    Docket No. 26-08-04 Page 14 Andover Energy recommended retaining the bid preferences adopted for Years 6 and 7. Andover Energy Corresp., Sept. 14, 2026, p. 1. Andover Energy argued that the existing bid preference levels provide preferred site types with an opportunity to participate in the SCEF Program while maintaining rates that are reasonable for ratepayers. Id. Save the Sound supported maintaining the Year 7 bid preference levels for Year 8. Save the Sound Comments, Sept. 14, 2026, p. 4. Save the Sound noted that one landfill project was selected in the Year 8 procurement and that the project also represented the second-lowest evaluated bid in Eversource’s service territory. Id. Save the Sound argued that this result indicates that the existing 20% landfill/brownfield preference is sufficient to facilitate participation by landfill projects and that the limited number of other landfill or brownfield projects may be attributable to factors other than the bid preference amount. Id. Save the Sound also noted that two solar canopy bids were submitted in the Year 8 procurement, one of which was selected, and argued that this result supports maintaining the existing 40% solar canopy preference. Id., p. 5. Verogy likewise supported maintaining the existing bid preference levels for Year 8. Verogy Comments, Sept. 14, 2026, p. 3. Verogy additionally recommended permitting landfill and brownfield projects to bid above the price cap, similar to the treatment of solar canopy projects. Id., pp. 3–4. Verogy argued that this change would streamline the SCEF Program’s design and asserted that the existing general price cap has become prohibitive for development of projects on landfill and brownfield sites. Id. 2. Authority Analysis Consistent with the broad stakeholder support for maintaining the existing bid preferences, the SCEF bid preference categories and amounts shall remain unchanged for Year 8. Maintaining the existing 20% bid preference for landfill and brownfield projects and the 40% bid preference for solar canopy projects appropriately balances the objectives of encouraging development on preferred sites with the need to maintain a competitive and cost-effective procurement, particularly as the SCEF Program enters its final year. The Year 7 procurement results provide evidence that the existing bid preference amounts can support the development of preferred-site projects. In Eversource’s Year 7 procurement, one landfill project and one solar canopy project were selected. See Motion No. 6, May 15, 2026, Docket No. 25-08-04, Att. B. Moreover, the selected solar canopy project ranked seventh among the 10 selected projects based on evaluated bid price, while the selected landfill project had the second-lowest evaluated bid price. Id. Thus, the results demonstrate that projects receiving the existing bid preferences can remain competitive with other SCEF projects under the current procurement structure. Only one landfill project and one solar canopy project were selected; no additional brownfield, landfill, or solar canopy projects were selected in the Year 7 procurements. However, the limited number of selected preferred-site projects does not, by itself, establish that the existing bid preference amounts are insufficient to support development of those project types. The number of projects available for selection may also be affected
  2. Page 17 of 31

    Docket No. 26-08-04 Page 15 by the availability of suitable sites, the development characteristics and costs associated with individual sites, the number of developers pursuing such projects, and developers’ relative preference for developing preferred-site projects versus less complex standard projects. The Authority therefore does not find sufficient evidence in the Year 7 results to conclude that a change in the existing bid preferences is warranted. Maintaining the existing bid preferences also promotes stability and predictability as the SCEF Program enters its final year. The existing preferences have been in place for multiple years, and the Year 7 procurement provides recent evidence regarding their operation. Introducing new bid preference categories or materially changing existing preference amounts in the final Program year could create additional uncertainty for developers and make it more difficult to assess the effects of those changes within the remaining procurement period. The Authority considered Verogy’s proposal to permit landfill and brownfield projects to bid above the price cap in a manner similar to solar canopy projects. There is potential merit in evaluating whether the treatment of the various bid preference categories should be more consistent. However, the Authority does not believe that such a substantive change to the bid preferences is appropriate in the final year of the SCEF Program. Instead, the issue may be more appropriately considered in Docket No. 26-0604, Implementation of Clean Energy Successor Programs, as the Authority develops the successor NRES and SCEF Programs. Accordingly, the Authority determines that the SCEF bid preference categories and amounts for Year 8 shall remain unchanged from Year 7. The applicable bid preference categories and amounts are shown in Table 2 below. Table 2: SCEF Program Bid Preferences Preference Type E. Preference Amount Solar Canopy4 40% Landfills or Brownfield 20% PROGRAM DOCUMENTS 1. EDC Proposed Changes Order No. 13 of the Year 7 Decision requires the EDCs to file, by September 1 each year, the current SCEF Program Requirements and all RFP documents “proposing modifications, as necessary and appropriate.” Year 7 Decision, p. 19. In compliance with this directive, the EDCs filed Motion No. 2 on August 31, 2026, which includes updated 4 As determined by the Year 5 Decision, solar canopies may submit bids above the price cap, provided that the final bid price, inclusive of the bid preference, does not exceed the price cap. See Year 5 Decision, pp. 12–13.
