket No. 25-08-03, Ex. B. B. PRICE CAPS In the following section, the Authority reviews stakeholder comments and NRES bid solicitation data to determine whether changes are warranted to the NRES price cap methodology and bid preferences established in prior decisions. Pursuant to General Statutes § 16-244z(a)(5), the maximum purchase price for energy and RECs in a given NRES procurement may not exceed the maximum selected purchase price for the same resources in the prior year’s solicitation, unless the Authority determines that “changed circumstances” warrant a different approach. Pursuant to Order No. 3 of the Year 5 Decision, the EDCs submitted proposed price caps for the Authority’s review and approval in this proceeding. Motion No. 4, July 29, 2026. As in previous years, EDCs calculated the proposed Year 6 proposed buy-all price caps using the bids received in the Year 4 August and Year 5 February Requests for Proposals (RFPs), after eliminating withdrawn, disqualified, or declined bids. Id., p. 1. The EDCs then selected the higher value of either the highest selected bid price or the eightieth percentile bid price from each category, using the evaluated bid price for solar 2 These figures exclude projects that were selected but subsequently terminated their tariff agreement.
  2. Page 8 of 28

    Docket No. 26-08-03 Page 6 canopy projects allowed to bid above the price caps, where applicable. Id., pp. 1-2. As a result, the EDCs proposed the following price caps: Table 2: EDC-Proposed Price Caps Size Category Small Zero Emission Medium Zero Emission Large Zero Emission School Solar Id., p. 2. Year 5 BuyAll Price Cap ($/MWh) 250.42 236.74 182.94 236.74 Year 6 Proposed Buy-All Price Cap ($/MWh) 250.42 236.74 179.00 236.74 Proposed Change Amount ($/MWh) 0.00 0.00 -3.94 0.00 OCC supports the EDCs’ recommended Year 6 price caps, asserting that “the established methodology has produced a stable, predictable framework for competitive procurement” and that the Year 6 proposal reflects the intended result of cost containment with flat or declining price caps. OCC Comments, Aug. 20, 2026, pp. 1-2. Verogy argues that the price caps should be increased due to changed circumstances outside of the control of NRES Program participants. Verogy Comments, Aug. 20, 2026, pp. 1-2. Specifically, Verogy cites new tariffs expected to take effect in December 2026 which are likely to increase module costs by approximately 5-7.5%, justifying a commensurate 5-7.5% increase in the price caps. Id. Additionally, Verogy notes that increasing interconnection costs; supply chain constraints resulting from the rush to safe harbor projects by July 4, 2026, or have projects placed in service by December 31, 2027; and economy-wide inflation contribute to rising project costs. Id. The Authority concludes that maintaining the same general price cap setting methodology is appropriate given the program’s maturity. The Year 5 February procurement maintained a relatively consistent number and capacity of bid submissions priced at or below the approved price caps, indicating that the price caps are set at reasonable levels. See EDC Corresp., Aug. 20, 2026, pp. 4-7, 19-21. Additionally, continuity in the bid price caps supports the Program objectives, particularly objectives one, three, and four, by providing participants with a methodology that is accessible and stable from year to year while ensuring least-cost outcomes through a competitive process. Accordingly, the Authority approves the proposed Year 6 price caps shown in Table 3 below.
