Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Draft Decision

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 21 of 31

    Docket No. 26-08-04 Page 19 Accordingly, the Year 8 Program Manual shall be revised to incorporate the Development Period Security refund requirements established above. 4. Updated Documents No later than December 31, 2026, the EDCs, in coordination with DEEP, shall jointly file for Authority review and approval clean and redlined versions of the Year 8 SCEF Program documents, including the Program Manual, Appendix B, and the RFP documents, incorporating all changes approved in this Decision. V. CONCLUSION AND ORDERS A. CONCLUSION In this Decision, the Authority approves changes to the SCEF Program to better serve the Program Objectives. The Decision also approves, with modification, the procurement price cap for applications submitted in the 2027 calendar year. Additionally, the Decision includes the Authority’s ruling on Motion No. 2. B. ORDERS For Orders requiring a filing, the Company shall file an electronic version through the Authority’s website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Orders must be identified by: Docket Number, Title, and Order Number. Compliance with orders shall commence and continue as indicated in each specific Order or until the Company requests and the Authority approves that the Company’s compliance is no longer required after a certain date. Unless otherwise provided or determined by the Authority, filings submitted in compliance with an order shall constitute satisfaction of the Order. Filings requiring Authority approval must be filed as a motion. The below standing orders are a summation of prior orders related to the SCEF Program that continue to apply. In certain instances, the Authority has amended those standing orders through the redline edits reflected below. Because next year is expected to be the final year of the SCEF Program, the Authority has also added language sunsetting orders that will no longer be applicable following the conclusion of the Program. The orders below apply on a prospective basis. 1. Standing Orders 1. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 3, p. 22: No later than ninety (90) days after the issuance of this Decision [19-07-01 Final Decision], and semi-annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall provide a detailed cost estimate for the SCEF implementation costs in the most recent annual review proceeding, and updates to the forecasted implementation costs and ongoing program administration. 2. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 9, pp. 23-24: No later than November 30, 2022, and annually thereafter until January 1 2031, each EDC shall review SCEF subscriptions in the aggregate for the preceding year and report to the Authority in the most recent annual review
  2. Page 22 of 31

    Docket No. 26-08-04 Page 20 proceeding on the status of the aggregate SCEF subscriptions by Customer type, specifically providing: a. Annual aggregate SCEF production; b. Annual aggregate SCEF Subscribed Energy by Customer eligibility type, including opt-in Subscribers; c. Information on each Subscriber who was a Subscriber in the preceding year, including the Subscriber’s meter address, customer class, date of entry and exit, and Subscription kWhs, as applicable; d. The number of residential Subscribers and corresponding Subscription kWhs in the preceding year that were subscribed by way of physical written documentation from a rooftop solar installer that demonstrates they are unable to have solar panels installed on their roof, including any associated documentation; e. The number of Subscribers and corresponding Subscription kWhs in the preceding year that are in excess of the load covered by net metering, virtual net metering, LREC/ZREC contracts, or PA 18-50 tariffs other than those in this Program, for such Subscriber; f. All marketing materials used to recruit opt-in Subscribers in the preceding year, including, but not limited to, the website used by the EDC; and g. The number of Subscriptions, and kWhs associated with any such Subscriptions, which were: (1) transferred to another location when a Subscriber moved; (2) terminated; or (3) resized in the preceding year. 3. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 10, p. 24: No later than November 30, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, each EDC shall provide in the most recent annual review proceeding an aggregate list of eligible LMI customers readily identifiable in the EDC’s billing system, by number of customers and annual electricity consumption, not currently subscribed through the SCEF program. 4. Reference Docket No. 19-07-01 Final Decision, Dec. 18, 2019, Order No. 11, p. 24: The EDCs shall seek recovery of the costs and revenues of the Modified SCEF Program Requirements in their annual RAM proceeding through the NBFMCC charge, in accordance with the requirements in Section Q., Cost Recovery for the EDCs, unless and until recovery of such costs is authorized by the Authority in an alternative manner pursuant to the requirements of General Statutes § 16a-3m. 5. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 9, p. 22: No later than August 1, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall provide an annual summary of their SCEF engagement activities in the most recent Annual Review proceeding, including a description of any training sessions held with organizations regarding the SCEF Program and any lessons learned and recommended improvements. 6. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 10, p. 22: No later than November 30, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, each EDC shall review SCEF
  3. Page 23 of 31