  3. Page 18 of 31

    Docket No. 26-08-04 Page 16 SCEF Program documents, including a revised Program Manual. See Motion No. 2, Aug. 31, 2026. The EDCs did not propose substantive changes to the SCEF Program documents, citing the maturity of the SCEF Program and its entry into its final year. Motion No. 2, Aug. 31, 2026, p. 1; EDC Comments, Sept. 11, 2026, p. 7. The EDCs stated that the revisions proposed in Motion No. 2 are limited to addressing instances of inconsistency and ambiguity in the existing Program documents and are not intended to modify the underlying Program structure or requirements. EDC Comments, Sept. 11, 2026, p. 7. When commenting on the proposed changes, OCC requested, among other things, that the Authority clarify how unused budget or MW allocations will be treated at the conclusion of the Program’s final year, including whether such funds will lapse or be addressed through successor programs. OCC Comments, Sept. 14, 2026, p. 3. The Authority finds that the EDCs’ proposed revisions are limited in scope and are primarily intended to improve consistency among the Program documents and clarify existing requirements. Accordingly, except as otherwise addressed in this Decision, the Authority approves the redline changes proposed by the EDCs, thereby granting Motion No. 2 with modification. The Authority also notes that the revised Program documents provide that any unallocated Program budget will expire and will not roll over into a subsequent Program year. Motion No. 2, Aug. 31, 2026, Att. 1, p. 11. This provision addresses OCC’s request for clarification regarding the treatment of unused Program budget following the final SCEF procurement. 2. DEEP Proposed Changes Order No. 15 of the Year 7 Decision requires DEEP to file, annually by September 1, proposed changes to Appendix B of the SCEF Program Manual. Year 7 Decision, p. 19. In compliance with this directive, DEEP submitted proposed revisions to Appendix B. See DEEP Compliance, Sept. 1, 2026. DEEP characterized its proposed modifications as minimal and stated that none of the proposed changes impose additional burdens on bidders. Id., p. 4. DEEP indicated that most of the proposed revisions are intended to clarify existing requirements. Id. For example, DEEP proposed revisions specifying that bidders must provide the full 11-digit census tract number; confirming that Appendix B submissions are due to DEEP by the date and time established by the EDCs in their SCEF RFP; adding a new section addressing Freedom of Information Act (FOIA) exemptions; and revising the Veracity of Statement Affidavit to clarify that the affiant refers to an individual bid rather than a batch of bids submitted by the same developer. Id., pp. 4–5. The Authority finds that DEEP’s proposed changes are limited in scope, primarily clarify existing requirements, and do not introduce new barriers to participation. Accordingly, the Authority approves the redlined changes proposed by DEEP that are not otherwise impacted by other sections of this Decision.