  3. Page 9 of 28

    Docket No. 26-08-03 Page 7 Table 3: Buy-All Price Caps for NRES Program Year 6 Size Category Small Zero Emission Medium Zero Emission Large Zero Emission School Solar C. Year 5 Buy-All Price Cap ($/MWh) $250.42 $236.74 $179.00 $236.74 BID PREFERENCES Pursuant to Order No. 3 of the Year 3 Decision, the EDCs submitted bid preferences for the Authority’s review and approval in this proceeding. Motion No. 4, pp. 2-3. The EDCs recommend maintaining the bid preferences from the Year 5 NRES RFP for the Year 6 RFP. Id. The EDCs’ selections in the Large Zero Emission category were “heavily impacted” by the distressed municipality bid preference, and the Medium Zero Emission category saw robust participation under solar canopy and distressed municipality bid preferences. Id. In the Large Zero Emission category, ten out of 11 selected projects in the February 2026 solicitation received the distressed municipality bid preference. Motion No. 12, Docket No. 25-08-03, Ex. B1; Motion No. 18, Docket No. 25-08-03, Ex. B. In the Medium Zero Emission category, out of 42 selected projects in the February 2026 solicitation, 11 received the distressed municipality bid preference and 17 received the solar canopy bid preference. Id. Thus, the EDCs conclude that the bid preferences are having the desired effect. Motion No. 4, pp. 2-3. No stakeholder objected to the EDCs’ proposal to maintain the bid preferences for Year 6 of the program. The Authority finds that maintaining the existing bid preferences for the final year of the NRES Program is appropriate to enhance program continuity and reduce the potential for stakeholder confusion, furthering the first and fourth Program Objectives. Additionally, maintaining the distressed municipality bid preference will continue the effective advancement of the fifth Program Objective of program participation by customers in underserved and environmental justice communities. A summary of the Year 6 bid preferences is included in Table 4 below: Table 4: Bid Preferences for NRES Program Year 6 Project Category Bid Preference Distressed Municipality 20% Landfills or Brownfields 20% Solar Canopy/Carport 30% D. BID FEE Order No. 19 of the Year 5 Decision directed the EDCs to propose an updated nonrefundable application fee to cover the administrative costs associated with running
  4. Page 10 of 28

    Docket No. 26-08-03 Page 8 the NRES Program, based on the most recent application numbers and administrative cost data. Year 5 Decision, p. 23. The EDCs propose increasing the nonrefundable application fee to $700 per bid. Compliance, July 30, 2026, p. 2. Both EDCs estimated that six months of time for four staff members is required for bid review, tariff agreement award and processing activities. Id., pp. 1-2. The EDCs divided their anticipated administrative costs by the average annual number of bids received by each EDC across the last three full procurement years, in addition to the cost of third-party vendor services and ombudsperson services, to calculate a per-bid cost. Id. The estimated total bid fee for Eversource is approximately $730 for Eversource and $871 for UI. Accordingly, the EDCs recommended increasing the bid fee from the currently approved amount of $450 to $700 to decrease the difference in fees collected when compared to administrative program costs. Id. OCC supports approval of the proposed $700 bid fee in full, reiterating its position that “application fees should reflect the actual administrative costs that program participants impose, even where a lower fee might encourage greater participation.” OCC Comments, Aug. 20, 2026, p. 3. OCC argues that the current $450 fee falls short of the EDCs’ cost per bid, with ratepayers bearing the remaining cost. Id. OCC notes that in the Year 5 Decision, the Authority declined to approve the full increase due to expected disruptions to the solar industry from federal policy changes, but states that developers “have had ample time to adjust to change federal landscape.” Id. Additionally, OCC does not expect that a $700 nonrefundable fee would pose a barrier to entry for a viable, well capitalized project. Id. Finally, OCC asserts that the Authority should consider replacing the single flat statewide fee with territory-specific fees reflecting each EDC’s actual administrative costs, which would more accurately assign costs to the participants who cause them. Id. In contrast, Verogy argues that the bid fee should remain at its current level of $450 and increasing the bid fee by 55% runs contrary to the Program Objectives. Verogy Comments, Aug. 20, 2026, p. 