    Docket No. 26-08-04 Page 21 subscriptions in the aggregate for the preceding year and report to the Authority in the most recent annual review proceeding on the status of the aggregate SCEF energy and subscriptions allocated to customers in EJ communities and in municipalities with SCEFs sited on landfills or brownfields with its filing provided in compliance with Order No. 9 of the SCEF Decision. 7. Reference Docket No. 19-07-01RE01 Final Decision, Sept. 15, 2021, Order No. 11, p. 23: The EDCs shall provide as compliance in this docket [19-07-01RE01] and the most recent annual SCEF review docket information on any webinars and public presentations or trainings on the SCEF program two weeks before the day of the event. The EDCs may provide such information closer to the event, if two weeks is impossible or impractical. This order shall sunset when the SCEF Program stops accepting new bid submissions. 8. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 3, pp. 17-18: For program Year 2, and all subsequent program years, each EDC shall inform the Authority, on the first day of issuance, that disqualified bidders and winning bidders have been notified. The EDCs shall inform the Authority via a sample notification provided to disqualified bidders (e.g., an anonymized email sent to disqualified bidders) and winning bidders (e.g., an anonymized email sent to winning bidders) as a compliance filing in the most recent annual review proceeding. For clarity, the EDCs shall provide one notification on the first day disqualified bidders are notified and another notification on the day that winning bidders are notified. This order shall sunset when the SCEF Program stops accepting new bid submissions. 9. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 4, p. 18: For program Year 2, and all subsequent program years, each EDC shall continue the practice of submitting the selected SCEF bids as a motion in the relevant annual review proceeding (i.e., for Year 6 selected projects, in Docket No. 24-08-04) for the Authority’s review and approval. The public summary shall be sorted by evaluated Bid price(s), and shall include for each Bid: the Bid/Project ID, address; Subscriber Organization name; Bid status (disqualified, selected, withdrawn, etc.); as-Bid project size in MW; expected annual production in kWh; Y/N for each Bid Preference considered during the solicitation(s); Bid price(s); evaluated Bid price(s) if Bid preferences are applied; projected annual amount to be paid to Subscriber Organization; the projected annual amount to be paid to Subscribers; estimated in-service date; fuel type (e.g., solar, fuel cell, etc.); and customer class/tariff (e.g., rate 27, rate 30, etc.). If an EDC adjusts its annual SCEF budget cap to reflect projects from prior solicitation years that were terminated, withdrawn, or installed at capacities different from those originally proposed, the EDC shall provide a detailed breakdown of the methodology and calculations used to determine the budget adjustment. 10. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 5, p. 18: For program Year 2, and all subsequent program years, each EDC shall provide a narrative summary of the SCEF program solicitation in its motion filed in accordance with Order No. 4 seeking approval of the selected SCEF bids (Summary Report), providing an overview of the key data and metrics. The
  4. Page 24 of 31

    Docket No. 26-08-04 Page 22 Summary Report shall be similar in form to the LREC/ZREC Procurement Plan submitted for the LREC/ZREC program.5 The Summary Report shall also include a section in the narrative summary that clearly articulates how any disqualified bids met the following criteria: 1) there is a violation of clear program rules; 2) disqualification is not in conflict with the objectives of the program; and 3) disqualification does not represent an unnecessary barrier to entry. Both companies shall use the same format and include the same type of information and data in their Summary Report. Both companies shall also post both the Summary Report and public summary data, in Excel, to their respective websites. 11. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 6, p. 18: For program Year 2, and all subsequent program years, each EDC shall file in the most recent annual review proceeding a composite list of the most up-todate information and data for the most recent and all previous SCEF program solicitations (Annual SCEF Summary Data), no later than 60 days after the Authority’s approval of the selected bids. Such report shall include all of the information included in the public summary data filing listed above for each SCEF bid received to-date, as well as an accounting of all unallocated megawatts; all allocated, but unused megawatts; and total in-service megawatts; and the percentage of each in-service project’s anticipated electricity output allocated to each customer eligibility type (e.g., the portion subscribed by low-income customers, etc.). The EDCs shall use the same format in providing the Annual SCEF Summary Data, which shall be submitted in an unlocked Excel spreadsheet and concurrently posted to the company’s website. 12. Reference Docket No. 19-07-01RE02 Final Decision, April 28, 2021, Order No. 7, p. 18: On a going forward basis, all SCEF bid documents shall be sent to the relevant EDC and DEEP as outlined in Section III.B.1 of the 19-07-01RE02 Final Decision to ensure that both the EDCs and DEEP have all the requisite information to complete their respective reviews. In conducting such reviews, both DEEP and the EDCs shall consider a bid complete if either DEEP or an EDC is in possession of the required documentation. 13. Reference Docket No. 21-08-04 Final Decision, November 17, 2021, Order No. 2, p. 19: No later than September 1, 2022, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall jointly file the current SCEF Program Requirements and all RFP documents in the applicable Annual Review proceeding (i.e., Docket No. 22-08-04, 23-08-04, etc.), and proposing modifications, as necessary and appropriate, that will allow the SCEF Program to better meet the Program Objectives. 14. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 14, p. 19: No later than January 5, 2025, and annually thereafter until the SCEF Program stops accepting new bid submissions, the EDCs shall file in the most recent annual review proceeding an updated Frequently Asked Question 5 See, e.g., Docket No. 11-12-06, UI Compliance Filing Order No. 5, Year 9 Final Procurement Plan, Dec. 31, 2020, Compliance Filings for 11-12-06 (state.ct.us).
  5. Page 25 of 31

