  1. Page 28 of 69

    Docket No. 26-08-05 Page 26 If the Authority nevertheless adopts an enrollment incentive clawback mechanism, CGB recommended limiting its application, where appropriate, to commercial-scale and residential third-party owned (TPO) projects. CGB Comments, July 9, 2026, p. 2. CGB argued that homeowner-owned residential systems present distinct equity and administrative considerations that differ from commercial-scale and residential TPO projects. Id. Finally, CGB noted that customers already have a significant financial incentive to remain enrolled in the ESS Program because early disenrollment results in the loss of ongoing performance incentive payments. Id. OCC argued that ratepayer-funded enrollment incentives should be conditioned on delivering ratepayer value throughout the full enrollment term for which they were designed. OCC Comments, July 9, 2026, p. 2. According to OCC, an enrollment incentive clawback serves two purposes: recovering incentive funds when customers disenroll early and deterring opportunistic disenrollment, thereby preserving the ESS Program's cost-effectiveness. Id. OCC argued that these ratepayer protection benefits outweigh the administrative costs of implementing a clawback mechanism and supported an equal prorated repayment schedule. Id., p. 3. OCC nevertheless urged the Authority to adopt narrowly tailored exemptions for circumstances genuinely beyond a participant's control. Id. OCC recommended that any such exemptions require affirmative documentation, place the burden of proof on the participant seeking relief, and not undermine the overall clawback framework. OCC Comments, July 9, 2026, p. 3. OCC further argued that repayment responsibility should generally rest with the party that received and benefited from the enrollment incentive while accounting for which party had control over the event leading to disenrollment. Id. OCC also recommended applying any outstanding performance incentive payments toward satisfaction of an enrollment incentive clawback before seeking additional repayment. Id., p. 4. Lastly, although OCC supported applying a clawback across all customer classes, it acknowledged that a de minimis threshold may be appropriate where administrative costs would be disproportionate to the amount recoverable from the smallest residential participants.3 Id. The Alliance for Climate Transition (ACT), the Solar Energy Industries Association (SEIA), and the Coalition for Community Solar Access (CCSA; collectively, the Energy Storage Stakeholders) argued that the administrative costs of implementing an enrollment incentive clawback would likely exceed the value of any recovered funds, would not effectively deter early disenrollment, and would primarily affect customers whose disenrollment resulted from circumstances beyond their control. Energy Storage Stakeholder Comments, July 9, 2026, p. 2. The Energy Storage Stakeholders asserted that the decision to not institute an enrollment incentive clawback in the prior annual review represented a significant program design improvement that was expected to increase participation in and performance of the ESS Program. Id., p. 2. 3 In its second set of written comments, recognizing the lower enrollment incentive available through Construct 5 and the administrative complexities associated with enforcing the clawback, OCC revised its position and stated that it did not oppose limiting the clawback mechanism to commercial priority customers and residential TPO systems. OCC Comments, Aug. 28, 2026, p. 2.
