Page 8 of 69
Docket No. 26-08-05 Page 6 Tables 4 and 5, below, provide a summary of the number of C&I and residential ESS projects approved by the Program Administrators from January 1, 2022 to June 30, 2026. As can be seen from the tables, 133.60 MW of C&I energy storage projects and 21.41 MW of residential energy storage projects have been approved by the Program Administrators and are currently active.2 Table 4: Commercial Project Application Data as of June 30, 2026 Size Category Number of Approved/Complete Projects Total System Power Rating (MW) Large C&I Eversource UI Medium C&I Eversource UI Small C&I Eversource UI Grand Total 36 31 5 22 17 5 14 12 2 72 95.85 87.34 8.51 30.28 27.86 2.42 7.47 6.71 0.76 133.60 Total System Energy Capacity (kWh) 229,990 202,332 27,658 77,056 70,994 6,062 25,142 23,410 1,732 332,188 Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 2, pp. 6–7, 29. Table 5: Residential Project Application Data as of June 30, 2026 Eversource UI Grand Total Number of Approved/ Completed Projects 1,461 352 1,813 Total System Power Rating (MW) 18.90 2.51 21.41 Total System Energy Capacity (kWh) 38,007 5,821 43,828 Low Income (# of Projects) 101 175 276 Underserved Community (# of Projects) 166 61 227 Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 2, pp. 6–7, 29. 2 Tables 4 and 5 exclude withdrawn or canceled projects, meaning the actual total number of MWs approved by the Program Administrators over the life of the Program is higher. See Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 2, pp. 6–7. For more granular and up-to-date data, see the Program’s data dashboard, which is updated daily, here: Energy Storage Solutions Performance Report – Energy Storage Solutions.Page 9 of 69
Docket No. 26-08-05 B. Page 7 BIDIRECTIONAL EV PARTICIPATION 1. Background During last year’s annual ESS Program review, the Authority directed the ESS Program Administrators to establish and jointly lead a Bidirectional EV Working Group. Year 5 Decision, p. 60. On behalf of the Working Group, the Program Administrators were required to submit a Bidirectional EV Report presenting the group’s findings and recommendations regarding the integration of bidirectional EVs into the ESS Program. Id. The Program Administrators filed the Bidirectional EV Report (Report) on July 29, 2026. See Program Administrator Order No. 20 Compliance, July 29, 2026. The Report recommended allowing commercial bidirectional EVs with a minimum discharge capacity of 20 kW per charging port to participate in the ESS Program, provided they are not simultaneously enrolled in the state’s managed charging program. Id., Att. 1, p. 61. Under this recommendation, eligible commercial bidirectional EVs would receive the existing small/medium commercial ESS performance incentive for a 10-year enrollment period but would not be eligible for an enrollment incentive, as the Report concluded that this structure maintains a positive Ratepayer Impact Measure (RIM) score. Id., pp. 58, 61– 62. For residential bidirectional EVs, the Report did not recommend immediate inclusion in the ESS Program. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 62. Instead, the Report recommended establishing a pathway with defined milestones that should be achieved before residential participation is considered. Id. These milestones included, among other things, completion of the Bidirectional Energy Innovative Energy Solutions (IES) pilot, incorporation of lessons learned from ongoing Massachusetts demonstrations, resolution of issues related to dual participation in the managed charging and ESS Programs, successful implementation of updated interconnection requirements, and clarification of metering and distributed generation policy considerations. Id., pp. 62–63. The Report recommended revisiting residential bidirectional EV participation during next year's ESS Program review if the Authority determines that doing so remains a priority. Id., p. 63. As discussed above, the Report did not recommend allowing simultaneous enrollment in the ESS and managed charging programs, because of several implementation challenges. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 38. First, absent coordination between the two programs, customer behavior could produce a “timer-peak” effect in which ESS-enrolled vehicles begin charging simultaneously at the conclusion of a dispatch event after discharging energy, thereby undermining the load-shifting objectives of managed charging. Id., p. 36. Stakeholders also raised concerns regarding double penalization, as under the current ESS Program design, charging during an ESS event may negatively affect ESS performance incentives, while the same charging activity could also be penalized under the managed charging program, potentially subjecting a customer to overlapping negative consequences for the same action. Id.Page 10 of 69
