  1. Page 58 of 69

    Docket No. 26-08-05 Page 56 interconnection application; (6) a list of the most common reasons for ESS interconnection delays; and (7) EDC-proposed solutions for each of the most common reasons delaying ESS interconnections. 15. Reference Decision, Nov. 29, 2023, Docket No. 23-08-05, Order No. 30, p. 63: No less than once annually after the Energy Storage Siting Resource referenced in Order No. 20 of the Year 3 Decision is first completed, and until the ESS Program stops accepting new enrollments, CGB shall hold at least one seminar with Program stakeholders reviewing the siting and safety requirements for energy storage projects. The seminar shall help ensure that Program participants are informed of any potential energy storage code or safety changes. As compliance, CGB shall file the date of such seminar annually with the Authority in the applicable annual review proceeding (i.e., if 2024, Docket No. 24-08-05) no less than 10 days after such seminar is held. 16. Reference Decision, Dec. 4, 2024, Docket No. 24-08-05, Order No. 22, pp. 51-52: No later than November 1, 2025, and annually thereafter, the Program Administrators shall submit in the relevant annual review proceeding all recommended clawback fee waivers for Authority approval annually. This submission must include: (1) the total number and percentage of projects for which clawback fee waivers are recommended, categorized by residential and commercial sectors, as well as by battery manufacturer and contractor; (2) a clear and detailed rationale for each recommended fee waiver; and (3) an updated RIM score, illustrating the impact of waiving and not waiving clawback fees for the respective projects. All requests for clawback fee waivers shall be consolidated into a single motion for review and approval, rather than be submitted as separate filings for each waiver. Lastly, the Program Administrators shall first apply any clawback fees against a project’s eligible performance incentive payments before pursuing direct collection from the customer. 17. Reference Decision, Dec. 17, 2025, Docket No. 25-08-05, Order No. 26, pp. 6162: CGB shall update the ESS Program documents to reflect the adoption of CGB Proposals 1 and 2, as modified by this Decision, should CGB Proposals 1 and 2 be approved by CGB’s Board of Directors. The updated Program materials shall include new, standalone terms and conditions for each proposal, clearly delineating the specific rights, obligations, and repayment provisions applicable to participating customers. System owners must expressly acknowledge and sign these terms and conditions before enrolling in CGB Proposal 1 or CGB Proposal 2, thereby ensuring that participants fully understand the financial and operational implications of enrollment. The updated Program documents shall also specify the maximum upfront incentive available to each customer class, as well as the estimated timeline for CGB’s recovery of that incentive through performance payments. CGB shall also take steps to minimize customer confusion arising from the implementation of Proposals 1 and 2. When enrolling customers under either framework, CGB shall ensure that customers clearly understand: the financing process and expected recovery timelines; the nature of performance payments,
  2. Page 59 of 69

    Docket No. 26-08-05 Page 57 including that such payments will be made to CGB and netted against the upfront incentive until the balance is fully settled; and how incentive payments and enrollment terms may change depending on the proposal under which the customer enrolls. CGB shall file the updated Program documents as compliance in the present proceeding. Alternatively, if CGB decides not to pursue either CGB Proposals 1 or 2, CGB shall notify the Authority through a compliance filing in this proceeding. 18. Reference Decision, Dec. 17, 2025, Docket No. 25-08-05, Order No. 27, p. 62: CGB shall notify the Authority via a compliance filing in the present proceeding if a viable solution is identified to restore inoperable ESS systems (e.g., SunPower batteries) to operational status within the EDCs’ DERMS platforms. CGB may issue a formal request for proposals to identify a suitable solution; however, if ratepayer funding is to be used, CGB must obtain Authority approval before entering into any contract. 2. New Orders 19. No later than December 21, 2026, the Program Administrators shall file for the Authority’s review and approval updated ESS Program documents incorporating all the approved modifications authorized in this Decision. The Program Administrators shall ensure that the updated Program documents accurately reflect all the Authority’s determinations, including those in Sections IV.B., Bidirectional EV Participation, IV.C., Enrollment Incentive Clawback, and IV.F., Program Redline and Recommended Changes. Such filing shall include both a clean and a redlined version of all ESS Program documents, including the Program Manual. 20. No later than January 4, 2027, the EDCs shall use the revised Interconnection Guidelines for all applicable bidirectional EV interconnection requests. See EDC Order No. 25 Compliance, July 1, 2026. The EDCs shall also update their respective interconnection webpages to include the revised Interconnection Guidelines and shall file compliance with the Authority confirming that such updates have been completed. 21. No later than March 1, 2027, CGB shall reestablish the FTM Storage Working Group and shall file compliance with the Authority upon its reestablishment. Subject to future prudence review, costs incurred by CGB in connection with this effort shall be eligible for consideration for cost recovery in future RAM proceedings and shall be submitted as a specific line item in CGB's RAM filing. CGB shall invite, at a minimum, the EDCs, DEEP, OCC, ACT, SEIA, CCSA, and all members of the original FTM Storage Working Group to participate in the process. See EDC Compliance, Docket No. 22-08-05, Dec. 29, 2023, WG Report, p. 19. 22. No later than April 1, 2027, CGB shall add performance incentive payment information to the ESS Program data dashboard no later than April 1, 2027. The
  3. Page 60 of 69