  2. Page 29 of 69

    Docket No. 26-08-05 Page 27 The Energy Storage Stakeholders further argued that administering an enrollment incentive clawback would require significant resources to monitor disenrollment, calculate repayment amounts, coordinate with customers, OEMs, and third parties that received enrollment incentives, and collect repayment, potentially causing administrative costs to exceed any recovered funds. Id. The Energy Storage Stakeholders also contended that introducing repayment risk, including risks associated with manufacturer bankruptcy, customer relocation, or changes in battery ownership, would discourage customers from participating in the ESS Program. Id., p. 3. According to the Energy Storage Stakeholders, early disenrollment is expected to be rare because customers already have a strong financial incentive to remain enrolled, as the loss of a single year of performance incentive payments typically exceeds the enrollment incentive for most battery systems. Energy Storage Stakeholder Comments, July 9, 2026, p. 3. Nevertheless, if the Authority adopts an enrollment incentive clawback, the Energy Storage Stakeholders recommended applying it only to the entity that received the enrollment incentive and calculating the repayment amount on a prorated basis for the remaining enrollment term. Id. The Connecticut Solar and Storage Association (ConnSSA) opposed any enrollment incentive clawback that would hold installers or contractors responsible for circumstances beyond their control, including a customer's decision to disenroll from the ESS Program. ConnSSA Comments, July 9, 2026, pp. 1-2. ConnSSA argued that the Construct 5 framework already substantially shifted customer compensation from upfront incentives to performance-based payments, thereby reducing ratepayer risk by tying most compensation to actual grid performance. Id., p. 1. According to ConnSSA, a broad enrollment incentive clawback would create customer confusion, discourage ESS Program participation, and increase administrative burden while providing little additional ratepayer protection. Id. If the Authority nevertheless adopts an enrollment incentive clawback, ConnSSA recommended limiting repayment responsibility to the party that owns the battery system, receives the enrollment incentive, controls the enrollment decision, or affirmatively causes the project to be removed from the ESS Program. Id., p. 2. ConnSSA argued that contractor liability should be limited to contractor-caused issues, such as installing ineligible equipment, failing to complete required project documentation, or other precompletion noncompliance within the contractor's control. ConnSSA Comments, July 9, 2026, p. 2. Accordingly, ConnSSA urged the Authority to distinguish between contractorcaused noncompliance and customer-controlled post-completion conduct if it implements an enrollment incentive clawback. Id. CPower did not oppose a prorated enrollment incentive clawback for residential and commercial customers that disenroll before completing their 10-year enrollment term. CPower Comments, July 9, 2026, p. 2. CPower argued that battery projects are economically dependent on continued participation in the ESS Program and, therefore, are unlikely to disenroll before the end of their enrollment term except in cases of catastrophic battery damage. Id. In those circumstances, CPower argued that recovering a prorated share of the enrollment incentive would be appropriate because ratepayers would no longer receive the intended benefits from the battery system. Id. CPower
  3. Page 30 of 69

    Docket No. 26-08-05 Page 28 further recommended assessing any clawback against the entity receiving ESS Program payments at the time the clawback is imposed, rather than the entity that received payments when the project originally enrolled, to ensure repayment responsibility rests with the party then responsible for the battery system while reducing administrative complexity. Id. Earthlight cautioned against adopting an overly broad enrollment incentive clawback that would apply to customers who disenroll before completing their 10-year enrollment term, arguing that doing so would create unnecessary negative customer experiences and discourage future ESS Program participation. Earthlight Comments, July 9, 2026, p. 2. Earthlight noted that most early disenrollments result from circumstances beyond a customer's control, such as OEM bankruptcy. Id. Earthlight further argued that the Construct 5 framework already adequately protects ratepayers by reducing the upfront enrollment incentive and shifting a larger share of compensation to performance-based payments, thereby ensuring that customers receive most ESS Program incentives only if they continue participating in seasonal dispatch events. Id., p. 3. 