  1. Page 17 of 46

    Docket No. 26-08-06 Page 13 database file, and instituting a maximum port cap of 10 ports per parcel. Id., pp. 39–44; Annual Report, Att. 10a, pp. 5–7. Both Scenario 1 and Scenario 2 propose to reduce the DCFC program area port deployment target to zero. Annual Report, pp. 40–44; Annual Report, Att. 10a, p. 5. The EDCs provided a map showing the DCFC projects in the state to demonstrate the widespread deployment of DCFC infrastructure. Avangrid Corresp. Oct. 9, 2026, Joint EDC Presentation, p. 12. On October 16, 2026, there were an additional 413 ports in approximately 80 locations across the state in the queue of known projects participating in incentive-based programs. Interrog. Resp. CAE-002, p. 1. However, the known project queue fell to 352 ports across 69 locations as of October 30, 2026. Interrog. Resp. CAE002, p. 1. The map does not show the DCFCs that did not receive incentives, so does not include Tesla, IONNA or other market supported chargers. Tech. Mtg. Tr. 67:6–12. Additionally, the Authority previously increased the deployment targets in the DCFC program area, surpassing the initial deployment targets. Motion Ruling No. 5, May 27, 2026, Docket No. 26-08-06, Annual EV Charging Program Review – Year 6. 3. Stakeholder Comments In response to the potential to reduce incentive amounts, CTC highlighted that make-ready costs often exceed the $1500 per port incentive the EDCs propose. CTC Comments, October 5, 2026, p. 1. Small MUDs are commonly old housing stock that requires new electrical service to accommodate an EV charging installation. Id. DEEP agreed with the EDCs recommendation to move from a per-site incentive to a per-port incentive structure while reducing the port deployment targets to align with the statutory budget cap. DEEP Comments, October 20, 2026, p. 3. DEEP adds that, regardless of whether the incentive structure would remain per-site or shift to per-port, a maximum of 10 ports per site should be instituted to ensure distribution of incentive funds across sites. Id. Additionally, DEEP agreed that the Underserved Community enhanced incentive should be limited to 40% of the ports funded for each project type, after which all customers will receive the Baseline incentive, in alignment with the Authority’s Justice40 targeting. DEEP Comments, October 20, 2026, p. 3. DEEP also agreed with the EDC recommendation to discontinue public DCFC funding, suggesting that the market is successfully deploying DCFC ports at a level to support EV adoption in Connecticut. Id, p. 4. OCC notes that Attachment 9 in the Annual Report supports the general conclusion that incentive levels are currently at the appropriate levels. OCC Comments, October 20, 2026, p. 1. However, OCC emphasized that the limited response rates suggest that the conclusion born out of the interviews and surveys should be viewed as directional rather than conclusive. Id. OCC recommends conducting more research to tie the analysis provided in Attachment 9 more directly to a different incentive structure, rather than relying on hypothetical percentage reductions to the current program. Id. Sharing the Authority’s
  2. Page 18 of 46

    Docket No. 26-08-06 Page 14 perplexity regarding program expenditures and budget8 OCC also sought additional review of cost data. Id. Additionally, OCC’s position on the EDC proposal to discontinue DCFC incentives and redirect the resources to the Level 2 category, developed over the proceeding. While initially not opposing discontinuation of the DCFC incentives, OCC also noted concern about locational gaps in DCFC access9 and believes the category should not be discontinued until that concern is addressed. OCC Comments, October 20, 2026, p. 1. In its Brief, OCC argued that discontinuing DCFC deployment at this juncture would be premature, as the known pipeline of DCFC projects decreased and a number of those projects have unknown completion dates or are not expected online until 2027-2029. OCC Briefs, pp. 1-2. OCC encouraged the Authority to maintain the DCFC incentives but reconsider the issue at a later point. OCC Briefs, p. 2. 10 OCC does not oppose the EDCs’ proposal to switch from a per-site incentive to a per-port incentive and to implement a maximum incentive cap of 10 ports per parcel. OCC Comments, October 20, 2026, p. 2. Port incentives may provide more granular data and improve budget clarity, and the per-parcel cap should prevent large projects from absorbing a disproportionate share of the annual budget. Id. OCC recommended that these caps should be part of the application review to avoid geographic infrastructure gaps. Id. Overall, OCC cautioned against assuming that the Scenario 2 deployment targets will be achieved because the budget supports the number of ports at the lower rebate, especially as Attachment 9 suggests participation may fall as incentives