Docket No. 26-08-05 Page 8 In addition, operating two programs concurrently on the same asset using separate charging and discharging signals could require real-time communication between the respective technology platforms, visibility into the vehicle’s state of charge, and a coordinated customer-facing interface, creating significant implementation complexity. Id., p. 37. Stakeholders also raised customer-related concerns, including the need to enroll in two programs with different compensation structures and the need to ensure that customers retain control over EV dispatch and maintain a state of charge sufficient to meet their transportation needs. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 37. Further, under current EV program rules, receipt of a make-ready or electric vehicle supply equipment (EVSE) rebates for residential customers are conditioned on 24 months of managed charging enrollment, which would prevent such customers from enrolling in the ESS Program during that period. Id., p. 38. Accordingly, until these issues are resolved, the Report did not recommend allowing dual participation. The Report also recommended several technical and programmatic modifications to facilitate bidirectional EV participation. These recommendations included: • • • • • • treating bidirectional EVs as behind-the-meter (BTM) resources, even where the only on-site load is EV charging; removing the existing islanding and backup power requirement for commercial bidirectional EV installations; using the maximum charging capacity of the bidirectional EVSE, rather than historical site demand, when applying the ESS Program’s sizing limitation; requiring several applicable safety and communication certifications; requiring completed distributed energy resource management system (DERMS) integration; and requiring the same static and interval telemetry fields currently required under the ESS Program, while allowing discretion to waive the 15-minute reporting interval for state-of-charge data. Id., pp. 65–66. Separately, in the Year 5 Decision, the Authority directed the EDCs, on behalf of the Interconnection Working Group, to file recommended revisions to the interconnection process for bidirectional EVs, including proposed revisions to the Interconnection Guidelines and any necessary modifications to the PowerClerk system. Year 5 Decision, p. 61. The EDCs submitted these compliance filings on July 1, 2026. See EDC Order No. 25 Compliance, July 1, 2026. The Authority requested written comments on both the Report and the EDCs' recommended interconnection changes for bidirectional EVs. Notice, Aug. 12, 2026, p. 4. The Authority asked stakeholders to identify any specific recommendations they opposed and propose alternative approaches where appropriate. Id. 2. Stakeholder Comments Eversource, UI, and CGB largely echoed the recommendations in the Report, with several additions discussed below. UI Comments, Aug. 27, 2026, pp. 5–7; Eversource Comments, Aug. 28, 2026, pp. 6–9, CGB Comments, Aug. 28, 2026, pp. 4–5. UIPage 11 of 69
Docket No. 26-08-05 Page 9 reiterated that unmanaged interactions between charging and discharging programs could result in conflicting dispatch signals, increased customer confusion, technology integration challenges, and adverse charging behavior that undermines the objectives of both programs. UI Comments, Aug. 27, 2026, p. 6. UI therefore recommended resolving these issues before allowing dual participation. Id. Eversource similarly recommended that residential EV enrollment in the ESS Program be deferred until several additional conditions are satisfied, including evidence that customers are willing to participate in vehicle-to-grid (V2G) programs; that participating customers are home and their vehicles are plugged in during events; that customer vehicles provide a meaningful amount of discharge capacity during events; that EVSE can integrate with a DERMS; and that DERMS platforms can both send EVSE dispatch signals and receive EVSE dispatch performance data. Eversource Comments, Aug. 28, 2026, p. 7. OCC agreed that participation should be limited to a single program, either ESS or managed charging, to avoid duplicative incentives for similar grid benefits. OCC Comments, Aug. 28, 2026, p. 3. OCC explained that the two programs are inherently linked because ESS dispatch necessarily precludes simultaneous charging. Id. OCC also supported focusing initially on commercial bidirectional EVs, citing the importance of the commercial sector to achieving the ESS Program’s overall goals, the ongoing residential Bidirectional Energy IES Pilot, and the more individualized and less predictable usage patterns of residential customers compared to commercial customers. Id., pp. 3– 4. OCC further supported most of the technical requirements for bidirectional EV participation in the ESS Program proposed in the Report. Id., p. 4. OCC cautioned, however, against potentially removing the requirement to report stored kWh data at 15minute intervals, noting that less frequent reporting could result in telemetry delays that hinder troubleshooting and performance monitoring. OCC Comments, Aug. 28, 2026, p. 4. EV.Energy advocated for two primary changes to the Report’s recommendations: (1) establishing a timely framework to enable bidirectional EVs to participate simultaneously