STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY TEN FRANKLIN SQUARE NEW BRITAIN, CT 06051 DOCKET NO. 26-08-06 ANNUAL EV CHARGING PROGRAM REVIEW - YEAR 6 November 17, 2026 PROPOSED FINAL DECISION This proposed final decision is being distributed to the participants in this proceeding for comment. The proposed decision is not final. The Authority will consider the participants’ arguments and exceptions before reaching a final decision, which may differ from the proposed decision. Therefore, this proposed decision does not establish any precedent and does not necessarily represent the Authority’s final conclusion.Page 2 of 46
TABLE OF CONTENTSPage 3 of 46
I. INTRODUCTION ........................................................................................... 1 A. SUMMARY ................................................................................................. 1 B. BACKGROUND AND CONDUCT OF THE PROCEEDING ..................................... 1 C. PARTICIPANTS ........................................................................................... 2 II. LEGAL AUTHORITY ..................................................................................... 3 III. EV CHARGING PROGRAM OBJECTIVES .................................................. 4 IV. PROGRAM DESIGN & IMPLEMENTATION ................................................. 5 A. UP-FRONT INCENTIVE STRUCTURE AND DEPLOYMENT TARGET PROPOSAL TO COMPLY WITH STATUTORY EXPENSE CAP........................................................................ 5 1. Background ..................................................................................... 5 2. 2026 Proposal by the EDCs............................................................ 8 3. Stakeholder Comments .................................................................. 13 4. Authority Analysis .......................................................................... 15 B. DCFC UPTIME REQUIREMENT AND ENFORCEMENT STRUCTURE ................... 17 C. EDC COMMERCIAL PROGRAM RECOMMENDATIONS ..................................... 18 1. Level 2 EVSE Application Process ................................................ 18 2. Level 2 Commercial Waitlist Process and Prioritization .............. 19 3. Restrictions on Stacked Funding .................................................. 20 4. Incentives for New Construction Stretch Building Codes........... 21 D. RESIDENTIAL PROGRAM RECOMMENDATIONS .............................................. 23 1. Residential Managed Charging Enrollment Incentive ................. 23 2. Incentive Flexibility ......................................................................... 25 E. LOAD OPTIMIZATION, COST-AVOIDANCE AND FULL VALUE POTENTIAL .......... 26 1. Value Stack and Load Optimization Report .................................. 26 2. Fast Track Process ......................................................................... 28 F. MARKETING AND OUTREACH ...................................................................... 29 1. Point-of-Purchase Enrollment ....................................................... 29 G. NORTH AMERICAN CHARGING STANDARD ................................................... 31 1. Proposal........................................................................................... 31 2. Stakeholder Comments .................................................................. 32 3. Authority Analysis .......................................................................... 32 H. MUD MANAGED CHARGING ....................................................................... 32 1. MUD Pilot Findings ......................................................................... 33 2. EDC Proposal .................................................................................. 34 3. Stakeholder Comments .................................................................. 35 4. Authority Analysis .......................................................................... 36 I. SMALL MUDS, LEVEL 1 AND SMART OUTLET CHARGING INSTALLATIONS ...... 36 1. CTC Proposal .................................................................................. 36 2. EDC Proposal .................................................................................. 37 3. Stakeholder Comments .................................................................. 38 4. Authority Analysis .......................................................................... 39 V. CONCLUSION AND ORDERS ...................................................................... 39 A. CONCLUSION ............................................................................................. 39Page 4 of 46