3. Authority Analysis An enrollment incentive clawback provision is necessary to ensure that ratepayerfunded enrollment incentives remain reasonably aligned with the benefits the ESS Program is intended to provide over a participant’s enrollment term. Although the enrollment incentive under Construct 5 is substantially smaller than the upfront incentive offered under the prior passive dispatch structure, it is not de minimis. The enrollment incentive may be $3,900 or more for grid-edge residential customers and may be substantially higher for commercial priority customers, depending on system size. See Program Administrator Corresp., Aug. 3, 2026, pp. 5–6. Without a clawback provision, a system owner could disenroll from the ESS Program shortly after receiving the enrollment incentive while retaining the full payment. Such an outcome would allow a participant to receive a ratepayer-funded benefit without providing the full period of Program participation contemplated by Construct 5 and could reduce the peak reduction, dispatch, and other system benefits expected from the Program, thereby adversely affecting the Program’s RIM score. The Authority recognizes the stakeholder concerns regarding the administrative costs associated with implementing and enforcing a clawback, as well as the potential for customers to disenroll for legitimate reasons beyond their control. Further, Construct 5 has already substantially reduced ratepayer risk by shifting a greater portion of participant compensation from upfront incentives to performance-based payments. Nevertheless, the existing compensation structure does not eliminate the need for a narrowly tailored clawback. The enrollment incentive remains a material payment, and the possibility that a participant could retain the full incentive after prematurely ending their participation creates a risk that is not addressed by the loss of future performance incentive payments alone. This concern is particularly relevant as TPOs are expected to become increasingly important to the ESS Program as a result of recent changes to the federal investment tax
  4. Page 31 of 69

    Docket No. 26-08-05 Page 29 credit (ITC).4 TPOs may manage portfolios containing numerous ESS Program customers and, as a result, may have the ability to cause multiple projects to disenroll if they are unable or unwilling to maintain their systems for Program participation as their financial circumstances or business models change. Although the Authority does not conclude that widespread or opportunistic disenrollment by TPOs is inevitable, the potential for a single entity to cause multiple projects to leave the Program presents a material risk to Program deployment and ratepayer benefits. Establishing an enrollment incentive clawback mechanism before such circumstances arise will provide an appropriate safeguard while the Program continues to evolve. Several participants have raised the concern that it would be unfair to impose a clawback upon customers who must disenroll from the Program for circumstances outside their control. The Authority disagrees. The purpose of the clawback is not to penalize participants for wrongdoing. Rather, the clawback is an adjustment intended to ensure that ratepayer-funded benefits actually materialize. The premise and goal of the ESS Program as a whole is that ratepayer-funded incentives will ultimately derive grid benefits that exceed the financial value of the incentives provided. Where Program participants are unable to continue their participation – for any reason – the value proposition is disrupted and the justification for ratepayer contributions are nullified. The clawback is therefore intended to address this shortfall by aligning the value of the incentives retained with the benefits actually delivered. Accordingly, an enrollment incentive clawback shall be implemented for all new system owners enrolling in the ESS Program, effective when the revised Program Manual is approved following this Decision. A system owner may not disenroll from the ESS Program until the applicable prorated clawback amount has been collected in full. The clawback shall be calculated on a prorated basis according to the portion of the system owner’s 10-year enrollment term remaining at the time of disenrollment. For example, if a system owner disenrolls one year into its 10-year enrollment term, the enrollment incentive clawback shall equal 90% of the original enrollment incentive. This approach appropriately balances the interests of ratepayers and participants by recognizing that a participant that remains enrolled for a portion of the required term has provided some of the benefits contemplated by the enrollment incentive, while ensuring that the participant does not retain the full incentive after shortening their participation period. The clawback shall apply prospectively to new system owners only. System owners that enrolled in the ESS Program before the effective date of the revised Program Manual shall be grandfathered under the requirements applicable at the time of their enrollment. Applying a new repayment obligation to existing system owners would be inequitable where those owners enrolled in the Program and accepted the requirements in effect at the time of their enrollment. 4 Unlike TPO systems, homeowner-owned batteries are no longer eligible for ITC benefits after 2025.