in the ESS and managed charging programs; and (2) accelerating the incorporation of residential bidirectional EVs into the ESS Program. EV.Energy Comments, Aug. 28, 2026, p. 1. Although EV.Energy agreed that the ESS Program provides greater grid value than the managed charging program, it argued that characterizing the programs in those terms was inappropriate. Id., p. 2. Specifically, EV.Energy emphasized that managed charging shifts EV charging to off-peak periods rather than discharging energy during peak periods. Id., pp. 2–3. Accordingly, EV.Energy argued that dual enrollment could maximize grid benefits, particularly if software-based charging solutions prevent EVs from resuming charging during peak periods. Id., p. 5. EV.Energy further stated that more than 12 passenger EV models and approximately 3,000 individual bidirectional EVs are currently registered in Connecticut and capable of discharging. EV.Energy Comments, Aug. 28, 2026, p. 4. EV.Energy argued that deferring residential EV enrollment for another year would unnecessarily exclude a potentially beneficial source of discharge capacity from the ESS Program. Id. If residential enrollment is nevertheless deferred, EV.Energy requested that the ProgramPage 12 of 69
Docket No. 26-08-05 Page 10 Administrators establish formal program-year goals for resolving the outstanding issues and provide quarterly progress updates. Id., p. 6. Finally, EV.Energy agreed that the technical requirements proposed in the Report were reasonable and recommended establishing a process for updating those requirements as applicable standards evolve, without requiring additional filings for each update. Id. Tesla stated that a program enabling EVs to discharge energy to the grid provides greater benefits than the load-shifting that currently characterizes the managed charging program. Tesla Comments, Aug. 28, 2026, p. 2. Tesla nevertheless opposed limiting bidirectional EV participation to a single program, either managed charging or ESS, asserting that the challenges associated with dual enrollment are contractual rather than programmatic in nature. Id., p. 3. Tesla stated, however, that if prohibiting dual participation is necessary, it would not oppose limiting bidirectional EVs to a single program during the initial years while the Authority works through these issues and develops a more comprehensive framework. Id., pp. 3–4. Like EV.Energy, Tesla also supported allowing residential bidirectional EVs to participate in the ESS Program. Id., p. 3. Tesla cited the successful launch of programs in Texas and California, the recent codification of UL certification pathways, and the expansion of bidirectional capabilities in Tesla models, including the Cybertruck and certain Model Y vehicles. Tesla Comments, Aug. 28, 2026, p. 3. Tesla emphasized that ratepayers would be protected because residential bidirectional EV owners would receive incentives only for services actually performed. Id. Tesla also supported the revised Interconnection Guidelines filed by the EDCs and the technical requirements identified in the Report. Id., pp. 4–5. Tesla recommended, however, that the communication standards be treated as guidelines rather than mandatory requirements, including by expressly preserving the Report’s proposed ability for the Program Administrators to grant exemptions from those standards. Tesla Comments, Aug. 28, 2026, pp. 4–5. Finally, Tesla expressed concern that the Program Manual revisions proposed by the Program Administrators, specifically the UL 1741 requirement on page 108, do not fully capture the range of certification pathways described in the Report. Id., p. 5. Tesla emphasized the importance of ensuring that the Program Manual accurately reflects the distinctions and nuances of the certification pathways discussed in the Report. Id. The Vehicle Grid Integration Council (VGIC) argued that, assuming participation is limited to a single program, participation in the ESS Program provides greater overall benefits to ratepayers than participation in Connecticut’s managed charging program for bidirectional EV charging systems. VGIC Comments, Aug. 28, 2026, p. 5. VGIC attributed this difference primarily to the greater per-vehicle depth of response available under the ESS Program. Id. For example, citing the 2024 managed charging program evaluation report, VGIC stated that managed charging typically provides less than 0.2 kW of response per vehicle, whereas bidirectional EV charging systems offer approximately 9.6 to 11.5 kW of export capability. Id., pp. 5–6. VGIC further noted that the EV marketPage 13 of 69