B. ORDERS.................................................................................................... 39 1. Standing Orders .............................................................................. 40 2. New Orders ...................................................................................... 40Page 5 of 46
Docket No. 26-08-06 Page 1 PROPOSED FINAL DECISION I. INTRODUCTION A. SUMMARY In this Decision, the Public Utilities Regulatory Authority (Authority or PURA) approves updates to the statewide electric vehicle (EV) charging program (EV Charging Program or Program) administered by The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) and The United Illuminating Company (UI; collectively, the electric distribution companies, EDCs, or Companies). The Authority also approves, with modification, certain new program design proposals associated with these updates. The EV Charging Program shall continue to be made available to all customers and customer classes within the service territories of the EDCs, subject to the direction provided herein. B. BACKGROUND AND CONDUCT OF THE PROCEEDING On July 14, 2021, the Authority issued a Decision in Docket No. 17-12-03RE04, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Zero Emission Vehicles (EV Decision), establishing a statewide EV Charging Program. Pursuant to Section VI.F. of the EV Decision, the Authority conducts an annual review beginning on or around August 1 of each year to review key Program metrics and to make strategic adjustments to ensure: (1) continued alignment with the program objectives established in the EV Decision; and (2) that the Program is on track to meet its deployment targets. EV Decision, p. 42. On February 2, 2026, the EDCs filed a motion for review and approval (Motion No. 1) in compliance with Order No. 14 of the Authority’s December 17, 2025 Decision in Docket No. 25-08-06, Annual Review of the Electric Vehicle Charging Program – Year 5 (Year 5 EV Decision). Motion No. 1 includes the EDCs’ proposal regarding Direct Current Fast Charger (DCFC) uptime requirements and their enforcement. To solicit feedback on Motion No. 1, on February 9, 2026, the Authority issued a Notice of Request for Written Comments for docket participants to provide comments on the EDCs’ proposal to align with the National Electric Vehicle Incentive (NEVI) 97% uptime requirement for DCFC stations, and the EDCs’ proposal regarding the Authority’s Office of Education, Outreach & Enforcement (EOE) as the responsible party for the enforcement of DCFC uptime requirements through monetary penalties. On May 11, 2026, the EDCs filed a joint motion for review and approval (Motion No. 6) in compliance with Order No. 17 of the Year 5 EV Decision, which includes a summary of current efforts to coordinate DCFC deployments with the Connecticut Department of Transportation (ConnDOT) as well as a proposal to align ConnDOT’s port deployment methodologies in the NEVI Program with the EDCs’ DCFC port deployment methodologies.Page 6 of 46
Docket No. 26-08-06 Page 2 On May 15, 2026, the EDCs filed a joint motion for review and approval (Motion No. 7) in compliance with Order No. 16 of the Year 5 EV Decision. Motion No. 7 includes the EDCs’ update regarding current efforts and proposal to expand marketing efforts to enroll EV drivers in the Program at the point of purchase. Motion No. 7, p. 1. On July 9, 2026, the Authority issued a second Notice of Request for Written Comments for docket participants to provide comments on a PURA proposal for DCFC Uptime Requirement and Enforcement Structure, and Motion Nos. 6 and 7. On June 11, 2026, Tesla submitted correspondence requesting that connector technical requirements be revised to accept North American Charging Standard (NACS) as a standard connector. On August 3, 2026, the EDCs jointly submitted Annual Report filings (Annual Report) in compliance with Order No. 14 of the EV Decision, Standing Order Nos. 4 and 6 and New Order No. 18 in the