decline. Id. OCC encouraged monitoring and adjustment based on actual participation and program data. Id. Save the Sound supports shifting resources from DCFC incentives to Level 2 incentives. Save the Sound Comments, Oct. 5, 2026, p. 1. Ev.energy commented that utilities may be best positioned to support multifamily and some workplace charging that is not already funded by federal or private resources. Ev.energy Comments, Oct. 5, 2026, p. 4. In its letter in lieu of briefs, Save the Sound expressed concern that eliminating DCFC incentives may be premature, based on the data provided by the EDCs in CAE-002. Save the Sound Brief, pp. 1-2. While the total number of existing and planned DCFC ports approaches the statewide need projected by the EVI Pro-Lite tool, the infrastructure is unevenly distributed. Save the Sound Brief, p. 1. Save the Sound recommended redirecting DCFC program support to the underserved areas of the state to better serve the goals of the program. Save the Sound, Brief, p. 2. 8 See CAE-3 9 See CAE-2.
  3. Page 19 of 46

    Docket No. 26-08-06 4. Page 15 Authority Analysis a. Incentive and Site Structure The Statutory Expense Cap necessitates adjustment to the Program incentives. As the EDCs note, the two primary levers to adjust for the Statutory Expense Cap are the incentive levels and the deployment targets. The Authority agrees with the EDCs that a reasonable approach to adjusting for the Statutory Expense Cap is to maintain incentive levels and reduce deployment targets. The EDCs’ analysis clearly affirmed that current incentive levels are appropriate, and any reduction to incentive levels may have a direct and meaningful downward impact on deployments. However, as OCC noted, the conclusions reached in the EDCs’ analysis were based on a limited set of interviews and surveys and, therefore, should be considered directional rather than conclusive. Since 2025, the EDCs have maintained that the Program should shift from a persite to a per-port incentive structure. While the Authority agrees in principle that a perport incentive structure would provide greater granularity in forecasting budgets, it is unclear that doing so at this time is sensible when a primary program goal is adherence to the Statutory Expense Cap. Specifically in the EDCs’ Scenario 1 proposal, despite the stated goal to maintain incentive levels, the proposal still appears to reduce incentive levels. Given that the EDCs’ analysis provides directional information that any reduction in incentives will have a direct and meaningful impact on deployment, the current incentive levels should be maintained for the upcoming program year in order to continue to support the Program Objectives. Finally, the Authority agrees that the EDCs’ recommendation to update the definition of sites to parcels as defined by CAMA will provide a greater level of detail to the definition of sites. Additionally, the proposed limit to 10 ports per site would provide a necessary guardrail to prevent large projects from absorbing a disproportionate portion of the Statutory Expense Cap and promote the diversity of geographic siting of EV charging infrastructure. Therefore, the Authority directs the EDCs to maintain the per-site incentive structure, update the definition of sites to parcels as defined by CAMA, institute a 10-port limit on a per-site basis, and maintain existing incentive levels until further research can be performed and provided to the Authority for considering a shift to a per-port incentive structure. Such further research should include incentive levels provided, total project costs, and out-of-pocket expenses borne by site hosts and contractors. In light of the Authority’s decision to retain the existing per-site structure and current incentive levels, a reduction in the Program’s deployment targets is required to adhere to the $20 million Statutory Expense Cap. b. DCFCs and Deployment Targets The EV Decision established a DCFC incentive because fast-charging infrastructure is essential to meeting Connecticut’s EV adoption and emissions goals. EV
  4. Page 20 of 46

    Docket No. 26-08-06 Page 16 Decision, p. 29. The Authority found that both the high upfront costs and the challenges posed by demand charges necessitated specific DCFC incentives, make-ready investments, and DCFC-specific rates. EV Decision, p. 29. While Program DCFC incentives have supported the expansion of fast charging infrastructure throughout the state, the Authority is concerned that certain transit corridors still lack DCFCs. The updated estimate and map of DCFC installations and projects, both installed and in the queue, provided by the EDCs11 show 1,099 DCFC ports across 220 locations in service and in the queue; however, the planned infrastructure largely follows the same geographic distribution of those already in service. Annual Report, pp. 