  5. Page 32 of 69

    Docket No. 26-08-05 Page 30 Further, certain implementation provisions are necessary to ensure that the clawback mechanism itself does not impose costs on ratepayers that exceed the amounts reasonably expected to be recovered or unnecessarily discourage Program participation. 5 First, to minimize administrative and collection costs, the Program Administrators shall apply any remaining unpaid performance incentive amounts owed to the system owner toward satisfaction of the enrollment incentive clawback before seeking additional repayment. This approach is consistent with the methodology previously established by the Authority for recovery of upfront incentive clawbacks. See Year 5 Decision, p. 31. If the amount of unpaid performance incentives is insufficient to satisfy the clawback, the Program Administrators shall contact the system owner and provide an opportunity for voluntary repayment of the remaining amount. If voluntary repayment is unsuccessful, the Program Administrators may pursue additional collection measures, including legal action or referral to a collection agency, provided that the Program Administrators reasonably determine that the expected amount to be recovered exceeds the costs of pursuing such collection. This requirement will ensure that ratepayers do not incur collection costs that are or greater than the amount of the enrollment incentive expected to be recovered. Second, although the enrollment incentive clawback obligation shall apply to all new system owners, the Program Administrators shall pursue involuntary collection through legal action or a collection agency only when the system owner is a TPO or commercial customer. The amounts recoverable from individual residential customers are more likely to be insufficient to justify the costs associated with formal collection efforts.6 Limiting formal collection efforts for residential customers will also reduce the potential for the clawback mechanism to create a disproportionate financial deterrent to residential participation in the ESS Program. This limitation does not eliminate the clawback obligation for residential system owners; rather, it appropriately limits the circumstances in which ratepayer-funded resources may be expended to pursue collection of a relatively small amount. Third, the enrollment incentive clawback shall apply solely to the current system owner. The system owner is the appropriate party to bear responsibility for the clawback because the system owner is the entity that enters into the ESS Program and accepts the associated Program requirements. This approach appropriately aligns repayment responsibility with the party that controls the decision to remain enrolled in the ESS 5 To the extent that the process described in the Program Administrators’ response to Interrogatory CAE-9 is consistent with the determinations herein, the Program Administrators may implement the enrollment incentive clawback in accordance with that process, provided that all provisions set forth herein are also followed. 6 The Program Administrators estimated that, excluding legal costs, pursuing clawbacks could result in administrative costs of approximately $707 to $1,414 per project, based on the labor hours associated with these efforts. Program Administrator Interrog. Resp. CAE-9, p. 3. Nevertheless, where a TPO seeks to disenroll multiple projects or its entire fleet, the Authority expects that economies of scale would reduce the per-project labor costs associated with pursuing the applicable clawbacks.
  6. Page 33 of 69

    Docket No. 26-08-05 Page 31 Program while avoiding the unintended assignment of liability to parties that may have no control over a customer’s decision to disenroll. Finally, narrowly tailored exceptions are appropriate where early disenrollment results from circumstances that are genuinely beyond the system owner’s reasonable control. Accordingly, the Program Administrators shall waive the enrollment incentive clawback when, after reviewing the circumstances of the disenrollment, they determine that the system owner did not cause or could not reasonably have prevented the event resulting in disenrollment. Such circumstances may include, but are not limited to, qualifying force majeure events and battery malfunction or failure attributable to the manufacturer, contractor, or other party outside the system owner’s reasonable control. The exceptions shall be applied narrowly and shall not extend to voluntary disenrollment or circumstances that could reasonably have been prevented by the system owner. These provisions appropriately balance ratepayer protection with the need to maintain customer participation and minimize unnecessary administrative costs. The resulting mechanism preserves the Authority’s determination that the enrollment incentive is intended to support sustained participation over the 10-year enrollment term, while avoiding a collection process that could impose disproportionate costs on ratepayers