  1. Page 31 of 69

    Docket No. 26-08-05 Page 29 credit (ITC).4 TPOs may manage portfolios containing numerous ESS Program customers and, as a result, may have the ability to cause multiple projects to disenroll if they are unable or unwilling to maintain their systems for Program participation as their financial circumstances or business models change. Although the Authority does not conclude that widespread or opportunistic disenrollment by TPOs is inevitable, the potential for a single entity to cause multiple projects to leave the Program presents a material risk to Program deployment and ratepayer benefits. Establishing an enrollment incentive clawback mechanism before such circumstances arise will provide an appropriate safeguard while the Program continues to evolve. Several participants have raised the concern that it would be unfair to impose a clawback upon customers who must disenroll from the Program for circumstances outside their control. The Authority disagrees. The purpose of the clawback is not to penalize participants for wrongdoing. Rather, the clawback is an adjustment intended to ensure that ratepayer-funded benefits actually materialize. The premise and goal of the ESS Program as a whole is that ratepayer-funded incentives will ultimately derive grid benefits that exceed the financial value of the incentives provided. Where Program participants are unable to continue their participation – for any reason – the value proposition is disrupted and the justification for ratepayer contributions are nullified. The clawback is therefore intended to address this shortfall by aligning the value of the incentives retained with the benefits actually delivered. Accordingly, an enrollment incentive clawback shall be implemented for all new system owners enrolling in the ESS Program, effective when the revised Program Manual is approved following this Decision. A system owner may not disenroll from the ESS Program until the applicable prorated clawback amount has been collected in full. The clawback shall be calculated on a prorated basis according to the portion of the system owner’s 10-year enrollment term remaining at the time of disenrollment. For example, if a system owner disenrolls one year into its 10-year enrollment term, the enrollment incentive clawback shall equal 90% of the original enrollment incentive. This approach appropriately balances the interests of ratepayers and participants by recognizing that a participant that remains enrolled for a portion of the required term has provided some of the benefits contemplated by the enrollment incentive, while ensuring that the participant does not retain the full incentive after shortening their participation period. The clawback shall apply prospectively to new system owners only. System owners that enrolled in the ESS Program before the effective date of the revised Program Manual shall be grandfathered under the requirements applicable at the time of their enrollment. Applying a new repayment obligation to existing system owners would be inequitable where those owners enrolled in the Program and accepted the requirements in effect at the time of their enrollment. 4 Unlike TPO systems, homeowner-owned batteries are no longer eligible for ITC benefits after 2025.
  2. Page 32 of 69

    Docket No. 26-08-05 Page 30 Further, certain implementation provisions are necessary to ensure that the clawback mechanism itself does not impose costs on ratepayers that exceed the amounts reasonably expected to be recovered or unnecessarily discourage Program participation. 5 First, to minimize administrative and collection costs, the Program Administrators shall apply any remaining unpaid performance incentive amounts owed to the system owner toward satisfaction of the enrollment incentive clawback before seeking additional repayment. This approach is consistent with the methodology previously established by the Authority for recovery of upfront incentive clawbacks. See Year 5 Decision, p. 31. If the amount of unpaid performance incentives is insufficient to satisfy the clawback, the Program Administrators shall contact the system owner and provide an opportunity for voluntary repayment of the remaining amount. If voluntary repayment is unsuccessful, the Program Administrators may pursue additional collection measures, including legal action or referral to a collection agency, provided that the Program Administrators reasonably determine that the expected amount to be recovered exceeds the costs of pursuing such collection. This requirement will ensure that ratepayers do not incur collection costs that are or greater than the amount of the