    Docket No. 26-08-05 Page 58 information shall be broken out by season, where applicable, customer sector, and OEM. The EDCs shall provide CGB with the information necessary to verify the accuracy and completeness of the reported performance incentive payment data. CGB may, at its discretion, normalize performance incentive payments by kW or another metric that CGB determines would provide the most useful comparison for customers and stakeholders. Further, by the same date, CGB shall identify the annual ISO-NE system peak hour for all prior dispatch years on the Dispatch Event Metrics tab. CGB shall use a clear flag, filter, or comparable dashboard feature that allows users to readily identify and isolate dispatch events that occurred during the applicable annual system peak hour. CGB shall continue to add the annual ISO-NE system peak hour to the dashboard for each subsequent dispatch year once ISO-NE has made its final determination of the applicable peak hour. 23. No later than August 1, 2027, the Program Administrators shall submit a compliance filing containing a recommendation as to whether residential bidirectional EVs should be eligible to participate in the ESS Program and, if so, under what conditions. The Program Administrators’ compliance filing shall include, at a minimum, the following: a. Pilot Results. A detailed summary of the Bidirectional Energy IES pilot and Massachusetts Clean Energy Center (MassCEC) Vehicle to Everything (V2X) pilot results, including, where known, EV performance, dispatch participation and success rates, customer experience, and any identified barriers to residential V2G participation. b. Market and Technology Readiness. An updated assessment of the residential bidirectional EV market in Connecticut, including the number and types of residential EVs reasonably expected to be eligible for ESS participation and any material changes in market or technology readiness since the filing of the original Bidirectional EV Report. c. Interconnection. An assessment of the EDCs’ experience applying the revised bidirectional EV interconnection requirements, including: any implementation issues identified through commercial participation and the IES pilot; material issues, ambiguities, or necessary modifications requiring correction to better refine bidirectional EV interconnection; and any additional modifications that may be necessary to facilitate residential participation. Although this will be a joint filing, the EDCs shall be solely responsible for this portion of the filing because the EDCs administer the interconnection process. If the assessment identifies a need for changes to the interconnection requirements, the EDCs shall submit both clean and redlined versions of the applicable Interconnection Guidelines as part of the filing. d. BCA. An updated assessment of the BCA impacts associated with residential bidirectional EV participation under a proposed incentive structure in which performance incentives for residential bidirectional EVs would match the performance incentives applicable to standalone residential storage and no enrollment incentives would be provided.
  4. Page 61 of 69