or create an unreasonable barrier to ESS Program participation. D. FTM STORAGE TARIFF 1. Background During the Year 2 annual ESS Program review, the Authority convened an FTM Storage Working Group to develop a comprehensive set of FTM storage tariff and incentive design proposals for Authority consideration. Year 2 Decision, p. 39. Following that effort, the EDCs each developed Wholesale Distribution Access Tariffs (WDATs) to enable FTM storage resources to interconnect with the distribution system and participate in wholesale markets. EDC Compliance, Docket No. 22-08-05, Dec. 29, 2023. The EDCs subsequently filed their respective WDATs with the Federal Energy Regulatory Commission (FERC), which approved each proposal.7 However, the record developed in Docket No. 25-02-14, Renewable Energy Tariff Programs Successor Study, indicated that the WDAT framework is limited in scope. Specifically, the WDATs facilitate the sale of energy into wholesale markets but do not provide a mechanism for FTM storage resources to purchase energy from the EDCs at retail (i.e., the WDAT functions as a one-way tariff). PURA Corresp., Feb. 27, 2026, Docket No. 25-02-14, p. 106. In that proceeding, SEIA and New Leaf advocated for the development of a bidirectional time-of-use (TOU) retail rate applicable to standalone FTM storage. New Leaf Corresp., Sept. 23, 2025, Docket No. 25-02-14, p. 8; SEIA Comments, Sept. 10, 2025, Docket No. 25-02-14, p. 4. UI further noted that standalone storage is not currently eligible to participate in any existing retail TOU tariffs in Connecticut as a 7 See FERC dockets ER24-3153-000 https://elibrary.ferc.gov/eLibrary/search. and ER24-2939, available at:
  7. Page 34 of 69

    Docket No. 26-08-05 Page 32 distinct resource class. UI Interrog. Resp. CAE-49, Docket No. 25-02-14, p. 2. Although the WDATs approved by FERC include TOU constructs, those provisions apply solely to wholesale transactions and do not establish retail rate structures. Id. In light of these limitations, the Authority expressed interest in directing the EDCs, in a future proceeding, to develop retail TOU rates for standalone FTM storage to support its effective integration and operation. PURA Corresp., Feb. 27, 2026, Docket No. 25-0214, p. 106. Accordingly, the Authority sought stakeholder input on the appropriate process for developing retail TOU rates for standalone FTM storage, as well as the key design features such rates should include. Notice, June 16, 2026, pp. 3–4. 2. Stakeholder Comments Eversource argued that establishing a retail TOU rate for FTM storage presents a fundamental legal issue. Eversource Comments, July 9, 2026, p. 6. Specifically, Eversource asserted that both the purchase of electricity by, and the sale of electricity from, a stand-alone FTM storage resource are facially FERC-jurisdictional wholesale transactions. Id. According to Eversource, because a stand-alone FTM storage resource has no retail load other than station power, the purchase of electricity for charging constitutes a wholesale transaction subject to FERC jurisdiction. Id. Although Eversource asserted that FERC has indicated that commingling retail station power load with wholesale load may render the entire transaction state-jurisdictional, Eversource maintained that, even if the Authority could lawfully establish a retail rate for electricity purchased by stand-alone FTM storage resources, it could not establish a rate governing power sales from those resources to an EDC unless the EDC itself consumed the electricity. Id. Eversource further argued that stand-alone FTM storage resources are not qualifying facilities under the Public Utility Regulatory Policies Act (PURPA), and, therefore, cannot be required to sell wholesale energy to an EDC at a state-established rate. Eversource Comments, July 9, 2026, p. 6. Eversource also questioned the economic viability of a bundled retail TOU rate for stand-alone FTM storage. Id., pp. 6–7. Eversource argued that a retail TOU rate would necessarily include transmission, distribution, and other non-bypassable charges and, therefore, would generally exceed the wholesale rates at which FTM storage resources could otherwise procure unbundled energy services. Id. As a result, Eversource questioned why a stand-alone FTM storage resource with no on-site load would purchase electricity under a retail tariff rather than at wholesale rates unless the retail TOU rate substantially discounted those charges. Id., p. 7. Accordingly, Eversource concluded that, absent a stakeholder proposal addressing these legal and economic concerns, there is no basis for initiating a stakeholder process to develop a retail TOU rate for FTM storage. Eversource Comments, July 9, 2026, p. 7. UI also opposed considering a retail TOU rate for FTM storage in this proceeding, although for reasons different from those raised by Eversource. UI acknowledged that the current WDAT allows stand-alone FTM storage resources to participate in wholesale markets but does not provide a mechanism for those resources to procure charging