43–44; Joint Interrog, CAE-2, Att. 1. As such, the geographic areas lacking DCFC installations are not expected to be covered by future DCFCs from the existing queue barring a deliberate effort. Due to the evident gaps in existing and planned DCFC siting, the Authority determines that an update to Prioritization Criteria 2d of the Program Manual’s DCFC Selection Criteria section is needed to ensure that any additional DCFC applications address these gaps in DCFC deployment. Notwithstanding the need to address DCFC geographic distribution gaps, the Authority also finds that the DCFC proliferation has advanced such that incentivizing additional DCFCs outside of these targeted areas is no longer necessary. Although the Authority does not accept the EDCs’ proposal to end the DCFC incentive component of the Program in this year’s decision, a focused approach to the DCFC incentives limited only to filling in the unserved areas of the map sets the DCFC Program component on a path to sunsetting in the coming years. Accordingly, the Authority directs the EDCs to propose an updated Prioritization Criteria, no later than February 1, 2027, to address the areas lacking DCFC deployments for review and approval to the Authority in the instant docket. Relatedly, the Authority determines that Motion No. 6 is rendered moot. Similarly, the effort to narrowly target geographic deployments of DCFC will correspond to reduced deployment targets for that category. A reduction in deployment targets extends to all categories, not just the DCFC program area, due to comply with the Statutory Expense Cap. In the EDCs Scenario 1 modeling, the Authority notes that despite the stated premise being that incentive levels remain the same, there is a clear difference in the historical incentive vs the proposed incentive. Annual Report, Att. 10a, p. 5. As stated earlier in this Decision, the Authority determined that incentive levels will remain the same for the upcoming Program year. Accordingly, the Authority used the existing incentive levels, as ordered in this decision, to calculate the deployment targets as shown in Table 7. Accordingly, the Authority directs the EDCs to update the deployment targets as calculated in Table 7: Authority-Calculated 2027 Deployment Targets 11 The Companies provided an updated map with DCFC projects currently under review and anticipated to be built in the future. Joint Interrog, CAE-2, Att. 1.
  5. Page 21 of 46

    Docket No. 26-08-06 Page 17 . Table 7: Authority-Calculated 2027 Deployment Targets Program Area Residential SingleFamily (Level 2) Multi-Unit Dwellings (Level 2) Destination (Level 2) Workplace/Light-Duty Fleets (Level 2) Direct-Current Fast Chargers (DCFCs) Totals B. Per-Site Incentive Baseline Per-Site Incentive Underserved Historical Per-Port Incentive12 - $ 1,500 $ 1,500 360 $ $ $ 20,000 20,000 $ $ 40,000 40,000 $ $ 11,977 9,957 1,190 218 $ 14,252,630 $ 2,170,626 $ 20,000 $ 40,000 $ 6,788 333 $ $ 150,000 $ 250,000 $ 56,987 10 2,111 $ 569,870 $ 19,793,530 Port Targets Budget (Fully Subscribed) 540,000 2,260,404 DCFC UPTIME REQUIREMENT AND ENFORCEMENT STRUCTURE On February 2, 2026, the EDCs proposed an uptime requirement, as defined and required as part of NEVI at 23 C.F.R. § 680.116(b), for DCFC installations awarded after January 1, 2027. Motion No. 1, p. 1. The EDCs recommended that the Terms and Conditions of the commercial program, which already require that participants authorize the EVSE manufacturer/network integrator to provide the utility with “Utilization Data” and “Financial Data,” should be amended to also require “Uptime Data,” mirroring the current requirements of the NEVI program. Id., p. 2. The EDCs proposed Uptime Data be reported every six months to align with NEVI requirements. Id., p. 3. Finally, the EDCs proposed that the enforcement mechanism for compliance with the uptime requirement be a monetary penalty imposed by EOE. Id., p. 7. To solicit feedback on Motion No. 1, the Authority issued a Notice of Request for Written Comments for docket participants to provide comments on the EDCs’ uptime requirement proposal. Notice of Written Comments, Docket No. 26-08-06, February 9, 2026. The Authority received responses from DEEP, OCC, and Save the Sound. DEEP Comments, March 2, 2026; OCC Comments, March 2, 2026; Save the Sound Comments, March 2, 2026. Subsequently, the Authority issued a second Notice of Request for Written Comments on July 9, 2026, for docket participants to provide comments on a modified version of the EDCs’ uptime proposal. Notice of Written Comments, Docket no. 20-08- 12 Because the deployment targets are by port, in order to calculate new deployment targets that adhere to the Statutory Expense Cap, the historical per-port incentives must be used. The EDCs provided the historical per-port incentives in Annual Report, Att. 10a, Table 6; Table 8.