enrollment incentive expected to be recovered. Second, although the enrollment incentive clawback obligation shall apply to all new system owners, the Program Administrators shall pursue involuntary collection through legal action or a collection agency only when the system owner is a TPO or commercial customer. The amounts recoverable from individual residential customers are more likely to be insufficient to justify the costs associated with formal collection efforts.6 Limiting formal collection efforts for residential customers will also reduce the potential for the clawback mechanism to create a disproportionate financial deterrent to residential participation in the ESS Program. This limitation does not eliminate the clawback obligation for residential system owners; rather, it appropriately limits the circumstances in which ratepayer-funded resources may be expended to pursue collection of a relatively small amount. Third, the enrollment incentive clawback shall apply solely to the current system owner. The system owner is the appropriate party to bear responsibility for the clawback because the system owner is the entity that enters into the ESS Program and accepts the associated Program requirements. This approach appropriately aligns repayment responsibility with the party that controls the decision to remain enrolled in the ESS 5 To the extent that the process described in the Program Administrators’ response to Interrogatory CAE-9 is consistent with the determinations herein, the Program Administrators may implement the enrollment incentive clawback in accordance with that process, provided that all provisions set forth herein are also followed. 6 The Program Administrators estimated that, excluding legal costs, pursuing clawbacks could result in administrative costs of approximately $707 to $1,414 per project, based on the labor hours associated with these efforts. Program Administrator Interrog. Resp. CAE-9, p. 3. Nevertheless, where a TPO seeks to disenroll multiple projects or its entire fleet, the Authority expects that economies of scale would reduce the per-project labor costs associated with pursuing the applicable clawbacks.
  3. Page 33 of 69

    Docket No. 26-08-05 Page 31 Program while avoiding the unintended assignment of liability to parties that may have no control over a customer’s decision to disenroll. Finally, narrowly tailored exceptions are appropriate where early disenrollment results from circumstances that are genuinely beyond the system owner’s reasonable control. Accordingly, the Program Administrators shall waive the enrollment incentive clawback when, after reviewing the circumstances of the disenrollment, they determine that the system owner did not cause or could not reasonably have prevented the event resulting in disenrollment. Such circumstances may include, but are not limited to, qualifying force majeure events and battery malfunction or failure attributable to the manufacturer, contractor, or other party outside the system owner’s reasonable control. The exceptions shall be applied narrowly and shall not extend to voluntary disenrollment or circumstances that could reasonably have been prevented by the system owner. These provisions appropriately balance ratepayer protection with the need to maintain customer participation and minimize unnecessary administrative costs. The resulting mechanism preserves the Authority’s determination that the enrollment incentive is intended to support sustained participation over the 10-year enrollment term, while avoiding a collection process that could impose disproportionate costs on ratepayers or create an unreasonable barrier to ESS Program participation. D. FTM STORAGE TARIFF 1. Background During the Year 2 annual ESS Program review, the Authority convened an FTM Storage Working Group to develop a comprehensive set of FTM storage tariff and incentive design proposals for Authority consideration. Year 2 Decision, p. 39. Following that effort, the EDCs each developed Wholesale Distribution Access Tariffs (WDATs) to enable FTM storage resources to interconnect with the distribution system and participate in wholesale markets. EDC Compliance, Docket No. 22-08-05, Dec. 29, 2023. The EDCs subsequently filed their respective WDATs with the Federal Energy Regulatory Commission (FERC), which approved each proposal.7 However, the record developed in Docket No. 25-02-14, Renewable Energy Tariff Programs Successor Study, indicated that the WDAT framework is limited in scope. Specifically, the WDATs facilitate the sale of energy into wholesale markets but do not provide a mechanism for FTM storage resources to purchase energy from the EDCs at retail (i.e., the WDAT functions as a one-way tariff). PURA Corresp., Feb. 27, 2026, Docket No. 25-02-14, p. 106. In that proceeding, SEIA and New Leaf advocated for the development of a bidirectional time-of-use (TOU) retail rate applicable to standalone FTM storage. New Leaf Corresp., Sept. 23, 2025, Docket No. 25-02-14, p. 8; SEIA Comments, Sept. 10, 2025, Docket No. 25-02-14, p. 4. UI further noted that standalone storage is not currently eligible to participate in any existing retail TOU tariffs in Connecticut as a 7 See FERC dockets ER24-3153-000 https://elibrary.ferc.gov/eLibrary/search. and ER24-2939, available at:
