  1. Page 18 of 69

    Docket No. 26-08-05 Page 16 more difficult to determine whether a participant has satisfied the performance requirements of either program. The potential interaction between the programs also creates a risk that the operation of one program could undermine the objectives of the other. For example, a managed charging signal could limit charging or otherwise affect the vehicle’s state of charge in a manner that reduces the vehicle’s ability to respond to an ESS dispatch event called later. Avoiding these outcomes would require the programs to be coordinated not merely at the enrollment level, but at the dispatch and control level. See Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, pp. 36–37. The Authority is not persuaded that the benefits of dual enrollment warrant undertaking this additional level of program integration. Second, dual enrollment could unnecessarily complicate the customer experience. A customer participating in two programs would be required to understand and comply with two sets of eligibility requirements, program rules, performance obligations, compensation structures, and dispatch windows. The customer would also need to understand how participation in one program could affect the vehicle’s ability to respond to the other program. These complications could make it difficult for customers to understand how their vehicle will operate, what compensation they can expect to receive, and whether the vehicle will remain available for their transportation needs. The Authority is particularly concerned that unnecessary complexity at the point of enrollment or during program participation could discourage participation and undermine customer confidence in bidirectional EV technology, which remains an emerging resource. Third, and most importantly, the Authority must ensure that ratepayers do not provide duplicative compensation for the same underlying grid benefit. Managed charging and ESS can provide distinct benefits: managed charging generally shifts consumption to different hours, while ESS provides a dispatchable reduction in net load through discharge. However, when a bidirectional EV is enrolled in ESS and discharges during a period of system need, the vehicle necessarily is not charging during that period. The ESS dispatch therefore can simultaneously provide the principal benefit that managed charging is intended to achieve during system peaks, reducing or avoiding charging load, while also providing the additional benefit of injecting energy into the grid. To the extent the relevant system peak period would occur at the same time regardless of which program the customer is enrolled in, enrolling the same vehicle in both programs could result in two incentive streams being paid for behavior that is substantially overlapping. The Authority therefore must distinguish between circumstances in which dual enrollment produces a genuinely incremental grid benefit and circumstances in which it merely increases compensation for a resource response that the ESS Program already incentivizes. This concern is particularly important because the ESS Program is already designed to compensate resources for their performance in responding to grid needs. A second incentive is not warranted simply because the same resource could technically satisfy the requirements of another program. Rather, additional compensation should be
  2. Page 19 of 69

    Docket No. 26-08-05 Page 17 justified by a material change in customer behavior that would not otherwise occur. Dual enrollment would not consistently produce such an incremental benefit sufficient to justify the additional administrative and technical complexity. This approach is consistent with the treatment of other storage resources participating in the ESS Program. A standalone commercial stationary battery used for demand charge reduction can both avoid charging during peak periods and discharge during those periods; however, the ESS Program does not provide a separate managed charging incentive for the avoided charging associated with this behavior. The Authority therefore sees no compelling reason to provide bidirectional EVs with an additional incentive for a comparable charging behavior merely because the underlying asset is an EV. Such a distinction could result in materially different compensation for resources providing substantially similar grid services and could undermine the principle that ESS incentives should be commensurate with the incremental benefits provided to ratepayers. Accordingly, the Authority will prohibit dual participation by bidirectional EV charging systems enrolled in the ESS and managed charging programs. This approach will enable bidirectional EV participation in the ESS Program while avoiding the additional technical complexity and potential ratepayer value concerns that