    Docket No. 26-08-05 Page 59 e. Customer-Facing Issues. An evaluation of customer-facing issues associated with residential participation and a proposed mitigation strategy. This evaluation shall consider, among other things, whether a minimum state-of-charge requirement should apply to residential bidirectional EVs participating in active dispatch, as well as other measures to mitigate potential vehicle damage and the risk that customers may be unable to use their EVs to meet transportation needs. f. Program Requirements. Recommendations regarding any additional residential-specific eligibility requirements that should differ from or supplement the requirements applicable to commercial bidirectional EV charging systems. As part of this evaluation, the Program Administrators shall also consider whether the 20 kW per charging port minimum discharge capacity should be modified to allow for residential participation. g. Implementation Recommendations. A proposed framework and implementation timeline for residential bidirectional EV participation, incorporating all the above. 24. No later than December 1, 2027, CGB shall submit, as compliance, a comprehensive FTM Storage Tariff Report. The report shall identify the FTM Storage Working Group's findings and recommendations regarding the feasibility and design of a bidirectional retail TOU tariff for standalone FTM storage and shall identify any issues that may require additional statutory authorization before implementation. At a minimum, the FTM Storage Tariff Report shall address: a. the appropriate structure and time periods for any bidirectional retail TOU tariff, including whether charging and discharging should be subject to different time-varying rates or credits; b. the specific distribution-level benefits that could appropriately be recognized through a retail tariff and the methodology for quantifying and attributing those benefits to participating resources; c. the appropriate compensation mechanism for identified distribution-level benefits, including whether compensation should vary based on time, system conditions, or other relevant characteristics; d. whether the tariff should provide location-specific compensation for FTM storage resources that can avoid or defer identified distribution system investments and, if so, how any such compensation should be calculated; e. the appropriate charge structure, including the treatment of transmission, distribution, and non-bypassable charges and whether alternative charge methodologies are necessary to avoid inappropriate or duplicative charges; f. the appropriate eligibility, sizing, metering, and performance requirements for participating FTM storage resources, including the treatment of colocated resources; g. how the tariff should interact with the WDAT and wholesale market participation, including appropriate mechanisms to avoid conflicting price signals and duplicate compensation;
  5. Page 62 of 69

    Docket No. 26-08-05 Page 60 h. whether alternative versions of the tariff should be developed to support participation in a subset of wholesale markets (e.g., forward capacity market only); i. any federal legislation or regulation that explicitly permits or prohibits participation of an FTM storage resource in wholesale markets that takes service on a retail tariff; j. the appropriate treatment of cost allocation and the potential impacts on participating and non-participating customer classes; and k. the participant and ratepayer impacts of the proposed tariff, including the PCT and CT-RIM score, using ESS Program methodologies to the greatest extent possible.
  6. Page 63 of 69

    Docket No. 26-08-05 Page i APPENDIX A: List of Docket Participants Participant Representing Eric Annes Department of Energy and Environmental Protection 10 Franklin Square New Britain, CT 06051 DEEP/BETP Bernadette Antaki Michaud Law Group, LLC 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 Kinsley Energy Systems, LLC; Nevar Company; Silver Brook Energy, LLC; Solar Alliance for Virtual Energy; Triad Advanced Energy Development, LLC; TRITEC Americas, LLC Obinna Anugweje Staff Attorney Department of Energy & Environmental Protection 10 Franklin Square New Britain, CT 06051 DEEP/BETP Greg Berger CPower CPower Prabisha Bhandari Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Jeff Bishop Managing Director Key Capture Energy 150 State Street Salt Lake City, UT 84111 Key Capture Energy Julian Boggs Manager, Regulatory & Policy Affairs Key Capture Energy 25 Monroe Street, 3rd. Floor Albany, NY 12210 Key Capture Energy Ed Brolin RWE Clean Energy RWE Clean Energy Sean Burke BlueWave Project Development, LLC BlueWave Development, LLC
  7. Page 64 of 69

    Docket No. 26-08-05 Page ii 116 Huntington Avenue, Suite 601 Boston, MA 02116 Sergio Carrillo CT Green Bank 75 Charter Oak Avenue Hartford, CT 06106 CT Green Bank Nancy Chafetz Sr. Director, Regulatory & Govt. Affairs Enerwise Global Technologies, Inc. d/b/a CPower 1001 Fleet Street, Suite 400 Baltimore, MD 21202 CPower Alex Chaplin New Leaf Energy, Inc. 55 Technology Drive, Suite #102 Lowell, MA 01851 New Leaf Energy, Inc. James Charles Sunnova Energy Corporation 20 Greenway Plaza, Suite 475 Houston, TX 77046 Sunnova Energy Corporation Emma Cimino Acting Commissioner Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 DEEP Claire E. Coleman Consumer Counsel Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Jameson Christopher Davis Nonprofit Accountability Group 12 Chatterton Woods Hamden, CT 06514 Nonprofit Accountability Group NAG Amanda De Vito Trinsey, Esq. Couch White, LLP 540 Broadway P.O. Box 22222 Albany, NY 12201-2222 CIEC Ruthie DeWit Director State Affairs, Northeast Region Solar Energy Industries Association Solar Energy Industry Association
  8. Page 65 of 69