6. Verogy asserts that a $700 bid fee would be “unduly punitive to NRES program participants,” especially for projects in the small category, which has seen reduced participation levels compared to previous years. The Authority approves the proposed $700 bid fee for calendar year 2027. The intent of the nonrefundable bid fee has been to fully cover administrative costs related to bid and tariff agreement processing, to the extent possible. Year 3 Decision, p. 48; Year 5 Decision, p. 17. Increasing the bid fee to $700 reduces potential administrative costs in excess of fees collected, which are borne by all ratepayers through the non-bypassable federally mandated congestion charge (NBFMCC). Although the Authority determined that market conditions in 2025 warranted a more gradual increase in the bid fee in the Year 5 Decision, developers have since had time to adapt to federal policy changes and incorporate changed market circumstances into evaluations of project economic viability. Nevertheless, the EDCs’ calculated costs per bid reflect both increased administrative costs and lower annual program application volumes compared to the previous annual filing, while assuming a constant six months per year of staff time required to review and process bids. Compliance, July 30, 2026, Att. 1; Order No. 19
  5. Page 11 of 28

    Docket No. 26-08-03 Page 9 Compliance, Aug. 1, 2025, Docket No. 25-08-03, Att. 1. The Authority presumes that, although some administrative costs are fixed, certain cost components should vary based on application volumes. The EDCs annually recover prudently incurred NRES Program costs through the annual rate adjustment mechanism (RAM) proceedings (e.g., for 2026, Docket Nos. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company and 26-01-04, Annual Review of the Rate Adjustment Mechanisms of The United Illuminating Company), where the components of administrative costs and their drivers may be considered more fully. In the RAM proceedings, the Authority and parties scrutinize costs for prudence and the EDCs may be directed to provide additional explanation and support regarding the fixed and variable components of NRES Program administrative costs. Finally, the Authority seeks to minimize structural changes to the program in its final year and maintains a uniform bid fee across EDC territories. However, OCC’s suggestion for EDC-specific bid fees may be considered in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. E. EDC PROPOSED PROGRAM MANUAL REDLINES The Authority directed the EDCs to file recommended programmatic changes, clean and redlined versions of the updated Program Manual, and a narrative explanation of the proposed changes by August 1 annually. Year 5 Decision, p. 22. The EDCs filed updated Program documents in Motion No. 5. The EDCs proposed several changes to improve the clarity of program rules for participants. Motion No. 5, Att. 1, p. 1. These changes included a clarification that the Tariff Payment Beneficiary section of the Bid Certification Form and Tariff Agreement Cover Sheet is only required if the customer designates a Tariff Payment Beneficiary to receive payments; updates to reflect that any new load or beneficial electrification load must materialize within five years of the project’s in-service date, rather than the bid submission date; and a clarification that projects must receive Approval to Energize after the opening date of the solicitation in which the project is participating. Id., pp. 1-2. Additionally, the EDCs added text to the Bid Certification Form, Program Manual, and RFP noting that the project size and compensation structure cannot be modified after bid submission, as changes would impact other eligibly requirements, require a second eligibility screening, and delay the RFP schedule. Id., p. 2. Finally, the EDCs added text to note that any remaining unused budget or capacity will expire at the conclusion of the Year 6 RFP, since the NRES Program will be replaced by a successor program in 2028. Id. OCC does not object to the EDCs’ program document changes, noting that the proposed edits “are largely clarifying rather than substantive.” OCC Comments, Aug. 20, 2026, p. 2. OCC supports the adjusted language regarding load materialization within five years of the in-service date but recommends that the Authority direct the EDCs to continue verifying at the time of bid evaluation that the projected load reasonably supports the proposed project size. Id. Additionally, OCC supports the proposal that the unused Year 6 budget and capacity expire at the close of the Year 6 RFP. Id., p. 3.