  4. Page 19 of 31

    Docket No. 26-08-04 Page 17 3. Development Period Security Section 3.5 of the SCEF Program Manual currently requires bidders to post Development Period Security of $25/kW of the nameplate capacity of the bid at the time of bid submission. Motion No. 2, Aug. 31, 2026, Att. 1, p. 12. The EDCs are required to return the Development Period Security if at least one of the following conditions is met: (1) the selected project enters commercial operation in a timely fashion and begins producing energy consistent with the Program’s requirements; (2) the project is terminated for failure to receive regulatory approval satisfactory in substance to the EDC; (3) the project is terminated due to a force majeure event; or (4) the bid is not selected under the procurement for which the bid was submitted. Id. Development Period Security is forfeited if the project is terminated by the EDC for an event of default, including, but not limited to, the failure of a SCEF project to enter commercial operation within the required timeframe, or the bidder’s decision not to move forward with the bid after submission. Id. The Program Manual does not currently establish a specific deadline by which the EDCs must return Development Period Security following a refund request. See id. Allco argued that the Authority should require the EDCs to return Development Period Security to unselected bidders without requiring an action or request from the bidder within 30 days of the issuance of bid selection results. Allco Comments, Sept. 14, 2026, p. 4. Allco further argued that, if the EDCs fail to return the Development Period Security within that timeframe, the unreturned amount should accrue interest at the prevailing prime rate. Id. Allco cited its experience in Year 6 in support of its proposal, stating that $225,000 in Development Period Security associated with three non-selected bids remained unreturned for more than 15 months following the issuance of project selection results and were released only after repeated inquiries and the EDCs’ imposition of a “company letterhead” request requirement that Allco contended is not contained in the Program documents. Id. Allco argued that the return of Development Period Security should not depend on the bidder’s persistence in requesting a refund. Id. At the September 17, 2026 Technical Meeting, the Authority asked the EDCs to respond to Allco’s claims regarding the return of Development Period Security. Tech Mt’g Tr., Sept. 17, 2026, 24:1-8. The EDCs stated that they were not prepared to respond to project-specific questions. Tr., 24:9-14. Eversource nevertheless explained that, following the close of a solicitation, it contacts bidders regarding the return of Development Period Security and requires certain information, including banking information provided on company-specific letterhead, to protect against fraudulent payments. Tr., 24:20-25. Eversource stated that refunds can be issued within four to six weeks, assuming the bidder provides all required information in a timely manner. Tr., 26:1-15. UI similarly stated that the timing of refunds depends on how promptly the bidder provides the required documentation. Tr., 25:13-19. The Authority cannot determine from the record whether Allco’s claimed delay in receiving its Development Period Security was attributable to the EDCs, Allco, or a combination of circumstances. Nevertheless, the current Program documents do not provide sufficient clarity regarding the Development Period Security refund process. Specifically, the Program Manual establishes the circumstances under which Development Period Security must be returned but does not establish a deadline for the
  5. Page 20 of 31

    Docket No. 26-08-04 Page 18 EDCs to issue a refund or identify the documentation that a bidder must provide to facilitate the refund. See Motion No. 2, Aug. 31, 2026, Att. 1, p. 12. The absence of these requirements creates unnecessary uncertainty for bidders and may result in avoidable delays or repeated communications regarding the information necessary to process a refund. Accordingly, the Authority establishes the following requirements for the Year 8 Development Period Security refund process, which shall be reflected in the Year 8 Program Manual. First, an EDC shall return a bidder’s Development Period Security within 45 days after the bidder has submitted all documentation required by that EDC to process the refund. The Authority finds that 45 days provides a reasonable period for the EDCs to complete the necessary administrative and payment-processing activities. The timeframe is also consistent with, and slightly longer than, the four-to-six-week timeframe identified by Eversource at the Technical Meeting. Importantly, the 45-day period will not begin until the bidder has provided all information required by the applicable EDC, thereby ensuring that the EDC is not held responsible for delays resulting from an incomplete submission. The Year 8 Program Manual shall clearly state this requirement. Second, each EDC shall identify in the Year 8 Program Manual the specific documentation and information that a bidder must provide to receive a Development Period Security refund. The EDCs may reasonably require certain information to verify the identity of the recipient and prevent fraudulent payments. However, those requirements should be clearly communicated to bidders in the Program Manual rather than established through ad hoc or otherwise undocumented communications following a solicitation. Providing these requirements in advance will allow bidders to submit complete refund requests and reduce unnecessary back-and-forth communications that could delay the return of funds. Third, if an EDC fails to return Development Period Security within 45 days after the bidder has submitted all required documentation, the outstanding amount shall accrue interest at the Federal Funds Effective Rate, at the expense of the EDC and not ratepayers, until the Development Period Security is returned. This is the same interest rate that applies when an EDC retains a bidder’s Operating Period Security. See Motion No. 2, Aug. 31, 2026, Att. 4, pp. 4–6. Applying the interest obligation to the EDCs provides an appropriate incentive to timely process refunds while ensuring that any cost associated with an avoidable delay is not borne by ratepayers. These requirements appropriately balance the EDCs’ need to conduct reasonable verification and payment-processing procedures with bidders’ need for a clear and timely process for recovering their Development Period Security. The requirements also establish a consistent process across EDCs while allowing each EDC to specify reasonable documentation necessary to process a refund. Timely return of Development Period Security is particularly important because the funds represent capital that bidders may otherwise use to advance other projects. Establishing clear documentation requirements, a defined refund deadline, and an EDC-funded interest obligation will provide greater transparency and reduce the potential for unnecessary delays in the return of bidder funds.