    Docket No. 26-08-05 Page iii 1425 K Street, Suite 1000 Washington, D.C. 20005 Bryan Garcia President & CEO Connecticut Green Bank 75 Charter Oak Avenue Hartford, CT 06106 CT Green Bank Dominic Gatti Policy Analyst, Energy Policy Tesla, Inc. 1333 H Street NW, Suite 1100 West Washington, DC 20006 Tesla, Inc. Greg Geller Enel X Advisory Services USA, LLC f/k/a Enel X North America, Inc. Enel X North America, Inc. One Marina Park Drive, #400 Boston, MA 02210 Kimberly Giese Energy Storage System Project Developer 174 Power Global Corporation 9 E. 37th Street, 12th Floor New York, NY 10016 174 Power Global Corporation Dylan J. Gillis Michaud Law Group 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 Solar Alliance for Virtual Energy Nitzan Goldberger Energy Storage Association 1800 M Street, Suite 4005 Washington, DC 20036 Energy Storage Assoc. Rachel Goldwasser General Counsel Key Capture Energy 25 Monroe Street, Suite 300 Albany, NY 12210 Key Capture Energy S. Jay Goodman, Esq. Partner Couch White, LLP 540 Broadway P.O. Box 22222, Albany, NY 12201 CIEC Sarah Griffiths Head of Regulatory Affairs (Northeast, MidWest, Canada) Enel X North America, Inc.
  9. Page 66 of 69

    Docket No. 26-08-05 Page iv Enel X Advisory Services USA, LLC f/k/a Enel X North America, Inc. One Marina Drive, #400, Boston, MA 02210 Justin Gundlach Institute of Policy Integrity at NYU School of Law 139 MacDougal Street, 3rd. Floor New York, NY 10012 IPI at NYU School of Law Alice Horgan Sunnova Energy Corporation 20 Greenway Plaza, Suite 475 Houston, TX 77046 Sunnova Energy Corporation Cynthia Jennings Law Office of Cynthia R. Jennings 340 Broad Street, Suite 300 Windsor, CT 06095 Nonprofit Accountability Group NAG Angela Kent Manager, Regulatory Affairs EnergyHub, Inc. 41 Flatbush Avenue, Suite 40A Brooklyn, NY 11217 EnergyHub, Inc. Shannon C. King OCC Consultant Ted Ko Director of Policy Stem, Inc. 100 Rollins Road, Millbrae, CA 94030 Stem, Inc. Joel M. Kopylec Director, Regulatory Services & Policy UIL Holdings Corporation 180 Marsh Hill Road Orange, CT 06477 UI Anna Bella Korbatov VP Regulatory Affairs Fermata Energy 2488 Historic Decatur Rd. Suite 200 San Diego, CA 92106 Fermata Energy Alex Kovtunenko CT Green Bank 845 Brook Street Rocky Hill, CT 06067 CT Green Bank Shannon Laun, Esq. Conservation Law Foundation, Inc. Conservation Law Foundation
  10. Page 67 of 69

    Docket No. 26-08-05 Page v 62 Summer Street Boston, MA 02110 Julie Lelek, Esq. Staff Attorney Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Steve Letendre Vehicle Grid Integration Council 1401 21sr Street, #5409 Sacramento, CA 95811 Vehicle Grid Integration Council Emma Marshall-Torres Scale Microgrids Scale Microgrids Alison McHorney, Esq. Staff Attorney Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Paul R. Michaud Michaud Law Group, LLC 101 Centerpoint Drive, Suite 230 Middletown, CT 06457 Kinsley Energy Systems, LLC; Nevar Company; Silver Brook Energy, LLC; Solar Alliance for Virtual Energy; Triad Advanced Energy Development, LLC; TRITEC Americas, LLC Andrew Minikowski Legal Director Office of Consumer Counsel 10 Franklin Square New Britain, CT 06051 OCC Kevin Morgan World Energy Efficiency Services World Energy Efficiency Services Meghan Nutting Sunnova Energy Corporation 20 Greenway Plaza, Suite 540 Houston, TX 77046 Sunnova Energy Corporation Peter A. Olmsted Director of Regulatory Affairs Free Wire Technologies 53 Greenfield Avenue Saratoga Springs, NY 12866 Free Wire Technologies Vincent P. Pace Assistant General Counsel Eversource