  6. Page 12 of 28

    Docket No. 26-08-03 Page 10 Verogy suggests that Section 5.6.3 of the Program Manual, which states that any leftover MW in the small zero emission category will solely roll over to the small zero emission category for the following year, should be modified to allow any unallocated small zero emission budget or capacity allocation to be reallocated to the next most costefficient unawarded project(s) in the medium or large project category. Verogy Comments, Aug. 20, 2026, pp. 4-5. Section 4.2.4.1 and Appendix B of the Program Manual require bids with expected future load due to transportation, fuel switching, and/or the removal of existing generation to submit certification from a Connecticut License Professional Engineer. The Authority concurs with OCC that the EDCs shall continue to review these submissions and verify that the projected load submitted with project bids reasonably supports the proposed project size, but does not find that additional changes to the program documents are necessary. Additionally, the Authority finds that, solely for the final solicitation of the program, unallocated small zero emission budget or capacity may be reallocated to eligible medium or large projects. Rollover of unused capacity between project size categories was previously restricted due to concerns that uncommitted MW from the lower-priced, competitive medium and large zero emission categories would be reallocated to the higher-priced, noncompetitive small zero emission category, decreasing the program’s overall cost effectiveness. Year 2 Decision, p. 13. The Authority finds that allowing unallocated small budget or capacity to be reallocated to lower-cost, competitively selected categories does not pose the same cost-effectiveness concern, and will further the second program objective of deploying the full megawatt capacity allowable under statute. Accordingly, the EDCs shall use unallocated budget or capacity from the small zero emissions category remaining at the conclusion of the final NRES solicitation to select the next-lowest priced project(s) from the large and medium zero emission categories, provided that the total MW and budget of selected projects do not exceed programmatic limits. 1. “Rooftop Project” Definition and Metering Requirements The ombudsperson filed a motion with the Authority requesting a ruling regarding the definition of “Rooftop Project” in the NRES Program Manual, following a dispute regarding a Buy-All rooftop project located across two separate rooftops with the underlying buildings served by multiple tenant revenue meters. Motion No. 32, July 27, 2026, Docket No. 24-08-03. The ombudsperson encouraged the Authority to clarify the Program Manual definitions of “Rooftop Project” and “Revenue Meter” as they apply to Rooftop Buy-All facilities located on multiple rooftops. Id., p. 3. The NRES Program Manual defines “Rooftop Project” as a solar PV system “installed on top of either 1) a single building rooftop, or 2) a set of rooftops served by the same Revenue Meter, at the Project Site owned by the commercial or industrial Customer.” Compliance, Jan. 28, 2026, Docket No. 25-08-03, Att. 2a (Year 5 Program Manual), p. 9. The Program Manual also contains the following definitions: “Buy-All Production Meter” shall mean the new service established for the purpose of tracking production for a Buy-All project; “Production Meter” shall mean a meter installed and
  7. Page 13 of 28

    Docket No. 26-08-03 Page 11 owned by the EDC that measures the output from a Project prior to any netting of Customer load; and “Revenue Meter” shall mean the meter required under the Customer’s applicable general service rate schedule. Id., pp. 5, 8. Additionally, Section 8.1.1 of the NRES Program Manual states: Generally, there must be a Production Meter to measure the amount of energy produced from Customer Projects, which will all be located at or behind the EDC’s Delivery Point. In addition, there is also a Revenue Meter that measures energy exports and imports, to and from the distribution system. For Buy-All Projects, the Production Meter and Revenue Meter may be the same meter. Year 5 Program Manual, p. 35. The Authority recognized that Section 8.1.1 of the Program Manual, by allowing the Production Meter and Revenue Meter to be the same for Buy-All projects, “creates considerable, and likely unintended, ambiguity regarding the metering requirements for Buy-All projects.” Motion No. 32 Ruling, Aug. 13, 2026, p. 3. The Program Manual’s separate definitions of Production Meter and Revenue Meter do not suggest that a Production Meter can serve as a Revenue Meter for Buy-All Project; additionally, the Program Manual indicates that all projects (including Rooftop Buy-All projects) must be associated with a customer’s Revenue Meter, not solely a Production