Docket No. 26-08-05 Page 11 is rapidly moving toward bidirectional capability, citing programs in other states and the increasing number of bidirectional-capable EV models. Id., pp. 7–9. VGIC estimated that enrolling the approximately 3,000 bidirectional-capable EVs currently in Connecticut in the ESS Program could provide approximately 34 MW of nameplate capacity, which VGIC characterized as a significant potential benefit to ratepayers. VGIC Comments, Aug. 28, 2026, p. 11. VGIC disagreed with the Report’s recommendation to defer residential bidirectional EV enrollment in the ESS Program. Id., p. 13. VGIC stated that the risk to ratepayers would be low because incentives would be based on actual performance. Id., p. 7. VGIC also asserted that the Participant Cost Test (PCT) score for residential bidirectional EV charging systems would exceed that of residential stationary storage systems, which currently have a PCT below 1 but remain eligible for the ESS Program. Id., pp. 14–15. In addition, VGIC contended that the residential bidirectional EV market is more mature than the commercial market, excluding school buses, based on the rapid expansion of residential bidirectional EV offerings. VGIC Comments, Aug. 28, 2026, pp. 16–17. VGIC further argued that, even if the residential market is not yet sufficiently developed, deferring eligibility could create a “chicken and egg” problem because ESS performance incentives could themselves facilitate market development. Id., p. 17. VGIC also asserted that completion of additional residential bidirectional EV pilots is not necessary before allowing residential participation in the ESS Program because participants in the IES and Massachusetts pilots also participated in the Bidirectional EV Working Group and contributed to development of the Report’s recommendations. Id., p. 18. With respect to dual participation in ESS and managed charging, VGIC maintained that the identified obstacles concern implementation and program coordination and therefore do not justify excluding residential bidirectional EVs from the ESS Program. Id., p. 19. VGIC suggested that dual participation could remain prohibited temporarily while the operational issues are addressed in a future proceeding. VGIC Comments, Aug. 28, 2026, p. 19. Finally, VGIC argued that metering and interconnection issues should not be used as a basis for excluding residential bidirectional EVs because those issues are not unique to residential bidirectional EVs and presumably would also apply to commercial bidirectional EVs and stationary storage. Id., pp. 20–21. VGIC supported the Report’s technical requirements, subject to two specific qualifications. Id., pp. 21–22. First, VGIC recommended modifying the requirement that all systems satisfy UL 9741 to permit AC-coupled systems that cannot be certified to UL 9741 but can be certified to UL 1741 SC, asserting that UL 9741 does not apply to ACcoupled systems. Id., p. 22. Second, VGIC recommended that ISO 15118-20 not be treated as a rigid requirement and supported the Report’s recommendation to permit exceptions while the applicable certification and testing ecosystem matures. VGIC Comments, Aug. 28, 2026, p. 22. VGIC otherwise supported the Report’s recommendations and the revised Interconnection Guidelines incorporating bidirectional EVs. Id., pp. 23–25.Page 14 of 69
Docket No. 26-08-05 Page 12 3. Authority Analysis a. Overview Consistent with the Program Administrators' recommendation, eligible commercial bidirectional EV charging systems will be allowed to enroll in the ESS Program beginning January 1, 2027, at the existing small/medium performance incentive rate, subject to the requirements established below. Dual enrollment in the managed charging program will be prohibited due to the technical, operational, and compensation-related concerns discussed below. A phased approach to incorporating bidirectional EV charging systems into the ESS Program is appropriate because it will allow the Authority, Program Administrators, and other stakeholders to gain experience with the integration and operation of these resources while initially limiting participation to the vehicle and customer segments that are best positioned to provide reliable grid benefits. Residential bidirectional EV participation remains a priority and will be revisited during a future annual ESS Program review. The Authority’s rationale for initially limiting participation to commercial bidirectional EV charging systems, the requirements applicable to eligible commercial systems, and the process for evaluating future residential participation are discussed below. b. Benefits for Program Inclusion Bidirectional EV charging systems present a meaningful opportunity to expand the resources available to the ESS Program and provide additional benefits to ratepayers. Unlike conventional managed charging, which primarily provides grid value by shifting EV charging away from periods of high demand, bidirectional EV charging systems can provide an additional source of grid flexibility by discharging stored energy during ESS active dispatch events, thereby reducing net system demand. Their ability to provide both transportation services and grid services also creates an opportunity to leverage customer-funded or otherwise necessary vehicle and charging infrastructure as a distributed energy resource. The ESS Program’s benefit-cost analysis (BCA) may also support the inclusion of commercial bidirectional EV charging systems. The overall Program Ratepayer Impact Measure (RIM) score is 1.55, while the commercial sector has a RIM score of 1.84. Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 2, pp. 72, 74. However, the Connecticut-specific commercial RIM score of 1.23 falls short of the 1.4 RIM target, while the overall CT-RIM score is only 1.0. Program Administrator Order No. 3 Compliance, Aug. 3, 2026, Att. 2, pp. 73, 75. In addition to the direct grid benefits associated with dispatchable battery capacity, ESS participation may improve the economics of deploying bidirectional charging infrastructure and thereby support broader adoption of V2G-capable technologies. This consideration may be particularly important for commercial EV fleets, for which performance incentives can provide a direct revenue stream in exchange for makingPage 15 of 69