  4. Page 34 of 69

    Docket No. 26-08-05 Page 32 distinct resource class. UI Interrog. Resp. CAE-49, Docket No. 25-02-14, p. 2. Although the WDATs approved by FERC include TOU constructs, those provisions apply solely to wholesale transactions and do not establish retail rate structures. Id. In light of these limitations, the Authority expressed interest in directing the EDCs, in a future proceeding, to develop retail TOU rates for standalone FTM storage to support its effective integration and operation. PURA Corresp., Feb. 27, 2026, Docket No. 25-0214, p. 106. Accordingly, the Authority sought stakeholder input on the appropriate process for developing retail TOU rates for standalone FTM storage, as well as the key design features such rates should include. Notice, June 16, 2026, pp. 3–4. 2. Stakeholder Comments Eversource argued that establishing a retail TOU rate for FTM storage presents a fundamental legal issue. Eversource Comments, July 9, 2026, p. 6. Specifically, Eversource asserted that both the purchase of electricity by, and the sale of electricity from, a stand-alone FTM storage resource are facially FERC-jurisdictional wholesale transactions. Id. According to Eversource, because a stand-alone FTM storage resource has no retail load other than station power, the purchase of electricity for charging constitutes a wholesale transaction subject to FERC jurisdiction. Id. Although Eversource asserted that FERC has indicated that commingling retail station power load with wholesale load may render the entire transaction state-jurisdictional, Eversource maintained that, even if the Authority could lawfully establish a retail rate for electricity purchased by stand-alone FTM storage resources, it could not establish a rate governing power sales from those resources to an EDC unless the EDC itself consumed the electricity. Id. Eversource further argued that stand-alone FTM storage resources are not qualifying facilities under the Public Utility Regulatory Policies Act (PURPA), and, therefore, cannot be required to sell wholesale energy to an EDC at a state-established rate. Eversource Comments, July 9, 2026, p. 6. Eversource also questioned the economic viability of a bundled retail TOU rate for stand-alone FTM storage. Id., pp. 6–7. Eversource argued that a retail TOU rate would necessarily include transmission, distribution, and other non-bypassable charges and, therefore, would generally exceed the wholesale rates at which FTM storage resources could otherwise procure unbundled energy services. Id. As a result, Eversource questioned why a stand-alone FTM storage resource with no on-site load would purchase electricity under a retail tariff rather than at wholesale rates unless the retail TOU rate substantially discounted those charges. Id., p. 7. Accordingly, Eversource concluded that, absent a stakeholder proposal addressing these legal and economic concerns, there is no basis for initiating a stakeholder process to develop a retail TOU rate for FTM storage. Eversource Comments, July 9, 2026, p. 7. UI also opposed considering a retail TOU rate for FTM storage in this proceeding, although for reasons different from those raised by Eversource. UI acknowledged that the current WDAT allows stand-alone FTM storage resources to participate in wholesale markets but does not provide a mechanism for those resources to procure charging
  5. Page 35 of 69