Year 5 EV Decision. EDC Compliance, Aug. 3, 2026. On September 2, 2026, the EDCs filed a motion for review and approval (Motion No. 8) in compliance with Order No. 1 of the Authority’s July 1, 2026 Decision in Docket No. 22-08-07, Innovative Energy Solutions Program Cycle 01. Motion No. 8 includes the EDCs’ recommendations for scaled deployment of AmpUp’s Innovative Energy Solutions Cycle 1 project within the Multi-Unit Dwelling (MUD) managed charging final program design. On September 2, 2026, the EDCs filed a motion for review and approval (Motion No. 9) in compliance with Order No. 6 of the Year 5 EV Decision. Motion No. 9 includes the results of the EDCs’ MUD Managed Charging Pilot offering and a final program design proposal. On September 21, 2026, the Authority issued a third Notice of Request for Written Comments for docket participants to provide comments on the Annual Report, Motion Nos. 8 and 9, and Tesla’s June correspondence. The Authority held a noticed technical meeting on October 13, 2026, via teleconference, to discuss the EDCs’ Annual Report filing, proposals provided in Motion Nos. 8 and 9, and other relevant Program items. The Authority issued one set of interrogatories to the EDCs on October 16, 2026. Participants were provided the opportunity to file briefs by November 6, 2026. The EDCs filed a joint letter in lieu of briefs; OCC, Save the Sound, DEEP, and Clean Transportation Communities of Southern Connecticut each filed a letter in lieu of briefs. C. PARTICIPANTS The Authority designated all of the Participants in Docket No. 25-08-06, Annual EV Charging Program Review - Year 5, as Participants to this proceeding, including, but not limited to: Eversource, 107 Selden Street, Berlin, CT 06037; UI, 180 Marsh Hill Road, Orange, CT 06477; Connecticut Green Bank, 75 Charter Oak Avenue, Hartford, CTPage 7 of 46
Docket No. 26-08-06 Page 3 06106; the Office of Consumer Counsel (OCC), Ten Franklin Square, New Britain, CT 06051; the Authority’s Office of Education, Outreach, and Enforcement (EOE), Ten Franklin Square, New Britain, CT 06051; the Commissioner of the Department of Energy and Environmental Protection (DEEP), 79 Elm Street, Hartford, CT 06106; EV.ENERGY CORP. (ev.energy), 24 E. Windsor Avenue, Alexandria, VA 22301; Save the Sound, 900 Chapel Street, Suite 2202, New Haven, CT 06511; Electrify America, LLC, 2003 Edmund Halley Drive, Suite 200, Reston, VA 20191; and Clean Transportation Communities of Southern Connecticut (CTC), 87 Olice St. Unit T, New Haven, CT 06511. II. LEGAL AUTHORITY Electric distribution services are defined by statute as “the owning, leasing, maintaining, operating, managing or controlling of poles, wires, conduits or other fixtures along public highways or streets for the distribution of electricity, or electric distribution related services[.]” General Statutes § 16-1(a)(22). Thus, the EDCs are primarily engaged in the provision of distribution system infrastructure, and services collateral thereto. By the very nature of the EDCs’ role in the electric grid, the EDCs are a necessary party to the successful deployment of zero emission vehicles (ZEV) and their associated infrastructure of charging stations. The Authority has broad statutory power and an obligation to order reasonable improvements, repairs, or alterations to a public service company’s plant or equipment (i.e., infrastructure), or such changes in the manner of operation, as may be reasonably necessary in the public interest. General Statutes § 16-11. Further, pursuant to General Statutes § 16-244i(a) and (b), the Authority regulates the EDCs in accordance with the provisions of section 16-19 and subsection (a) of section 16-19e, and each EDC is obliged to connect all customers to the company's distribution system, subject to the rates, terms, and conditions as may be approved by the Authority in accordance with section 16-19 and the principles in subsection (a) of section 16-19e. In providing electric distribution services, the EDCs are expected to provide safe, reliable, affordable, and available electric service to all customers in a uniform and equitable manner. General Statutes § 16-244. Further, the services must be provided with economy, efficiency, and care for public safety and energy security; promote economic development; consider the need for energy