  6. Page 21 of 31

    Docket No. 26-08-04 Page 19 Accordingly, the Year 8 Program Manual shall be revised to incorporate the Development Period Security refund requirements established above. 4. Updated Documents No later than December 31, 2026, the EDCs, in coordination with DEEP, shall jointly file for Authority review and approval clean and redlined versions of the Year 8 SCEF Program documents, including the Program Manual, Appendix B, and the RFP documents, incorporating all changes approved in this Decision. V. CONCLUSION AND ORDERS A. CONCLUSION In this Decision, the Authority approves changes to the SCEF Program to better serve the Program Objectives. The Decision also approves, with modification, the procurement price cap for applications submitted in the 2027 calendar year. Additionally, the Decision includes the Authority’s ruling on Motion No. 2. B. ORDERS For Orders requiring a filing, the Company shall file an electronic version through the Authority’s website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Orders must be identified by: Docket Number, Title, and Order Number. Compliance with orders shall commence and continue as indicated in each specific Order or until the Company requests and the Authority approves that the Company’s compliance is no longer required after a certain date. Unless otherwise provided or determined by the Authority, filings submitted in compliance with an order shall constitute satisfaction of the Order. Filings requiring Authority approval must be filed as a motion. The below standing orders are a summation of prior orders related to the SCEF Program that continue to apply. In certain instances, the Authority has amended those standing orders through the redline edits reflected below. Because next year is expected to be the final year of the SCEF Program, the Authority has also added language sunsetting orders that will no longer be applicable following the conclusion of the Program. The orders below apply on a prospective basis. 1. Standing Orders 1. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 3, p. 22: No later than ninety (90) days after the issuance of this Decision [19-07-01 Final Decision], and semi-annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall provide a detailed cost estimate for the SCEF implementation costs in the most recent annual review proceeding, and updates to the forecasted implementation costs and ongoing program administration. 2. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 9, pp. 23-24: No later than November 30, 2022, and annually thereafter until January 1 2031, each EDC shall review SCEF subscriptions in the aggregate for the preceding year and report to the Authority in the most recent annual review
  7. Page 22 of 31

    Docket No. 26-08-04 Page 20 proceeding on the status of the aggregate SCEF subscriptions by Customer type, specifically providing: a. Annual aggregate SCEF production; b. Annual aggregate SCEF Subscribed Energy by Customer eligibility type, including opt-in Subscribers; c. Information on each Subscriber who was a Subscriber in the preceding year, including the Subscriber’s meter address, customer class, date of entry and exit, and Subscription kWhs, as applicable; d. The number of residential Subscribers and corresponding Subscription kWhs in the preceding year that were subscribed by way of physical written documentation from a rooftop solar installer that demonstrates they are unable to have solar panels installed on their roof, including any associated documentation; e. The number of Subscribers and corresponding Subscription kWhs in the preceding year that are in excess of the load covered by net metering, virtual net metering, LREC/ZREC contracts, or PA 18-50 tariffs other than those in this Program, for such Subscriber; f. All marketing materials used to recruit opt-in Subscribers in the preceding year, including, but not limited to, the website used by the EDC; and g. The number of Subscriptions, and kWhs associated with any such Subscriptions, which were: (1) transferred to another location when a Subscriber moved; (2) terminated; or (3) resized in the preceding year. 3. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 10, p. 24: No later than November 30, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, each EDC shall provide in the most recent annual review proceeding an aggregate list of eligible LMI customers readily identifiable in the EDC’s billing system, by number of customers and annual electricity consumption, not currently subscribed through the SCEF program. 4. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 11, p. 24: The EDCs shall seek recovery of the costs and revenues of the Modified SCEF Program Requirements in their annual RAM proceeding through the NBFMCC charge, in accordance with the requirements in Section Q., Cost Recovery for the EDCs, unless and until recovery of such costs is authorized by the Authority in an alternative manner pursuant to the requirements of General Statutes § 16a-3m. 5. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 9, p. 22: No later than August 1, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall provide an annual summary of their SCEF engagement activities in the most recent Annual Review proceeding, including a description of any training sessions held with organizations regarding the SCEF Program and any lessons learned and recommended improvements. 6. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 10, p. 22: No later than November 30, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, each EDC shall review SCEF
  8. Page 23 of 31

    Docket No. 26-08-04 Page 21 subscriptions in the aggregate for the preceding year and report to the Authority in the most recent annual review proceeding on the status of the aggregate SCEF energy and subscriptions allocated to customers in EJ communities and in municipalities with SCEFs sited on landfills or brownfields with its filing provided in compliance with Order No. 9 of the SCEF Decision. 7. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 11, p. 23: The EDCs shall provide as compliance in this docket [19-07-01RE01] and the most recent annual SCEF review docket information on any webinars and public presentations or trainings on the SCEF program two weeks before the day of the event. The EDCs may provide such information closer to the event, if two weeks is impossible or impractical. This order shall sunset when the SCEF Program stops accepting new bid submissions. 8. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 3, pp. 17-18: For program Year 2, and all subsequent program years, each EDC shall inform the Authority, on the first day of issuance, that disqualified bidders and winning bidders have been notified. The EDCs shall inform the Authority via a sample notification provided to disqualified bidders (e.g., an anonymized email sent to disqualified bidders) and winning bidders (e.g., an anonymized email sent to winning bidders) as a compliance filing in the most recent annual review proceeding. For clarity, the EDCs shall provide one notification on the first day disqualified bidders are notified and another notification on the day that winning bidders are notified. This order shall sunset when the SCEF Program stops accepting new bid submissions. 9. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 4, p. 18: For program Year 2, and all subsequent program years, each EDC shall continue the practice of submitting the selected SCEF bids as a motion in the relevant annual review proceeding (i.e., for Year 6 selected projects, in Docket No. 24-08-04) for the Authority’s review and approval. The public summary shall be sorted by evaluated Bid price(s), and shall include for each Bid: the Bid/Project ID, address; Subscriber Organization name; Bid status (disqualified, selected, withdrawn, etc.); as-Bid project size in MW; expected annual production in kWh; Y/N for each Bid Preference considered during the solicitation(s); Bid price(s); evaluated Bid price(s) if Bid preferences are applied; projected annual amount to be paid to Subscriber Organization; the projected annual amount to be paid to Subscribers; estimated in-service date; fuel type (e.g., solar, fuel cell, etc.); and customer class/tariff (e.g., rate 27, rate 30, etc.). If an EDC adjusts its annual SCEF budget cap to reflect projects from prior solicitation years that were terminated, withdrawn, or installed at capacities different from those originally proposed, the EDC shall provide a detailed breakdown of the methodology and calculations used to determine the budget adjustment. 10. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 5, p. 18: For program Year 2, and all subsequent program years, each EDC shall provide a narrative summary of the SCEF program solicitation in its motion filed in accordance with Order No. 4 seeking approval of the selected SCEF bids (Summary Report), providing an overview of the key data and metrics. The
  9. Page 24 of 31