    Docket No. 26-08-05 Page 33 energy at retail. UI Comments, July 9, 2026, p. 5. According to UI, this structural gap will affect the Authority's consideration of time-varying rates across multiple proceedings and may prevent FTM storage resources from responding efficiently to consistent time-based charging and discharging price signals. Id., pp. 5–6. UI recommended that the Authority maintain a clear distinction between the ESS Program and stand-alone FTM storage because those resources provide different services than BTM storage participating in the ESS Program. Id., p. 6. In UI's view, incorporating FTM storage into the ESS Program would be inconsistent with the Program's intended design and create both administrative and jurisdictional complications. Id. Instead, UI recommended addressing FTM storage through a separate regulatory framework, such as a non-wires solutions (NWS) program or distribution system planning process. UI Comments, July 9, 2026, pp. 7–8. UI further argued that any retail TOU rate developed for FTM storage should be revenue neutral, grounded in principles of cost causation, and limited to establishing how stand-alone FTM storage resources procure electricity at retail. Id. UI also recommended that any such tariff exclude ratepayer-funded incentives to avoid duplicative compensation with wholesale market revenues. Id., p. 8. Finally, UI maintained that an NWS framework is better suited to procure FTM storage because those resources are deployed to address specific distribution system needs and can therefore be evaluated through a planning and procurement process focused on reliability, system performance, and cost-effectiveness. Id. While a retail TOU tariff may influence charging behavior, UI argued that it cannot substitute for a planning-based procurement process designed to resolve identified distribution system constraints. UI Comments, July 9, 2026, p. 8. Conversely, OCC emphasized that any future retail TOU rate for FTM storage should closely reflect principles of cost causation to provide accurate price signals that encourage efficient charging and discharging behavior. OCC Comments, July 9, 2026, p. 5. OCC also argued that a more granular TOU structure would better maximize peak demand reductions and the resulting ratepayer benefits. Id. In addition, OCC expressed support for a load reducer model under which FTM storage resources would forego wholesale market participation in exchange for sharing the value of measured load reductions through reduced energy, capacity, and transmission costs. Id. According to OCC, incorporating avoided transmission costs into a retail TOU tariff would produce a more complete price signal and promote an efficient level of FTM storage deployment that reflects the full value provided to ratepayers. Id. OCC nevertheless argued that the avoided costs associated with FTM storage must first be demonstrated through a rigorous avoided cost study showing that those benefits exceed the costs of facility operation and tariff implementation before the Authority establishes a new tariff. OCC Comments, July 9, 2026, p. 5. OCC also noted that the metering infrastructure required to support a retail TOU rate raises important cost and standardization considerations. Id., p. 6. Accordingly, OCC recommended that the Authority require the EDCs to identify any necessary metering upgrades for FTM storage participants and specify who would bear those costs before finalizing a tariff. Id.
  6. Page 36 of 69

    Docket No. 26-08-05 Page 34 OCC further recommended that any retail TOU tariff precisely define eligible FTM storage resources to avoid overlap with hybrid or co-located resources that may have different cost structures and operational characteristics. Id. At a minimum, OCC recommended that the tariff address: (a) whether co-located generation affects eligibility for the retail TOU rate; (b) whether a minimum storage capacity threshold is necessary to ensure cost-effectiveness; and (c) how eligibility would interact with ESS Program participation for resources that could otherwise qualify under both frameworks. OCC Comments, July 9, 2026, p. 6. Lastly, OCC recommended a phased approach to developing a retail TOU rate for FTM storage, beginning with a technical working group to address metering requirements, WDAT alignment, and eligibility criteria, followed by circulation of a straw proposal for stakeholder comment and an EDC compliance filing implementing the Authority's approved rate design. Id. OCC opposed any expedited schedule that would limit meaningful stakeholder participation on issues with significant long-term ratepayer cost implications. Id. OCC also emphasized that, while revenue neutrality is an important ratepayer protection, it does not resolve cost allocation issues, including whether any costs or benefits associated with FTM storage participation would be allocated equitably among customer classes. Id. The Energy Storage Stakeholders argued that the WDAT is inadequate for developers because it provides no corresponding mechanism to capture distributionsystem benefits, provides wholesale market revenues that are insufficient to support development, and provides less certain revenue streams that cannot be relied upon for project financing. Energy