could arise from dual enrollment in both programs. It will also allow demonstration of bidirectional EV performance, dispatch, customer participation, and program administration within a single incentive structure. e. Incentives Commercial bidirectional EVs participating in the ESS Program shall be eligible solely for performance incentives at the current incentive rate applicable to the small/medium commercial customer class. Applying the existing commercial incentive rate provides a consistent and administratively straightforward approach while avoiding the need to establish a separate incentive level before sufficient operating and cost data are available. It also supports the Program’s objective of ensuring that the addition of bidirectional EV resources does not adversely affect ratepayer benefits. The commercial customer class currently has a positive CT-RIM score of 1.23 at existing incentive levels, including enrollment incentives, indicating that a performance-only incentive structure can maintain positive ratepayer benefits. Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 21, p. 75. Further, bidirectional EVs shall not receive an enrollment incentive. Unlike an enrollment incentive, which provides compensation based principally on a resource’s enrollment, a performance incentive is paid only when a participating resource responds to an active dispatch event and delivers measurable grid value. The latter approach is particularly appropriate for bidirectional EV participation because there is limited operating experience regarding the frequency, duration, and consistency with which these resources will be available for dispatch. Bidirectional EVs have operational constraints that do not apply to standalone energy storage systems. EV availability can depend on transportation needs, charging schedules, and other customer-specific circumstances. These factors make it difficult to
  3. Page 20 of 69

    Docket No. 26-08-05 Page 18 establish an enrollment incentive that can be demonstrated to provide benefits commensurate with its cost to ratepayers. Accordingly, compensation based exclusively on demonstrated performance during active dispatch events strikes an appropriate balance between encouraging early deployment of bidirectional EV resources and protecting ratepayers. f. Program Requirement Changes As identified in the Report, existing Program requirements must be clarified or waived to allow commercial bidirectional EVs to participate in the ESS Program. First, EVSE enrolling in the ESS Program shall be considered BTM resources. Certain charging sites may have no load other than the EV charger. If such a site were solely occupied by a stationary battery, the battery would be considered FTM and therefore would be ineligible to participate in the ESS Program. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 29. However, the primary purpose of an EV charging site is to provide transportation-related charging services, rather than to operate as a standalone grid resource. Accordingly, it is reasonable to treat EVSE as BTM for purposes of ESS Program eligibility, regardless of whether other customer load is present at the charging site. Additionally, the ESS Program currently requires enrolled resources to be capable of islanding and providing backup power during grid outages. Id. This requirement is not appropriate for bidirectional EVs because the vehicles are mobile and may not be connected to the applicable EVSE when an outage occurs. In addition, requiring an EV to remain available for backup power could interfere with its primary transportation function. The requirement is also of limited practical value at charging sites where the EVSE serves no load other than the vehicle itself. Accordingly, the Authority waives the islanding and backup-power requirement for all bidirectional EV charging systems enrolling in the ESS Program. g. MW Cap and PCT The Authority clarifies two quantitative considerations applicable to bidirectional EVs participating in the ESS Program. First, the Report proposed that the appropriate cost basis for evaluating the economics of bidirectional EV participation in the ESS Program is the incremental cost of moving from a unidirectional EV to a fully V2G-capable system, rather than the full cost of the EV and EVSE. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 54. The Authority agrees. The primary purpose of a bidirectional EV is transportation, rather than grid services. Accordingly, the economics of ESS participation from the perspective of an EV owner should be evaluated based on the incremental costs necessary to enable the EV or EVSE to provide bidirectional functionality, rather than costs associated with the vehicle and charging equipment that the customer would incur for transportation purposes regardless of ESS participation.