  6. Page 22 of 46

    Docket No. 26-08-06 Page 18 06, July 9, 2026. The Authority received responses from UI, ev.energy, OCC, and Save the Sound. The Authority appreciates the EDCs’ proposal as well as the thoughtful feedback from stakeholders on this matter throughout this proceeding. However, while the DCFC category of the Program will continue, the Authority has determined in Section IV.A.4 of this Decision that the DCFC category will be winding down and future deployments will be limited in scale and targeted to geographic areas that lack DCFC infrastructure. Since the NEVI uptime requirements would apply to incentive Terms and Conditions moving forward only, this proposal would create different operating requirements for a smaller number of DCFC installations yet to enter the program, may create an additional barrier to host site and contractor participation and ultimately, may be at odds with the goal of filling geographic DCFC gaps. Given the relatively limited remaining deployment targets for DCFC, the costs associated with enforcing an uptime requirement also might not drive commensurate benefits. While the Authority supports the spirit of the proposal to adopt NEVI uptime requirements, it is impractical to develop and enforce these new requirements on a limited number of projects as the DCFC incentive program area winds down in the coming years. Accordingly, the Authority denies Motion No. 1. C. EDC COMMERCIAL PROGRAM RECOMMENDATIONS 1. Level 2 EVSE Application Process In Docket No. 25-08-06 the EDCs proposed to adopt the DCFC application process for the Level 2 EVSE Program Areas. Year 5 Decision, p. 10. DCFC applications are accepted in a defined application window, are scored according to a prioritization criteria matrix, and incentives are awarded to the top scored applications until the annual DCFC port deployment target is reached. Id., pp. 10–11. The EDCs argued that adopting this application process for Level 2 EVSE is anticipated to “more precisely control spending and ensure an equitable” distribution of incentives for Level 2 EVSE Program Areas. Id., p. 11. In the Year 5 Decision, Order No. 18.b. directed the EDCs to submit: a proposal regarding Program incentives and deployment targets that includes the following: (1) a proposed methodology for a commercial Level 2 EVSE application process based on the existing DCFC application process, that includes a (a) proposed timeline, (b) prioritization criteria matrix with associated criteria weights, and (c) incentive distribution plan. Id., p. 53. In response to Order No. 18.b., the EDCs proposed the incentive distribution plan discussed in Section IV.A.2 of this Decision, and recommended maintaining a rolling application window for commercial Level 2 Program Areas. Annual Report, p. 38. Interviews conducted by the EDCs' Evaluation, Measurement & Verification (EM&V) Vendor, Demand Side Analytics (DSA), found that customers and contractors strongly prefer maintaining a rolling application window, as it provides the flexibility necessary to
  7. Page 23 of 46

    Docket No. 26-08-06 Page 19 plan and budget projects. Id. The interviewees indicated that moving to a fixed application period would create long windows where funding availability would be unknown, ultimately slowing market interest. Id. Additionally, the EDCs propose a minimum criteria threshold for projects within Level 2 EVSE Program Areas to qualify for incentives, ensuring that incentives are awarded to high-quality projects. Id. Potential minimum criteria include: Site Safety: • Security cameras covering the charging area; • Existing or proposed lighting of the charging area; • Appropriate directional and charger location signage; and • Accessible pedestrian pathways between charging stations and site amenities. Other Amenities: • Public restroom access; • Food and beverage options; • Retail establishments; and • Covered seating or waiting area. Annual Report, pp. 38–39. Stakeholders offered no comment on these specific EDC proposals. The Authority approves the EDCs proposal for maintaining a rolling application window for the commercial Level 2 Program Areas. This change is expected to provide a more flexible application and participation experience for applicants. Additionally, the Authority approves the minimum criteria listed by the EDCs related to Site Safety, however, those listed as Other Amenities shall not be used as minimum criteria. While the Site Safety criteria are important features to protect public use of the charging infrastructure and the investment of site hosts, the Other Amenities criteria create a higher bar for projects that could preclude otherwise adequate projects. 