Docket No. 26-08-05 Page 13 otherwise necessary vehicle battery capacity available as a flexible grid resource. Early participation by commercial fleets can also generate operational experience and performance data that may inform the eventual expansion of V2G participation to other customer segments. c. Commercial vs. Residential Eligibility At this time, the Authority will limit ESS Program enrollment for bidirectional EVs to EVSE installed at commercial accounts, as this customer segment is best positioned to participate effectively in the ESS Program under current market and operating conditions. The Report identified several factors supporting this distinction. Commercial fleet operators generally have more predictable vehicle schedules and greater ability to manage vehicle availability, state of charge, and dispatch requirements. Program Administrator Order No. 20 Compliance, July 29, 2026, Att. 1, p. 62. Electric school buses, for example, are more likely to be available during ESS dispatch periods occurring in the evening during the Program’s summer dispatch season because school buses are generally not in use during the summer. Id., pp. 15–16. Commercial participants are also more likely to deploy multiple charging ports at a single site, which can increase the amount of dispatchable capacity associated with each enrollment and improve the administrative efficiency and total grid value of participation. Residential applications present greater operational uncertainty. Residential EV use is inherently more variable, and an individual vehicle may not be plugged in, may not have sufficient state of charge, or may be needed for transportation during an ESS active dispatch event. These considerations create additional uncertainty regarding customer availability, state-of-charge management, and the ability to consistently participate in active dispatch. The Report appropriately identified these factors, as well as the potential conflict between transportation needs and grid dispatch, as important considerations for residential V2G participation. Id., pp. 15–16, 61. The Program’s performance-based incentive structure provides important ratepayer protection because participating customers are compensated only based on actual performance. Nevertheless, the Authority is particularly concerned about the potential customer impacts of enrolling residential bidirectional EVs in the ESS Program before the operational and customer-facing issues associated with residential participation are sufficiently understood. For example, a residential customer could be unable to use an EV when needed for transportation because the vehicle participated in an active dispatch event that discharged the battery to a state of charge insufficient to meet the customer’s transportation needs. Such outcomes could undermine customer confidence in V2G technology and discourage broader residential adoption, to the detriment of Connecticut’s longer-term grid and EV objectives. Further, individual residential customers generally have less ability than commercial fleet operators to manage vehicle availability and coordinate EV use with grid dispatch requirements. Nevertheless, residential bidirectional EVs could ultimately provide benefits to customers and the grid. Accordingly, the Authority’s decision to initially limit participationPage 16 of 69
Docket No. 26-08-05 Page 14 to commercial customers is a matter of sequencing, not a determination that residential bidirectional EVs are unsuitable for the ESS Program. A staged approach will allow the ESS Program to establish operational experience with V2G resources, identify and address technical issues, and develop a stronger evidentiary record regarding residential performance before extending eligibility more broadly. The Authority will therefore revisit residential bidirectional EV eligibility as part of a future annual ESS Program review. In advance of that review, the Authority directs the Program Administrators to submit, no later than August 1, 2027, a compliance filing containing a recommendation as to whether residential bidirectional EVs should be eligible to participate in the ESS Program and, if so, under what conditions. The Program Administrators’ compliance filing shall include, at a minimum, the following: 1. Pilot Results. A detailed summary of the Bidirectional Energy IES pilot and Massachusetts Clean Energy Center (MassCEC) Vehicle to Everything (V2X) pilot results, including, where known, EV performance, dispatch participation and success rates, customer experience, and any identified barriers to residential V2G participation. 