  4. Page 21 of 69

    Docket No. 26-08-05 Page 19 Second, the Report recommended that, for purposes of the Program’s 580 MW deployment target, the export rating, in kW, of EVSE enrolled in the ESS Program be counted toward the Program’s MW goal. Id., p. 64. The Authority agrees that the export rating shall be used for this purpose unless performance data demonstrates that bidirectional EVs consistently perform substantially below their rated export capacity. This approach is consistent with the treatment of stationary storage, for which the full export rating is counted toward the Program’s MW deployment target upon enrollment, notwithstanding that actual performance during dispatch may be lower. Counting bidirectional EVs on the same basis promotes consistency across resource types and avoids establishing a different treatment for EV-based storage without a demonstrated need to do so. Accordingly, absent compelling evidence demonstrating that the rated export capacity materially overstates the capacity reasonably available from enrolled bidirectional EVs, the Authority does not anticipate revisiting this determination. h. Technical and Telemetry Requirements The Report proposed several technical requirements and certifications for bidirectional EV participation, as summarized in Table 6 below. Given the broad stakeholder support for these requirements, the Authority approves the technical standards identified in Table 6, subject to the clarifications discussed below. Table 6: Standards and Certifications Applicable to Bidirectional EV Participation in the ESS Program Standard/Certification UL 1741 SB UL 1741 SC Description Enhanced inverter/grid standard with advanced functions. Already required by EDCs for interconnection. Applicable pathway for DCcoupled EVSE. Extension of UL 1741 designed for mobile, onboard vehicle inverters (ACcoupled systems). Requires paired EV to be SAE J3072 certified. Finalized in May 2026. Applicable to EVSE? Applicable to EV? Recommendation Yes No Require for DCcoupled EVSE as well as for stationary storage Yes (ACCoupled) No Require for ACcoupled EVSE upon finalization
  5. Page 22 of 69

    Docket No. 26-08-05 Standard/Certification UL 1741 SB CRD SAE J3072 UL 9741 UL 2594 UL 2202 ISO 15118- 20 Page 20 Description Pathway for jointly certifying a specific EV-EVSE pair as a composite DER under the SB framework. Available now; used by some manufacturers (e.g., Tesla). Defines bidirectional energy transfer requirements for plug-in EVs paired with UL 1741 SC EVSE. Safety standard for bidirectional EVSE capable of exporting power to the grid or premises. Safety standard for Level 1 and Level 2 AC EVSE. Safety standard for DC fast charging EVSE. Governs EV-toEVSE communication for bidirectional power transfer. Applicable to EVSE? Applicable to EV? Recommendation Yes (Paired) Permitted as alternative pathway for composite DER pairings (ACcoupled) Yes (ACCoupled) Yes (ACCoupled) Require for EVs paired with UL 1741 SC EVSE; not a standalone requirement Yes No Require Yes (AC) No Require for Level 1/2 AC chargers Yes (DC) No Require for DC fast chargers Yes (partial) Require, with Program Administrator discretion to grant exceptions where certification ecosystem not yet mature Yes Yes Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, pp. 44–45. As noted by VGIC, certain AC-coupled systems may be unable to obtain UL 9741 certification but may be capable of obtaining UL 1741 SC certification. VGIC Comments, Aug. 28, 2026, p. 22. The Authority cannot independently determine from the record whether UL 9741 is technically inapplicable to all AC-coupled systems. Nevertheless, rigid application of specific certification standards could unnecessarily restrict participation in a rapidly evolving technology market, particularly where an alternative or
  6. Page 23 of 69

    Docket No. 26-08-05 Page 21 subsequently developed certification provides comparable assurance of safety and functionality. Accordingly, for the purposes of ESS enrollment, the Authority authorizes the Program Administrators to waive any technical requirement identified in Table 6 when an applicant demonstrates either that: (1) an alternative or subsequently developed certification or standard fulfills the same substantive purpose as the applicable requirement; or (2) the specified certification is not technically applicable or reasonably obtainable for a particular class of resources. The Program Administrators shall incorporate this clarification into the revised Program Manual filed in compliance with this Decision. The burden of demonstrating that a waiver is warranted shall rest with the applicant. The Program Administrators shall not be required to establish independently that an alternative certification satisfies the applicable requirement absent a sufficient showing by the applicant. The Authority does not extend this waiver authority to the Program’s telemetry requirements. The Report recommended maintaining the current requirement that enrolled resources provide telemetry data at 15-minute intervals, while also allowing the Program Administrators discretion to waive that requirement for stored kWh because a working group participant indicated that some EVs may be unable to consistently provide data at that frequency. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 51. However, detailed telemetry data is fundamental to effective ESS Program administration. Granular telemetry is necessary to evaluate resource performance and identify and troubleshoot operational issues. Accordingly, bidirectional EV charging systems enrolled in the ESS Program shall be required to provide stored kWh telemetry at 15-minute intervals, and the Program Administrators shall not waive this requirement. If an enrolled bidirectional EV charging system fails to provide required discharge telemetry data for a particular period, the performance associated with that period shall be recorded as zero for purposes of calculating the applicable performance incentive. This approach appropriately places the risk of inadequate telemetry on the participant and avoids compensating a resource for performance that the Program cannot verify. Finally, the Authority agrees with Tesla that the Program Manual revisions proposed by the Program Administrators do not appear to fully capture the technical requirements and certification pathways described in the Report. See Tesla Comments, Aug. 28, 2026, p. 5; Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 5, pp. 24–25. Accordingly, the Program Administrators shall carefully review and revise the Program Manual to ensure that it accurately and comprehensively incorporates all technical and programmatic requirements applicable to bidirectional EV participation identified in the Report and approved by the Authority. The revised Program Manual shall also clearly reflect the waiver authority established by this Decision and the requirement for 15-minute telemetry data. i. Sizing Requirements The Report recommended a minimum discharge capacity threshold of 20 kW per charging port for commercial bidirectional EV charging systems enrolling in the ESS
  7. Page 24 of 69

    Docket No. 26-08-05 Page 22 Program. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 4. The Program Administrators explained that this threshold is intended to focus initial enrollment on direct current fast charging (DCFC) stations, as AC or Level 2 chargers typically have a maximum discharge capacity below 20 kW. Program Administrator Interrog. Resp. CAE-13, p. 1. According to the Program Administrators, focusing initially on DCFC chargers would streamline potential fleet-discharging use cases and facilitate smoother V2G integration into the ESS Program, while also reducing the need to enroll individual AC-coupled bidirectional EVs because Level 2 chargers generally lack an inverter. Id. The Authority agrees with the 20 kW per port minimum for the first year of commercial bidirectional EV charging system enrollment. The threshold provides a reasonable means of focusing initial ESS Program participation on larger, more readily dispatchable commercial charging applications while the Program Administrators and the Authority gain experience with bidirectional EV enrollment, dispatch, telemetry, and performance. The Authority views this as an initial implementation threshold rather than a permanent limitation on the types of bidirectional EV resources that may participate in the ESS Program. As the Program Administrators gain operational experience and data, and as the Authority considers residential eligibility, the Authority expects to revisit the threshold. In particular, the Authority does not intend to limit future eligibility solely to DCFC systems. The inability of a Level 2 or other AC charging system to meet the initial threshold, including circumstances in which the charger itself lacks an inverter and bidirectional functionality must instead be provided through the vehicle, should not constitute a permanent barrier to otherwise cost-effective participation. As the technology and market mature and the Program develops greater experience with bidirectional EV resources, the Authority will consider whether a lower threshold could expand participation while continuing to provide benefits commensurate with incentive costs. Further, there shall be no maximum sizing limitation for EV charging systems enrolling in the ESS Program. The Report recommends using the maximum charging rating of the bidirectional EVSE as a proxy for historical maximum peak demand when applying the ESS Program’s sizing limitation of 150% of the customer’s annual peak demand, or 2 MW. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 30. That limitation, however, was developed in connection with the Program’s prior passive dispatch construct, which is no longer open to new enrollments. Year 2 Decision, pp. 20–21. The current Program construct, Construct 5, does not impose a maximum sizing limitation for active dispatch. Year 5 Decision, p. 23. Accordingly, to maintain consistency with the current Program design, there shall be no separate maximum size limit for bidirectional EV charging systems enrolling in the ESS Program. j. Interconnection Guidelines Consistent with the broad stakeholder support for the revised Interconnection Guidelines developed to facilitate interconnection of bidirectional EV charging systems, the Authority approves the revised Interconnection Guidelines and directs the EDCs to
  8. Page 25 of 69