Storage Stakeholder Interrog. Resp. CAE-41, pp. 1–2. They further argued that the value of a bidirectional retail TOU tariff lies in integrating charging and discharging under a single tariff, such that price signals for both withdrawing and injecting electricity minimize system costs and maximize system benefits while supporting the efficient operation of FTM storage resources. Energy Storage Stakeholder Comments, July 9, 2026, pp. 4–5. The Energy Storage Stakeholders also argued that the Authority need not develop such a tariff from first principles because the EDCs' existing WDAT tariffs provide a proven framework that can be adapted for a retail TOU rate. Id., p. 5. With respect to tariff design, the Energy Storage Stakeholders proposed charging and crediting energy at higher prices during periods of system stress and at lower prices during periods of lower system demand. Id. For the energy supply component, they recommended mirroring wholesale locational marginal prices (LMPs), with hourly purchases billed at LMP and hourly exports credited at LMP. Id. Consistent with the WDAT, they also recommended excluding volumetric distribution delivery charges, limiting volumetric charges to energy supply and any non-bypassable charges determined through a threshold analysis. Energy Storage Stakeholder Comments, July 9, 2026, p. 5. The Energy Storage Stakeholders further recommended aligning local distribution and transmission charges with the WDAT by assessing those charges on a demand, rather than volumetric, basis because the EDCs incur those costs based on peak
  7. Page 37 of 69

    Docket No. 26-08-05 Page 35 demand. Id. They also proposed allowing FTM storage resources to receive negative demand charges, or compensation, when discharging during monthly ISO New England system peaks, citing similar treatment in Illinois and arguing that such an approach would pass measurable transmission cost savings through to Connecticut ratepayers. Id., pp. 5–6. The Energy Storage Stakeholders emphasized that each grid service or system benefit should be compensated only once and suggested preserving, as part of the stakeholder process, the question of whether EDC-administered compensation should be available for capacity contributions. Id., p. 6. They further noted that any retail TOU tariff should be developed using the EDCs' PURA-approved retail revenue requirements and cost-of-service studies, rather than the FERC Form 1 methodology used to develop the WDAT. Energy Storage Stakeholder Comments, p. 6. With respect to non-bypassable charges, the Energy Storage Stakeholders argued that applying volumetric public policy charges to electricity used for charging storage systems results in double payment because those charges are assessed both when the storage resource charges and again when the electricity is ultimately delivered to the enduse customer. Id. Accordingly, they recommended that the Authority direct the EDCs to evaluate alternative approaches, such as demand-based or net-throughput methodologies, during tariff development. Id. According to the Energy Storage Stakeholders, no other design issue will have a greater impact on whether a revenueneutral retail TOU rate is commercially viable. Id. The Energy Storage Stakeholders also recommended that the cost of charging during lower-priced periods be meaningfully less than the compensation available for discharging during periods when electricity provides the greatest value to the grid. Energy Storage Stakeholder Comments, p. 6. They further argued that the retail TOU tariff and the WDAT should use compatible peak period definitions to avoid conflicting price signals. Id., p. 7. With respect to implementation, the Energy Storage Stakeholders recommended maintaining simple metering requirements because, under a purely retail framework, all energy measured at the meter would constitute retail service. Id. They also proposed limiting eligibility to stand-alone, distribution-connected FTM storage resources without establishing a minimum size threshold, arguing that this approach directly addresses the gap identified in Docket No. 25-02-14. Id. Finally, the Energy Storage Stakeholders recommended that the Authority establish a robust stakeholder process to resolve the remaining technical issues associated with developing a retail TOU tariff. Energy Storage Stakeholder Comments, p. 7. They urged the Authority to adopt a clear schedule with defined milestones that provides sufficient time for stakeholder engagement while maintaining steady progress toward implementation and recommended completing the tariff development process by March 31, 2027. Id., p. 8.