    Docket No. 26-08-04 Page 22 Summary Report shall be similar in form to the LREC/ZREC Procurement Plan submitted for the LREC/ZREC program.5 The Summary Report shall also include a section in the narrative summary that clearly articulates how any disqualified bids met the following criteria: 1) there is a violation of clear program rules; 2) disqualification is not in conflict with the objectives of the program; and 3) disqualification does not represent an unnecessary barrier to entry. Both companies shall use the same format and include the same type of information and data in their Summary Report. Both companies shall also post both the Summary Report and public summary data, in Excel, to their respective websites. 11. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 6, p. 18: For program Year 2, and all subsequent program years, each EDC shall file in the most recent annual review proceeding a composite list of the most up-todate information and data for the most recent and all previous SCEF program solicitations (Annual SCEF Summary Data), no later than 60 days after the Authority’s approval of the selected bids. Such report shall include all of the information included in the public summary data filing listed above for each SCEF bid received to-date, as well as an accounting of all unallocated megawatts; all allocated, but unused megawatts; and total in-service megawatts; and the percentage of each in-service project’s anticipated electricity output allocated to each customer eligibility type (e.g., the portion subscribed by low-income customers, etc.). The EDCs shall use the same format in providing the Annual SCEF Summary Data, which shall be submitted in an unlocked Excel spreadsheet and concurrently posted to the company’s website. 12. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 7, p. 18: On a going forward basis, all SCEF bid documents shall be sent to the relevant EDC and DEEP as outlined in Section III.B.1 of the 19-07-01RE02 Final Decision to ensure that both the EDCs and DEEP have all the requisite information to complete their respective reviews. In conducting such reviews, both DEEP and the EDCs shall consider a bid complete if either DEEP or an EDC is in possession of the required documentation. 13. Reference Docket No. 21-08-04 Final Decision, November 17, 2021, Order No. 2, p. 19: No later than September 1, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall jointly file the current SCEF Program Requirements and all RFP documents in the applicable Annual Review proceeding (i.e., Docket No. 22-08-04, 23-08-04, etc.), and proposing modifications, as necessary and appropriate, that will allow the SCEF Program to better meet the Program Objectives. 14. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 14, p. 19: No later than January 5, 2025, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall file in the most recent annual review proceeding an updated Frequently Asked Question 5 See, e.g., Docket No. 11-12-06, UI Compliance Filing Order No. 5, Year 9 Final Procurement Plan, Dec. 31, 2020, Compliance Filings for 11-12-06 (state.ct.us).
  10. Page 25 of 31

    Docket No. 26-08-04 Page 23 document and Fact Sheet for the SCEF Program that reflects the Program modifications as directed in the most recent final Decision issued through the SCEF Program Annual Review proceeding, Docket No. XX-08-04. 15. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 15, p. 19: No later than September 1, 2025, and annually thereafter until the SCEF Program stops accepting new bid submissions, the Authority requests that DEEP file in the most recent annual review proceeding its recommended Bid Preferences and Procurement Price Cap consistent with § 3.3 of the SCEF Program Manual and proposed changes to Appendix B – Submittal to DEEP. 16. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 2, p. 16: As soon as practicable after approval, the ombudsman shall file as compliance any approved extension requests, including whether each request was granted or denied, in the SCEF annual review docket related to the solicitation year in which the project was selected (e.g., Docket No. 22-08-04 if the project was selected in Year 4 of the Program, i.e., calendar year 2022). The ombudsman shall also annually file a summary of any extension request denials in the relevant SCEF proceeding by August 1. 2. New Orders 17. No later than December 31, 2026, the EDCs, in coordination with DEEP, shall jointly file in the present proceeding, for Authority review and approval, clean and redlined versions of the Year 8 SCEF Program documents, including the Program Manual, Appendix B, and the RFP documents, incorporating all changes approved in this Decision. The EDCs shall conduct the Year 8 SCEF procurement in accordance with the final, approved documents and the Program Objectives.