    Docket No. 26-08-05 Page 23 use the revised Guidelines for all applicable bidirectional EV interconnection requests no later than January 4, 2027. See EDC Order No. 25 Compliance, July 1, 2026. By the same date, the EDCs shall also update their respective interconnection webpages to include the revised Interconnection Guidelines and shall file compliance with the Authority confirming that such updates have been completed. However, implementation of the revised Interconnection Guidelines will provide the first significant opportunity to identify whether additional modifications are necessary. Accordingly, the EDCs shall monitor their implementation of the revised Interconnection Guidelines and identify any material issues, ambiguities, or necessary modifications. Any proposed revisions shall be included in the compliance filing addressing residential bidirectional EV eligibility described prior, which specifically addresses whether further revisions to the Interconnection Guidelines are warranted based on the EDCs’ implementation experience. k. Conclusion The Authority approves commercial bidirectional EV charging system participation in the ESS Program beginning January 1, 2027, subject to the requirements and conditions established in this Decision and the final approved Program Manual. This initial eligibility is intended to provide the ESS Program with meaningful experience with V2G resources while maintaining appropriate protections for residential bidirectional EV owners. The Authority considers residential bidirectional EV participation to remain an important future opportunity and has therefore established a defined process for evaluating residential eligibility as part of a subsequent annual ESS Program review. In contrast, the Authority does not identify dual enrollment of bidirectional EV charging systems in the ESS and managed charging programs as an immediate priority. The Authority will require participating bidirectional EVs to enroll in a single program, based on the significant technical, operational, customer-facing, and ratepayercompensation concerns discussed above. Finally, any requirement, recommendation, or proposal contained in the Report that is not expressly addressed in this section is approved, provided that it is consistent with the determinations and requirements established elsewhere in this Decision. C. ENROLLMENT INCENTIVE CLAWBACK 1. Background During the Year 5 ESS annual review cycle, the Authority adopted Construct 5, which eliminated passive dispatch and significantly reduced upfront incentives in favor of a predominantly performance-based compensation structure. Year 5 Decision, pp. 20– 21. This construct was intended to minimize ratepayer exposure while better aligning participant compensation with realized system value. Id. Construct 5 does not include a
  9. Page 26 of 69

    Docket No. 26-08-05 Page 24 clawback provision tied to participation in active dispatch, as active dispatch participation is not a condition for receipt of the enrollment incentive. Id., pp. 14-15. Further, Section 3.7 of the ESS Program Manual provides that, once a customer who has received an enrollment incentive unenrolls from active dispatch, “there is no requirement to return any portion of the Enrollment Incentive.” Motion No. 15, Jan. 6, 2026, Docket No. 25-08-05, Att. 2, p. 27. In Section A of its January 13, 2026 ruling on Motion No. 15, the Authority directed the Program Administrators to implement a clawback mechanism for the enrollment incentive where participants disenroll from the ESS Program prior to the expiration of their 10-year term. Motion No. 15 Ruling, Jan. 13, 2026, Docket No. 25-08-05, p. 2. The Authority determined that, although the enrollment incentive under Construct 5 is not conditioned on active dispatch participation, it is premised on continued participation in the ESS Program over the 10-year enrollment term. Id. Specifically, allowing a participant to retain the full enrollment incentive despite early disenrollment could undermine the structure and intent of Construct 5 by creating a potential incentive to enroll solely to obtain the upfront payment without delivering sustained ratepayer benefits. Id. The ESS Program Administrators objected and filed a motion for reconsideration pursuant to General Statutes § 16-9. Motion No. 16, Jan. 21, 2026, Docket No. 25-0805, p. 2. The ESS Program Administrators raised concerns regarding the feasibility and implementation of an enrollment incentive clawback requirement, including administrative burden and cost, the potential for customers to be subject to clawbacks due to circumstances beyond their control (such as manufacturer bankruptcy), and uncertainties associated with customer relocation or transfer of battery ownership. Id., pp. 3-4. The ESS Program Administrators requested that the issue be deferred to the Year 6 annual ESS Program review to allow for broader stakeholder input. Id., p. 4. In light of these concerns, the Authority stayed Section A of its Motion No. 15 Ruling and indicated its intent to revisit the issue during the Year 6 annual ESS Program review. Motion No. 16 Ruling, Jan. 29, 2026, Docket No. 25-08-05, p. 3. The Authority further clarified that the absence of a clawback provision in the Year 5 Decision reflected a determination specific to dispatch participation requirements, rather than continued enrollment in the ESS Program. Id., p. 2; Year 5 Decision, pp. 14–15. Accordingly, the Authority sought stakeholder input on whether an enrollment incentive clawback should be implemented such that, if a project disenrolls prior to the conclusion of its 10-year enrollment term, a prorated portion of the enrollment incentive must be repaid. Notice, June 16, 2026, p. 2. For example, a project that disenrolls after one year could be required to return 90% of the incentive. Id. Consistent with prior determinations, any clawback could be conditioned solely on continued ESS Program enrollment and not on participation in active dispatch. Id.