2. Level 2 Commercial Waitlist Process and Prioritization In the 2025 EV Charging Program proceeding, the EDCs recommended that waitlisted applications should only be valid through the end of the Program Year in which they applied, and that if they are not awarded incentive funds, they should reapply in the subsequent Program Year. Year 5 Decision, p. 18. The EDCs argued that this would allow applicants to understand differences in the Program from year-to-year (i.e., in response to the annual review proceedings) and agree to updated terms and conditions. Id. The Authority concurred and found it appropriate for waitlisted applications to expire at the end of each Program Year. Id. However, the Authority directed the EDCs to notify waitlisted applicants of the re-submission requirements. Id. Further, for each waitlisted applicant that is not awarded incentive funds, the EDCs were directed to inform such applicants that they will not receive funds and must re-submit their application in the
  8. Page 24 of 46

    Docket No. 26-08-06 Page 20 subsequent Program Year. Year 5 Decision, p. 18. Finally, the Authority directed the EDCs to prioritize any applications received from formerly waitlisted applicants above newly received applications in that Program Year. Id. In other words, a 2026 waitlisted application that re-applies in 2027 should be prioritized for review above new applications received in 2027 and likewise in subsequent years. Id. In response, the EDCs recommended establishing a standardized commercial Level 2 waitlist and prioritization process for 2026 projects and beyond. Annual Report, p. 53. Specifically, the EDCs recommend the following: Any projects remaining on the waitlist at the end of the program year shall expire and may be resubmitted during a defined reapplication period in the following program year. Prioritization of projects would only apply to waitlisted applications that reapplied by March 1 of the following year. To provide administrative certainty and facilitate timely allocation of available funding, such priority status would apply only during the first 60 days of the subsequent program year. To promote broad market participation and ensure funding opportunities are distributed among multiple market actors, no single contractor on the waitlist may account for more than 40% of the estimated charging ports allocated for the program year through the waitlist prioritization process. The waitlist would be limited to the number of projects that can reasonably be supported by the estimated funding available in the subsequent program year. This approach is intended to prevent the accumulation of an unmanageable backlog of unfunded projects and provide applicants with realistic expectations regarding the likelihood of future funding. Id. The EDCs state that “[s]tandardizing the waitlist prioritization process will improve program transparency, create more predictable outcomes for applicants, and facilitate efficient administration of the commercial charging program.” Id. Stakeholders offered no comment on this specific issue. The Authority approves the proposed process. The Authority directs the EDCs to report the number of waitlisted applicants in the 2027 Annual Report filing in Docket No. 27-08-06. 3. Restrictions on Stacked Funding To maximize the number of customers and charging ports supported through the EV Charging Program, the EDCs recommend that projects receiving funding from another source for the same eligible equipment or installation costs be ineligible for incentives through the commercial program. Annual Report, p. 53–54. Other sources of incentives may include, but are not limited to, the DEEP Volkswagen Settlement Program, the U.S.