    Docket No. 26-08-04 Page 23 document and Fact Sheet for the SCEF Program that reflects the Program modifications as directed in the most recent final Decision issued through the SCEF Program Annual Review proceeding, Docket No. XX-08-04. 15. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 15, p. 19: No later than September 1, 2025, and annually thereafter until the SCEF Program stops accepting new bid submissions, the Authority requests that DEEP file in the most recent annual review proceeding its recommended Bid Preferences and Procurement Price Cap consistent with § 3.3 of the SCEF Program Manual and proposed changes to Appendix B – Submittal to DEEP. 16. Reference Docket No. 24-08-04 Final Decision, December 11, 2024, Order No. 2, p. 16: As soon as practicable after approval, the ombudsman shall file as compliance any approved extension requests, including whether each request was granted or denied, in the SCEF annual review docket related to the solicitation year in which the project was selected (e.g., Docket No. 22-08-04 if the project was selected in Year 4 of the Program, i.e., calendar year 2022). The ombudsman shall also annually file a summary of any extension request denials in the relevant SCEF proceeding by August 1. 2. New Orders 17. No later than December 31, 2026, the EDCs, in coordination with DEEP, shall jointly file in the present proceeding, for Authority review and approval, clean and redlined versions of the Year 8 SCEF Program documents, including the Program Manual, Appendix B, and the RFP documents, incorporating all changes approved in this Decision. The EDCs shall conduct the Year 8 SCEF procurement in accordance with the final, approved documents and the Program Objectives.
  6. Page 26 of 31

    Docket No. 26-08-04 – Appendix A Page 1 APPENDIX A: List of Docket Participants Participant Ross Abbey United States Solar Corporation 100 N. 6th Street, Suite 410B Minneapolis, MN 55403 Bernadette Antaki Michaud Law Group, LLC 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 Emily Basham Connecticut Green Bank 75 Charter Oak Avenue, Suite 1-103 Hartford, CT 06106 David M. Bodendorf Senior Environmental Engineer Materials Innovation and Recycling Authority 200 Corporate Place, Suite 202 Rocky Hill, CT 06067 Michael Borkowski Community Power Group Carole Briggs, Esq. Department of Agriculture/Office of the Commissioner 450 Columbus Boulevard, Suite 701 Hartford, CT 06103 Ed Brolin Vice President, Policy & Regulatory Affairs Clean Energy Collective 27B Midstate Drive, Suite 106 Auburn, MA 01501 Cal Brown Sustainable Energy Advantage, LLC Richard W. Caperton Senior Director, Regulatory Affairs and Market Development Arcadia Power 1121 14th Street NW, Suite 300 Washington, DC 20005 Michelle Carpenter Turning Point Energy 999 18th Street, Suite 3000 Denver, CO 80202 Representing US Solar Corp. Solar Alliance for Virtual Energy CT Green Bank Materials Innovation & Recycling Authority Community Power Group Dept. of Agriculture/Office of the Commissioner Clean Energy Collective SEA, LLC Arcadia Power Turning Point
  7. Page 27 of 31

    Docket No. 26-08-04 Participant Samantha Chasalow Glenvale, LLC 3190 Washington Street Boston, MA 02130 Mateo Chaskel Director/Development UGE USA, Inc. 330 W 38th Street, Suite 1103 New York, NY 10018 Emma Cimino Acting Commissioner Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Claire E. Coleman Consumer Counsel Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 Jarryd Commerford Summit Ridge Energy 1401 Wilson Boulevard, Suite 800 Arlington, VA 22209 Amanda De Vito Trinsey, Esq. Couch White, LLP 540 Broadway P.O. Box 22222 Albany, NY 12201-2222 Samantha Dynowski State Director Sierra Club Connecticut P.O. Box 270595 West Hartford, CT 06127 Ryan Fahey Ameresco 111 Speen Street Framingham, MA 01701 Jordan Garfinkle Sr. Policy Manager, NE Bloom Energy Corporation 4353 N 1st Street San Jose, CA 95134 William Gary National Fuel Cell Research Center University of California, Irvine Irvine, CA 92697 Page 2 Representing Glenvale, LLC UGE USA, Inc. DEEP OCC Summit Ridge Energy CIEC Sierra Club Ameresco Bloom Energy Corp. National Fuel Cell Research Center
  8. Page 28 of 31