  10. Page 27 of 69

    Docket No. 26-08-05 Page 25 2. Stakeholder Comments Eversource argued that implementing a formal enrollment incentive clawback mechanism would not be a prudent use of customer funds given the limited number of customers expected to enroll in the ESS Program solely to obtain an enrollment incentive before promptly disenrolling. Eversource Comments, July 9, 2026, p. 3. Eversource expressed concern that implementing such a mechanism would impose administrative costs on customers that could exceed any amounts ultimately recovered. Id. Eversource also noted that customers may disenroll before completing their 10-year enrollment term for legitimate reasons beyond their control, including the sale of a home, battery damage or malfunction, or battery original equipment manufacturer (OEM) bankruptcy. Id., pp. 34. According to Eversource, applying an enrollment incentive clawback in these circumstances would be inequitable. Id., p. 4. Finally, Eversource argued that battery systems continue to provide resilience benefits to customers regardless of whether they remain enrolled in the ESS Program. Eversource Comments, July 9, 2026, p. 4. UI raised similar concerns, stating that implementing an enrollment incentive clawback would increase administrative complexity and labor costs, which ultimately would be borne by all ratepayers. UI Comments, July 9, 2026, p. 2. Nevertheless, if the Authority elects to implement such a mechanism, UI recommended establishing a costeffectiveness threshold to ensure that administrative costs do not materially exceed the expected ratepayer benefits from recovered enrollment incentives. Id. UI also recommended exempting customers whose early disenrollment results from circumstances beyond their reasonable control, including equipment failure not attributable to the customer, OEM or vendor bankruptcy, force majeure events, and property transfers where the original participant no longer controls the battery system. Id., p. 3. In addition, UI recommended limiting any enrollment incentive clawback to residential and commercial customers who both disenroll early and install battery systems exceeding their annual peak demand, to discourage customers from intentionally oversizing battery systems to maximize enrollment incentives under Construct 5. Id. UI concluded that any clawback mechanism should complement, rather than materially complicate, the Construct 5 framework adopted last year and should avoid introducing unnecessary complexity that could reduce customer understanding or participation. UI Comments, July 9, 2026, p. 4. Similarly, CGB opposed implementing an enrollment incentive clawback for homeowner-owned residential projects, arguing that the administrative costs and adverse impacts on customer participation would outweigh any potential ratepayer benefits. CGB Comments, July 9, 2026, p. 1. CGB argued that an enrollment incentive clawback would create financial uncertainty, particularly for underserved customers who may disenroll for reasons beyond their control, such as relocation, equipment failure, or the need to preserve battery capacity for backup power during outages. Id. According to CGB, the prospect of an enrollment incentive clawback could discourage participation, negatively affect customer perceptions of the Program, and diminish the resilience benefits the ESS Program provides to vulnerable communities. Id. CGB further noted that battery systems continue to provide grid and resilience benefits through backup power and increased solar self-consumption even after a customer disenrolls from the ESS Program. Id., p. 2.