  8. Page 35 of 69

    Docket No. 26-08-05 Page 33 energy at retail. UI Comments, July 9, 2026, p. 5. According to UI, this structural gap will affect the Authority's consideration of time-varying rates across multiple proceedings and may prevent FTM storage resources from responding efficiently to consistent time-based charging and discharging price signals. Id., pp. 5–6. UI recommended that the Authority maintain a clear distinction between the ESS Program and stand-alone FTM storage because those resources provide different services than BTM storage participating in the ESS Program. Id., p. 6. In UI's view, incorporating FTM storage into the ESS Program would be inconsistent with the Program's intended design and create both administrative and jurisdictional complications. Id. Instead, UI recommended addressing FTM storage through a separate regulatory framework, such as a non-wires solutions (NWS) program or distribution system planning process. UI Comments, July 9, 2026, pp. 7–8. UI further argued that any retail TOU rate developed for FTM storage should be revenue neutral, grounded in principles of cost causation, and limited to establishing how stand-alone FTM storage resources procure electricity at retail. Id. UI also recommended that any such tariff exclude ratepayer-funded incentives to avoid duplicative compensation with wholesale market revenues. Id., p. 8. Finally, UI maintained that an NWS framework is better suited to procure FTM storage because those resources are deployed to address specific distribution system needs and can therefore be evaluated through a planning and procurement process focused on reliability, system performance, and cost-effectiveness. Id. While a retail TOU tariff may influence charging behavior, UI argued that it cannot substitute for a planning-based procurement process designed to resolve identified distribution system constraints. UI Comments, July 9, 2026, p. 8. Conversely, OCC emphasized that any future retail TOU rate for FTM storage should closely reflect principles of cost causation to provide accurate price signals that encourage efficient charging and discharging behavior. OCC Comments, July 9, 2026, p. 5. OCC also argued that a more granular TOU structure would better maximize peak demand reductions and the resulting ratepayer benefits. Id. In addition, OCC expressed support for a load reducer model under which FTM storage resources would forego wholesale market participation in exchange for sharing the value of measured load reductions through reduced energy, capacity, and transmission costs. Id. According to OCC, incorporating avoided transmission costs into a retail TOU tariff would produce a more complete price signal and promote an efficient level of FTM storage deployment that reflects the full value provided to ratepayers. Id. OCC nevertheless argued that the avoided costs associated with FTM storage must first be demonstrated through a rigorous avoided cost study showing that those benefits exceed the costs of facility operation and tariff implementation before the Authority establishes a new tariff. OCC Comments, July 9, 2026, p. 5. OCC also noted that the metering infrastructure required to support a retail TOU rate raises important cost and standardization considerations. Id., p. 6. Accordingly, OCC recommended that the Authority require the EDCs to identify any necessary metering upgrades for FTM storage participants and specify who would bear those costs before finalizing a tariff. Id.
  9. Page 36 of 69

    Docket No. 26-08-05 Page 34 OCC further recommended that any retail TOU tariff precisely define eligible FTM storage resources to avoid overlap with hybrid or co-located resources that may have different cost structures and operational characteristics. Id. At a minimum, OCC recommended that the tariff address: (a) whether co-located generation affects eligibility for the retail TOU rate; (b) whether a minimum storage capacity threshold is necessary to ensure cost-effectiveness; and (c) how eligibility would interact with ESS Program participation for resources that could otherwise qualify under both frameworks. OCC Comments, July 9, 2026, p. 6. Lastly, OCC recommended a phased approach to developing a retail TOU rate for FTM storage, beginning with a technical working group to address metering requirements, WDAT alignment, and eligibility criteria, followed by circulation of a straw proposal for stakeholder comment and an EDC compliance filing implementing the Authority's approved rate design. Id. OCC opposed any expedited schedule that would limit meaningful stakeholder participation on issues with significant long-term ratepayer cost implications. Id. OCC also emphasized that, while revenue neutrality is an important ratepayer protection, it does not resolve cost allocation issues, including whether any costs or benefits associated with FTM storage participation would be allocated equitably among customer