Meter. Id. In addition, the Authority posited that: [T]he limiting language in the Rooftop Project definition could create an illogical result not originally contemplated when the Rooftop Project definition was amended to allow projects that span multiple rooftops. Decision, Nov. 8, 2026, Docket No. 23-08-03, pp. 60-61. Specifically, Section 4.2.1.1 of the Year 4 Program Manual requires all bids, including rooftop buy-all projects, to “submit load information for the meter(s) associated with the Project,” where the use of plural “meter(s)” suggests that there could be multiple Revenue Meters associated with a single rooftop; however, only Rooftop Projects that span multiple rooftops must adhere to the requirement that the rooftops be served by a single Revenue Meter. Year 4 Program Manual, pp. 18. Accordingly, such a requirement may arbitrarily limit the ability to maximize solar systems on underutilized rooftop space, contrary to the intent of General Statutes § 16-244z(f), which permits oversizing of NRES rooftop projects. Id. Consequently, the Authority stated that it would also consider in the present proceeding whether the definition of “Rooftop Project” should be amended to further the intent of General Statutes § 16-244z(f). Id. The EDCs recommend editing Section 8.1.1 of the Program Manual to clarify that, for Buy-All projects, the Production Meter will also serve as the EDC Revenue Meter for purposes of associated billing. Interrog. Resp. CAE-5. The EDCs also recommend
  8. Page 14 of 28

    Docket No. 26-08-03 Page 12 expressly stating that the above provision addresses the metering and billing configuration for Buy-All projects and is not an eligibility requirement. Id.3 In the Year 3 proceeding, several stakeholders recommended expanding the Rooftop Project definition to allow a project to utilize multiple rooftops located at the same Project Site. Year 3 Decision, p. 60; Interrog. Resp. CAE-6. At that time, the EDCs were open to a modified definition but proposed instead limiting rooftop projects to a set of rooftops served by the same Revenue Meter; the Authority accepted the EDCs’ proposed redlines. Year 3 Decision, p. 61. The EDCs state that their proposal was intended to maintain “a clear relationship between the project and the applicable electric service and metering arrangement.” Interrog. Resp. CAE-6. However, the EDCs would not oppose modifying the Rooftop Project definition to allow a set of rooftops located at the same Project Site to qualify without requiring that the rooftops be served by the same Revenue Meter. Interrog. Resp. CAE-7. The EDCs note that, for Buy-All projects, the Production Meter serves as the Revenue Meter for purposes of Program billing and settlement, so the presence of multiple customer Revenue Meters on the underlying building or site does not necessarily mean that the project itself is measured or settled through multiple Revenue Meters. Id. Accordingly, the EDCs recommend that “any such revision clearly establish the applicable eligibility criteria and distinguish the physical location of the project from the electric service and metering arrangements associated with the site.” The Authority finds that the EDCs’ proposed revision to Section 8.1.1 of the Program Manual will improve the clarity of metering and billing arrangements applicable to Buy-All projects. Additionally, the Authority determines that modifying the definition of “Rooftop Project” by allowing a project to be installed on top of a set of rooftops located on a single Project Site will further the intent of General Statutes § 16-244z(f) to maximize solar systems on underutilized rooftop space. The EDCs shall modify the Program Manual accordingly and may propose language to distinguish the physical location of the project from the site’s electric service and metering arrangements. With the addition of the changes discussed above, the Authority finds that the EDCs’ proposed changes to the program documents will further the Program Objectives by improving clarity for participants and approves the EDCs’ proposed redline changes to the program documents. The EDCs shall file updated clean and redlined program 3 The EDCs’ propose the following revision: “8.1.1. Projects shall be equipped with a Production Meter to measure the amount of energy produced from Customer Projects, which will be located at or behind the EDC’s Delivery Point. In addition, there is a Revenue Meter that measures energy exports and imports to and from the distribution system. For Buy-All Projects, the Production Meter shall also serve as the EDC Revenue Meter for purposes of associated billing, and no separate Revenue Meter shall be required. This provision addresses the metering and billing configuration for Buy-All Projects and is not an eligibility requirement.” Interrog. Resp. CAE-5.