conservation, energy efficiency, the prudent management of the environment, and provide protection for relevant foreseeable public interests. General Statutes § 16-19e(a). The Authority, in exercising its full powers under Title 16, examines and regulates the expansion of the plant and equipment of the EDCs, the operations and internal workings of the EDCs, and the establishment of the level and structure of rates consistent with those principles. Rates for those services must ultimately conform to the principles and guidelines set forth in section 16-19e, must not be unreasonably discriminatory or more or less than just, reasonable, and adequate, and the service furnished in exchange for a rate must not be inadequate to or in excess of public necessity and convenience. General Statutes § 16-19(a). In the EV Decision, the Authority exercised its broad statutory powers and obligations under General Statutes §§ 16-11 and 16-244i to establish the EV Charging Program. EV Decision, pp. 2–4. A proactive, programmatic approach to facilitating thePage 8 of 46
Docket No. 26-08-06 Page 4 deployment and integration of ZEVs and associated infrastructure is necessary and in the public interest, pursuant to its statutory authority and the state’s overarching public policy objectives. Id.; see infra Section III, EV Charging Program Objectives; see also General Statutes §§ 16-2(m).1 III. EV CHARGING PROGRAM OBJECTIVES In the EV Decision, the Authority adopted objectives (Program Objectives) to guide the EV Charging Program and the EDCs in their administration of the Program. EV Decision, pp. 4–5. The Authority subsequently clarified the following Program Objectives in the Authority’s December 15, 2021, Decision in Docket No. 21-08-06, Annual Review of the Electric Vehicle Charging Program – Year 1 (Year 1 Decision): 1. Enable Connecticut’s commitment to the ten-state Memorandum of Understanding (MOU) to collectively deploy 3.3 million ZEVs among the participating states by 2025, and the deployment of approximately 125,000–150,000 EVs in Connecticut by 2025; 2. Facilitate the seamless integration of new and emerging ZEV-related technologies to realize the potential electric system benefits of ZEVs, along with the economic, health, and environmental benefits they provide; 3. Deploy and integrate ZEVs into Connecticut’s electric grid (i.e., the distribution system infrastructure) as a key component of meeting the objectives of the Authority’s Framework for an Equitable Modern Grid, namely: a. Support (or remove barriers to) the growth of Connecticut’s green economy; b. Enable a cost-effective economy-wide transition to a decarbonized future; c. Enhance customer access to a more resilient, reliable, and secure commodity; and d. Advance the ongoing energy affordability dialogue in the state, particularly in underserved communities; and 4. Achieve an equitable transition to wide-scale EV deployment across all communities in Connecticut. Year 1 Decision, pp. 3–4. The Authority subsequently recognized an additional Program Objective to achieve the National Electric Vehicle Infrastructure (NEVI) Program’s goal of deploying 40% of all EVSE projects in underserved communities in accordance with the federal Justice40 initiative. Decision, Dec. 14, 2022, Docket No. 22-08-06, Annual Review of the Electric Vehicle Charging Program – Year 2 (Year 2 Decision), p. 55. The Authority relied on these Program Objectives in evaluating the current EV Charging Program and in assessing any possible changes to be ordered in this Decision. 1 “Notwithstanding any provision of the general statutes, the decisions of the Public Utilities Regulatory Authority, including, but not limited to, decisions relating to rate amendments arising from the Comprehensive Energy Strategy, the Integrated Resources Plan, the Conservation and Load Management Plan and policies established by the Department of Energy and Environmental Protection, shall be guided by said strategy and plans and such policies.” General Statutes §§ 16-2(m).Page 9 of 46