  8. Page 38 of 69

    Docket No. 26-08-05 Page 36 3. Authority Analysis a. Overview There is insufficient information or quantitative data to establish the parameters or requirements of a bidirectional retail TOU tariff specifically tailored to standalone FTM storage. However, the existing regulatory framework does not fully address the unique characteristics of FTM storage, warranting further investigation into whether, and under what circumstances, a new retail tariff could facilitate the efficient deployment and operation of FTM storage while providing commensurate benefits to Connecticut ratepayers. Accordingly, the Authority finds it appropriate to reestablish the FTM Storage Working Group that developed the original WDAT framework to further investigate these issues and develop a comprehensive tariff framework for the Authority's consideration. b. Regulatory Gap and Need The record does not indicate any current deployment of TPO FTM storage in Connecticut, notwithstanding the Legislature's express recognition of FTM storage in General Statutes § 16-243ee(c). DEEP selected a 200 MW FTM storage project in 2024; however, that project did not ultimately8 successfully negotiate a contract with the EDCs. See PURA Corresp., Docket No. 25-02-14, p. 97. At the same time, Connecticut does not currently have a retail tariff specifically tailored to standalone FTM storage. UI interrog. Resp. CAE-49, Docket No. 25-02-14, p. 2. Although the WDAT framework provides FTM storage resources with access to the distribution system for participation in wholesale markets, the WDAT does not establish a retail mechanism through which a standalone FTM storage resource can procure charging energy from an EDC at retail. PURA Corresp., Docket No. 25-02-14, p. 106. Stakeholders have also indicated that wholesale energy price arbitrage and other wholesale market services under the existing WDAT framework may not, by themselves, provide sufficient or sufficiently predictable revenue to support FTM storage development or financing. Energy Storage Stakeholder Interrog. Resp. CAE-41, pp. 1–2. This regulatory and economic gap warrants further examination, particularly given the continued stakeholder interest in FTM storage demonstrated in this proceeding, prior ESS annual reviews, and Docket No. 25-01-15, Front-of-the-Meter Storage Program. Furthermore, the Authority is considering time-differentiated compensation for successor solar programs in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. See Notice of Request for Written Comments, July 28, 2026, pp. 1–2. Non-residential state, agricultural, and municipal (SAM) projects are virtual netmetered FTM solar resources, and community solar projects are FTM by design. To the extent successor solar programs provide time-differentiated compensation, pairing FTM solar resources with storage could allow the resources to shift the timing of energy injections to periods when such energy provides greater value to the electric system and, therefore, potentially increase the value of the resources to Connecticut ratepayers. 8 See https://www.dpuc.state.ct.us/DEEPEnergy.nsf/c6c6d525f7cdd1168525797d0047c5bf/ec10b8406c78d8 6885258e7500525270/$FILE/2026%20Procurement%20Plan%20Update.pdf (page 3).
  9. Page 39 of 69

    Docket No. 26-08-05 Page 37 Because the underlying solar resources are FTM, storage paired with those resources would generally also need to be FTM to provide that capability. Accordingly, establishing an appropriate framework for FTM storage could help facilitate the implementation of time-differentiated compensation under successor solar programs and may enable those programs to better capture the potential system value of FTM solar generation. c. Ratepayer Benefits In addition to facilitating the integration and operation of FTM solar resources, FTM storage has the potential to provide multiple benefits to non-participating ratepayers. Unlike a conventional incentive program that requires participating ratepayers to fund the deployment of storage resources, a properly designed bidirectional retail TOU tariff could compensate FTM storage only for measurable services or benefits provided to the distribution system. For example, appropriately located and operated FTM storage could reduce demand during system or distribution peaks, thereby reducing the EDCs' costs associated with serving peak demand; reduce the EDCs' allocation of Regional Network Service costs; and avoid or defer distribution system investments where storage can reliably address an identified system constraint. These benefits could accrue to Connecticut ratepayers generally, including customers that do not own or participate in an FTM storage resource. To the extent the value of these benefits exceeds the costs of the tariff, FTM storage could therefore provide a net benefit to Connecticut ratepayers without requiring non-participating customers to subsidize the deployment of participating resources or provide an upfront incentive. d. Statutory Authority The Legislature previously provided the Authority with explicit authority to develop an FTM storage program and subsequently rescinded that authority through Public Act 25-173, § 55, which amended General Statutes § 16-243ee. The Legislature also assigned DEEP a role in the procurement of storage resources. General Statutes § 16243dd. Accordingly, the Authority must carefully consider the scope of its existing statutory authority and the Legislature's allocation of responsibilities between the Authority and DEEP before establishing any FTM storage-specific tariff framework. At the same time, the Authority retains broad distribution ratemaking authority pursuant to General Statutes §§ 16-19 and 16-19e. Accordingly, the Authority finds that further investigation is warranted. Developing a detailed tariff framework will allow the Authority to better distinguish between a retail rate structure addressing the costs and benefits associated with distribution-connected FTM storage and a programmatic mechanism for procuring or subsidizing FTM storage resources. It will also allow the Authority to identify which aspects of a potential framework could be implemented under existing authority and whether additional legislative authorization would be appropriate or necessary. The Authority therefore considers the development of a well-supported tariff framework to be a necessary precursor to any future determination regarding implementation.