  9. Page 25 of 46

    Docket No. 26-08-06 Page 21 Department of Energy Efficiency and Conservation Block Grant (EECBG) Program, and other federal, state, or local funding opportunities. Id., p. 53. The EDCs point out that currently, applicants may have access to multiple sources of funding for a single project, and there is a lack of clear program guidance regarding incentive stacking. Id. The EDCs expressed concern that stacking incentives may prevent available program funds from being allocated as efficiently as possible. Id. Alternatively, if incentive stacking is permitted, the EDCs recommend that total funding received from all sources should not exceed total project costs, and that applicants be required to disclose all anticipated and awarded funding sources during the application process. Annual Report, p. 54. Save the Sound supports the EDCs’ proposal to require that total funding from all sources should not exceed total project costs and applicants should disclose other funding sources during the application process. Save the Sound Comments, October 5, 2026, p. 2. However, Save the Sound does not take a position on whether stacking of incentives should altogether be allowed or prohibited. Id. The acquisition of project funding from more than one source is a common practice, not just in EV charger development, but across other types of development projects. However, as a matter of policy, providing funding in excess of total project costs is not in the public interest. Nor is it appropriate for ratepayers to support projects that can be incentivized to achieve program objectives by other funding sources. Accordingly, the Authority agrees with the EDCs’ alternative recommendation that applicants be required to disclose all anticipated and awarded funding sources during the application process to ensure that incentive funding received from all sources should not exceed total project costs. Moreover, consistent with principles of equity and efficiency that guide the design and implementation of ratepayer funded and budget limited programs, project development should not be over-incentivized. Thus, the Authority also finds that financial incentives received from other sources must commensurately offset the funding allocated from this program for project development. A project with alternative funding resources that exceed amounts provided through this program would not be eligible for any funding under this program. 4. Incentives for New Construction Stretch Building Codes General Statutes § 4b-77 requires the following: (b) On and after July 1, 2026, the Commissioner of Administrative Services shall require each new state facility that will include public parking spaces and is projected to cost more than one hundred thousand dollars to be constructed such that at least eight per cent of the designated parking spaces for cars at such new state facility are electric vehicle capable parking spaces. …
  10. Page 26 of 46

    Docket No. 26-08-06 Page 22 (d) On and after January 1, 2023, a municipality shall require each new construction of a commercial building or multiunit residential building with thirty or more designated parking spaces for cars or light duty trucks to include electric vehicle charging infrastructure that is capable of supporting level two electric vehicle charging stations or direct current fast charging stations in at least ten per cent of such parking spaces. A municipality may, through its legislative body, require any such commercial building or multiunit residential building to include such electric vehicle charging infrastructure in more than ten per cent of such parking spaces. General Statutes § 4b-77(b),(d). No later than January 1, 2029, and every three years thereafter, the Commissioners of Administrative Services, Transportation and Energy and Environmental Protection are required to jointly submit recommendations proposing an appropriate requirement for future electric vehicle charging infrastructure at new state facilities. General Statutes § 4b-77(c). The EDCs recommended that PURA consider the eligibility of projects subject to EV-ready building code requirements. Annual Report, p. 55. Specifically, the Authority should consider whether projects required by code to install EV-ready infrastructure should remain eligible for EV Program incentives; and whether incentives should be limited to infrastructure installed beyond minimum code requirements. Id. The EDCs have observed an increase in commercial EV program applications associated with new construction projects that are subject to these EV charging infrastructure or EV-ready electrical infrastructure. Id., p. 54. The EDCs argue that to maximize the impact of limited program funds, incentives should not be used for projects where EV charging infrastructure is required by law. Id., pp. 54–55. Incentivizing these projects would not expand Connecticut’s charging network by supporting new sites. Annual Report, pp. 54–55. “This raises an important policy question: if the project would move forward regardless of incentive funding, is the incentive influencing the investment decision, or is it simply subsidizing an activity that would have occurred anyway.” Id., p. 55. The EDCs assert that making projects subject to EV-ready building code requirements ineligible for Program incentives would help ensure the cost-effective use of limited program funds that are directed toward projects where incentives are a material driver of deployment. Id. Save the Sound stated that subsidizing activity that is legally required, and would occur with or without incentives, is not the best use of ratepayer funds. Save the Sound Comments, Oct. 5, 2026, pp. 2–3. The Authority agrees with the EDCs and Save the Sound that funding EV charging projects that are legally required, and would occur with or without Program incentives, is not a sound use of ratepayer funds. The Program Objectives, stated in Section III of this Decision, aim to enable Connecticut’s deployment of EVs, remove barriers to the growth of Connecticut’s clean energy economy, and achieve an equitable transition to wide-scale EV deployment, among other objectives. Using ratepayer funds for EV charging projects that would otherwise be required would not serve to advance those objectives and simply