Docket No. 26-08-06 Page 5 The Program Objectives also guided the Authority’s review of the EDCs’ compliance filings. The Authority focused its review on ensuring compliance with the EV Decision and providing clarity to the EDCs and other stakeholders regarding Program implementation. Finally, the Authority reaffirms that the above-listed Program Objectives shall guide the EDCs in their administration of the EV Charging Program, with the aim of fostering the development of a self-sustaining ZEV market in Connecticut to meet the state’s greenhouse gas emissions and ZEV MOU targets in a just and equitable manner. IV. PROGRAM DESIGN & IMPLEMENTATION A. UP-FRONT INCENTIVE STRUCTURE AND DEPLOYMENT TARGET PROPOSAL TO COMPLY WITH STATUTORY EXPENSE CAP 1. Background a. Applicable Law Section 3 of Public Act No. 25-173, explicitly modifies the EV Charging Program and amends Section 16-244dd of the General Statutes, effective October 1, 2025, as follows: On and after January 1, 2026, the authority shall limit the expenses for electric vehicle charging stations, as defined in section 16-19f, as amended by this act, and customer wiring upgrades of any light-duty electric vehicle charging program established by the authority in a proceeding to twenty million dollars per year and further limit any expenses for electric vehicle charging stations and customer wiring upgrades incentivized as part of any residential single-family customer program to residents who make less than or equal to three hundred per cent of the federal poverty level or reside in any concentrated poverty census tract, as defined in section 327x. Public Act No. 25-173 § 3(b); General Statutes § 16-244dd(b). In the Year 5 EV Decision, the Authority determined that the statutory cap on EV Charging Program expenses contained in Section 3(b) of Public Act No. 25-173 (Statutory Expense Cap) is limited to the physical EVSE and customer wiring upgrade/make-ready costs. Year 5 EV Decision, p. 7. Therefore, the Authority determined that the Statutory Expense Cap does not include EV Charging Program marketing and administration expenses. Id. Further, the Statutory Expense Cap only applies to the existing light-duty EV Charging Program, and not to the (medium and heavy-duty) MHD Fleet Program as established in the Authority’s August 13, 2025 MHD Fleet Program Decision. Id. The Authority has clarified that the Statutory Expense Cap contained in Section 3(b) of Public Act No. 25-173 does not apply to applications received through DecemberPage 10 of 46
Docket No. 26-08-06 Page 6 31, 2025, provided that the applications are fully complete. Motion Ruling No. 9, Oct. 31, 2025, Docket No. 25-08-06, p. 2; Year 5 EV Decision, p. 7. In other words, all complete applications received in 2025 do not count towards the Statutory Expense Cap, even if the application is not yet processed and incentives are not yet awarded or received by the customer. Motion Ruling No. 9, Oct. 31, 2025, Docket No. 25-08-06, p. 3; Year 5 EV Decision, p. 7. The Authority reiterates that only non-capital EV Program costs shall be recouped as a component of the annual RAM proceedings. Decision, Aug. 14, 2024, Docket No. 24-01-03, PURA Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company (Eversource RAM Decision), p. 19; Decision, Aug. 14, 2024, Docket No. 24-01-04, PURA Annual Review of the Rate Adjustment Mechanisms of The United Illuminating Company (UI RAM Decision), p. 20; Year 5 EV Decision, p. 7. Capital costs are still to be recovered through electricity base distribution rates following regulatory review in a rate case proceeding. Year 5 EV Decision, p. 7. b. Current Port Deployment Targets and Incentives Table 1 summarizes the current EVSE incentive levels and deployment targets for all three of the three-year program cycles. Table 1: Existing EVSE Program Incentive Levels and Deployment Targets2 Per-Site Incentive Levels Program Area Residential Single-Family (Level 2) Multi-Unit Dwellings (Level 2) DCFC Destination Charging (Level 2) Workplace & Light-Duty Fleets (Level 2) Baseline - Underserved $ EVSE Deployment Targets (No. of Ports) 2022– 2025– 2028– 2024 2027 2030 Total 1,500 15,000 17,500 17,500 50,000 $ 20,000 $ $150,000 $ 40,000 250,000 3,639 438 9,000 172 9,000 172 21,639 782 $ 20,000 $ 40,000 1,578 1,654 1,654 4,868 $ 20,000 $ 40,000 2,314 2,521 2,521 7,356 2 Decision, Dec. 4, 2024, Docket No. 24-08-06, Annual Review of the Electric Vehicle Charging Program – Year 4, pp. 43-44; Decision, Dec. 17, 2025, Annual Review of the Electric Vehicle Charging Program – Year 5, p. 17.
As listed on the current system
Draft Decision, 11/17/2026 [26-08-06]