  10. Page 40 of 69Match

    Docket No. 26-08-05 Page 38 e. FERC vs PURA Jurisdiction As previously discussed, Eversource raised concerns that an FTM storage retail tariff can infringe on FERC’s jurisdiction to regulate wholesale electric rates. Particularly, Eversource cautioned that an FTM retail tariff that enables an FTM storage resource to purchase power to charge and subsequently sell its output to an EDC at a retail rate would constitute a FERC-jurisdictional transaction. Eversource Comments, pp. 5–6, July 9, 2026. Moreover, Eversource asserted that stand-alone FTM resources are not permitted to sell power to the EDCs under PURPA, which provides the sole means of compelling EDCs to purchase wholesale energy set by states. Id., p. 6. Eversource’s comments capture the complexity of FERC and state jurisdictional issues pertaining to the deployment and operation of FTM energy storage resources. Thus, any retail tariff for FTM storage must be carefully crafted to capture distributionlevel benefits while avoiding incursions into FERC’s jurisdiction over wholesale transactions. While the Authority must evaluate and adjudicate any jurisdictional issues pertaining to a specific FTM storage tariff in a ratemaking proceeding, the Authority briefly summarizes the relevant jurisdictional issues here to inform the Working Group’s deliberations. Under the Federal Power Act (FPA), FERC has exclusive jurisdiction over the sale of electricity as a matter of interstate commerce, while the regulation of retail electricity sales is reserved for the states, no matter the effects the state’s regulatory actions have on wholesale electricity rates. 16 U.S.C. § 824; F.E.R.C. v. Electric Power Assn, 577 U.S. 260, 280 (2016). Within the context of energy storage resources, FERC issued Order No. 841, which set forth the limits of FERC’s jurisdiction of such resources in the wholesale market. 162 FERC ¶ 61,127, Docket Nos. RM16-23-000; AD16-20-000; Order No. 841, Electric Storage Participation in Markets Operated by Regional Transmission Organizations and Independent System Operators (Feb. 15, 2018) (Order No. 841). Specifically, FERC held that “an electric storage resource that injects electricity back to the grid for purposes of participating in an RTO/ISO market engages in the sale of electric energy at wholesale in interstate commerce.”9 Order No. 841, p. 27. Therefore, under Order No. 841, a potential retail tariff cannot compensate FTM storage resources for participation in wholesale energy or ancillary-service markets or, in other words, where the energy from such resources is sold into the wholesale market. Importantly, FERC delineated between the sale of electric energy at wholesale from transactions that do not involve the sale of electricity at wholesale, such as those compensating storage resources as demand response resources.10 Order No. 841, p. 9 FERC defines an “electric storage resource” as a resource capable of receiving electric energy from the grid and storing it for later injection of electric energy back to the grid. Order No. 841, p. 1. FERC further clarified that a resource “capable of later injecting electricity back to the grid” means a storage resource both physically designed and configured to do so and is contractually permitted to do so. 10 A “demand response resource” is defined as a “resource capable of providing demand response.” 18 Code of Federal Regulations (CFR) § 35.28(b)(5). “Demand response” is defined as a “reduction in the consumption of electricity by customers from their expected consumption in response to an increase in the price of electric energy or to incentive payments designed to lower consumption of electric energy.” 18 C.F.R. § 35.28(4).