classes. Id. The Energy Storage Stakeholders argued that the WDAT is inadequate for developers because it provides no corresponding mechanism to capture distributionsystem benefits, provides wholesale market revenues that are insufficient to support development, and provides less certain revenue streams that cannot be relied upon for project financing. Energy Storage Stakeholder Interrog. Resp. CAE-41, pp. 1–2. They further argued that the value of a bidirectional retail TOU tariff lies in integrating charging and discharging under a single tariff, such that price signals for both withdrawing and injecting electricity minimize system costs and maximize system benefits while supporting the efficient operation of FTM storage resources. Energy Storage Stakeholder Comments, July 9, 2026, pp. 4–5. The Energy Storage Stakeholders also argued that the Authority need not develop such a tariff from first principles because the EDCs' existing WDAT tariffs provide a proven framework that can be adapted for a retail TOU rate. Id., p. 5. With respect to tariff design, the Energy Storage Stakeholders proposed charging and crediting energy at higher prices during periods of system stress and at lower prices during periods of lower system demand. Id. For the energy supply component, they recommended mirroring wholesale locational marginal prices (LMPs), with hourly purchases billed at LMP and hourly exports credited at LMP. Id. Consistent with the WDAT, they also recommended excluding volumetric distribution delivery charges, limiting volumetric charges to energy supply and any non-bypassable charges determined through a threshold analysis. Energy Storage Stakeholder Comments, July 9, 2026, p. 5. The Energy Storage Stakeholders further recommended aligning local distribution and transmission charges with the WDAT by assessing those charges on a demand, rather than volumetric, basis because the EDCs incur those costs based on peak
  10. Page 37 of 69

    Docket No. 26-08-05 Page 35 demand. Id. They also proposed allowing FTM storage resources to receive negative demand charges, or compensation, when discharging during monthly ISO New England system peaks, citing similar treatment in Illinois and arguing that such an approach would pass measurable transmission cost savings through to Connecticut ratepayers. Id., pp. 5–6. The Energy Storage Stakeholders emphasized that each grid service or system benefit should be compensated only once and suggested preserving, as part of the stakeholder process, the question of whether EDC-administered compensation should be available for capacity contributions. Id., p. 6. They further noted that any retail TOU tariff should be developed using the EDCs' PURA-approved retail revenue requirements and cost-of-service studies, rather than the FERC Form 1 methodology used to develop the WDAT. Energy Storage Stakeholder Comments, p. 6. With respect to non-bypassable charges, the Energy Storage Stakeholders argued that applying volumetric public policy charges to electricity used for charging storage systems results in double payment because those charges are assessed both when the storage resource charges and again when the electricity is ultimately delivered to the enduse customer. Id. Accordingly, they recommended that the Authority direct the EDCs to evaluate alternative approaches, such as demand-based or net-throughput methodologies, during tariff development. Id. According to the Energy Storage Stakeholders, no other design issue will have a greater impact on whether a revenueneutral retail TOU rate is commercially viable. Id. The Energy Storage Stakeholders also recommended that the cost of charging during lower-priced periods be meaningfully less than the compensation available for discharging during periods when electricity provides the greatest value to the grid. Energy Storage Stakeholder Comments, p. 6. They further argued that the retail TOU tariff and the WDAT should use compatible peak period definitions to avoid conflicting price signals. Id., p. 7. With respect to implementation, the Energy Storage Stakeholders recommended maintaining simple metering requirements because, under a purely retail framework, all energy measured at the meter would constitute retail service. Id. They also proposed limiting eligibility to stand-alone, distribution-connected FTM storage resources without establishing a minimum size threshold, arguing that this approach directly addresses the gap identified in Docket No. 25-02-14. Id. Finally, the Energy Storage Stakeholders recommended that the Authority establish a robust stakeholder process to resolve the remaining technical issues associated with developing a retail TOU tariff. Energy Storage Stakeholder Comments, p. 7. They urged the Authority to adopt a clear schedule with defined milestones that provides sufficient time for stakeholder engagement while maintaining steady progress toward implementation and recommended completing the tariff development process by March 31, 2027. Id., p. 8.