    Docket No. 26-08-04 Page 3 Participant Dylan J. Gillis Michaud Law Group 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 David Giordano Federal & State Government Relations Doosan Fuel Cell America, Inc. 195 Governor's Highway South Windsor, CT 06074 S. Jay Goodman, Esq. Partner Couch White, LLP 540 Broadway P.O. Box 22222 Albany, NY 12201 Joel Gordes Environmental Energy Solutions 38 Brookmoor Road West Hartford, CT 06107 Lindsay Griffin Vote Solar 13 Symphony Road Boston, MA 02110 William Herchel CEO Verogy Holdings, LLC 124 LaSalle Road, 2nd Floor West Hartford, CT 06107 Tom Hunt Clean Energy Collective 361 Centennial Parkway, Suite 301 Louisville, CO 80027 Alexandrea Isaac, Esq. Senior Legal Counsel FuelCell Energy, Inc. 3 Great Pasture Road Danbury, CT 06810 Morgan Kennedy Energy Resources Joel M. Kopylec Director, Regulatory Services & Policy UIL Holdings Corporation 180 Marsh Hill Road Orange, CT 06477 Anubhav Kumaria Office of Consumer Counsel Representing TRITEC Americas, LLC; Solar Alliance for Virtual Energy Doosan Fuel Cell America, Inc. CIEC Environmental Energy Solutions Vote Solar Verogy Holdings, LLC Clean Energy Collective FuelCell Energy, Inc. Energy Resources UI OCC
  9. Page 29 of 31

    Docket No. 26-08-04 Participant 10 Franklin Square New Britain, CT 06051 Michael Licamele MSL Group, Inc. 18 Wells Hill Road Easton, CT 06612 Michael Licamele MSL Group, Inc. - Residential Finance Network 185 Plains Road, Suite 100E Milford, CT 06461 Gannon Long Policy & Public Affairs Director Operation Fuel, Inc. 75 Charter Oak Avenue, Suite 2-240 Hartford, CT 06106 Jeff Lord Clean Energy Collective LLC 361 Centennial Parkway, Suite 301 Louisville, CO 80027 Matt Macunas Sr. Marketing Mgr. Connecticut Green Bank 75 Charter Oak Avenue, Suite 1-103 Hartford, CT 06106 Bruce McDermott Murtha Cullina LLP One Century Tower 265 Church Street New Haven, CT 06510 Michael Melone, Esq. Allco Renewable Energy, Ltd. 157 Church Street, 19th Floor New Haven, CT 06510 Thomas Melone Allco Renewable Energy Limited 157 Church Street, 19th Floor New Haven, CT 06510 Paul R. Michaud Michaud Law Group, LLC 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 Paul Michaud Michaud Law Group, LLC 175 Capital Boulevard, Suite 432 Rocky Hill, CT 06067 Page 4 Representing MSL Group, Inc. CHIP Fund 5 Operation Fuel Clean Energy Collective CT Green Bank FuelCell Energy, Inc. Jefferson Solar, LLC Allco Renewable Energy Limited Solar Alliance for Virtual Energy TRITEC Americas, LLC
  10. Page 30 of 31

    Docket No. 26-08-04 Participant Jonathan Miller Gravity Renewables, Inc. 1401 Walnut Street, Suite 420 Boulder, CO 80302 Suzannah Nigro, Esq. Staff Attorney Department of Energy and Environmental Protection 10 Franklin Square New Britain, CT 06051 DEEP Vincent Pace Assistant General Counsel Eversource Energy Service Company P. O. Box 270 Hartford, CT 06141-0270 James Patenaude 64Solar, LLC Paschaline Poku Staff Attorney Office of Consumer Counsel 10 Franklin Square New Britain, CT 06050 Deb Poulin CT Association for Community Action (CAFCA) 203 Main Street 300 Plaza Middlesex Middletown, CT 06457 Christie Prescott UIL Holdings Corporation 180 Marsh Hill Road Orange, CT 06477 Lisa Riffin Glenvale, LLC 3190 Washington Street Boston, MA 02130 Charles J. Rothenberger Climate & Energy Attorney CT Fund for the Environment/Save the Sound 900 Chapel Street, Suite 2202 New Haven, CT 06511 Shannon Scheiwiller Sr. Vice President, Marketing Clean Energy Collective 27B Midstate Drive, Suite 106 Auburn, MA 01501 Page 5 Representing Gravity Renewables, Inc. DEEP/BETP CL&P 64Solar, LLC OCC CAFCA UI Glenvale, LLC CFE/STS Clean Energy Collective
No matches

As listed on the current system

Draft Decision, 10/19/2026 [26-08-04]

This filing on the current system (opens in a new tab)