  9. Page 15 of 28

    Docket No. 26-08-03 Page 13 documents, incorporating all direction in this Decision, for review and approval in the instant proceeding by January 1, 2027. V. CONCLUSION AND ORDERS A. CONCLUSION In this Decision, the Authority explores and approves several changes to the NRES Program to better serve the Program Objectives. The Decision provides several additional clarifications for stakeholders and approves price caps for applications received in calendar year 2027. The Decision also provides rulings to Motion Nos. 3, 4, and 5. B. EXISTING AND NEW ORDERS For the following Orders, the Company shall file an electronic version through the Authority’s website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Orders must be identified by all three of the following: Docket Number, Title and Order Number. Compliance with orders shall commence and continue as indicated in each specific Order or until the Company requests and the Authority approves that the Company’s compliance is no longer required after a certain date. All Orders requiring Authority review and approval shall be submitted as a motion. The below standing orders are a summation of prior orders related to the NRES Program that continue to apply. In some instances, the Authority has amended those standing orders with redline edits. The below new orders apply on a going forward basis. 1. Standing Orders 1. Reference Decision, June 30, 2021, Docket No. 20-07-01, p. 43: For Program Years 2 through Year 6, the Authority directs the EDCs to hold two solicitations annually and to submit for the Authority’s review and approval the RFP schedules for the following year in the appropriate annual review docket, discussed in Section III.K [of the 20-07-01 Decision]. 2. Reference Decision, June 30, 2021, Docket No. 20-07-01, Order No. 15, p. 53: No later than April 1, 2022, and at least monthly thereafter [until the NRES Program stops accepting new bid submissions], each EDC shall post a list to their website that shows the most current small zero emission application queue. The project list shall anonymize project data, but include the bid number, proposed project size, and the date the bid was received, and the total small zero emission megawatts remaining for the given calendar year. 3. Reference Decision, June 30, 2021, Docket No. 20-07-01, Order No. 16, p. 53: Starting August 1, 2022, [and annually thereafter until the NRES Program stops accepting new bid submissions,] the EDCs shall submit in the relevant annual program review docket (Docket No. 22-08-03, 23-08-03, etc.) bid preferences and price caps for the subsequent program year. [The bid preferences shall be submitted for Authority review and approval. The bid price caps shall be submitted as compliance utilizing the methodology discussed and approved in Section IV.B.
  10. Page 16 of 28

    Docket No. 26-08-03 Page 14 of this Decision. Since the results of the Year 2 August solicitation will not be available when the price caps are filed, the EDCs shall use the results of the penultimate August solicitation (i.e., for Year 3, the Year 1 August solicitation), in addition to the most recent February solicitation, when determining the bid price caps.] 4. Reference Decision, June 30, 2021, Docket No. 20-07-01, Order No. 17, p. 53: No later than January 1, 2023, the EDCs shall create a webpage that provides summary data for the Non-Residential Tariffs Program consistent with the direction provided in Section III.L.2., including data fields determined in consultation with DEEP and the CGB. Such data shall be updated not less than quarterly. Ultimately, such webpage shall live on the EnergizeCT website and include all data relevant to the programs authorized in this Decision and the Residential Interim Decision, in an easily understood and digestible form. 5. Reference Decision, Nov. 3, 2021, Docket No. 21-08-03, p. 25: Not less than annually [until the NRES Program stops accepting new bid submissions], the Authority will publicly release summary statistics for the Program. Similarly, the EDCs shall only include summary installed cost data via the online data portal developed pursuant to Order No. 17 of the Non-Residential Tariff Decision. The Authority retains the right to modify this requirement in future Program years. 6. Reference Decision, June 30, 2021, Docket No. 20-07-01, Order No. 18, p. 53: In filing a motion seeking approval of the [partially executed tariff agreements] from each Non-Residential Tariffs Program solicitation, each EDC shall provide a narrative summary of such solicitation as outlined in Section III.L.3 of the Decision (Summary Report). Such a motion shall be filed in the annual program review docket opened the previous year (e.g., a motion seeking approval of projects selected in Program Year 1 in 2022 should be filed in Docket No. 21-08-03). Additionally, reference Docket No. 21-08-03, Motion No. 42, dated June 22, 2022, p. 3: At the conclusion of the rolling award notification process, submit as part of its compliance filing for Order No. 18, a listing of all [partially executed tariff agreements] for which award acceptance documentation has been ultimately completed. Additionally, reference Docket No. 21-08-03, Final Decision, dated November 3, 2021, p. 16: Further, each EDC shall submit the results of the February solicitation upon completion, requesting the Authority to issue an interim approval of the results. Finally, each EDC shall file the solicitation results for the entire Program Year, inclusive of both the February and August solicitations, no later than December 31 of the solicitation year. Both the results of the February and August solicitations shall be filed as motions for Authority review and approval in the prior year’s Annual Review proceeding. For example, the projects selected through the Year 1 Non-Residential Tariff Program solicitation should be filed as a motion in this proceeding, Docket No. 21-08-03. 7. Reference Decision, June 30, 2021, Docket No. 20-07-01, Order No. 19, p. 53: Not [later] than 60 days after the Authority’s approval of the selected bids [in each