2. Market and Technology Readiness. An updated assessment of the residential bidirectional EV market in Connecticut, including the number and types of residential EVs reasonably expected to be eligible for ESS participation and any material changes in market or technology readiness since the filing of the original Bidirectional EV Report. 3. Interconnection. An assessment of the EDCs’ experience applying the revised bidirectional EV interconnection requirements, including any implementation issues identified through commercial participation and the IES pilot and any additional modifications that may be necessary to facilitate residential participation. Although this will be a joint filing, the EDCs shall be solely responsible for this portion of the filing because the EDCs administer the interconnection process. If the assessment identifies a need for changes to the interconnection requirements, the EDCs shall submit both clean and redlined versions of the applicable Interconnection Guidelines as part of the filing. 4. BCA. An updated assessment of the BCA impacts associated with residential bidirectional EV participation under a proposed incentive structure in which performance incentives for residential bidirectional EVs would match the performance incentives applicable to standalone residential storage and no enrollment incentives would be provided. 5. Customer-Facing Issues. An evaluation of customer-facing issues associated with residential participation and a proposed mitigation strategy. This evaluation shall consider, among other things, whether a minimum stateof-charge requirement should apply to residential bidirectional EVsPage 17 of 69
Docket No. 26-08-05 Page 15 participating in active dispatch, as well as other measures to mitigate potential vehicle damage and the risk that customers may be unable to use their EVs to meet transportation needs. 6. Program Requirements. Recommendations regarding any additional residential-specific eligibility requirements that should differ from or supplement the requirements applicable to commercial bidirectional EV charging systems. As part of this evaluation, the Program Administrators shall also consider whether the 20 kW per charging port minimum discharge capacity should be modified to allow for residential participation. 7. Implementation Recommendations. A proposed framework and implementation timeline for residential bidirectional EV participation, incorporating all the above. The Authority expects this filing to provide sufficient quantitative, operational, and customer-experience information to determine whether residential bidirectional EV participation should be authorized as part of the subsequent annual ESS Program review. Providing a clear signal regarding the potential future availability of ESS incentives for residential bidirectional EVs will be important to support continued market development. Accordingly, the Authority expects that, if the identified challenges are satisfactorily resolved and the record demonstrates that residential participation can provide benefits commensurate with its costs, residential bidirectional EVs may be considered for inclusion in the ESS Program in the subsequent program year (i.e., 2028). d. Dual Program Enrollment The Authority will prohibit dual participation by bidirectional EV charging systems in the ESS and managed charging programs. The potential incremental benefits of dual participation do not justify the technical, operational, customer-facing, and ratepayercompensation issues associated with administering two programs on the same asset. Accordingly, the Authority is not inclined to revisit this determination in the immediate term. First, dual participation presents significant technical and operational challenges. A bidirectional EV participating in both programs would be subject to charging and discharging signals originating from separate program requirements and potentially separate technology platforms. The DERMS and associated EVSE controls would need to receive, prioritize, and coordinate these signals in real time while maintaining visibility into the vehicle’s state of charge and availability. The system would also need to appropriately attribute the vehicle’s performance to each program, including distinguishing charging behavior associated with managed charging from discharging behavior associated with an ESS event. These functions require reliable communication among the DERMS, EVSE, EV, and applicable program platforms and could require significant additional integration, testing, and operational coordination. Until these capabilities are demonstrated at scale, allowing dual participation could create uncertainty regarding which program signal governs the asset at a particular time and could make it
As listed on the current system
Draft Decision, 10/29/2026 [26-08-05]